GENERAL INSPECTION REPORT

ULTRA CLEAN FUEL (UCF) DIESEL


PROJECT: EURO V PROJECT
REPORT NO.: ITR-QC-003-PC-00007

Area : DHT Area Location :

Description : Touch up paint at welding joint Design DWG No. : -

Remarks:

TOA-Red-Oxide-Primer

• Note

# See find Attached.

Inspection by Subcontractor Contractor Company

Name Buchro Chanamit

Signature

Date
Form No. : ITR-QC-003
GENERAL INSPECTION REPORT

ULTRA CLEAN FUEL (UCF) DIESEL


PROJECT: EURO V PROJECT
REPORT NO.: ITR-QC-003-PC-00007

Area : DHT Area Location :

Description : Touch up paint at welding joint Design DWG No. : -

Remarks:

TOA-Red-Oxide-Primer

• Note

# See find Attached.

Inspection by Subcontractor Contractor Company

Name Buchro Chanamit

Signature

Date
Form No. : ITR-QC-003
GENERAL INSPECTION REPORT

ULTRA CLEAN FUEL (UCF) DIESEL


PROJECT: EURO V PROJECT
REPORT NO.: ITR-QC-003-PC-00008

Area : Rayong Technical Colleage Location :

Description : Concrete Test Design DWG No. : -

Remarks:

- Hardened Concrete 7 Days Compressive Strength

- 6600-XC-MA-019 Concrete Mix Design

- Concrete Strength : fc (Cylinder Strength) 400 ksc

• Note

# See find Attached.

Inspection by Subcontractor Contractor Company

Name Buchro Chanamit

Signature

Date
Form No. : ITR-QC-003
GENERAL INSPECTION REPORT

ULTRA CLEAN FUEL (UCF) DIESEL


PROJECT: EURO V PROJECT
REPORT NO.: ITR-QC-003-PC-00009

Area : DHT Area Location :

Description : Welding rod inspection Design DWG No. : -

Remarks:

- YAWATA ( L 55 ) 3.2 x 350.00 mm

• Note

# See find Attached.

Inspection by Subcontractor Contractor Company

Name Buchro Chanamit

Signature

Date