Turbine Stress Evaluator
Turbine Stress Evaluator
Turbine Stress Evaluator
STRESS
EVALUATOR
[T S E]
S. Mundle. DGM. CW
T S E (cont’d)
• IMPORTANT FOR TURBINE OPERATION
o To GUIDE THE OPERATOR during
o START UP & SHUTDOWN OPERATION
PREVENTING FATIGUE
T S E (cont’d)
• INPUTS TO T S E:-
‡ WALL TEMPERATURE MEASUREMENT
(TSE THERMOCOUPLES – Ti / T100 )
• BARGRAPH INDICATOR(back
up panel)
MINIMUM TEMP MARGINS
• MMI + TG DCS
ACTUAL LOAD, LOAD MARGINS, SPEED,
TEMP MARGINS, TEMPERTAURES.
T S E (cont’d)
• IMPORTANCE OF MARGINS
DURING STARTUP
LOADING OF TURBINE
Steam Temperature
Steam Flow
Steam Pressure
T S E (cont’d)
• SYSTEM DESCRIPTIONS:
– It is a µP (Procontrol ‘P’ ) Based System
T100
+ T Upper TUemperature
pper LoadMMargin
argin[dTu]
T50 TpermU
Function LowerLTpper Load MMargin
emperature argin [dTl]
Generator
TpermL
T S E (cont’d)
• SHAFT TEMPERATURE SIMULATION
[for HP / IP Turbine Shaft]
T100 FUNCTION
GENERATOR T50
Turbine Controller
T S E (cont’d)
SIGNAL EXCHANGE (Cont’d..)
T Pre-determined
> gradient
t
• Failure of Thermocouples
• Dynamic Alarm