Typical Beam Elevation: Foundation Plan
Typical Beam Elevation: Foundation Plan
Typical Beam Elevation: Foundation Plan
SCHEDULE OF TRUSSES
FOOTING SCHEDULE C-1 MARK TOP CHORD BOT. CHORD VM AND DM KP
250 L L
FOOTING DIMENSIONS (mm) REINFORCEMENT
GROUND FLOOR
FOOTING 8-16mmØ N.G.L.
MARK REMARKS L/3 L/3 L/3 L/3 HPT-1 2LX65X65X6 2LX65X65X6 2LX65X65X6
250
LENGTH WIDTH DEPTH Thickness
LEVEL
(L) (W) (D) (t) BAR X BAR Y LAP SPLICES ARE ALLOWED LAP SPLICES ARE ALLOWED
ONLY IN THIS PORTION ONLY IN THIS PORTION
D
TIES : Ø10 mm
F-1 1500 1500 1500 300 10-20Ø 10-20Ø SQUARE FOOTING 1@50,2@75,4@100, 6@150
REST @ 200mm TO Y - BARS
CENTER
BEAM SCHEDULE
C-2
t
X - BARS
BEAM STEEL REINFORCEMENTS 200
GROUND FLOOR
L/5 L/5 L/5 L/5
STIRRUPS 8-16mmØ
200
LEVEL
SECTION
(mm Ø)
b h TOP BOTT. TOP BOTT. TOP BOTT. (UNLESS NOTED OTHERWISE) W
TIES : Ø10 mm
650
L
Y - BARS
X - BARS
.
M
D.
F.F.L.
PC
D.
F1C1 TO GUSSET PLATE
M
100 100
.
3MM THICK
BOT. CHORD
F1C1 F1C2 300
t/3
WF-1 2Ø16 00 BASEPLATE
t/3 t/3
WF-1
t
16mmTHK.X200X300
WF-1 BOT. CHORD BS
ANCHOR BOLTS
GUSSET PLATE
4 WALL FOOTING DETAIL 3mm THK.
DETAILS
S-1 DRAWN NOT TO SCALE DETAILS
F1C1 OF "A"
WF-1 WF-1 OF "D"
F1C1 F1C2
550
FOUNDATION PLAN S-1 NOT TO SCALE
550
1
S-1 SCALE 1 : 100 mm
550
550
D
LAP SPLICE LENGTH:
REINF.
JOINT
H
10d MIN
350mm MAX
H
COLUMN
TIES
AS
0.165L
D
0.22L
REINF.
JOINT
H
D
1
S-1
350mm MAX
SCALE 1 : 100 mm
H
PREPARED BY: DESIGNED BY: PROPOSED APPROVED BY: CONTENTS SHEET NO. :