Saudi Aramco Typical Inspection Plan: Hydrostatic Testing of Pipelines SATIP-A-004-03 30-Oct-17 Mechanical
Saudi Aramco Typical Inspection Plan: Hydrostatic Testing of Pipelines SATIP-A-004-03 30-Oct-17 Mechanical
Saudi Aramco Typical Inspection Plan: Hydrostatic Testing of Pipelines SATIP-A-004-03 30-Oct-17 Mechanical
00 30-Jun-17
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
1.0 DOCUMENT REVIEW SPECIAL PROCESS (PRESSURE TESTING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS
1.1 Hydrostatic Testing Procedure SAIC-A-2001 SAIC-A-2001 RH RH Items 1.1, 1.2, 1.3, 1.4 & 1.5 may be combined
1.2 Review of Test Package Preparation SAIC-A-2003 SAIC-A-2003 RH R Follow SAEP-1160 Test Package Reqmts
Line Flushing or Internal Cleanliness This is in conjunction with the applicable SATIP (L-450
1.5 SAIC-L-2001 SAIC-L-2001 RH RH
Procedure Series) for pipelines/equipment.
3.0 APPLICATION
Verification of Testing equipment SAIC-A-2009 Safety Assessment can be performed along with SAIC-A-
3.3 SAIC-A-2009 H W
(including safety reqmts) 2011.
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Water Removal from Valve Cavities, Use SATR-A-2001V & SAIC-L-2042 Demonstrate effective
Corrosion Control after Testing SAIC-L-2041 SAIC-L-2041 preservation/corrosion control in conjunction with
4.1 W W
(In-line Tested approved cleaning & lay-up procedures for valves tested in
Valves) the line.
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Reinstatement Inspection 100% Visual Follow Detailed Reinstatement Procedure & Close out
4.3 Examination & Review of Documents SAIC-A-2006 SAIC-A-2006 H H Plan for Quality. Perform Punchlisting toward Final MCC in
Prior to Turnover a manner agreed upon with SA.
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels
1
of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative
3
is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative
4
in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection
###
###