Performance Calculation Sheet Unit 5 25-02-2022
Performance Calculation Sheet Unit 5 25-02-2022
Performance Calculation Sheet Unit 5 25-02-2022
UNIT 5
DATE 2/25/2022 Time
GENERATION 103
CALCULATION
Description Units Rated(#1-6) Rated(#7-10)
Air leakage into APH system (%)-assumed AL 9 9
Temperature of the combustion air at inlet to APH (TAI) 0
C 35 35
Temperature of the combustion air at Outlet of APH (TAO) 0
C 280 273
Temperature of the flue gas at Outlet of APH (TGO) 0
C 130 119
Temperature of the Flue gas at Inlet of APH (TIN) 0
C 319 309
APH A APH B
15.00 15.00
36 25
251 247
122 148
303 301
135 167
62.75 48.46
77.93 60.25
O – TAI)/(100 X Cpg)}+T GO
IN GREEN FIELDS
LPH 1,2,3 PERFORMANCE DATA
UNIT 5
DATE 2/25/2022 Time 6:10 PM
GENERATION 103
Description Units Rated(#1-6) Rated(#7-10) LPH-1 LPH-2
Steam inlet pressure LPH-1/2/3 kg/cm2 0.37/0.80/2.3 0.3 0.8
TTD of LPH-1/2/3(Ts-To) o
C 3.73/4.16/4.26 1.64 7.96
121.14
85
116
100
5.14
15
31
HPH 5 &6 PERFORMANCE DATA
UNIT 5
DATE 2/25/2022 Time 6:10 PM
GENERATION 103 MW
Description Units Rated(#1-6) Rated(#7-10) HPH-5 HPH-6
Steam inlet pressure HPH-5/6 kg/cm2 12.15/30.4 13.58/35.4 12.4 29.2
TTD of HPH-5/6(Ts-To) o
C 0/-0.43 2.63/2.03 17.56 29.29
CW outlet temperature(To) o
C 41 42.96
40
0.888
0.1280
50.32
46.6
43.6
18.32
10.32
3.72
6.72
0.44