Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

1400-0100 en

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Jenbacher 1400-0100

Technical Instruction No.:


Documentation Engine running-in procedure for
GE Jenbacher modules

1. References: ________________________________________________________1
2. Procedure: _________________________________________________________2
3. Engine running-in programmes: _______________________________________2
3.1 Engine running-in programme for type 2, 3 and 4 gas engines: 2
3.2 Engine running-in programme for type 6 gas engines: 3

1. References:

This Technical Instruction describes the engine running-in procedure for gas engines of type 2, 3 and 4
engines with coupled generator (also applies to 60 Hz nominal frequency).
La mise en service du moteur doit se faire au régime moteur approprié.

The purpose of carrying out the running-in procedure according to the instructions is to:

• be able to observe the engine’s operating behaviour closely following repair or maintenance to ensure
that the work has been carried out correctly and to reduce the risk for later normal operation to an
absolute minimum;

• achieve the required running-in wear of new engine components (cylinder linings, pistons, piston rings,
sliding bearings etc.).

• All new modules leaving the Jenbacher works are subjected to a mandatory running-in procedure on
the factory test stand and a functional test.

• All repaired modules leaving the works are subjected to a mandatory running-in procedure on the
factory test stand and a functional test.

• New engines which are coupled to the module on site must be run in and tested on site.

• Modules which are repaired on-site must be run in and tested on site.

Issued: Doku./Bilek (ÜBAL07) Checked: TPAQ/Pauer TEM/Jandewerth Date: 2009-01


EN 1400-0100_EN.doc Index: g Page - No.: 1 / 3
Jenbacher 1400-0100
Technical Instruction No.:
Documentation Engine running-in procedure for
GE Jenbacher modules

2. Procedure:

Before carrying out the engine running-in programme, carry out Inspection work - Daily inspection.
Having finished the engine running-in programme according to procedure (according to section 3), carry
out Maintenance following initial commissioning.

3. Engine running-in programmes:

Make sure that, if required, engine operation can be stopped immediately by using the
EMERGENCY STOP button!
That is why the EMERGENCY STOP button must be freely accessible at all times!

During running-in pay attention to any strange sounds, vibrations and temperature occurrences.
Engine running-in should take place at the appropriate nominal speed according to the instructions
below.
The purpose of the running-in stages (5 minutes each) is to check the mixture setting using the exhaust-
gas emission measurement. The NOx emission must not exceed 1,000 mg NOx/m3N (or 5% O2 in the
exhaust gas).

3.1 Engine running-in programme for type 2, 3 and 4 gas engines:


Carry out the running-in stages subsequently. When reaching nominal load, this load setting should be
maintained for 30 minutes after which the running-in procedure can be ended. Over-load operation is not
allowed!

ELECTRICAL POWER
Phase J 216 / J 316 / J 320 /
J 208 J 212 J 420 J 424
running time J 312 J 412 J 416
Running-
in phase Min. kW kW kW kW kW kW kW
1 10 0 0 0 0 0 0 0
2 5 35 50 65 90 120 150 180
3 5 85 130 160 220 290 360 430
4 10 130 205 250 350 470 580 700
5 10 200 305 380 520 700 870 1050
6 10 265 410 510 700 930 1160 1400
Rated Rated Rated Rated Rated Rated Rated
7 30
power power power power power power power

Issued: Doku./Bilek (ÜBAL07) Checked: TPAQ/Pauer TEM/Jandewerth Date: 2009-01


EN 1400-0100_EN.doc Index: g Page - No.: 2 / 3
Jenbacher 1400-0100
Technical Instruction No.:
Documentation Engine running-in procedure for
GE Jenbacher modules

3.2 Engine running-in programme for type 6 gas engines:


Carry out the running-in stages subsequently. When reaching nominal load, this load setting should be
maintained for 30 minutes after which the running-in procedure can be ended. Over-load operation is not
allowed!

ELECTRICAL POWER
Phase
running time J 612 J 616 J 620 J 624
Running-
in phase Min. kW kW kW kW
1 10 0 0 0 0
2 5 200 240 300 400
3 10 500 600 760 1000
4 10 750 900 1140 1500
5 10 1000 1210 1520 2000
6 10 1250 1520 1900 2500
7 10 1650 2000 2500 3300
Rated Rated Rated Rated
8 30
power power power power

Issued: Doku./Bilek (ÜBAL07) Checked: TPAQ/Pauer TEM/Jandewerth Date: 2009-01