Cep Waqar Ali: Electrical Power BATCH-6 Submitted To: Eng. Haseeb Khan
Cep Waqar Ali: Electrical Power BATCH-6 Submitted To: Eng. Haseeb Khan
Cep Waqar Ali: Electrical Power BATCH-6 Submitted To: Eng. Haseeb Khan
EDC-1 17mdele0461(Improvement)
Qu
Sr. Component
ant
no.
ity
Transforme
1 1
r
2 Diodes 4
Capacitor
3 1
1000µF
Voltage
4 Regulator 1
LM7812
Capacitor
5 1
1µF
6 Heat Sink 1
Circuit Diagram:
It is just Used for understanding values of Component
will be change in multisim simulation.
Simulation Diagram:
METHODOLOGY:
1. The circuit consists of a center trapped transformer having 120 rms
and two diodes which is
connected to a capacitor of 1000 uf.
2. The 7812 IC is used as a regulator.
3. The output terminal is also connected to a capacitor of 1uf.
4. The output voltage is approximately 12 V.
Output voltage: The specification for the 7812 shows that the output
voltage is typically 12 V but could be as low
as 11.5 V or as high as 12.5 V.
Literature Review
The selection of this project is to do something different when I
search the idea for electronics project
everywhere I found the project that having no specification and
the function of the component which is
used in the project is not explained well.
APPARATUS:
1. Center trapped transformer
2. IC 7812
3. Capacitor 470 uf
4. Capacitor 0.01uf
5. Diodes
BUDGET:
Approximately 1200 rupees.
PROJECT TIMELINE:
25 June to 20 July
REFERENCE:
1. Internet
2. Electronics lab
3. Books