The construction estimate includes costs for:
1) Carpentry, concrete, masonry, painting, electrical, doors/windows, plumbing, steel, and roofing works.
2) Materials such as lumber, rebar, concrete, tiles, and other hardware.
3) Labor and overhead, contingency, and miscellaneous expenses.
The total project cost is estimated at 453,316.34 Philippine pesos.
The construction estimate includes costs for:
1) Carpentry, concrete, masonry, painting, electrical, doors/windows, plumbing, steel, and roofing works.
2) Materials such as lumber, rebar, concrete, tiles, and other hardware.
3) Labor and overhead, contingency, and miscellaneous expenses.
The total project cost is estimated at 453,316.34 Philippine pesos.
The construction estimate includes costs for:
1) Carpentry, concrete, masonry, painting, electrical, doors/windows, plumbing, steel, and roofing works.
2) Materials such as lumber, rebar, concrete, tiles, and other hardware.
3) Labor and overhead, contingency, and miscellaneous expenses.
The total project cost is estimated at 453,316.34 Philippine pesos.
The construction estimate includes costs for:
1) Carpentry, concrete, masonry, painting, electrical, doors/windows, plumbing, steel, and roofing works.
2) Materials such as lumber, rebar, concrete, tiles, and other hardware.
3) Labor and overhead, contingency, and miscellaneous expenses.
The total project cost is estimated at 453,316.34 Philippine pesos.
6 pcs 17 Watts Led Bulb 195.00 1,170.00 6 pcs Receptacle 35.00 210.00 7 pcs Utility Box 35.00 245.00 3 pcs Duplex Convenience Outlet 150.00 450.00 1 set Aircon Outlet 700.00 700.00 1 box 2.0 sq. mm THHN Cu Wire 2250.00 2,250.00 30 mts 3.5 sq. mm THHN Cu Wire 20.00 600.00 1 set Panel Board with 4 Branches 2800.00 2,800.00 18 pcs 20mmØ PVC Electrical Conduit 45.00 810.00 2 roll Electrical Tape 50.00 100.00 2 pcs Two Gang Switch 135.00 270.00 2 pcs One Gang Switch 85.00 170.00 9,775.00
VI. DOORS AND WINDOWS Qty: 1 lot
Materials 4 sets 1.20m x 1.20m Glass Sliding Window 5500.00 22,000.00 1 set 0.8m x 2.1m Moulded Wooden Door 6000.00 6,000.00 2 sets Two Panel Aluminum Screen Door 6500.00 13,000.00 1 set 0.60m x 1.80m PVC Flush Door 1500.00 1,500.00 42,500.00
VII. PLUMBING WORKS Qty: 1 lot
Materials 1 pc Brass Faucet 300.00 300.00 1 set Lavatory with Fittings 2000.00 2,000.00 1 pc 4" Floor Drain 260.00 260.00 1 pc Ceramic Water Closet Toilet 3500.00 3,500.00 10 pcs 4"Ø PVC Pipe x 3 mts 590.00 5,900.00 1 pc PVC Wye Single Branch 45 deg x 4"Ø 130.00 130.00 4 pcs 101mm PVC Elbow 87.55 350.20 10 pcs 1/2"Ø uPVC Pipe 76.20 762.00 2 pcs 1/2"Ø uPVC Tee 35.00 70.00 6 pcs 1/2"Ø uPVC Elbow 28.00 168.00 1 can 400 cc PVC Solvent Cement 426.00 426.00 5 rolls Teflon Tape 15.00 75.00 1 lot Plumbing Fittings and Accessories 2000.00 2,000.00 15,941.20
VIII. STEEL WORKS Qty: 1 lot
Materials 10 pcs 2" x 2" x 4mm thk Angle Bar 900.00 9,000.00 6 pcs 1 1/2" x 1 1/2" x 4mm thk Angle Bar 580.00 3,480.00 6 pcs 1" x 1" x 4mm thk Angle Bar 450.00 2,700.00 10 kgs Welding Rod #6013 110.00 1,100.00 20 pcs Concrete Bolt 75.00 1,500.00 17,780.00
IX. ROOFING WORKS Qty: 1 lot
Materials 13 pcs Ordinary G.I. Roof GA #26 12' 500.00 6,500.00 26 pcs 100mm x 50mm x 1.2mm thk C-Purlins 850.00 22,100.00 5 pcs 8mm dia Round Bar 180.00 900.00 13 pcs HardieFlex Senepa (9mm x 10') 310.00 4,030.00 14 l.m. Pre-painted Ridge Roll (10') 280.00 3,920.00 12 l.m. Wall Flashing 8' GA 24 350.00 4,200.00 2 boxes Tek Screw 800.00 1,600.00 1 can 1/2 Liter Vulca Seal 300.00 300.00 43,550.00