(WWW - Entrance-Exam - Net) - IsTQB Sample Paper 6
(WWW - Entrance-Exam - Net) - IsTQB Sample Paper 6
(WWW - Entrance-Exam - Net) - IsTQB Sample Paper 6
Q1. ___________ Testing will be performed by the people at client own locations
A. Alpha testing
B. Field testing
C. Performance testing
D. System testing
A. Performance testing
B. Unit testing
C. Regression testing
D. Sanity testing
Q4. Who is responsible for document all the issues, problems and open point that were
identified during the review meeting
A. Moderator
B. Scribe
C. Reviewers
D. Author
Q5. What is the main purpose of Informal review
B. Find defects
Q7. ___________ technique can be used to achieve input and output coverage
B. Equivalence partitioning
A. Performance testing
B. Unit testing
C. Business scenarios
D. Static testing
A. Unit testing
B. Regression testing
C. Alpha testing
D. Integration testing
A. Supplier issues
B. Organization factors
C. Technical issues
Q13. ________ and ________ are used within individual workbenches to produce the right
output products.
Q15. A _____ is the step-by-step method followed to ensure that standards are met
A. SDLC
B. Project Plan
C. Policy
D. Procedure
Q16. Which of the following is the standard for the Software product quality
A. ISO 1926
B. ISO 829
C. ISO 1012
D. ISO 1028
Q17. Which is not the testing objectives
A. Finding defects
C. Preventing defects.
D. Debugging defects
A. Reliability
B. Usability
C. Scalability
D. Maintainability
A. Early testing
B. Defect clustering
C. Pesticide paradox
D. Exhaustive testing
Q21. ‘X’ has given a data on a person age, which should be between 1 to 99. Using BVA which
is the appropriate one
A. 0,1,2,99
B. 1, 99, 100, 98
C. 0, 1, 99, 100
D. –1, 0, 1, 99
D. None
B. Acceptance testing
C. Integration testing
D. Smoke testing
A. Equivalence partition
B. Decision tables
C. Transaction diagrams
D. Decision testing
A. Branch testing
B. Agile testing
C. Beta testing
D. Ad-hoc testing
A. L-N +2P
B. N-L +2P
C. N-L +P
D. N-L +P
B. The code
C. Individual’s knowledge
D. User manual
Q34. Stochastic testing using statistical information or operational profiles uses the following
method
Q35. A project that is in the implementation phase is six weeks behind schedule. The delivery
date for the product is four months away. The project is not allowed to slip the delivery date or
compromise on the quality standards established for this product. Which of the following
actions would bring this project back on schedule?
A. Eliminate some of the requirements that have not yet been implemented.
C. Ask the current developers to work overtime until the lost work is recovered.
Q36. One person has been dominating the current software process improvement meeting.
Which of the following techniques should the facilitator use to bring other team members into
the discussion?
A. Confront the person and ask that other team members be allowed to express their opinions.
B. Wait for the person to pause, acknowledge the person’ s opinion, and ask for someone else’
s opinion.
C. Switch the topic to an issue about which the person does not have a strong opinion.
D. Express an opinion that differs from the person’ s opinion in order to encourage others to
express their ideas.
Q37. Maintenance releases and technical assistance centers are examples of which of the
following costs of quality?
A. External failure
B. Internal failure
C. Appraisal
D. Prevention