Key Plan Showing Dado/ Cladding Tiles Location 1:50

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

600 600 3,200

790

790
1,200 1,200
1,200

2,200
750
SCREENSHOT OF PROPERTY MANAGER SHOWING FORMULA DERIVED FOR NUMBER OF TILES
750

OTHER FORMULAS USED FOR THE BELOW CALCULATIONS


ARE AS FOLLOWS :
1. WET VOLUME OF MORTOR = NET TILE AREA (SQ.M) *
1,430 0.012
2. DRY VOLUME = WET VOLUME * 0.4
900

3. TOTAL VOLUME OF MORTOR = WET VOLUME + DRY


VOLUME
4. NO. OF CEMENT BAGS = (TOTAL MORTOR VOL /4) / 0.035
5. RATE OF CEMENT BAGS = NOS OF BAGS * 280
KEY PLAN SHOWING DADO/ CLADDING TILES LOCATION 1:50 6. SAND IN CU.M = (TOTAL MORTOR VOL / 4) * 3
7. RATE OF SAND = SAND IN CU.M * 1060
8. COST OF TILE = (AREA OF WALL+ WASTAGE) *45 *10.764
9. WHITE CEMENT RATE = NET TILE AREA * 25
10. LABOUR RATE = NET TILE AREA * 20 *10.764

HERE, THE ASSUMED DIMENSTIONS OF TILE ARE :


LENGHT = 450 MM
HEIGHT = 300 MM

TYPE OF TILES USED FOR CLADDING WORK = CERAMIC TILES


KEY PLAN SHOWING ID'S FOR DADO TILE WALLS

DADO TILES
BATH BATH BATH BATH KITCHEN KITCHEN KITCHEN WB WB WC WC WC WC
ELEMENT ID
WALL 1 WALL 2 WALL 3 WALL 4 WALL 1 WALL 2 WALL 3 WALL 1 WALL 2 WALL 1 WALL 2 WALL 3 WALL 4
LENGTH OF THE
2,190 1,200 2,190 1,190 790 3,200 790 1,410 1,015 1,200 1,190 1,180 1,200
WALL
HEIGHT OF THE
2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100
WALL

NET TILE AREA 3.05 2.12 4.54 2.48 1.62 5.60 1.66 2.96 1.89 2.52 2.12 2.44 0.95

NO OF TILES 22.00 16.00 34.00 18.00 12.00 40.00 12.00 18.00 14.00 20.00 17.00 19.00 8.00 250.00

VOLUME OF WET
0.03 0.03 0.05 0.02 0.01 0.06 0.01 0.03 0.02 0.03 0.03 0.02 0.01
MORTOR

DRY MORTOR
0.00 0.01 0.02 0.01 0.01 0.02 0.01 0.10 9.00 0.01 0.01 0.02 0.00
VOLUME

TOTAL VOLUME OF
0.05 0.34 0.07 0.04 0.02 0.09 0.02 0.04 0.03 0.04 0.03 0.04 0.02 0.83 m³
MORTOR

NO OF CEMENT
0.36 0.25 0.54 0.29 0.19 0.67 0.19 0.35 0.22 0.30 0.25 0.29 0.11 4.01 m³
BAGS IN CU.M

RATE OF CEMENT
102.31 71.16 152.40 83.26 54.33 188.09 54.33 99.48 63.50 84.60 71.16 81.84 31.75 1,138.21 m³
BAGS

SAND IN CU.M 0.03 0.02 0.05 0.03 0.02 0.07 0.02 0.03 0.02 0.03 0.26 0.03 0.01 0.62 m³

AMOUNT OF
40.66 28.28 60.58 33.09 21.59 74.76 21.59 39.54 25.21 33.65 28.28 32.53 12.62 452.38 m³
SAND REQUIRED

COST OF TILES 1548.68 1077.21 2307.00 1260.30 822.40 2847.13 822.40 1505.96 961.25 1281.66 1077.21 1238.94 480.62 17230.76

WHITE CEMENT
76.13 52.95 113.40 61.95 40.43 139.95 41.48 74.03 47.25 63.00 52.95 60.90 23.63 848.05 m²
REQUIRED

LABOUR RATE PER


655.53 455.96 976.51 533.46 348.11 1,205.14 357.15 637.44 406.88 542.51 455.96 524.42 203.44 7,302.51 m²
SQ.MT

TITLE : NORTH
NAME : PRANITA ATUL ZAMBARE DATE SIGN
SUBJECT : BIM (ARCHICAD) SEM : 1
ESTIMATE FOR DADO TILES IN WC,BATH, WB & KITCHEN AREA M.ARCH (CONST.MGMT), ACOA,PUNE
GSEducationalVersion ROLL NO : 08