Creep and Shrinkage
Creep and Shrinkage
Creep and Shrinkage
A B C
Average initial losses
10.7% 11.3% 9.6%
C.G of tend 1.000 0.890 0.789 0.608 0.460 0.342 0.201 0.178 0.177
Area 1.339 1.339 1.079 0.818 0.818 0.818 0.818 0.818 0.818
I 0.445 0.445 0.4000 0.3692 0.3692 0.3692 0.3692 0.3692 0.3692
Ybot 1.030 1.030 1.056 1.0816 1.0816 1.0816 1.0816 1.0816 1.0816
Zbot 0.432 0.432 0.379 0.341 0.341 0.341 0.341 0.341 0.341
Ztop 0.511 0.511 0.474 0.451 0.451 0.451 0.451 0.451 0.451
ecc 0.030 0.140 0.267 0.473 0.622 0.739 0.880 0.904 0.905
P (Total force) 6,113 6,118 6,125 6,152 6,217 6,300 6,498 6,534 6,557
Mdead - 297 573 1,063 1,472 1,800 2,209 2,290 2,301
Transfer stress
Bottom 4.990 5.860 8.489 12.935 14.616 16.078 18.234 18.581 18.661
Top 4.21 3.48 3.43 3.43 2.29 1.36 0.16 (0.03) (0.04)
Calculation of losses due to elastic deformation
Loss of prestress due to creep of concrete
1200
1913 230
1888
1400
1600 1.0816
220
200
640
SECTION AT MIDDLE
Section properties
Creep is propotional to stress in concrete for stress upto 1/3 of concrete cube strength at transfer.
Loss of prestress is obtained from the product of the moduless of elastic of the tendon.
Required cube strength of concrete ater 7 to 14days from concreting= 36 N/mm2
40 N/mm2
Creep per unit length = 3.6E-05
4.0E-05 N/mm2
Calculate creep loss at tendon C at 15m length
fcu = 50 N/mm2
fc transfer = 40 N/mm2
1/3 of cube strength = 16.6667 N/mm2
Modification factor = 1.268
Material properties
Modules of elastisity strand = 2.0E+05 N/mm2
Creep fac 1 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
Creep fac 2 1.000 1.000 1.000 1.000 1.000 1.000 1.046 1.056 1.059
Creep loss 197.8 205.0 276.1 427.2 502.6 580.1 737.5 768.5 773.9
Shrinkage loss 216.0 216.0 216.0 216.0 216.0 216.0 216.0 216.0 216.0