Safety Understand The Requirement Calibration Documentation Calibration Procedure For Various Instrument
Safety Understand The Requirement Calibration Documentation Calibration Procedure For Various Instrument
Safety Understand The Requirement Calibration Documentation Calibration Procedure For Various Instrument
Safety
Calibration Documentation
Before removing the instrument from field/ panel for calibration always ensure
1) Necessary work permit is obtained
2) System is stopped
3) Isolation valve are properly closed
4) Approach to the device is earlier
5) Use of safety glass, helmet & shoe
6) Isolate the power supply.
Calibration Documentation
1) Carefully close both positive and negative side isolation valves. Open equalization
valve in the three way manifold.
2) Remove positive and negative pressure connection of gauges and associated
protection cover, clamp etc and take out the level gauge.
3) Connect the gauge to testing instrument set up(Pressure generating pump and
master gauge ). Positive side to pressure port and left open the negative side to
atmosphere.
4) Ensure no leakage with soap solution as even small leak will cause error.
5) Note zero (May be with/ without error)
6) Apply pressure equivalent to 20%, 40%, 60%, 80% and 100% of full range and
note down the reading
7) In descending order again check the reading and note down.
8) Correct the errors in zero and span range (By opening the Bezel glass window, dial
and access to the adjustments).
9) Repeat the exercise 5& 6 until both zero and readings in all range are okay
10) Assemble the gauge.
11)Take final reading in both ascending and descending order and note down the
reading.
12) Install back in position and carefully open isolation valves of the system and leak
test with soap water .Now close the equalization valve after opening negative side
and positive side valves slowly and carefully and test for leakages and ensure no
leaks by tightening the connections
13)Document readings and issue of certificates.
Calibration of Temperature Gauges
1) Get ready the temperature source oil bath or dry block type
2) Keep the master temperature indicator ready.
3) In general industrial application temperature gauges are checked from ambient
range to high range in case of low temperature application. Chilled water / brine
solution are used along with standard master instrument.
4) Put the temperature gauge under test and master instrument is the respective
test setup (oil bath/ dry block or chilled water/ brine solution).
5) In case of all set up expect dry block. Stir the solution and note down master
instrument reading and test gauge reading.
6) Raise the temperature of both in steps of 20%, 40%, 60%, 80% & 100% range of
the test gauge and note down the reading of master gauges and test gauges.
7) Again check the readings at all range and repeat that until correct readings are
obtained through out the range.
8) Note down the reading (after calibration).
9) Prepare document with all relevant data (instrument make, tag No, range,
accuracy etc.)
The procedures are same as of pressure gauge but calibrated electronically, Digital
multifunction calibrator is used instead of master gauge and output is measured in term
of 4 to 20 MA corresponding to zero and span. Error corrected through zero and span
pots.