PROPOSED SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT


CHANGGANG, BANTING FOR KENTING DEVELOPMENT SDN.
BHD.
____________________________________________________________________

SOIL INVESTIGATION REPORT

(DRAFT REPORT)

CLIENT :

KENTING DEVELOPMENT SDN. BHD.


No. 33-1, Jalan Damai Raya 1,
Alam Damai,
56000 Cheras,
Kuala Lumpur.
Tel : 03 – 9108 1349 Fax : 03 – 9108 1049

Consultant:

KnT CONSULT SDN. BHD.


K-2-6, Parklane Commercial Hub
Jalan SS7/26
47301 Kelana Jaya,
Selangor.
Tel/Fax: 03 – 7497 3030

SESB/2018/65
AUGUST 2018

SITE EXPLORATION SDN. BHD. (1041771-P)


AG-15, BLOCK A, JALAN MUHIBBAH 18, TAMAN MUHIBBAH
43300 SERI KEMBANGAN, SELANGOR DARUL EHSAN.
TEL : 03 – 8940 0776 FAX : 03 – 8940 0772
Email : siteexplorationsb@gmail.com, sesb2013@ymail.com
TABLE OF CONTENTS

Page No.

1. INTRODUCTION 1
2. FIELD WORKS 1
2.1 Rotary Drilling 1
2.2 Standard Penetration Test 2
2.3 Soil Sampling 2
2.4 Location Plan 2
2.5 Ground Water Level Monitoring 3
3. BORE LOGS 3
4. LABORATORY TEST RESULTS 3

APPENDIX A
PLAN

APPENDIX B
BORE LOG + WATER LEVEL RECORD

APPENDIX C
LABORATORY TEST RESULTS

APPENDIX D
PHOTOGRAPHS

i
Site Exploration Sdn. Bhd.
S.I. Works At Lot 73682, Bukit Changgang, Banting.

PROPOSED SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG,


BANTING FOR KENTING DEVELOPMENT SDN. BHD.

1. INTRODUCTION

This report presents the result of soil investigation works carried out for the
above captioned project. Site Exploration Sdn. Bhd. was engaged by the
Client, Kenting Development Sdn. Bhd. to carry out the works. To investigate
the subsoil conditions at the proposed site for purpose of foundation design,
the following was carried out.

a) Sinking One (01) number of borehole, inclusive of standard penetration


tests, disturbed and undisturbed soil samplings;
b) Conducting laboratory tests.

The field works commenced on 06th August 2018 and completed on 07th
August 2018.

2. FIELD WORKS

2.1 Rotary Drilling

Sub-surface exploration was carried out using a multi-speed YWE D90-R wash
boring rig operated by our experienced locally-trained driller.

Casing NW size (89mm dia.) were lowered into the borehole to prevent
collapse of the borehole wall. Water was circulated with YBM-SP40B Piston
Pump into the Boreholes to wash up samples for visual examination by our
supervisor.

If rock is encountered, rock coring using an NMLC size core barrel with a
diamond bit will be carried out. The normal drill run shall be 1.5m with the core
size of 50mm diameter. After completion of the drill run, the core barrel is
extracted from the borehole and the rock core samples are placed in
specified core boxes with the Core Recovery Ratio (CRR) and Rock Quality
Designation (RQD) calculated. The rock coring shall be continued until the
termination criteria is met.

1
Site Exploration Sdn. Bhd (1041771-P)
S.I. Works At Lot 73682, Bukit Changgang, Banting.

2.2 Standard Penetration Test (SPT)

Standard Penetration Tests were carried out at 1.5m intervals at each


borehole until the termination of the borehole or hitting rock. The S.P.T. is
carried out accordance with test No.19, B.S.1377 : 1990. A split spoon sampler
of 50mm O.D was driven into the soil by a 63.5kg automatic release trip
hammer. The hammer is dropped from a height of 760mm(±20mm) for a
sufficient number of times to secure the desired 450mm sampler penetration
or a maximum of 50 blows. The number of blows for the beginning 150mm is
defined as the seating drive and was recorded for reference and the
following 300mm penetration was recorded as the N-value.

Cohesive Soil

N-Blows 0-2 2-4 4-8 8 - 15 15 – 30 >30


Description Very soft Soft Firm Stiff Very stiff Hard

Non Cohesive Soil


N-Blows 0-4 4 - 10 10 - 30 30 – 50 > 50
Description Very loose Loose Medium dense Dense Very dense

2.3 Soil Sampling

Disturbed soil samples extruded from the split spoon sampler were sealed in
air-tight double layer plastic bags for visual examination. Undisturbed soil
samples were taken in soft cohesive layers from the borehole using 50 mm
diameter 600mm long thin walled sampling tube. All samples were duly
labelled and undisturbed soil samples obtained were clearly trimmed and
sealed both ends with non-shrinkage wax to prevent any change in moisture
content.

2.4 Site Plan

Plan showing the site and locations of boreholes/testing is presented in


Appendix A. Photographs showing existing site conditions also presented in
Appendix D.

2
Site Exploration Sdn. Bhd (1041771-P)
S.I. Works At Lot 73682, Bukit Changgang, Banting.

2.5 Ground Water Level Monitoring

The measurement of groundwater table in the borehole was taken


once before work commenced in the morning and once after work
stopped in the afternoon. These levels were recorded.

3. BORE LOGS

Details of soil types and result of SPT are presented in the engineering
borelogs in Appendix B. The soil description in the borelogs was made based
on the visual examination and classification tests on soil samples. The
borelogs represent the general subsoil conditions of the site.

4. LABORATORY TEST RESULTS

The disturbed and undisturbed soil samples collected from the boreholes
were forwarded to the laboratory for classification tests as below.

(i) Moisture Content (Part 2 : Method 3.2)

(ii) Atterberg Limits (Part 2 : Method 4.5)

(iii) Particle Size Distribution (Part 2 : Method 9.3 & 9.5)

(iv) Bulk Density (Part 2 : Method 7.4)

(v) Dry Density (Part 2 : Method 7.4)

(vi) Specific Gravity (Part 2 : Method 8.3)

(vii) One Dimensional Consolidation (Part 5 :Method 5) )

(viii) Chemical Test (Part 3 : Method 3,5,7,9)

Tests were carried out in accordance with the procedure outlined in British
Standards, BS 1337 : 1990. Summary and details of laboratory are presented in
Appendix C.

3
Site Exploration Sdn. Bhd (1041771-P)
APPENDIX A

- PLAN

Site Exploration Sdn Bhd (1041771-P)


LEGEND :

BOREHOLE

Borehole
BH1-73682
APPENDIX B

- BORELOGS + WATER LEVEL RECORD

Site Exploration Sdn Bhd (1041771-P)


Site Exploration Sdn Bhd (1041771-P) SHEET : 1 OF 3 RECORD OF BORING

PROJECT : PROPOSED SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING FOR KENTING DEVELOPMENT SDN. BHD.
Client : KENTING DEVELOPMENT SDN. BHD. Consultant : KnT CONSULT SDN. BHD. Supervisor: ANDY
Borehole No. : BH 1 Type of Drill : Rotary Wash Boring Date Started: 06/08/2018
Project No. : SESB/2018/65 Water Level : 3.67 m Date End : 07/08/2018
Reduced Level : Existing Ground Level Coordinate : E : - 4154.826 N :- 41182.313
SAMPLE Standard Penetration

Recovery
SCALE (m)

LEGEND

Test SPT SPT Plot


DEPTH DESCRIPTION
NO. 75 75 75 75 75 75 (N) No of Blows (N)
(m) 0 10 20 30 40 50
mm mm mm mm mm mm (%) 0.0
x x x Dark to medium brown,
x x 0.300 sandy SILT. 0.5
x x x

x x 1.0

x x x 1.500 P1 Firm, medium brown, 1 2 1 1 2 1 5 49% 1.5


x x 1.950 D1 slightly sandy SILT of intermediate plasticity.
x x x 2.0
x x

2.5
x x x
x x 3.000 P2 Firm, medium brown, 1 2 1 1 2 2 6 53% 3.0
3
x x x 3.450 D2 slightly sandy SILT of intermediate plasticity.
–– 3.500 UD1 Greyish, 100% 3.5
– 4.000 slightly sandy CLAY of high plasticity.
–– 4.0

4.500 P3 Firm, greyish, 1 1 1 1 1 2 5 36% 4.5

–– 4.950 D3 sandy CLAY of intermediate plasticity.


– 5.0

––
– 5.5

Depth (m)
–– 6.000 P4 Firm, greyish, 1 2 1 2 2 2 7 33% 6.0
6
– 6.450 D4 sandy CLAY of intermediate plasticity.
–– 6.500 UD2 Greyish, 96% 6.5

– 7.000 sandy CLAY of intermediate plasticity.


7.0

––
– 7.500 P5 Firm, ditto. 1 2 1 1 2 2 6 40% 7.5

–– 7.950 D5
– 8.0

–– 8.5


x x x 9.000 P6 Very stiff, light greyish, 1 1 1 2 4 7 14 38% 9.0
9
x x 9.450 D6 slightly sandy SILT of intermediate plasticity.
9.5
x x x

x x
10.0

x x x
10.5
x x 10.500 P7 Stiff, light greyish, 1 2 2 1 3 4 10 36%
x x x 10.950 D7 slightly sandy SILT of high plasticity.
11.0
x x

11.5
x x x

x x
12.0
12 x x x
NOTES:
P = Standard Penetration Test (SPT) REMARKS -
D = Disturbed sample
N = SPT Result Consistency / Relative Density Legend :
VS = Vane Shear Test – – – CLAY
Cohesive Soil (N) Non Cohesive Soil (N)
UD = 50 mm dia. undisturbed sample
M = Mazier Sample 0 - 2 Very Soft 0-4 Very Loose x x x SILT
W = Water sample 2 - 4 Soft 4 - 10 Loose
C = Rock Coring 4 - 8 Firm 10 - 30 Medium Dense SAND
RQD = Rock Quality Designation (%) 8 - 15 Stiff 30 - 50 Dense
15 - 30 Very Stiff 50 > Very Dense GRAVEL
30 > Hard
Site Exploration Sdn Bhd (1041771-P) SHEET : 2 OF 3 RECORD OF BORING

PROJECT : PROPOSED SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING FOR KENTING DEVELOPMENT SDN. BHD.
Client : KENTING DEVELOPMENT SDN. BHD. Consultant : KnT CONSULT SDN. BHD. Supervisor: ANDY
Borehole No. : BH 1 Type of Drill : Rotary Wash Boring Date Started: 06/08/18
Project No. : SESB/2018/65 Water Level : 3.67 m Date End : 07/08/2018
Reduced Level : Existing Ground Level Coordinate : E : - 4154.826 N :- 41182.313
SAMPLE Standard Penetration

Recovery
SCALE (m)

LEGEND

Test SPT SPT Plot


DEPTH DESCRIPTION
NO. 75 75 75 75 75 75 (N) No of Blows (N)
(m) 0 10 20 30 40 50
mm mm mm mm mm mm (%) 12.0
12 12.000 P8 Medium dense, light grey, 3 4 6 6 5 8 25 42%
12.450 D8 silty SAND of low plasticity. 12.5

13.0
x x

13.5
13.500 P9 Medium dense, ditto. 2 4 3 4 6 5 18 44%
13.950 D9 14.0

x x 14.5

15.0
15
15.000 P10 Medium dense, ditto. 3 3 5 6 6 5 22 38%
15.450 D10 15.5

x x
16.0

16.5

16.500 P11 Medium dense, light grey, 3 4 4 6 6 8 24 34%


x x 16.950 D11 silty fine SAND. 17.0

17.5

Depth (m)
18.0
18
x x 18.000 P12 Medium dense to dense, light grey, 4 5 5 8 7 10 30 40%
18.450 D12 silty fine SAND. 18.5

19.0

19.5
x x

19.500 P13 Dense, ditto. 5 6 6 8 8 14 36 44%


19.950 D13 20.0

20.5

x x
21.0
21
x x x 21.000 P14 Hard, dark to medum grey, 4 6 6 9 14 21 50 47%
21.5
x x 21.445 D14 sandy SILT. 70mm 295mm
x x x
22.0
x x

22.5
x x x

x x 22.500 P15 Hard, ditto. 6 10 12 13 25 50 48%


23.0
x x x 22.855 D15 55mm 205mm
x x
23.5

x x x
24.0
24 x x
NOTES:
P = Standard Penetration Test (SPT) REMARKS -
D = Disturbed sample
N = SPT Result Consistency / Relative Density Legend :
VS = Vane Shear Test – – – CLAY
Cohesive Soil (N) Non Cohesive Soil (N)
UD = 50 mm dia. undisturbed sample
M = Mazier Sample 0 - 2 Very Soft 0-4 Very Loose x x x SILT
W = Water sample 2 - 4 Soft 4 - 10 Loose
C = Rock Coring 4 - 8 Firm 10 - 30 Medium Dense SAND
RQD = Rock Quality Designation (%) 8 - 15 Stiff 30 - 50 Dense
15 - 30 Very Stiff 50 > Very Dense GRAVEL
30 > Hard
Site Exploration Sdn Bhd (1041771-P) SHEET : 3 OF 3 RECORD OF BORING

PROJECT : PROPOSED SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING FOR KENTING DEVELOPMENT SDN. BHD.
Client : KENTING DEVELOPMENT SDN. BHD. Consultant : KnT CONSULT SDN. BHD. Supervisor: ANDY
Borehole No. : BH 1 Type of Drill : Rotary Wash Boring Date Started: 06/08/18
Project No. : SESB/2018/65 Water Level : 3.67 m Date End : 07/08/2018
Reduced Level : Existing Ground Level Coordinate : E : - 4154.826 N :- 41182.313
SAMPLE Standard Penetration

Recovery
SCALE (m)

LEGEND

Test SPT SPT Plot


DEPTH DESCRIPTION
NO. 75 75 75 75 75 75 (N)
(m) No of Blows (N)
mm mm mm mm mm mm (%) 0 10 20 30 40 50
24.0
24 x x x 24.000 P16 Hard, light to medium grey, 7 15 20 30 50 59%
x x 24.280 D16 sandy SILT. 55mm 130mm
24.5
x x x

x x
25.0

x x x
25.5
x x 25.500 P17 Hard, ditto. 11 14 40 10 50 85%
x x x 25.700 D17 40mm 10mm 85mm
26.0
x x

26.5
x x x
x x
27 27.0
x x x 27.000 P18 Hard, greyish, 16 15 50 50 74%
x x 27.190 D18 sandy SILT. 40mm 75mm 75mm
27.5

x x x
28.0
x x

x x x
28.5
x x 28.500 P19 Hard, medium to dark grey, 11 14 32 18 50 75%
28.720 D19 sandy SILT. 50mm 20mm 95mm 29.0
x x x

x x
29.5
x x x

Depth (m)
x x 30.0
30
30.000 P20 Hard, ditto. 15 10 29 21 50 61%
x x x 30.205 D20 20mm 35mm 110mm 30.5

End of BH 1 at depth 30.205 m b.g.l. 31.0

31.5

32.0

32.5

33.0
33

33.5

34.0

34.5

35.0

35.5

36.0
36
NOTES:
P = Standard Penetration Test (SPT) REMARKS -
D = Disturbed sample
N = SPT Result Consistency / Relative Density Legend :
VS = Vane Shear Test – – – CLAY
Cohesive Soil (N) Non Cohesive Soil (N)
UD = 50 mm dia. undisturbed sample
M = Mazier Sample 0 - 2 Very Soft 0-4 Very Loose x x x SILT
W = Water sample 2 - 4 Soft 4 - 10 Loose
C = Rock Coring 4 - 8 Firm 10 - 30 Medium Dense SAND
RQD = Rock Quality Designation (%) 8 - 15 Stiff 30 - 50 Dense
15 - 30 Very Stiff 50 > Very Dense GRAVEL
30 > Hard
FIELD DAILY WATER LEVEL RECORD

Project Title : PROPOSED SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING
FOR KENTING DEVELOPMENT SDN. BHD.

Borehole No : BH 1

Water Level in Meter b.g.l Weather Condition


Date (Time Recorded) and
Morning Afternoon Remarks
06/08/2018 - 4.80 m

07/08/2018 5.71 m 3.67 m


APPENDIX C

- LABORATORY TEST RESULTS

Site Exploration Sdn Bhd (1041771-P)


No 23, Jalan 1/38C, Taman Sri Kepong Baru, Kepong, 52100, Wilayah Persekutuan Kuala Lumpur.

SUMMARY OF LABORATORY TEST RESULTS

Project : SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING


TRIAXIAL COMP. TEST

%
TRIAXIAL (CIU 38MM)
ATTERBERG PARTICLE SIZE

UNCONFINED COMPRESSION
NATURAL MOISTURE CONTENT,
COMP. TEST CONSOLIDATION TEST ROCK TEST CHEMICAL TEST
LIMITS TOTAL EFFECTIVE DISTRIBUTION, %

3
(UU)

Mg/m

LINEAR SHRINKAGE
DRY DENSITY, Mg/m
STRESS STRESS

STRENGTH, kN/m2
SPECIFIC GRAVITY
BOREHOLE NO.

SAMPLE NO.

APPARENT COHESION,

RESISTANCE, (f), deg.

RESISTANCE, (f), deg.


ANGLE OF SHEARING

ANGLE OF SHEARING

ANGLE OF SHEARING

SULPHATE CONTENT,

CHLORIDE CONTENT,
UNCONFINED COMP.

YOUNG'S MODULUS,
STRENGTH, N/mm2

ORGANIC CONTENT,
PRE. COMPRESSION

0.06 - 2 mm.
PLASTIC INDEX, %

POINT LOAD INDEX


BULK DENSITY,

PLASTIC LIMIT, %

> 2 mm.

< 0.06 mm.


LIQUID LIMIT, %

RESISTANCE, f

COHESION, kPa

COHESION, kPa
DEPTH

COMPRESSION
2
kN/m

INDEX, Cc.

pH VALUE
(m)

VOID RATIO,
2

CLAY
(Mpa)
GPa
kN/m

GRAVEL,
LOAD,

SAND,

SILT,
BH 1 D1 1.50 0.000 49 31 18 0.15 1 10 52 37

D2 3.00 0.000 48 30 18 0.13 1 13 51 35

UD1 3.50 38 1.687 1.226 2.52 57 28 29 1.056 52 0.385 6.2 <0.01 0.18 <0.01 0 7 39 54

D3 4.50 0.000 39 24 15 0.16 4 57 12 27

D4 6.00 0.000 41 23 18 0.09 13 39 16 32

UD2 6.50 24 1.901 1.535 2.61 45 24 21 0.701 61 0.351 6.6 <0.01 0.11 <0.01 1 34 25 40

D6 9.00 0.000 46 30 16 6 24 43 27

D7 10.50 53 33 20 0 3 56 41

D8 12.00 0.000 NP NP NP 7 85 8
NP = Non Plasticity N E S = Not Enough Sample

Note : 1) CIU - Isotropic Consolidation Undrained Triaxial Test with Pore water pressure measurements.
2) UU - Unconsolidated Undrained Test without Pore water pressure measurements.
3) UCT- Unconfined Compression Test ( On soil sample ) Approved by :
4) Unconfined Compression Test ( On Rock Core sample tested with measurement of Young's Modulus and poison ratio )
5) One Dimensional consolidation Test

SOIL RESEARCH LAB


( company No : 002573768-H )

( CIDB Reg. No : 0120161028-WP180965 )


ATTERBERG LIMITS DETERMINATION

Project : SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

Sample No. : BH 1 / D1 ( 1.50 m ) Date Tested : 14/8/2018

DETERMINATION NO. LIQUID LIMIT PLASTIC LIMIT 60

Can No. 59 40 3 44
Wt. of wet soil + can ( gm ) 49.76 41.79 41.57 12.55 55

Water Content, w %
Wt. of dry soil + can ( gm ) 36.26 31.01 32.02 11.47
Wt. of can ( gm ) 9.61 8.01 8.98 8.00 50
Wt. of dry soil ( gm ) 26.65 23.00 23.04 3.47
LL = 49
Wt. of moisture ( gm ) 13.50 10.78 9.55 1.08 45
Water content, w (%) 50.66 46.88 41.44 31.11
No. of blows, N 22 29 38 40

Liquid limit = 49 %
35 25
Plastic limit = 31 % 10 100
No. of Blows, N
Plasticity index = 18 %

Sample No. : BH 1 / D2 ( 3.00 m ) Date Tested : 14/8/2018

DETERMINATION NO. LIQUID LIMIT PLASTIC LIMIT 60

Can No. 33 9 21 28
Wt. of wet soil + can ( gm ) 40.86 41.50 42.12 11.38 55
Water Content, w %

Wt. of dry soil + can ( gm ) 30.08 30.92 32.13 10.60


Wt. of can ( gm ) 8.26 7.59 7.86 7.95 50
Wt. of dry soil ( gm ) 21.82 23.33 24.27 2.65
Wt. of moisture ( gm ) 10.78 10.58 9.99 0.78 LL = 48
45
Water content, w (%) 49.41 45.33 41.18 29.56
No. of blows, N 21 31 39 40

Liquid limit = 48 %
35 25
Plastic limit = 30 % 10 100
No. of Blows, N
Plasticity index = 18 %

Sample No. : BH 1 / UD1 ( 3.50 m ) Date Tested : 14/8/2018

DETERMINATION NO. LIQUID LIMIT PLASTIC LIMIT 80

Can No. 11 37 10 31
Wt. of wet soil + can ( gm ) 44.70 39.24 35.30 12.07
70
Water Content, w %

Wt. of dry soil + can ( gm ) 29.70 27.62 25.80 11.21


Wt. of can ( gm ) 7.77 7.99 8.15 8.10
Wt. of dry soil ( gm ) 21.93 19.63 17.65 3.11 60
Wt. of moisture ( gm ) 15.00 11.62 9.50 0.86
Water content, w (%) 68.41 59.19 53.82 27.57 LL = 57
No. of blows, N 14 24 29 50

Liquid limit = 57 %
40 25
Plastic limit = 28 % 10 100
No. of Blows, N
Plasticity index = 29 %
ATTERBERG LIMITS DETERMINATION

Project : SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

Sample No. : BH 1 / D3 ( 4.50 m ) Date Tested : 14/8/2018

DETERMINATION NO. LIQUID LIMIT PLASTIC LIMIT 50

Can No. 24 63 35 69
Wt. of wet soil + can ( gm ) 46.50 49.25 44.19 12.42 45

Water Content, w %
Wt. of dry soil + can ( gm ) 34.98 38.50 34.73 12.00
Wt. of can ( gm ) 8.25 10.72 8.62 10.23 40
Wt. of dry soil ( gm ) 26.73 27.78 26.11 1.77
LL = 39
Wt. of moisture ( gm ) 11.52 10.75 9.46 0.42 35
Water content, w (%) 43.09 38.71 36.24 23.80
No. of blows, N 17 26 31 30

Liquid limit = 39 %
25 25
Plastic limit = 24 % 10 100
No. of Blows, N
Plasticity index = 15 %

Sample No. : BH 1 / D4 ( 6.00 m ) Date Tested : 14/8/2018

DETERMINATION NO. LIQUID LIMIT PLASTIC LIMIT 55

Can No. 52 66 45 54
50
Wt. of wet soil + can ( gm ) 42.90 41.51 37.24 12.93
Water Content, w %

Wt. of dry soil + can ( gm ) 31.82 32.35 29.25 12.38 45


Wt. of can ( gm ) 9.98 9.96 8.28 10.02
Wt. of dry soil ( gm ) 21.84 22.39 20.97 2.36 40
LL = 41
Wt. of moisture ( gm ) 11.08 9.16 7.99 0.55
Water content, w (%) 50.74 40.92 38.11 23.45 35
No. of blows, N 13 25 33
30

Liquid limit = 41 %
25 25
Plastic limit = 23 % 10 100
No. of Blows, N
Plasticity index = 18 %

Sample No. : BH 1 / UD2 ( 6.50 m ) Date Tested : 14/8/2018

DETERMINATION NO. LIQUID LIMIT PLASTIC LIMIT 55

Can No. 5 12 13 15
Wt. of wet soil + can ( gm ) 43.02 38.78 37.48 11.32 50
Water Content, w %

Wt. of dry soil + can ( gm ) 31.76 29.43 29.09 10.73


Wt. of can ( gm ) 8.05 8.15 8.29 8.25 45
Wt. of dry soil ( gm ) 23.71 21.28 20.80 2.48 LL = 45
Wt. of moisture ( gm ) 11.26 9.35 8.39 0.59 40
Water content, w (%) 47.49 43.93 40.35 23.84
No. of blows, N 20 27 34 35

Liquid limit = 45 %
30 25
Plastic limit = 24 % 10 100
No. of Blows, N
Plasticity index = 21 %
ATTERBERG LIMITS DETERMINATION

Project : SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

Sample No. : BH 1 / D6 ( 9.00 m ) Date Tested : 14/8/2018

DETERMINATION NO. LIQUID LIMIT PLASTIC LIMIT 60

Can No. 18 7 62 56
55
Wt. of wet soil + can ( gm ) 50.17 49.96 50.60 16.19

Water Content, w %
Wt. of dry soil + can ( gm ) 36.56 37.10 39.60 15.20 50
Wt. of can ( gm ) 9.03 8.26 11.28 11.89
Wt. of dry soil ( gm ) 27.53 28.84 28.32 3.31 45
LL = 46
Wt. of moisture ( gm ) 13.61 12.86 11.00 0.99
Water content, w (%) 49.43 44.60 38.84 29.89 40
No. of blows, N 20 30 40
35

Liquid limit = 46 %
30 25
Plastic limit = 30 % 10 100
No. of Blows, N
Plasticity index = 16 %

Sample No. : BH 1 / D7 ( 10.50 m ) Date Tested : 14/8/2018

DETERMINATION NO. LIQUID LIMIT PLASTIC LIMIT 70

Can No. 14 2 51 61
Wt. of wet soil + can ( gm ) 45.98 48.46 47.46 12.23
60
Water Content, w %

Wt. of dry soil + can ( gm ) 31.81 34.19 35.65 11.73


Wt. of can ( gm ) 8.12 8.27 10.32 10.21
Wt. of dry soil ( gm ) 23.69 25.92 25.33 1.52 50 LL = 53
Wt. of moisture ( gm ) 14.17 14.27 11.81 0.50
Water content, w (%) 59.82 55.05 46.61 32.73
No. of blows, N 18 23 33 40

Liquid limit = 53 %
30 25
Plastic limit = 33 % 10 100
No. of Blows, N
Plasticity index = 20 %

Sample No. : Date Tested :

DETERMINATION NO. LIQUID LIMIT PLASTIC LIMIT 55

Can No.
Wt. of wet soil + can ( gm ) 50
Water Content, w %

Wt. of dry soil + can ( gm )


Wt. of can ( gm ) 45
Wt. of dry soil ( gm )
Wt. of moisture ( gm ) 40
Water content, w (%)
No. of blows, N 35

Liquid limit = %
30
Plastic limit = % 10 100
No. of Blows, N
Plasticity index = %
PROJECT : SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

BOREHOLE NO. : BH 1 BOREHOLE NO. : BH 1


SAMPLE NO. : D1 SAMPLE NO. : D2
DEPTH (m) : 1.50 DEPTH (m) : 3.00
DATE : 14/8/2018 DATE : 14/8/2018

Meniscus Correction, Cm 0.5 h Hr Calibration Equation, 100 Gs


D = 0.005531 K = Rd
Temperature, T 28 °C ( Gs - 1 ) t Hr = -4.1083 Rh + 260.67 m ( Gs - 1 )
Viscosity of Water, h 0.835 mPa.s Reading in Dispersant, Ro' -2

SIEVE ANALYSIS SIEVE ANALYSIS


TEST MASS PERCENTAGE TOTAL TEST MASS PERCENTAGE TOTAL
SIEVE RETAINED RETAINED PASSING SIEVE RETAINED RETAINED PASSING
( gms ) (%) (%) Dry Mass of Soil : ( gms ) (%) (%) Dry Mass of Soil :
20.00 mm 0.00 100.00 55.93 gms 20.00 mm 0.00 100.00 54.61 gms
14.00 mm 0.00 0.00 100.00 14.00 mm 0.00 0.00 100.00
10.00 mm 0.00 0.00 100.00 Gs : 2.53 10.00 mm 0.00 0.00 100.00 Gs : 2.54
6.30 mm 0.00 0.00 100.00 6.30 mm 0.00 100.00
5.00 mm 0.00 0.00 100.00 GRAVEL : 1 % 5.00 mm 0.00 100.00 GRAVEL : 1 %
3.35 mm 0.00 100.00 3.35 mm 0.00 100.00
2.00 mm 0.73 1.31 98.69 SAND : 10 % 2.00 mm 0.38 0.70 99.30 SAND : 13 %
1.18 mm 2.55 4.56 94.14 1.18 mm 2.30 4.21 95.09
0.600 mm 1.06 1.90 92.24 SILT : 52 % 0.600 mm 1.11 2.03 93.06 SILT : 51 %
0.425 mm 0.80 1.43 90.81 0.425 mm 1.17 2.14 90.92
0.300 mm 0.35 0.63 90.18 CLAY : 37 % 0.300 mm 0.72 1.32 89.60 CLAY : 35 %
0.212 mm 0.16 0.29 89.90 0.212 mm 0.52 0.95 88.65
0.150 mm 0.12 0.21 89.68 Total : 100 % 0.150 mm 0.33 0.60 88.04 Total : 100 %
0.075 mm 0.21 0.38 89.31 0.075 mm 1.15 2.11 85.94

HYDROMETER ANALYSIS HYDROMETER ANALYSIS


ELAPSED HYDROMETER Rh' + Cm EFFECTIVE PARTICLE Rh' - Ro' PERCENTAGE ELAPSED HYDROMETER Rh' + Cm EFFECTIVE PARTICLE Rh' - Ro' PERCENTAGE
TIME READING DEPTH DIAMETER FINER THAN D TIME READING DEPTH DIAMETER FINER THAN D
t ( min ) Rh' = Rh Hr ( mm ) D ( mm ) = Rd K ( % ) t ( min ) Rh' = Rh Hr ( mm ) D ( mm ) = Rd K ( % )

1 28.0 28.5 143.6 0.0489 30.0 88.65 1 26.0 26.5 151.8 0.0501 28.0 84.52
2 27.0 27.5 147.7 0.0351 29.0 85.69 2 25.0 25.5 155.9 0.0359 27.0 81.50
4 26.0 26.5 151.8 0.0252 28.0 82.74 4 24.0 24.5 160.0 0.0257 26.0 78.48
8 25.0 25.5 155.9 0.0180 27.0 79.78 8 23.0 23.5 164.1 0.0184 25.0 75.46
30 23.0 23.5 164.1 0.0096 25.0 73.87 30 21.0 21.5 172.3 0.0098 23.0 69.43
60 21.0 21.5 172.3 0.0069 23.0 67.96 60 19.0 19.5 180.6 0.0071 21.0 63.39
120 17.5 18.0 186.7 0.0051 19.5 57.62 120 16.0 16.5 192.9 0.0052 18.0 54.33
240 13.0 13.5 205.2 0.0038 15.0 44.32 240 12.5 13.0 207.3 0.0038 14.5 43.77
1440 10.0 10.5 217.5 0.0016 12.0 35.46 1440 9.0 9.5 221.6 0.0016 11.0 33.20

100
GRAVEL : 1.31 0.31 0.31 0 1 GRAVEL : 0.70 0.70 0.70 1 1
90 SAND : 9.39 0.39 0.00 1 10 SAND : 13.37 0.37 0.37 0 13
PERCENTAGE PASSING ( % )

SILT : 52.18 0.18 0.18 0 52 SILT : 50.78 0.78 0.00 1 51


80 CLAY : 37.13 0.13 0.13 0 37 CLAY : 35.15 0.15 0.15 0 35

70 Total : 100 1.00 100 Total : 100 2.00 100

60 1 max 55.93 1 max 54.61


2 0.39 98.69 2 0.78 99.30
50 4 0.31 89.31 4 0.70 85.94

40 min min
0.13 0.15
30
Page
20 1

10

0
0.001 0.01 0.1 1 10 100
PARTICLE SIZE (mm)

SILT SAND GRAVEL


CLAY
FINE MEDIUM COARSE FINE MEDIUM COARSE FINE MEDIUM COARSE
PARTICLE SIZE DISTRIBUTION GRADATION CURVE
TO BRITISH STANDARD BS 1377 : Part 2 : 1990
PROJECT : SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

BOREHOLE NO. : BH 1 BOREHOLE NO. : BH 1


SAMPLE NO. : UD1 SAMPLE NO. : D3
DEPTH (m) : 3.50 DEPTH (m) : 4.50
DATE : 14/8/2018 DATE : 14/8/2018

Meniscus Correction, Cm 0.5 h Hr Calibration Equation, 100 Gs


D = 0.005531 K = Rd
Temperature, T 28 °C ( Gs - 1 ) t Hr = -4.1083 Rh + 260.67 m ( Gs - 1 )
Viscosity of Water, h 0.835 mPa.s Reading in Dispersant, Ro' -2

SIEVE ANALYSIS SIEVE ANALYSIS


TEST MASS PERCENTAGE TOTAL TEST MASS PERCENTAGE TOTAL
SIEVE RETAINED RETAINED PASSING SIEVE RETAINED RETAINED PASSING
( gms ) (%) (%) Dry Mass of Soil : ( gms ) (%) (%) Dry Mass of Soil :
20.00 mm 0.00 100.00 56.24 gms 20.00 mm 0.00 100.00 61.43 gms
14.00 mm 0.00 0.00 100.00 14.00 mm 0.00 0.00 100.00
10.00 mm 0.00 0.00 100.00 Gs : 2.52 10.00 mm 0.00 0.00 100.00 Gs : 2.68
6.30 mm 0.00 0.00 100.00 6.30 mm 0.00 0.00 100.00
5.00 mm 0.00 0.00 100.00 GRAVEL : 0 % 5.00 mm 0.00 100.00 GRAVEL : 4 %
3.35 mm 0.00 0.00 100.00 3.35 mm 0.00 100.00
2.00 mm 0.00 0.00 100.00 SAND : 7 % 2.00 mm 2.26 3.68 96.32 SAND : 57 %
1.18 mm 0.00 0.00 100.00 1.18 mm 9.51 15.48 80.84
0.600 mm 0.00 100.00 SILT : 39 % 0.600 mm 7.53 12.26 68.58 SILT : 12 %
0.425 mm 0.00 100.00 0.425 mm 4.50 7.33 61.26
0.300 mm 0.00 100.00 CLAY : 54 % 0.300 mm 4.20 6.84 54.42 CLAY : 27 %
0.212 mm 1.06 1.88 98.12 0.212 mm 3.40 5.53 48.88
0.150 mm 1.37 2.44 95.68 Total : 100 % 0.150 mm 2.26 3.68 45.21 Total : 100 %
0.075 mm 1.50 2.67 93.01 0.075 mm 3.57 5.81 39.39

HYDROMETER ANALYSIS HYDROMETER ANALYSIS


ELAPSED HYDROMETER Rh' + Cm EFFECTIVE PARTICLE Rh' - Ro' PERCENTAGE ELAPSED HYDROMETER Rh' + Cm EFFECTIVE PARTICLE Rh' - Ro' PERCENTAGE
TIME READING DEPTH DIAMETER FINER THAN D TIME READING DEPTH DIAMETER FINER THAN D
t ( min ) Rh' = Rh Hr ( mm ) D ( mm ) = Rd K ( % ) t ( min ) Rh' = Rh Hr ( mm ) D ( mm ) = Rd K ( % )

1 29.5 30.0 137.4 0.0480 31.5 92.84 1 13.0 13.5 205.2 0.0558 15.0 38.94
2 28.5 29.0 141.5 0.0345 30.5 89.89 2 12.5 13.0 207.3 0.0397 14.5 37.64
4 28.0 28.5 143.6 0.0246 30.0 88.41 4 12.0 12.5 209.3 0.0282 14.0 36.34
8 27.0 27.5 147.7 0.0176 29.0 85.47 8 11.5 12.0 211.4 0.0200 13.5 35.04
30 25.0 25.5 155.9 0.0093 27.0 79.57 30 11.0 11.5 213.4 0.0104 13.0 33.75
60 23.5 24.0 162.1 0.0067 25.5 75.15 60 10.5 11.0 215.5 0.0074 12.5 32.45
120 21.5 22.0 170.3 0.0049 23.5 69.26 120 10.0 10.5 217.5 0.0052 12.0 31.15
240 19.0 19.5 180.6 0.0036 21.0 61.89 240 9.5 10.0 219.6 0.0037 11.5 29.85
1440 15.5 16.0 194.9 0.0015 17.5 51.58 1440 8.0 8.5 225.7 0.0015 10.0 25.96

100
GRAVEL : 0.00 0.00 0.00 0 0 GRAVEL : 3.68 0.68 0.68 1 4
90 SAND : 6.99 0.99 0.00 1 7 SAND : 56.93 0.93 0.00 1 57
PERCENTAGE PASSING ( % )

SILT : 38.96 0.96 0.96 1 39 SILT : 12.62 0.62 0.62 0 12


80 CLAY : 54.06 0.06 0.06 0 54 CLAY : 26.77 0.77 0.77 1 27

70 Total : 100 2.00 100 Total : 100 3.00 100

60 1 max 56.24 1 max 61.43


2 0.99 100.00 2 0.93 96.32
50 4 0.96 93.01 5 0.77 39.39

40 min min
0.00 0.62
30
Page
20 2

10

0
0.001 0.01 0.1 1 10 100
PARTICLE SIZE (mm)

SILT SAND GRAVEL


CLAY
FINE MEDIUM COARSE FINE MEDIUM COARSE FINE MEDIUM COARSE
PARTICLE SIZE DISTRIBUTION GRADATION CURVE
TO BRITISH STANDARD BS 1377 : Part 2 : 1990
PROJECT : SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

BOREHOLE NO. : BH 1 BOREHOLE NO. : BH 1


SAMPLE NO. : D4 SAMPLE NO. : UD2
DEPTH (m) : 6.00 DEPTH (m) : 6.50
DATE : 14/8/2018 DATE : 14/8/2018

Meniscus Correction, Cm 0.5 h Hr Calibration Equation, 100 Gs


D = 0.005531 K = Rd
Temperature, T 28 °C ( Gs - 1 ) t Hr = -4.1083 Rh + 260.67 m ( Gs - 1 )
Viscosity of Water, h 0.835 mPa.s Reading in Dispersant, Ro' -2

SIEVE ANALYSIS SIEVE ANALYSIS


TEST MASS PERCENTAGE TOTAL TEST MASS PERCENTAGE TOTAL
SIEVE RETAINED RETAINED PASSING SIEVE RETAINED RETAINED PASSING
( gms ) (%) (%) Dry Mass of Soil : ( gms ) (%) (%) Dry Mass of Soil :
20.00 mm 0.00 100.00 63.46 gms 20.00 mm 0.00 100.00 57.56 gms
14.00 mm 0.00 0.00 100.00 14.00 mm 0.00 0.00 100.00
10.00 mm 0.00 0.00 100.00 Gs : 2.65 10.00 mm 0.00 0.00 100.00 Gs : 2.61
6.30 mm 0.00 0.00 100.00 6.30 mm 0.00 0.00 100.00
5.00 mm 0.00 0.00 100.00 GRAVEL : 13 % 5.00 mm 0.00 100.00 GRAVEL : 1 %
3.35 mm 2.62 4.13 95.87 3.35 mm 0.00 100.00
2.00 mm 5.43 8.56 87.31 SAND : 39 % 2.00 mm 0.57 0.99 99.01 SAND : 34 %
1.18 mm 7.64 12.04 75.28 1.18 mm 5.25 9.12 89.89
0.600 mm 6.26 9.86 65.41 SILT : 16 % 0.600 mm 4.35 7.56 82.33 SILT : 25 %
0.425 mm 3.15 4.96 60.45 0.425 mm 2.62 4.55 77.78
0.300 mm 2.43 3.83 56.62 CLAY : 32 % 0.300 mm 1.52 2.64 75.14 CLAY : 40 %
0.212 mm 1.38 2.17 54.44 0.212 mm 1.29 2.24 72.90
0.150 mm 1.34 2.11 52.33 Total : 100 % 0.150 mm 1.17 2.03 70.87 Total : 100 %
0.075 mm 2.52 3.97 48.36 0.075 mm 3.39 5.89 64.98

HYDROMETER ANALYSIS HYDROMETER ANALYSIS


ELAPSED HYDROMETER Rh' + Cm EFFECTIVE PARTICLE Rh' - Ro' PERCENTAGE ELAPSED HYDROMETER Rh' + Cm EFFECTIVE PARTICLE Rh' - Ro' PERCENTAGE
TIME READING DEPTH DIAMETER FINER THAN D TIME READING DEPTH DIAMETER FINER THAN D
t ( min ) Rh' = Rh Hr ( mm ) D ( mm ) = Rd K ( % ) t ( min ) Rh' = Rh Hr ( mm ) D ( mm ) = Rd K ( % )

1 16.8 17.3 189.6 0.0541 18.8 47.53 1 20.5 21.0 174.4 0.0527 22.5 63.44
2 16.5 17.0 190.8 0.0384 18.5 46.77 2 20.0 20.5 176.4 0.0375 22.0 62.03
4 16.0 16.5 192.9 0.0273 18.0 45.50 4 19.5 20.0 178.5 0.0266 21.5 60.62
8 15.5 16.0 194.9 0.0194 17.5 44.24 8 19.0 19.5 180.6 0.0190 21.0 59.21
30 15.0 15.5 197.0 0.0101 17.0 42.98 30 18.0 18.5 184.7 0.0099 20.0 56.39
60 14.5 15.0 199.0 0.0072 16.5 41.71 60 17.0 17.5 188.8 0.0071 19.0 53.57
120 13.5 14.0 203.2 0.0051 15.5 39.18 120 16.0 16.5 192.9 0.0051 18.0 50.75
240 12.5 13.0 207.3 0.0037 14.5 36.66 240 14.5 15.0 199.0 0.0036 16.5 46.53
1440 10.0 10.5 217.5 0.0015 12.0 30.34 1440 11.5 12.0 211.4 0.0015 13.5 38.07

100
GRAVEL : 12.69 0.69 0.69 1 13 GRAVEL : 0.99 0.99 0.00 1 1
90 SAND : 38.95 0.95 0.00 1 39 SAND : 34.03 0.03 0.03 0 34
PERCENTAGE PASSING ( % )

SILT : 16.62 0.62 0.62 0 16 SILT : 25.01 0.01 0.01 0 25


80 CLAY : 31.74 0.74 0.74 1 32 CLAY : 39.96 0.96 0.96 1 40

70 Total : 100 3.00 100 Total : 100 2.00 100

60 1 max 63.46 1 max 57.56


2 0.95 87.31 2 0.99 99.01
50 4 0.74 48.36 4 0.96 64.98

40 min min
0.62 0.01
30
Page
20 3

10

0
0.001 0.01 0.1 1 10 100
PARTICLE SIZE (mm)

SILT SAND GRAVEL


CLAY
FINE MEDIUM COARSE FINE MEDIUM COARSE FINE MEDIUM COARSE
PARTICLE SIZE DISTRIBUTION GRADATION CURVE
TO BRITISH STANDARD BS 1377 : Part 2 : 1990
PROJECT : SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

BOREHOLE NO. : BH 1 BOREHOLE NO. : BH 1


SAMPLE NO. : D6 SAMPLE NO. : D7
DEPTH (m) : 9.00 DEPTH (m) : 10.50
DATE : 14/8/2018 DATE : 14/8/2018

Meniscus Correction, Cm 0.5 h Hr Calibration Equation, 100 Gs


D = 0.005531 K = Rd
Temperature, T 28 °C ( Gs - 1 ) t Hr = -4.1083 Rh + 260.67 m ( Gs - 1 )
Viscosity of Water, h 0.835 mPa.s Reading in Dispersant, Ro' -2

SIEVE ANALYSIS SIEVE ANALYSIS


TEST MASS PERCENTAGE TOTAL TEST MASS PERCENTAGE TOTAL
SIEVE RETAINED RETAINED PASSING SIEVE RETAINED RETAINED PASSING
( gms ) (%) (%) Dry Mass of Soil : ( gms ) (%) (%) Dry Mass of Soil :
20.00 mm 0.00 100.00 50.71 gms 20.00 mm 0.00 100.00 51.98 gms
14.00 mm 0.00 0.00 100.00 14.00 mm 0.00 0.00 100.00
10.00 mm 0.00 0.00 100.00 Gs : 2.59 10.00 mm 0.00 0.00 100.00 Gs : 2.51
6.30 mm 0.00 0.00 100.00 6.30 mm 0.00 0.00 100.00
5.00 mm 0.00 0.00 100.00 GRAVEL : 6 % 5.00 mm 0.00 0.00 100.00 GRAVEL : 0 %
3.35 mm 0.00 0.00 100.00 3.35 mm 0.00 0.00 100.00
2.00 mm 3.12 6.15 93.85 SAND : 24 % 2.00 mm 0.00 0.00 100.00 SAND : 3 %
1.18 mm 4.38 8.64 85.21 1.18 mm 0.00 0.00 100.00
0.600 mm 2.29 4.52 80.69 SILT : 43 % 0.600 mm 0.00 0.00 100.00 SILT : 56 %
0.425 mm 1.15 2.27 78.43 0.425 mm 0.00 0.00 100.00
0.300 mm 1.38 2.72 75.70 CLAY : 27 % 0.300 mm 0.00 0.00 100.00 CLAY : 41 %
0.212 mm 0.87 1.72 73.99 0.212 mm 0.00 100.00
0.150 mm 0.39 0.77 73.22 Total : 100 % 0.150 mm 0.00 100.00 Total : 100 %
0.075 mm 1.47 2.90 70.32 0.075 mm 1.73 3.33 96.67

HYDROMETER ANALYSIS HYDROMETER ANALYSIS


ELAPSED HYDROMETER Rh' + Cm EFFECTIVE PARTICLE Rh' - Ro' PERCENTAGE ELAPSED HYDROMETER Rh' + Cm EFFECTIVE PARTICLE Rh' - Ro' PERCENTAGE
TIME READING DEPTH DIAMETER FINER THAN D TIME READING DEPTH DIAMETER FINER THAN D
t ( min ) Rh' = Rh Hr ( mm ) D ( mm ) = Rd K ( % ) t ( min ) Rh' = Rh Hr ( mm ) D ( mm ) = Rd K ( % )

1 19.5 20.0 178.5 0.0536 21.5 69.08 1 28.0 28.5 143.6 0.0493 30.0 95.94
2 19.0 19.5 180.6 0.0381 21.0 67.47 2 27.0 27.5 147.7 0.0353 29.0 92.74
4 18.5 19.0 182.6 0.0271 20.5 65.87 4 26.0 26.5 151.8 0.0253 28.0 89.54
8 18.0 18.5 184.7 0.0193 20.0 64.26 8 25.0 25.5 155.9 0.0182 27.0 86.34
30 16.5 17.0 190.8 0.0101 18.5 59.44 30 23.0 23.5 164.1 0.0096 25.0 79.95
60 15.0 15.5 197.0 0.0073 17.0 54.62 60 21.0 21.5 172.3 0.0070 23.0 73.55
120 13.0 13.5 205.2 0.0052 15.0 48.20 120 18.5 19.0 182.6 0.0051 20.5 65.56
240 10.5 11.0 215.5 0.0038 12.5 40.16 240 14.0 14.5 201.1 0.0038 16.0 51.17
1440 5.5 6.0 236.0 0.0016 7.5 24.10 1440 10.0 10.5 217.5 0.0016 12.0 38.37

100
GRAVEL : 6.15 0.15 0.15 0 6 GRAVEL : 0.00 0.00 0.00 0 0
90 SAND : 23.53 0.53 0.53 1 24 SAND : 3.33 0.33 0.33 0 3
PERCENTAGE PASSING ( % )

SILT : 43.44 0.44 0.44 0 43 SILT : 55.93 0.93 0.00 1 56


80 CLAY : 26.88 0.88 0.00 1 27 CLAY : 40.74 0.74 0.74 1 41

70 Total : 100 2.00 100 Total : 100 2.00 100

60 1 max 50.71 1 max 51.98


2 0.88 93.85 2 0.93 100.00
50 4 0.53 70.32 4 0.74 96.67

40 min min
0.15 0.00
30
Page
20 4

10

0
0.001 0.01 0.1 1 10 100
PARTICLE SIZE (mm)

SILT SAND GRAVEL


CLAY
FINE MEDIUM COARSE FINE MEDIUM COARSE FINE MEDIUM COARSE
PARTICLE SIZE DISTRIBUTION GRADATION CURVE
TO BRITISH STANDARD BS 1377 : Part 2 : 1990
PROJECT : SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

BOREHOLE NO. : BH 1 BOREHOLE NO. :


SAMPLE NO. : D8 SAMPLE NO. :
DEPTH (m) : 12.00 DEPTH (m) :
DATE : 14/8/2018 DATE :

Meniscus Correction, Cm 0.5 h Hr Calibration Equation, 100 Gs


D = 0.005531 K = Rd
Temperature, T 28 °C ( Gs - 1 ) t Hr = -4.1083 Rh + 260.67 m ( Gs - 1 )
Viscosity of Water, h 0.835 mPa.s Reading in Dispersant, Ro' -2

SIEVE ANALYSIS SIEVE ANALYSIS


TEST MASS PERCENTAGE TOTAL TEST MASS PERCENTAGE TOTAL
SIEVE RETAINED RETAINED PASSING SIEVE RETAINED RETAINED PASSING
( gms ) (%) (%) Dry Mass of Soil : ( gms ) (%) (%) Dry Mass of Soil :
20.00 mm 0.00 100.00 51.49 gms 20.00 mm 100.00 1.00 gms
14.00 mm 0.00 0.00 100.00 14.00 mm 0.00 100.00
10.00 mm 0.00 0.00 100.00 Gs : 2.78 10.00 mm 0.00 100.00
6.30 mm 0.00 0.00 100.00 6.30 mm 0.00 100.00
5.00 mm 0.00 100.00 GRAVEL : 7 % 5.00 mm 0.00 100.00 GRAVEL :
3.35 mm 0.00 100.00 3.35 mm 0.00 100.00
2.00 mm 3.68 7.15 92.85 SAND : 85 % 2.00 mm 0.00 100.00 SAND :
1.18 mm 19.51 37.89 54.96 1.18 mm 0.00 100.00
0.600 mm 10.82 21.01 33.95 SILT : 0 % 0.600 mm 0.00 100.00 SILT :
0.425 mm 3.53 6.86 27.09 0.425 mm 0.00 100.00
0.300 mm 3.42 6.64 20.45 CLAY : 8 % 0.300 mm 0.00 100.00 CLAY :
0.212 mm 3.04 5.90 14.55 0.212 mm 0.00 100.00
0.150 mm 1.15 2.23 12.31 Total : 100 % 0.150 mm 0.00 100.00 Total : 0 %
0.075 mm 2.43 4.72 7.59 0.075 mm 0.00 100.00

HYDROMETER ANALYSIS HYDROMETER ANALYSIS


ELAPSED HYDROMETER Rh' + Cm EFFECTIVE PARTICLE Rh' - Ro' PERCENTAGE ELAPSED HYDROMETER Rh' + Cm EFFECTIVE PARTICLE Rh' - Ro' PERCENTAGE
TIME READING DEPTH DIAMETER FINER THAN D TIME READING DEPTH DIAMETER FINER THAN D
t ( min ) Rh' = Rh Hr ( mm ) D ( mm ) = Rd K ( % ) t ( min ) Rh' = Rh Hr ( mm ) D ( mm ) = Rd K ( % )

100
GRAVEL : 7.15 0.15 0.15 0 7 GRAVEL : 0.00 0.00 0.00 0 0
90 SAND : 85.26 0.26 0.26 0 85 SAND : 0.00 0.00 0.00 0 0
PERCENTAGE PASSING ( % )

SILT and 0.00 0.00 0.00 0 0 SILT and 0.00 0.00 0.00 0 0
80 CLAY : 7.59 0.59 0.00 1 8 CLAY : 100.00 0.00 0.00 0 100

70 Total : 100 1.00 100 Total : 100 0.00 100

60 1 max 51.49 max 1


2 0.59 92.85 0.00 100.00
50 4 0.26 7.59 0.00 100.00

40 min min
0.00 0.00
30
Page
20 5

10

0
0.001 0.01 0.1 1 10 100
PARTICLE SIZE (mm)

SILT SAND GRAVEL


CLAY
FINE MEDIUM COARSE FINE MEDIUM COARSE FINE MEDIUM COARSE
PARTICLE SIZE DISTRIBUTION GRADATION CURVE
TO BRITISH STANDARD BS 1377 : Part 2 : 1990
ONE DIMENSIONAL CONSOLIDATION TEST
( BS 1377 : PART 5 : 1990 )

PROJECT : SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

Sample : BH 1 / UD 1 ( 3.50 m ) Date Tested : 11 / 08 / 2018

INITIAL CONDITION FINAL CONDITION


Diameter of sample (mm) 50.00 50.00

Wt. of ring + wet soil (gm) 138.77 133.41

Wt. of ring (gm) 72.52 72.52

Wt. of wet soil (gm) 66.25 60.89

Wt. of dry soil (gm) 48.13 48.13

Wt. of water (gm) 18.12 12.76

Water Content (%) 37.65 26.52

Specific Gravity 2.52 2.52

Ht. of solid, hs (mm) 9.727 9.727

Ht. of soil (mm) 20.000 20.000

Void Ratio, e 1.056 0.676

Bulk Density (Mg/m3) 1.687 1.902

DRY Density (Mg/m3) 1.226 1.503

Deg. of Saturation (%) 89.84 98.79

Compression Index, Cc 0.385


Preconsolidated Pressure e'p (kPa) 52

Applied Pressure Settlement Height Height Void Change Mean Fitting Coefficient of Coefficient of
Pressure dp dh h hv Ratio e Ratio hm t90 Mv Cv
( kPa ) ( kPa ) ( mm ) ( mm ) ( mm ) =( h-hs )/hs de ( mm ) ( min ) ( m2/MN ) ( m2/year )

0.00 0.00 0.000 20.000 10.273 1.056 0.000 0.00 0.00 0.000 0.000

12.50 12.50 0.143 19.857 10.130 1.042 0.015 19.93 9.61 0.572 4.587

25.00 12.50 0.322 19.535 9.808 1.008 0.033 19.70 16.00 1.297 2.691

50.00 25.00 0.581 18.954 9.227 0.949 0.060 19.24 25.00 1.190 1.644

100.00 50.00 0.919 18.035 8.308 0.854 0.094 18.49 36.00 0.970 1.055

200.00 100.00 1.089 16.946 7.219 0.742 0.112 17.49 34.81 0.604 0.975

400.00 200.00 1.127 15.819 6.092 0.626 0.116 16.38 32.49 0.333 0.917

100.00 0.127 15.946 6.220 0.639 0.00

25.00 0.360 16.306 6.579 0.676 0.00

0.000 0.00
Wt.of wet Wt.of dry
Cont Wt.of Wt.of dry Wt.of M/C
soil and soil and
no. container soil moisture %
container container Average %
( M2 - M3)
( M2 ) ( M3 ) ( M1 ) ( M3 - M1) ( M2 - M3 ) ( M3 - M1)
x 100

G62 113.93 85.98 12.50 73.48 27.95 38.04


37.65
Y21 106.28 80.74 12.21 68.53 25.54 37.27
ONE DIMENSIONAL CONSOLIDATION TEST
SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

BH 1 / UD 1 ( 3.50 m )

1.10

1.05

1.00
Precons. Pressure
0.95 e'p 52 kPa

0.90
Void Ratio, e

0.85

0.80

0.75

0.70

0.65

0.60
1 10 100 1000 10000

Applied Pressure ( kPa )

Coeff. of Volume Compressibility, mv vs Log Pressure


2.00
1.80
1.60
1.40
mv (m2/MN)

1.20
1.00
0.80
0.60
0.40
0.20
0.00
1 10 100 1000 10000

Log Pressure (kN/m²)

Coeff. of Consolidation, cv vs Log Pressure


5.00
4.50
4.00
3.50
cv (m²/year)

3.00
2.50
2.00
1.50
1.00
0.50
0.00
1 10 100 1000 10000
Log Pressure (kN/m²)
ONE DIMENSIONAL CONSOLIDATION TEST
( BS 1377 : PART 5 : 1990 )

PROJECT : SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

Sample : BH 1 / UD 2 ( 6.50 m ) Date Tested : 11 / 08 / 2018

INITIAL CONDITION FINAL CONDITION


Diameter of sample (mm) 50.00 50.00

Wt. of ring + wet soil (gm) 146.21 140.55

Wt. of ring (gm) 71.56 71.56

Wt. of wet soil (gm) 74.65 68.99

Wt. of dry soil (gm) 60.27 60.27

Wt. of water (gm) 14.38 8.72

Water Content (%) 23.87 14.48

Specific Gravity 2.61 2.61

Ht. of solid, hs (mm) 11.760 11.760

Ht. of soil (mm) 20.000 20.000

Void Ratio, e 0.701 0.385

Bulk Density (Mg/m3) 1.901 2.157

DRY Density (Mg/m3) 1.535 1.884

Deg. of Saturation (%) 88.90 98.09

Compression Index, Cc 0.351


Preconsolidated Pressure e'p (kPa) 61

Applied Pressure Settlement Height Height Void Change Mean Fitting Coefficient of Coefficient of
Pressure dp dh h hv Ratio e Ratio hm t90 Mv Cv
( kPa ) ( kPa ) ( mm ) ( mm ) ( mm ) =( h-hs )/hs de ( mm ) ( min ) ( m2/MN ) ( m2/year )

0.00 0.00 0.000 20.000 8.240 0.701 0.000 0.00 0.00 0.000 0.000

12.50 12.50 0.125 19.875 8.115 0.690 0.011 19.94 10.24 0.500 4.309

25.00 12.50 0.213 19.662 7.902 0.672 0.018 19.77 21.16 0.857 2.050

50.00 25.00 0.518 19.144 7.384 0.628 0.044 19.40 33.64 1.054 1.242

100.00 50.00 0.938 18.206 6.446 0.548 0.080 18.68 39.69 0.980 0.975

200.00 100.00 1.169 17.037 5.277 0.449 0.099 17.62 39.69 0.642 0.868

400.00 200.00 1.242 15.795 4.035 0.343 0.106 16.42 37.21 0.365 0.804

100.00 0.120 15.915 4.155 0.353 0.00

25.00 0.374 16.289 4.530 0.385 0.00

0.000 0.00
Wt.of wet Wt.of dry
Cont Wt.of Wt.of dry Wt.of M/C
soil and soil and
no. container soil moisture %
container container Average %
( M2 - M3)
( M2 ) ( M3 ) ( M1 ) ( M3 - M1) ( M2 - M3 ) ( M3 - M1)
x 100

B56 148.28 122.41 12.56 109.85 25.87 23.55


23.87
H51 146.42 120.32 12.43 107.89 26.10 24.19
ONE DIMENSIONAL CONSOLIDATION TEST
SOIL INVESTIGATION WORKS AT LOT 73682, BUKIT CHANGGANG, BANTING

BH 1 / UD 2 ( 6.50 m )

0.75

0.70

0.65 Precons. Pressure


e'p 61 kPa
0.60
Void Ratio, e

0.55

0.50

0.45

0.40

0.35

0.30
1 10 100 1000 10000

Applied Pressure ( kPa )

Coeff. of Volume Compressibility, mv vs Log Pressure


2.00
1.80
1.60
1.40
mv (m2/MN)

1.20
1.00
0.80
0.60
0.40
0.20
0.00
1 10 100 1000 10000

Log Pressure (kN/m²)

Coeff. of Consolidation, cv vs Log Pressure


5.00
4.50
4.00
3.50
cv (m²/year)

3.00
2.50
2.00
1.50
1.00
0.50
0.00
1 10 100 1000 10000
Log Pressure (kN/m²)
APPENDIX D

- PHOTOGRAPHS

Site Exploration Sdn Bhd (1041771-P)


S.I. Works At Lot 73682, Bukit Changgang, Banting.

Disturbed Sample BH 1
Depth : 3.00 m

BH 1 In Progress

Disturbed Sample BH 1 Disturbed Sample BH 1


Depth : 4.50 m Depth : 6.00 m

__________________________________________________________________________________________________
Site Exploration Sdn Bhd
S.I. Works At Lot 73682, Bukit Changgang, Banting.

Disturbed Sample BH 1 Disturbed Sample BH 1


Depth : 9.00 m Depth : 10.50 m

Disturbed Sample BH 1 Disturbed Sample BH 1


Depth : 12.00 m Depth : 13.50 m

Disturbed Sample BH 1 Disturbed Sample BH 1


Depth : 22.50 m Depth : 28.50 m

__________________________________________________________________________________________________