Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
63 views

Visual Examination Report

A visual examination was conducted on October 23, 2020 of welds on a safety ladder. The welds were made using the SMAW welding process. Most criteria such as joint alignment, surface weld quality, undercut, and reinforcement were acceptable according to AWS D1.1 standards. Some minor issues like surface dents, dirt, corrosion, and underfill were present but within tolerance. Photos were taken to document the inspection results.

Uploaded by

Kassie
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views

Visual Examination Report

A visual examination was conducted on October 23, 2020 of welds on a safety ladder. The welds were made using the SMAW welding process. Most criteria such as joint alignment, surface weld quality, undercut, and reinforcement were acceptable according to AWS D1.1 standards. Some minor issues like surface dents, dirt, corrosion, and underfill were present but within tolerance. Photos were taken to document the inspection results.

Uploaded by

Kassie
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

VISUAL EXAMINATION REPORT

Welding Process : SMAW Examination Date : October 23, 2020

Item : Safety Ladder Location :

RESULTS

ACCEPTANCE
CHECK ITEM ACCEPTABLE UNACCEPTABLE DATE REMARKS
CRITERIA

Material surface condition AWS D1.1 P 10/23/20 Minimal surface dents

Visible surface dirts and


Surface cleaning of joints AWS D1.1 P 10/23/20
corrosion
Proper joint alignmet was
Joint alignment AWS D1.1 P 10/23/20
achieved
Surface discontinuities are in
Surface weld AWS D1.1 P 10/23/20
allowable tolerance
Presence of underfill on some
Weld reinforcement AWS D1.1 P 10/23/20
weldments

Undercut of weld AWS D1.1 P 10/23/20 Within tolerance (std. 1mm)

Presence of corrosion on
Surface cleaning of weld AWS D1.1 P 10/23/20
some weldments

P Accepted Unaccepted Re-inspection

Photos :

Prepared by: Reviewed by:

QA/QC Inspector QA/QC Manager