This document provides a risk assessment for an unnamed project. It includes a risk score calculator to determine the level of risk for each hazard based on probability and severity ratings. The assessment then lists specific tasks and hazards, detailing the consequence, original risk score, current control measures, residual risk score, and whether additional controls are needed. The assessment is signed off by an assessor and approved by a manager, with a 3 month review period defined.
This document provides a risk assessment for an unnamed project. It includes a risk score calculator to determine the level of risk for each hazard based on probability and severity ratings. The assessment then lists specific tasks and hazards, detailing the consequence, original risk score, current control measures, residual risk score, and whether additional controls are needed. The assessment is signed off by an assessor and approved by a manager, with a 3 month review period defined.
This document provides a risk assessment for an unnamed project. It includes a risk score calculator to determine the level of risk for each hazard based on probability and severity ratings. The assessment then lists specific tasks and hazards, detailing the consequence, original risk score, current control measures, residual risk score, and whether additional controls are needed. The assessment is signed off by an assessor and approved by a manager, with a 3 month review period defined.
This document provides a risk assessment for an unnamed project. It includes a risk score calculator to determine the level of risk for each hazard based on probability and severity ratings. The assessment then lists specific tasks and hazards, detailing the consequence, original risk score, current control measures, residual risk score, and whether additional controls are needed. The assessment is signed off by an assessor and approved by a manager, with a 3 month review period defined.
Download as DOCX, PDF, TXT or read online from Scribd
Download as docx, pdf, or txt
You are on page 1of 3
Contractor Logo
Risk Assessment for _________Project
Project Name: Contract Ref:
Sub- Con Logo RA No. RA Rev No. Contract Task Description Task Site Location
RISK SCORE CALCULATOR
Use Risk Score Calculator to determine level of risk for each hazard What is the PROBABILITY of an occurrence? Hierarchy of Controls What would the SEVERITY of an occurrence be? Severity Almost Very Can the hazard be Eliminated or removed from the work Very Likely Likely Unlikely Rating Certain Unlikely place? Catastrophic Multiple Fatalities/ High High High Med Med Can the product or process be substituted for a less Environmental release with detrimental effects 5 25 20 15 10 5 hazardous alternative? requiring external emergency services/ >10m AED Major Single Fatality/ Multiple LTI’s/ Major Illness or High High High Med Low 4 Can the hazard be engineered away with guards or barriers? Injury, disability/ Environmental release with 20 16 12 8 4 minimal off site impact/ 1-10m AED Moderate Single LTI/ Serious but non-permanent injury or ill health High High Med Med Low Can Administrative Controls be adopted 3 Work days lost/ 15 12 9 6 3 i.e. procedures, job rotation etc. On site release requiring environmental emergency plan to be activated/ 100k-1m AED Minor Medical attention needed. Med Med Med Low Low Can Personal Protective Equipment & Clothing be worn to 2 No work restrictions/ Local on-site environmental 10 8 6 4 2 safeguard against hazards? release treated locally/ 10-100k AED Negligible Minor cuts & bruises or sickness/ Med Low Low Low Low RISK RATING (Probability x Severity) 1 Nuisance release with no adverse impact/ 1-10k 5 4 3 2 1 1-4 LOW RISK (No further action required) AED 5-10 MEDIUM RISK (Procedure to be available) 12-25 HIGH RISK (Full time supervision present) Probability Rating 5 4 3 2 1
Page 1 of 3 Rev. 0.0 [01-Septeber -2021] CRM Controlled
Document Contractor Logo Risk Assessment for _________Project
Risk Assessed Residual Risk
Consequence Risk Risk Risk Risk SI No. Task Step Hazard Details P S Current Control Measures P S Additional Control Measures Details Score Rating Score Rating
Page 2 of 3 Rev. 0.0 [01-Septeber -2021] CRM Controlled
Document Contractor Logo Risk Assessment for _________Project
Assessor’s Name Position Signature
Reviewed By Position Signature Approved By Position Signature
Risk Assessment Date of Next
Review Period 03 Months Date Review
Page 3 of 3 Rev. 0.0 [01-Septeber -2021] CRM Controlled