Risk Assessment (RA) : Part 1: Location Details

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Risk Assessment (RA)

ELECTRICAL POWER DISTRIBUTION & MAINTENANCE OF


Date: 1ST June 2017
33KVA TRANSFORMER
Version: 1

PART 1: LOCATION DETAILS

Address of work location: ALL PLANT

PART 2: CHECK LIST & SIGN OFF


In preparing, reviewing and approving this RA, the following considerations have been taken into account:

Legislative requirements (Safety and Environment) Site Safety Plan/Environment Management Plan Task-specific training Consultation with experienced
Relevant Codes of Practice/Industry Standards Customer approvals persons
Relevant Standards Permits/approvals required Consultation with workers
involved
Manufacturer’s Operators Manual

Prepared by Name: Function: Date: Signature:

Reviewed by Name: Function: Date: Signature:

Approved by Name: Function: Date: Signature:


PART 3: RA INSTRUCTIONS
1. The RA must be specific to the process.
2. The management involved in carrying out the work activity must be consulted in identifying the external and internal issues that are relevant to its purpose and its strategic
direction

Risk Assessment methodology:

LIKELIHOOD

1 – Remote <20% likelihood of impact happening


2 – Possible 20% to 50%
3 – Probable 50% to 80%
4 – Likely >80%
CONSEQUENCES OR IMPACT(SEVERITY)

1 – Minor
2 – Moderate
3 – Significant
4 - Severe
ACTIVITY STEPS POTENTIAL RISK CONTROL MEASURES RISK RESPONSIBILITY
HAZARDS and RISKS Residual
(Who is going to
(Break the job down) (What can harm you?) ensure this
happens?)
A Power supply through  Transformer may be  Over Voltage & over current preventer equipment is 
transformer burst due to over Severe incorporated with the power supply circuit.
voltage & current

B Periodical  Periodic maintenance is  Preventive maintenance schedule is defined and 


maintenance & not carried out on Moderate being inspected by Electrical HOD. SOP is present for
dehydration of schedule this activity.
transformer oil
 Equipment is not Moderate  Equipment cleaned & checked properly by trained 
properly cleaned and person & verification can be done by respective
checked Supervisors. SOP is defined for the process.
 Transformer oil is not Severe  SOP is defined for the process.
dehydrated properly
C Cleaning of equipment  Equipment internal parts Moderate  Parts should be cleaned & checked properly by 
internal parts are not cleaned properly trained & authorized person. SOP is defined for the
process.
 Damage of internal parts Severe  Parts should be cleaned & checked properly by 
trained & authorized person.

D Assembling of  Equipment is wrong Severe  Equipment assembling carried out by trained person 
equipment assembled or technician. SOP is defined.
  
 
  
  
  
  
  
  
  
  
  
ACTIVITY STEPS POTENTIAL RISK CONTROL MEASURES RISK RESPONSIBILITY
HAZARDS and RISKS Residual
(Who is going to
(Break the job down) (What can harm you?) ensure this
happens?)
  
  