Layout Inspection Report: M/s Pricol LTD
Layout Inspection Report: M/s Pricol LTD
Layout Inspection Report: M/s Pricol LTD
No:-SEI/QA/F-12
Rev. Date.:-19.11.19
CUSTOMER NAME
PART NAME: CORE MOVING Bill No…………………… Date - Report No.
M/s Pricol Ltd.
PART NO: P801105010601000A Lot No…………………. Sample Size :- 05 Pcs
Observation
S.NO DESCRIPTION SPC. DIM. Insp. Method Status
1 2 3 4 5
1 Length 6.90/7.00 MM
2 Roughness Ra 1.6 RT
8 ID Roughness Ra 6.3 RT
ZINC Plating
& Trivalent Chrome Passivation as per
12 Surface Treatment ASTM B117 Visually
Colour :-ISIDESCENT BLUE
17
18
19
20
OK √ Remarks:-
VALUE
30
7.023
L.C.L. 7.0175 7.0175 7.0175 7.0175 7.0175 7.0175 7.0175 7.0175
7.022 7.0175 7.0175 7.0170 7.0185 12 12
7.021
U.C.L.
25 0.0101 0.0101 0.0101 0.0101 0.0101 0.0101 0.0101 0.0101
7.02 0.0101 0.0101 7.0185 7.0200 25 37
7.019 A
X-BAR
20 7.0203 7.0203 7.0203 7.0203 7.0203 7.0203 7.0203 7.0203
7.016 7.0203 7.0203 7.0215 7.0230 9 46
QTY
7.015
R-BAR 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048
7.014 0.0048 0.0048 7.0230 7.0245 0 46
1 2 3 4 5 6 7 8 9 10
15
SAMPLE 7.0245 7.0260 4 50
0
0.002
0.0010 3 L.C.L.2 ={2 x D3} 0
7.0125 7.0140 7.0155 7.0170 7.0185 7.0200 7.0215 7.0230 7.0245 7.0260 7.0275
7.0110 7.0125 7.0140 7.0155 7.0170 7.0185 7.0200 7.0215 7.0230 7.0245 7.0260
0 0.0001 4 Std.Dev."σ"= 0.00192
1 2 3 4 5 6 7 8 9 10
DIMENSION Cp=(S/6σ)= 2.61690
Cpk={1-K}xCp)= 1.69530
REMARKS: - PROCESS IS EXCELLENT
AUD. BY 26/09/2021
09/26/2021 Page 2
DOC No:-SEI/PD/F-14
Safety and/or Government Regulation Purchase Order No. Weight (Kg) 0.0017
Checking Aid No. SEI/P2/CA-09 Checking Aid Engineering Change Level Dated
Plot No. 400/1 Sainik colony ,Hissar Road, Rohtak 124001 M/s Pricol ltd. , Plant -2 ,
Street Address Buyer/Buyer Code
MATERIALS REPORTING
Has customer-required Substances of Concern information been reported?
Submitted by IMDS or other customer format:
SUBMISSION RESULTS
The results for
These results meet all drawing and specification requirements: (If "NO" - Explanation Required)
Mold / Cavity / Production Process As per PFD
DECLARATION
I hereby affirm that the samples represented by this warrant are representative of our parts which were made by a process that meets all Production Part
Approval Process Manual 4th Edition Requirements. I further affirm that these samples were produced at the production rate o 16000 / 8 hrs hours.
I also certify that documented evidence of such compliance is on file and available for review. I have noted any deviations from this declaration below.
EXPLANATION / COMMENTS: NO
Print Name Mr. Paramvir singh Phone No. 7876767789 Fax No.
PPAP INDEX
Date 12.02.2021
SUBMIT RETAIN
Sl.
No. Requirements Responsibility Comments
(Cust. Folder) (In house folder)
6 Process FMEA y
7 Dimensional Results y
12 Control Plan y
16 Master Sample y
17 Checking Aids y
Action Results
Potenial Cause(s)/ Current Process Controls
Part Process Function/ Bolloni
Specification/Potential Failure Mode Potential Effect(s) of Failure Sev. Class Mechanism(s) of Occ. Det. RPN Recomm. Responsibility &
process nu. Requirements ng Drg. Actions target Date Actions Sev. Occ. Det. RPN
Failure Taken
Prevention Detection
4 Dia 7.30/7.40 Machining Problem 6 M ------ 3 Supplier QPCR rasied & Material send t 3 54
10 Raw material
1) Chemical Analysis
R/M Process Fault, R/m Verify from out-side Lab
Effect on Part Performance at every SIX MONTHS 2 PCS by Third Party
10 Material S45c
user end 8 C Mixing at Supplier or 3 Inspection Report 3 72
Consumer End 2) Incoming Raw Material
Record (SEI/SUP/F-03)
1) Dent's,rusty 1) Not proper location 1) Set location 1)R/M identification tag (SEI/QA/F-
20 Storage Raw material 2) Reject on customer end 4 Mn 2) Wrong Material 3 2) Fifo tag 58) 4 48
handling 2)colour coding
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection
1) Wrong Setting 1) Resetting /Prod./Rejection Report
2) Reset Offset & Inprocess
1) Fittment Problem 2) 2) By Wrong offset (SEI/QA/F-03)
1 Length 6.92/6.98 U/s,O/s Reject On Customer End
5 M
3) Insert Burnt
3 Inspection 4 60
4) Instrument Error 3) Set Tool Life Frequency 3) Daily Tool Life Monitoring Sheet
4) Instrument Verification (SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Wrong Setting /Prod./Rejection Report
1) Fittment Problem 2) 2) By Wrong offset 2) Reset Offset & Inprocess (SEI/QA/F-03)
4 Dia 7.10/7.15 U/s,O/s Reject On Customer End 5 M 3) Insert Burnt 3 Inspection 4 60
3) Next Operator Problem 3) Set Tool Life Frequency
4) Instrument Error 4) Instrument Verification 3) Daily Tool Life Monitoring Sheet
(SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Wrong Setting /Prod./Rejection Report
1) Fittment Problem 2) 2) By Wrong offset 2) Reset Offset & Inprocess (SEI/QA/F-03)
5 Counter dia Ref. 4.80 U/s,O/s Reject On Customer End
5 M
3) Insert Burnt
3 Inspection 5 75
3) Set Tool Life Frequency
4) Instrument Error 4) Instrument Verification 3) Daily Tool Life Monitoring Sheet
(SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Wrong Setting 2) Reset Offset & Inprocess /Prod./Rejection Report
1) Fittment Problem 2) 2) By Wrong offset (SEI/QA/F-03)
6 I.D 2.95/3.05 U/s,O/s Reject On Customer End 5 Mn 3) Insert Burnt 3 Inspection 5 75
4) Instrument Error 3) Set Tool Life Frequency 3) Daily Tool Life Monitoring Sheet
4) Instrument Verification
(SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
30 Turning
DOC.No:-SEI/PD/F-10
SEI POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS (PROCESS FMEA) Rev.No:-00
Eff.date:-01.10.2018
Vendor Name: M/s Sahyog Engineering Industries Process Responsibility: Mr. PARAMVIR SINGH FMEA NUMBER: SEI/P2/PFMEA-09
Part No: P801105010601000A Key Date: PREPARED BY:- Mr. Sumit kumar
Part Name: CORE MOVING Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Date (Orig.): 12.02.2021
Model: ………….. Date (Rev.):
Core Team: Process Engg,Q.A,Production/Manufacturing Page: 01 of 01 Rev.date:-00
Action Results
Potenial Cause(s)/ Current Process Controls
Part Process Function/ Bolloni
Specification/Potential Failure Mode Potential Effect(s) of Failure Sev. Class Mechanism(s) of Occ. Det. RPN Recomm. Responsibility &
process nu. Requirements ng Drg. Actions target Date Actions Sev. Occ. Det. RPN
Failure Taken
Prevention Detection
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Wrong Setting /Prod./Rejection Report
Both Chamfer 0.25± 0.15 1) Fittment Problem 2) 2) By Wrong offset 2) Reset Offset & Inprocess (SEI/QA/F-03)
30 Turning 7 U/s,O/s Reject On Customer End 4 Mn 3) Insert Burnt 3 Inspection 5 60
Angle x45°±2˚ 3) Set Tool Life Frequency
4) Instrument Error 4) Instrument Verification 3) Daily Tool Life Monitoring Sheet
(SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Wrong Setting /Prod./Rejection Report
1) Fittment Problem 2) 2) By Wrong offset 2) Reset Offset & Inprocess (SEI/QA/F-03)
8 ID Roughness Ra 6.3 U/s,O/s Reject On Customer End 4 Mn 3) Insert Burnt 3 Inspection 5 60
3) Set Tool Life Frequency
4) Instrument Error 4) Instrument Verification 3) Daily Tool Life Monitoring Sheet
(SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Wrong Setting 2) Reset Offset & Inprocess /Prod./Rejection Report
3
Both Face Ra 3.2 U/s,O/s 1) Fittment Problem 2) 4 Mn 2) By Wrong offset 3 Inspection (SEI/QA/F-03) 5 60
Roughness Reject On Customer End 3) Insert Burnt
4) Instrument Error 3) Set Tool Life Frequency 3) Daily Tool Life Monitoring Sheet
4) Instrument Verification (SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Wrong Setting 2) Reset Offset & Inprocess /Prod./Rejection Report
1) Fittment Problem 2) 2) By Wrong offset (SEI/QA/F-03)
9 Counter Angle 0.75x45° U/s,O/s Reject On Customer End 5 Mn 3) Insert Burnt 3 Inspection 5 75
4) Instrument Error 3) Set Tool Life Frequency 3) Daily Tool Life Monitoring Sheet
4) Instrument Verification
(SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Wrong Setting 2) Reset Offset & Inprocess /Prod./Rejection Report
1) Fittment Problem 2) 2) By Wrong offset (SEI/QA/F-03)
11 Appreance Free from burrs. Reject On Customer End
2 Mn
3) Insert Burnt
4 Inspection 5 40
4) Instrument Error 3) Set Tool Life Frequency 3) Daily Tool Life Monitoring Sheet
4) Instrument Verification (SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection
1) Wrong Setting 1) Resetting /Prod./Rejection Report
2) Reset Offset & Inprocess
9 Counter Angle 0.75±0.10 X U/s,O/s 1) Fittment Problem
Reject On Customer End
2) 5 Mn 2) By Wrong offset
3) Insert Burnt
3 Inspection (SEI/QA/F-03) 4 60
45˚±2˚ 3) Set Tool Life Frequency
4) Instrument Error 3) Daily Tool Life Monitoring Sheet
4) Instrument Verification (SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
40 Counter
DOC.No:-SEI/PD/F-10
SEI POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS (PROCESS FMEA) Rev.No:-00
Eff.date:-01.10.2018
Vendor Name: M/s Sahyog Engineering Industries Process Responsibility: Mr. PARAMVIR SINGH FMEA NUMBER: SEI/P2/PFMEA-09
Part No: P801105010601000A Key Date: PREPARED BY:- Mr. Sumit kumar
Part Name: CORE MOVING Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Date (Orig.): 12.02.2021
Model: ………….. Date (Rev.):
Core Team: Process Engg,Q.A,Production/Manufacturing Page: 01 of 01 Rev.date:-00
Action Results
Potenial Cause(s)/ Current Process Controls
Part Process Function/ Bolloni
Specification/Potential Failure Mode Potential Effect(s) of Failure Sev. Class Mechanism(s) of Occ. Det. RPN Recomm. Responsibility &
process nu. Requirements ng Drg. Actions target Date Actions Sev. Occ. Det. RPN
Failure Taken
Prevention Detection
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Wrong Setting /Prod./Rejection Report
1) Fittment Problem 2) 2) By Wrong offset 2) Reset Offset & Inprocess (SEI/QA/F-03)
40 Counter Counter dia Ref. 4.80 U/s,O/s Reject On Customer End 5 Mn 3) Insert Burnt 3 Inspection 5 75
3) Set Tool Life Frequency
4) Instrument Error 4) Instrument Verification 3) Daily Tool Life Monitoring Sheet
(SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Wrong Setting /Prod./Rejection Report
1) Fittment Problem 2) 2) By Wrong offset 2) Reset Offset & Inprocess (SEI/QA/F-03)
11 Appreance Free from burrs. Reject On Customer End 2 Mn 3) Insert Burnt 4 Inspection 3 24
3) Set Tool Life Frequency
4) Instrument Error 4) Instrument Verification 3) Daily Tool Life Monitoring Sheet
(SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Setting Wrong 2) Wheel Dress & Inprocess /Prod./Rejection Report
1) Fittment Problem 2) 2) No dress Wheel (SEI/QA/F-03)
4 DIA 7.00/7.03 U/s,O/s Reject On Customer End 5 M timely 3 Inspection 5 75
3) Instrument Error 3) Set Tool Life Frequency 3) Daily Tool Life Monitoring Sheet
4) Instrument Verification (SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Setting Wrong 2) Wheel Dress & Inprocess /Prod./Rejection Report
1) Fittment Problem 2) 2) No dress Wheel (SEI/QA/F-03)
50 Dia Grinding 2 Roughness Ra 1.6 O/s Reject On Customer End 4 Mn timely 3 Inspection 5 60
3) Instrument Error 3) Set Tool Life Frequency 3) Daily Tool Life Monitoring Sheet
4) Instrument Verification
(SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
1) Setting Approval
(SEI/QA/F-06)
1) Resetting 2) Daily Inprocess Inspection
1) Setting Wrong 2) Wheel Dress & Inprocess /Prod./Rejection Report
1) Fittment Problem 2) 2) No dress Wheel (SEI/QA/F-03)
11 Appreance Free from burrs. Reject On Customer End
2 Mn
timely
3 Inspection 5 30
3) Instrument Error 3) Set Tool Life Frequency 3) Daily Tool Life Monitoring Sheet
4) Instrument Verification (SEI/PROD/F-07)
4) Daily Instrument Verification Sheet
(SEI/QA/F-30)
ZINC Plating & Trivalent Supllier Audit Incoming Inspection Report (Plating)
13 Plating 10 um MIN
1) Reject On Customer End 5 M Not proper Plating 3
(SEI/SUP/F-04) (SEI/SUP/F-03A)
5 75
60 Plating SST Life WR No White Corrosion allowed 1) Reject On Customer End 4 Mn Not proper Plating 3 Supllier Audit
(SEI/SUP/F-04)
Incoming Inspection Report (Plating)
(SEI/SUP/F-03A)
5 60
After 48 hrs salt Sppray Test
DOC.No:-SEI/PD/F-10
SEI POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS (PROCESS FMEA) Rev.No:-00
Eff.date:-01.10.2018
Vendor Name: M/s Sahyog Engineering Industries Process Responsibility: Mr. PARAMVIR SINGH FMEA NUMBER: SEI/P2/PFMEA-09
Part No: P801105010601000A Key Date: PREPARED BY:- Mr. Sumit kumar
Part Name: CORE MOVING Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Date (Orig.): 12.02.2021
Model: ………….. Date (Rev.):
Core Team: Process Engg,Q.A,Production/Manufacturing Page: 01 of 01 Rev.date:-00
Action Results
Potenial Cause(s)/ Current Process Controls
Part Process Function/ Bolloni
Specification/Potential Failure Mode Potential Effect(s) of Failure Sev. Class Mechanism(s) of Occ. Det. RPN Recomm. Responsibility &
60 nu.
process Plating
Requirements ng Drg. Actions target Date Actions
Failure Sev. Occ. Det. RPN
Prevention Detection Taken
SST Life RR No Red Corrosion allowed 1) Reject On Customer End 4 Mn Not proper Plating 3
Supllier Audit Incoming Inspection Report (Plating)
5 60
After 120 hrs salt Sppray Test (SEI/SUP/F-04) (SEI/SUP/F-03A)
Action Results
Potenial Cause(s)/ Current Process Controls
Part Process Function/ Bolloni
Specification/Potential Failure Mode Potential Effect(s) of Failure Sev. Class Mechanism(s) of Occ. Det. RPN Recomm. Responsibility &
process nu. Requirements ng Drg. Actions target Date Actions Sev. Occ. Det. RPN
Failure Taken
Prevention Detection
ZINC Plating 1) Worng Instrument 1)Final Inspection Standard Final Inspection Standard
Surface & Trivalent Chrome Passivation as per Use SEI/QA/F-48 (SEI/QA/F-48)
12 Treatment ASTM B117 1) Reject On Customer End 5 M 2) Unskilled Person 2 2) As per Material handling Work Final Inspection Report 5 50
Colour :-ISIDESCENT BLUE Instrction (SEI/QA/WI-09) (SEI/QA/F-72)
90 Dispatch
As per VEHICLE TEST W.I 1) Reject on Customer End 4 Mn 1) Box Damage 2 Dock Audit OK BY AUTHORISED PERSON 4 32
(SEI/PROD/WI-11) (SEI/QA/F-64)
22.03.2021 01 Mr.Sumit inspection frequency ,inspection ,setting approval sample size recording updated in CP
DVC - DIGITAL VERNIER CALLIPER PP - PROFILE PROJECTOR TPG - THREAD PLUG GAUGE DMM - DIGITAL MICROMETER Mn - MINOR DMM - DIGITAL MICROMETER
MM - MICROMETER DI - DIAL INDICATOR TRG - THREAD RING GAUGE C - CRITICAL PPG- Plain Plug Gauge
REV. DATE
Product Parameter
ALL DIMENSION ARE IN mm. Evaluation
Dimension & Measurement
Sample
Control
Sr. No. Chracterstics Class Tol Resp. Method Record
Technique Size Freq.
2
4
2
1
4 5
0.2±0.10X45°
5
Ra 1.6
7. 7
0
7 0/ 1
7.
0 8
3
Ø2.95/3.05
3 2
6
2
0.75±0.10 X 45˚±2
Process Parameter
1 TOOL CONTROL WHEEL GRINDING WHEEL
2 RPM 40 1200/1400
3 FEED
Remark ;-
NAME SIGN. DATE I - Inspector O - Operator C - Critical M - Major Mn - Minnor
REV. DATE
Product Parameter
ALL DIMENSION ARE IN mm. Evaluation
Dimension & Measurement
Sample
Control
Sr. No. Chracterstics Class Tol Resp. Method Record
Technique Size Freq.
1
4
0.2±0.10X45°
5
7
Ø2.95/3.05
3 2
6
2
0.75±0.10 X 45˚±2
Process Parameter
1 TOOL DRILL 8 MM
2 RPM 1500
3 FEED 0.06
Remark ;-
NAME SIGN. DATE I - Inspector O - Operator C - Critical M - Major Mn - Minnor
REV. DATE
Product Parameter
ALL DIMENSION ARE IN mm. Evaluation
Dimension & Measurement
Sample
Control
Sr. No. Chracterstics Class Tol Resp. Method Record
Technique Size Freq.
3
7
2
7. 7
Both Face
Mn Ra 3.2 RT 5 Pcs 2 Setup QA Ins. Setting Approval Yes
Ø2.0±0.10
Process Parameter
1 TOOL TNMG 0.4 MM DRILL 8MM DRILL 3MM PARTING 2 MM
Remark ;-
NAME SIGN. DATE I - Inspector O - Operator C - Critical M - Major Mn - Minnor
Control Plan Number : SEI/P2/CP-09 Key Contact / Phone : Mr. Paramvir singh Date (Org) Issue no Date Rev No. Customer / Model
12.02.2021 01 22.03.2021 01 PRICOL LTD
PartNumber / Latest Change Level
Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Customer Engineering Approval / Date (If Req'd)
P801105010601000A
Part Name
Supplier / Plant Approval / Date M/s Sahyog Engineering Industries Customer Quality Approval / Date (If Req'd)
CORE MOVING
Methods
Part / Process Name / Machine / Characteristics Customer
Device,Jig, Bollon drg. Sample
Process Operations Tools for No. S.No Class specification Evaluation / Reaction Plan Corrective action
Number Description requirement * Product / Process Measurement Error Control Method Resp
Manufacturing Specification proofing
Product Process Technique Size Freq. Recording
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Reject lot Suspected Area and 100% shorting
1 1 Length M 6.92/6.98 MM 2) 2 pcs 2) 2 hrs 2) 2 pcs QA Insp. / Opr. (SEI/QA/F-27) & Material & Rasied QPCR as per NC
3) W.I. (SEI/PROD/WI-06) inform to QA HOD material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Reject lot Suspected Area and 100% shorting
4 2 Dia M 7.10/7.15 MM 2) 2 pcs 2) 2 hrs 2) 2 pcs QA Insp. / Opr. (SEI/QA/F-27) & Material & Rasied QPCR as per NC
3) W.I. (SEI/PROD/WI-06) inform to QA HOD material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
DOC.No:-SEI/PD/F-09
Control Plan Number : SEI/P2/CP-09 Key Contact / Phone : Mr. Paramvir singh Date (Org) Issue no Date Rev No. Customer / Model
12.02.2021 01 22.03.2021 01 PRICOL LTD
PartNumber / Latest Change Level
Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Customer Engineering Approval / Date (If Req'd)
P801105010601000A
Part Name
Supplier / Plant Approval / Date M/s Sahyog Engineering Industries Customer Quality Approval / Date (If Req'd)
CORE MOVING
Methods
Part / Process Name / Machine / Characteristics Customer
Device,Jig, Bollon drg. Sample
Process Operations Tools for No. S.No Class specification Evaluation / Reaction Plan Corrective action
Number Description requirement * Product / Process Measurement Error Control Method Resp
Manufacturing Specification proofing
Product Process Technique Size Freq. Recording
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Reject lot Suspected Area and 100% shorting
5 3 Counter dia Mn Ref. 4.80 PP QA Insp. / Opr. (SEI/QA/F-27) & Material & Rasied QPCR as per NC
2) 1 pcs 2) 4 hrs 2) 1 pcs 3) W.I. (SEI/PROD/WI-06) inform to QA HOD material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-28A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Reject lot Suspected Area and 100% shorting
6 4 I.D M 2.95/3.05 PPG QA Insp. / Opr. (SEI/QA/F-27) & Material & Rasied QPCR as per NC
2) 2 pcs 2) 2 hrs 2) 2 pcs 3) W.I. (SEI/PROD/WI-06) inform to QA HOD material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Reject lot Suspected Area and 100% shorting
CNC 7 5 Both Chamfer Angle Mn 0.25± 0.15 x45°±2˚ PP
2) 1 pcs 2) 4 hrs 2) 1 pcs
QA Insp. / Opr. (SEI/QA/F-27) & Material & Rasied QPCR as per NC
3) W.I. (SEI/PROD/WI-06) inform to QA HOD material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Reject lot Suspected Area and 100% shorting
8 6 ID Roughness Mn Ra 6.3 RT QA Insp. / Opr. (SEI/QA/F-27) & Material & Rasied QPCR as per NC
2) 1 pcs 2) 4 hrs 2) 1 pcs 3) W.I. (SEI/PROD/WI-06) inform to QA HOD material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
DOC.No:-SEI/PD/F-09
Control Plan Number : SEI/P2/CP-09 Key Contact / Phone : Mr. Paramvir singh Date (Org) Issue no Date Rev No. Customer / Model
12.02.2021 01 22.03.2021 01 PRICOL LTD
PartNumber / Latest Change Level
Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Customer Engineering Approval / Date (If Req'd)
P801105010601000A
Part Name
Supplier / Plant Approval / Date M/s Sahyog Engineering Industries Customer Quality Approval / Date (If Req'd)
CORE MOVING
Methods
Part / Process Name / Machine / Characteristics Customer
Device,Jig, Bollon drg. Sample
Process Operations Tools for No. S.No Class specification Evaluation / Reaction Plan Corrective action
Number Description requirement * Product / Process Measurement Error Control Method Resp
Manufacturing Specification proofing
Product Process Technique Size Freq. Recording
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
Both Face 1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Reject lot Suspected Area and 100% shorting
3 7 Mn Ra 3.2 RT QA Insp. / Opr. (SEI/QA/F-27) & Material & Rasied QPCR as per NC
Roughness 2) 1 pcs 2) 4 hrs 2) 1 pcs 3) W.I. (SEI/PROD/WI-06) inform to QA HOD material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-28A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Reject lot Suspected Area and 100% shorting
9 8 Counter Angle Mn 0.75x45° PP QA Insp. / Opr. (SEI/QA/F-27) & Material & Rasied QPCR as per NC
2) 1 pcs 2) 4 hrs 2) 1 pcs 3) W.I. (SEI/PROD/WI-06) inform to QA HOD material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
Turning
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Reject lot Suspected Area and 100% shorting
11 9 Appreance Mn Free from burrs. Visual QA Insp. / Opr. (SEI/QA/F-27) & Material & Rasied QPCR as per NC
2) 2 pcs 2) 2 hrs 2) 2 pcs 3) W.I. (SEI/PROD/WI-06) inform to QA HOD material handling procedure and
30 4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection
/Prod./Rejection Report Inform to CNC Stop Machine & Reset
1.1 RPM 3200 M/C Display Setup time/ shift start time (SEI/QA/F-03) M/c Setter /Opr.
Progg. Process Parameter
3) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection
TNMG (0.4 MM) /Prod./Rejection Report Inform to CNC Stop Machine & Reset
1.2 FEED 0.1 M/C Display Setup time/ shift start time (SEI/QA/F-03) M/c Setter /Opr.
Progg. Process Parameter
3) PROCESS DRAWING SHEET
(SEI/PD/F-17)
Turning
DOC.No:-SEI/PD/F-09
Control Plan Number : SEI/P2/CP-09 Key Contact / Phone : Mr. Paramvir singh Date (Org) Issue no Date Rev No. Customer / Model
12.02.2021 01 22.03.2021 01 PRICOL LTD
PartNumber / Latest Change Level
Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Customer Engineering Approval / Date (If Req'd)
P801105010601000A
Part Name
Supplier / Plant Approval / Date M/s Sahyog Engineering Industries Customer Quality Approval / Date (If Req'd)
CORE MOVING
Methods
Machine / TNMGCharacteristics
(0.4 MM)
Part / Process Name / Device,Jig, Bollon drg. Customer
Process Operations S.No Class specification Evaluation / Sample Reaction Plan Corrective action
Number Description Tools for No. requirement * Product / Process Error
Manufacturing Specification Measurement proofing Control Method Resp
Product Process Technique Size Freq. Recording
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection
2.1 RPM 3000 M/C Display Setup time/ shift start time /Prod./Rejection Report
M/c Setter /Opr.
Inform to CNC Stop Machine & Reset
(SEI/QA/F-03) Progg. Process Parameter
3) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
DRILL (8 MM) 2) Daily Inprocess Inspection
/Prod./Rejection Report Inform to CNC Stop Machine & Reset
2.2 FEED 0.06 M/C Display Setup time/ shift start time (SEI/QA/F-03) M/c Setter /Opr.
Progg. Process Parameter
3) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
DRILL (3 MM) 2) Daily Inprocess Inspection
3.2 FEED 0.04 M/C Display Setup time/ shift start time /Prod./Rejection Report
M/c Setter /Opr.
Inform to CNC Stop Machine & Reset
(SEI/QA/F-03) Progg. Process Parameter
3) PROCESS DRAWING SHEET
(SEI/PD/F-17)
SEI MACHINE
PARAMETER
SAHYOG ENGINEERING INDUSTRIES, ROHTAK Rev No:-00
Eff.date:-01.10.2018
Control Plan Number : SEI/P2/CP-09 Key Contact / Phone : Mr. Paramvir singh Date (Org) Issue no Date Rev No. Customer / Model
12.02.2021 01 22.03.2021 01 PRICOL LTD
PartNumber / Latest Change Level
Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Customer Engineering Approval / Date (If Req'd)
P801105010601000A
Part Name
Supplier / Plant Approval / Date M/s Sahyog Engineering Industries Customer Quality Approval / Date (If Req'd)
CORE MOVING
Methods
Part / Process Name / Machine / Characteristics Customer
Device,Jig, Bollon drg. Sample
Process Operations Tools for No. S.No Class specification Evaluation / Reaction Plan Corrective action
Number Description requirement * Product / Process Measurement Error Control Method Resp
Manufacturing Specification proofing
Product Process Technique Size Freq. Recording
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection
4.1 RPM 1800 M/C Display Setup time/ shift start time /Prod./Rejection Report
M/c Setter /Opr.
Inform to CNC Stop Machine & Reset
(SEI/QA/F-03) Progg. Process Parameter
3) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
PARTING (2 MM) 2) Daily Inprocess Inspection
/Prod./Rejection Report Inform to CNC Stop Machine & Reset
4.2 FEED 0.06 M/C Display Setup time/ shift start time (SEI/QA/F-03) M/c Setter /Opr.
Progg. Process Parameter
3) PROCESS DRAWING SHEET
(SEI/PD/F-17)
Collet
life 1) Tool Life Monitoring Sheet Inform to CNC
5 Collet 7.40 mm (7.40m
15000 pcs Setup time/ shift start time (SEI/PROD/F-07) M/c Setter /Opr. Progg. Collet Change
m)
Collet
life 1) Setting Approval
Collet 6 Chuck Pressure 15000 pcs Setup time/ shift start time (SEI/QA/F-06) M/c Setter /Opr. Inform
Progg.
to CNC
Collet Change
(7.40m
m)
Collet
Coolant life 1) Tool Life Monitoring Sheet Inform to CNC
7
Consteration (7.40m
15000 pcs Setup time/ shift start time (SEI/PROD/F-07) M/c Setter /Opr. Progg. Collet Change
m)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Inform to CNC Suspected Area and 100% shorting
9 1 Counter Angle Mn 0.75±0.10 X 45˚±2˚ PP 2) 1 pcs 2) 4 hrs 2) 1 pcs QA Insp. / Opr. Progg. Material & Rasied QPCR as per NC
3) W.I. (SEI/PROD/WI-06) material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
CNC
DOC.No:-SEI/PD/F-09
Control Plan Number : SEI/P2/CP-09 Key Contact / Phone : Mr. Paramvir singh Date (Org) Issue no Date Rev No. Customer / Model
12.02.2021 01 22.03.2021 01 PRICOL LTD
PartNumber / Latest Change Level
Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Customer Engineering Approval / Date (If Req'd)
P801105010601000A
Part Name
Supplier / Plant Approval / Date M/s Sahyog Engineering Industries Customer Quality Approval / Date (If Req'd)
CORE MOVING
Methods
Part / Process Name / Machine / Characteristics Customer
Device,Jig, Bollon drg. Sample
Process Operations Tools for No. S.No Class specification Evaluation / Reaction Plan Corrective action
Number Description requirement * Product / Process Measurement Error Control Method Resp
Manufacturing Specification proofing
Product Process Technique Size Freq. Recording
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Suspected Area and 100% shorting
CNC 5 2 Counter dia Mn Ref. 4.80 PP QA Insp. / Opr. Inform to CNC Material & Rasied QPCR as per NC
2) 1 pcs 2) 4 hrs 2) 1 pcs 3) W.I. (SEI/PROD/WI-06) Progg. material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
40 Counter 1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Suspected Area and 100% shorting
11 3 Appreance Mn Free from burrs. Visual QA Insp. / Opr. Inform to CNC Material & Rasied QPCR as per NC
2) 2 pcs 2) 2 hrs 2) 2 pcs 3) W.I. (SEI/PROD/WI-06) Progg. material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection
/Prod./Rejection Report Inform to CNC Stop Machine & Reset
1.1 RPM 1500 M/C Display Setup time/ shift start time (SEI/QA/F-03) M/c Setter /Opr.
Progg. Process Parameter
3) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
Machine 2) Daily Inprocess Inspection
Parameter DRILL (8 MM)
/Prod./Rejection Report Inform to CNC Stop Machine & Reset
1.2 FEED 0.06 M/C Display Setup time/ shift start time M/c Setter /Opr.
(SEI/QA/F-03) Progg. Process Parameter
3) PROCESS DRAWING SHEET
(SEI/PD/F-17)
Control Plan Number : SEI/P2/CP-09 Key Contact / Phone : Mr. Paramvir singh Date (Org) Issue no Date Rev No. Customer / Model
12.02.2021 01 22.03.2021 01 PRICOL LTD
PartNumber / Latest Change Level
Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Customer Engineering Approval / Date (If Req'd)
P801105010601000A
Part Name
Supplier / Plant Approval / Date M/s Sahyog Engineering Industries Customer Quality Approval / Date (If Req'd)
CORE MOVING
Methods
Part / Process Name / Machine / Characteristics Customer
Device,Jig, Bollon drg. Sample
Process Operations Tools for No. S.No Class specification Evaluation / Reaction Plan Corrective action
Number Description requirement * Product / Process Measurement Error Control Method Resp
Manufacturing Specification proofing
Product Process Technique Size Freq. Recording
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Suspected Area and 100% shorting
4 1 DIA M 7.00/7.03 DMM QA Insp. / Opr. Inform to CNC Material & Rasied QPCR as per NC
2) 2 pcs 2) 2 hrs 2) 2 pcs 3) W.I. (SEI/PROD/WI-06) Progg. material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Suspected Area and 100% shorting
CLG 2 2 Roughness Mn Ra 1.6 RT QA Insp. / Opr. Inform to CNC Material & Rasied QPCR as per NC
2) 1 pcs 2) 4 hrs 2) 1 pcs 3) W.I. (SEI/PROD/WI-06) Progg. material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-28A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection Hold material , reset process
/Prod./Rejection Report parameter,Material Forward to
1) 5 pcs 1) Start up 1) 5 pcs (SEI/QA/F-03) Suspected Area and 100% shorting
11 3 Appreance Mn Free from burrs. Visual QA Insp. / Opr. Inform to CNC Material & Rasied QPCR as per NC
2) 2 pcs 2) 2 hrs 2) 2 pcs 3) W.I. (SEI/PROD/WI-06) Progg. material handling procedure and
4) Daily Instrument Verification Check Effectiveness Three Lot/Three
Months(SEI/QA/F-27A)
Sheet (SEI/QA/F-30)
5) PROCESS DRAWING SHEET
(SEI/PD/F-17)
1) Setting Approval
(SEI/QA/F-06)
2) Daily Inprocess Inspection
50 Dia Grinding 1.1 RPM 1200/1400 Techometer Setup time/ shift start time /Prod./Rejection Report M/c Setter /Opr. Inform to CLG Stop Machine & Reset Process
(SEI/QA/F-03) Forman Parameter
Grinding Wheel
DOC.No:-SEI/PD/F-09
Control Plan Number : SEI/P2/CP-09 Key Contact / Phone : Mr. Paramvir singh Date (Org) Issue no Date Rev No. Customer / Model
12.02.2021 01 22.03.2021 01 PRICOL LTD
PartNumber / Latest Change Level
Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Customer Engineering Approval / Date (If Req'd)
P801105010601000A
Part Name
Supplier / Plant Approval / Date M/s Sahyog Engineering Industries Customer Quality Approval / Date (If Req'd)
CORE MOVING
Methods
50 Dia Grinding
Part / Process Name / Machine / Characteristics Customer
Device,Jig, Bollon drg. Sample
Process Operations Tools for No. S.No Class specification Evaluation / Reaction Plan Corrective action
Number Description requirement * Product / Process Measurement Error Control Method Resp
Manufacturing Specification proofing
Product Process Technique Size Freq. Recording
1) Setting Approval
Grinding Wheel (SEI/QA/F-06)
2) Daily Inprocess Inspection
1.2 FEED MANUAL CONTROL Setup time/ shift start time /Prod./Rejection Report M/c Setter /Opr. Inform to CLG Stop Machine & Reset Process
(SEI/QA/F-03) Forman Parameter
1) Setting Approval
(SEI/QA/F-06)
CONTROL WHEEL 2) Daily Inprocess Inspection
2.2 FEED MANUAL CONTROL Setup time/ shift start time /Prod./Rejection Report M/c Setter /Opr. Inform to CLG Stop Machine and Change Die &
(SEI/QA/F-03) Forman Reset Process Parameter
WHEEL DRESSING LIFE 1) wheel dressing Monitoring Sheet Inform to CLG Stop Machine and Change Die &
2.3 TOOL LIFE Setup time/ shift start time (SEI/MNT/F-14) M/c Setter /Opr. Reset Process Parameter
3000 Pcs Forman
13 1 Plating M ZINC Plating & Trivalent Thickness 5 pcs Every lot 5 pcs Incoming inspectionReport IMI Incharge Inform to QA HOD
10 um MIN tester (Plating) (SEI/SUP/F-03A)
12 2 Passivation Mn Inridescent Blue Colour Visual 5 pcs Every lot 5 pcs Incoming inspectionReport IMI Incharge Inform to QA HOD
(Plating) (SEI/SUP/F-03A)
Control Plan Number : SEI/P2/CP-09 Key Contact / Phone : Mr. Paramvir singh Date (Org) Issue no Date Rev No. Customer / Model
12.02.2021 01 22.03.2021 01 PRICOL LTD
PartNumber / Latest Change Level
Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Customer Engineering Approval / Date (If Req'd)
P801105010601000A
Part Name
Supplier / Plant Approval / Date M/s Sahyog Engineering Industries Customer Quality Approval / Date (If Req'd)
CORE MOVING
Methods
Part / Process Name / Machine / Characteristics Customer
Reject the Material/Ask Vendor
Device,Jig, Bollon drg. for Corrective
Process
60 Operations
Plating Tools for No. S.No Class specification Evaluation / Sample Reaction Plan Corrective&action
Preventive
Number Description requirement * Product / Process Measurement Error Control Method Resp Action (SEI/QA/F-29) & Rasied
Manufacturing Specification proofing QPCR
Product Process Technique Size Freq. Recording
Incoming inspectionReport
11 5 Appreance Mn Free from burrs. Visual 5 pcs Every lot 5 pcs IMI Incharge Inform to QA HOD
(Plating) (SEI/SUP/F-03A)
Control Plan Number : SEI/P2/CP-09 Key Contact / Phone : Mr. Paramvir singh Date (Org) Issue no Date Rev No. Customer / Model
12.02.2021 01 22.03.2021 01 PRICOL LTD
PartNumber / Latest Change Level
Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Customer Engineering Approval / Date (If Req'd)
P801105010601000A
Part Name
Supplier / Plant Approval / Date M/s Sahyog Engineering Industries Customer Quality Approval / Date (If Req'd)
CORE MOVING
Methods
Part / Process Name / Machine / Characteristics Customer
Device,Jig, Bollon drg. Sample
Process Operations Tools for No. S.No Class specification Evaluation / Reaction Plan Corrective action
Number Description requirement * Product / Process Measurement Error Control Method Resp
Manufacturing Specification proofing
Product Process Technique Size Freq. Recording
Control Plan Number : SEI/P2/CP-09 Key Contact / Phone : Mr. Paramvir singh Date (Org) Issue no Date Rev No. Customer / Model
12.02.2021 01 22.03.2021 01 PRICOL LTD
PartNumber / Latest Change Level
Core Team Mr. Mahavir , Mr. Paramvir, Mr. Sumit, Mr. Vinay, Mr.Banwari Customer Engineering Approval / Date (If Req'd)
P801105010601000A
Part Name
Supplier / Plant Approval / Date M/s Sahyog Engineering Industries Customer Quality Approval / Date (If Req'd)
CORE MOVING
Methods
Part / Process Name / Machine / Characteristics Customer
Device,Jig, Bollon drg. Sample
Process Operations Tools for No. S.No Class specification Evaluation / Reaction Plan Corrective action
Number Description requirement * Product / Process Measurement Error Control Method Resp
Manufacturing Specification proofing
Product Process Technique Size Freq. Recording
80 Packing As packing _ 1 Packing Mn Polythene bag / packing Packing std. 100% Packing Standard Final Inspection Fill the short Recalibration of weighting scale
std, slip as per packing std. (SEI/PD/F-29) Incharge quantity
22.03.2021 01 Mr.Sumit inspection frequency ,inspection ,setting approval sample size recording updated in CP
DVC - DIGITAL VERNIER CALLIPER PP - PROFILE PROJECTOR TPG - THREAD PLUG GAUGE M - MAJOR Mn - MINOR DMM - DIGITAL MICROMETER
MM - MICROMETER DI - DIAL INDICATOR TRG - THREAD RING GAUGE C - CRITICAL PPG- Plain Plug Gauge
Tick ( √ )appropiate Option Setting Approval with ref. to 4M Change Setting Approval with ref. to routine Set up
DIMENSIONAL REPORT
Observed Dimensions
S. NO. Charecteristics Drg. Dimensions Checking Method Status
1 2 3 4 5
2 Roughness Ra 1.6 RT
Status (OK/NG)
Process Parameter
Machine Parameter
RPM FEED
S. NO. Operation Name Tool Name
STD ACTUAL STD ACTUAL Parameter STD ACTUAL
3 HYDRAULIC PRESSURE :-
Tick ( √ )appropiate Option Setting Approval with ref. to 4M Change Setting Approval with ref. to routine Set up
DIMENSIONAL REPORT
Observed Dimensions
S. NO. Charecteristics Drg. Dimensions Checking Method Status
1 2 3 4 5
1 Length 6.92/6.98 MM
2 Dia 7.10/7.15 MM
6 ID Roughness Ra 6.3 RT
Status (OK/NG)
Process Parameter
Machine Parameter
RPM FEED
S. NO. Operation Name Tool Name
STD ACTUAL STD ACTUAL Parameter STD ACTUAL
Tick ( √ )appropiate Option Setting Approval with ref. to 4M Change Setting Approval with ref. to routine Set up
DIMENSIONAL REPORT
Observed Dimensions
S. NO. Charecteristics Drg. Dimensions Checking Method Status
1 2 3 4 5
Status (OK/NG)
Process Parameter
Machine Parameter
RPM FEED
S. NO. Operation Name Tool Name
STD ACTUAL STD ACTUAL Parameter STD ACTUAL
2 CHUCK PRESSURE :-
3 HYDRAULIC PRESSURE :-
Shift M/C No. Date IN OUT Operator name Operator code Part name Part Number Operation Name Next operation Customer
Time:-
INSPECTION STANDARD First five pcs.reading Rejection / Rework Details
Status
(OK/NG)
Sample Inspection
DIM. NO. Parameters Specfication Insp.method
Size Feq.
Recording 1 2 3 4 5 Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. U/S O/S
MACHINE
PRODUCTION CHART M/C SETTING DATA RPM FEED BREAK DOWN
INTERNAL QPCR DETAILS
Lot No/ Heat NO Machine Efficiency (100%) TNMG 0.4 3200 0.1
Action Taken:-
Per Hrs. Prod. (90%) P/cut DRILL 3 MM 500 0.04
Q.A HOD
Sign.
Target (90%) M/c sett. Time PARTING 2 MM 1800 0.06
Note: Rasied QPCR If Any defects :- (A) IF PART REJECTED ≥10% OF PROD./2 HOURS. , (B) IF PART REJECTED ≥5% NOS 101~1000 NOS./SHIFT PROD.. , (C) IF PART REJECTED ≥2% MORE THAN 1000 NOS./SHIFT PROD.(D) ABNORMAL SETTING REJECTION ≥ 15 PCS
REMARKS:-
Note: All Dimmensions are in mm Legends DVC -Digital veriner, MM-Micrometer, PP -Profile Projector, RHT-Rockwell Hardness Tester, DMM -Digital Micrometer, RT-Roughness Tester
DOC.No:-SEI/QA/F-03
Shift M/C No. Date IN OUT Operator name Operator code Part name Part Number Operation Name Next operation Customer
Time:-
INSPECTION STANDARD First five pcs.reading Rejection / Rework Details
Status
(OK/NG)
Sample Inspection
DIM. NO. Parameters Specfication Insp.method
Size Feq.
Recording 1 2 3 4 5 Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. U/S O/S
MACHINE
PRODUCTION CHART M/C SETTING DATA RPM FEED BREAK DOWN INTERNAL QPCR DETAILS
Time Total
Reason :-
Description Tooling STD ACTUAL STD ACTUAL Start End Time
Reason
Action Taken:-
Per Hrs. Prod. (90%) P/cut
Q.A HOD
Sign.
Target (90%) M/c sett. Time
Note: Rasied QPCR If Any defects :- (A) IF PART REJECTED ≥10% OF PROD./2 HOURS. , (B) IF PART REJECTED ≥5% NOS 101~1000 NOS./SHIFT PROD.. , (C) IF PART REJECTED ≥2% MORE THAN 1000 NOS./SHIFT PROD.(D) ABNORMAL SETTING REJECTION ≥ 15 PCS
REMARKS:-
Note: All Dimmensions are in mm Legends DVC -Digital veriner, MM-Micrometer, PP -Profile Projector, RHT-Rockwell Hardness Tester, DMM -Digital Micrometer, RT-Roughness Tester
DOC.No:-SEI/QA/F-03
Shift M/C No. Date IN OUT Operator name Operator code Part name Part Number Operation Name Next operation Customer
Time:-
INSPECTION STANDARD First five pcs.reading Rejection / Rework Details
Status
(OK/NG)
Sample Inspection
DIM. NO. Parameters Specfication Insp.method
Size Feq.
Recording 1 2 3 4 5 Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. U/S O/S
MACHINE
PRODUCTION CHART M/C SETTING DATA RPM FEED BREAK DOWN
INTERNAL QPCR DETAILS
Time Total
Reason :-
Description Tooling STD ACTUAL STD ACTUAL Start End Time Reason
Action Taken:-
Per Hrs. Prod. (90%) P/cut
Q.A HOD
Sign.
Target (90%) M/c sett. Time
Note: Rasied QPCR If Any defects :- (A) IF PART REJECTED ≥10% OF PROD./2 HOURS. , (B) IF PART REJECTED ≥5% NOS 101~1000 NOS./SHIFT PROD.. , (C) IF PART REJECTED ≥2% MORE THAN 1000 NOS./SHIFT PROD.(D) ABNORMAL SETTING REJECTION ≥ 15 PCS
REMARKS:-
Note: All Dimmensions are in mm Legends DVC -Digital veriner, MM-Micrometer, PP -Profile Projector, RHT-Rockwell Hardness Tester, DMM -Digital Micrometer, RT-Roughness Tester
DOC.No:-SEI/PD/F-21
Eff.date:-01.10.2018
Customer Name : PRICOL LTD Supplier Name : M/s Sahyog Engineering Industries
Dimension in mm
Process. No. Measuring Instrument ID Least Count Range Calibration Date Calibration Due Location
Instrument No. Date
Operation Parameter Tolrance
10 Raw material Raw material 7.30/7.40 MM SEI-MM-01 0.01 mm 0-25 mm 03/09/2020 04/09/2021 IMI
X Axis=150mm, Y
Counter dia Ref. 4.80 PP SEI-PP-01 0.005 mm Axis=100 mm , 03/09/2020 03/12/2020 Standard Room
0-360°
X Axis=150mm, Y
30 Turning Both Chamfer Angle 0.25± 0.15 x45°±2˚ PP SEI-PP-01 0.005 mm Axis=100 mm , 03/09/2020 04/09/2021 Standard Room
0-360°
X Axis=150mm, Y
Counter Angle 0.75x45° PP SEI-PP-01 0.005 mm Axis=100 mm , 03/09/2020 04/09/2021 Standard Room
0-360°
Appreance Free from burrs. Visual …………………… …………………… …………………… …………………… …………………… ……………………
X Axis=150mm, Y
Counter Angle 0.75±0.10 X 45˚±2˚ PP SEI-PP-01 0.005 mm Axis=100 mm , 03/09/2020 04/09/2021 Standard Room
0-360°
X Axis=150mm, Y
40 Counter Counter dia Ref. 4.80 PP SEI-PP-01 0.005 mm Axis=100 mm , 03/09/2020 04/09/2021 Standard Room
0-360°
DOC.No:-SEI/PD/F-21
Eff.date:-01.10.2018
Customer Name : PRICOL LTD Supplier Name : M/s Sahyog Engineering Industries
Dimension in mm
Process. Measuring Instrument ID Calibration Date Calibration Due
40 No. Counter Instrument No.
Least Count Range
Date
Location
Operation Parameter Tolrance
Appreance Free from burrs. Visual …………………… …………………… …………………… …………………… …………………… ……………………
DIA 7.00/7.03 DMM SEI-DMM-02 0.01 mm 0-25 mm 03/09/2020 04/09/2021 Standard Room
Appreance Free from burrs. Visual …………………… …………………… …………………… …………………… …………………… ……………………
60 Plating Passivation Inridescent Blue Colour Visual …………………… …………………… …………………… …………………… …………………… ……………………
Appreance Free from burrs. Visual …………………… …………………… …………………… …………………… …………………… ……………………
Dia 7.00/7.05 DMM SEI-DMM-02 0.01 mm 0-25 mm 03/09/2020 04/09/2021 Shop Floor
X Axis=150mm, Y
Counter dia 4.80 PP SEI-PP-01 0.005 mm Axis=100 mm , 03/09/2020 04/09/2021 Standard Room
0-360°
Eff.date:-01.10.2018
Customer Name : PRICOL LTD Supplier Name : M/s Sahyog Engineering Industries
Dimension in mm
Process. No. Measuring Instrument ID Least Count Range Calibration Date Calibration Due Location
Instrument No. Date
Operation Parameter Tolrance
X Axis=150mm, Y
Chamfer Angle 2 x 0.25±0.15 x45° PP SEI-PP-01 0.005 mm Axis=100 mm , 03/09/2020 04/09/2021 Standard Room
0-360°
X Axis=150mm, Y
Counter Angle 2 x 0.75x45° PP SEI-PP-01 0.005 mm Axis=100 mm , 03/09/2020 04/09/2021 Standard Room
0-360°
Apprearance Free From Burr ,Dents Visually …………………… …………………… …………………… …………………… …………………… ……………………
ZINC Plating
& Trivalent Chrome Passivation as
Surface Treatment per ASTM B117 Visually …………………… …………………… …………………… …………………… …………………… ……………………
Colour :-ISIDESCENT BLUE
10 Microns Min Thickness tester SEI-TT-01 0.001 mm 03/09/2020 04/09/2021 Standard Room
Prepared By Approved By
DOC.No:-SEI/PD/F-29
Eff.date:-01.10.2018
Address Plot No. 400/1 Sainik colony ,Hissar Road, Rohtak 124001
E-mail ID sahyog_industries@yahoo.co.in
Packing Details:
Primary Secondary
Appropriate Dimension
Quantity Packed
Gross Weight 0 kg 0 kg
Signature of Authorized
Representative
2.The responsibility for ensuring material safety and quality from Supplier site to the point of use remains with Supplier.
3.Packaging other than through agreed methodology will be considered as a Non-conformity and the material shall not be
received at pricol Stores.
Sheet 1 of 1
Prepared by / date
Doc No: SEI/PD/F-06
Eff.date:-01.10.2018
Packing Standard
80 Packing AS PER PACKING STANDARD (SEI/PD/F-29)
When something is done to or by the subject being followed at a given work area. Something is being changed added
Operation to or created.
When something is done to or by the subject being followed at a given work area. Something is being changed added
Operation Cum Inspection to or created and at the same time Inspection is also done along with the Process.
Transportation When something is moving or being moved from one workplace or location to another.
Inspection When something is checked or verified to quality or examined for information or the act of doing so.
22.03.2021 01 Mr.Sumit inspection frequency ,inspection ,setting approval sample size recording updated in CP
Prepared By :- Approved By :-