Job Safety Analysis (Jsa) : Fabrication Works, Welding Works Using Power Tools, Hand Tools, Welding Machine Wapstech
Job Safety Analysis (Jsa) : Fabrication Works, Welding Works Using Power Tools, Hand Tools, Welding Machine Wapstech
Job Safety Analysis (Jsa) : Fabrication Works, Welding Works Using Power Tools, Hand Tools, Welding Machine Wapstech
No. Break down the activity Potential hazards Preventative measures Responsibilities Remark
1.0 INSTALLATION WORKS,CABLE 1. CAUGHT IN BETWEEN 1. PROPER WORK PERMIT SHALL BE PERMIT
PULLING / TERMINATION WORKS PINCH POINT OBTAIN PROPER PERMIT RECEIVER/ELECTRICAL
2. TRIPPING HAZZARD 2. SECURE BARRICADE AT WORK AREA SUPERVISOR
3. ELECTRIC SHOCK 3. USE PROPER PPE
4. COLOR CODED TOOLS & INSPECTED
BY COMPETENT PERSON
5. USE MULTI METER FOR TEST VOLTAGE
SOURCE
6. TAG OUT/ LOCK OUT FOR ENERGIZED
EQUIPMENT
3.0 INSTALLATION WORKS OF 1. FIRE DURING HOT 1. WEAR PROPER PPE SUPERVISOR
FABRICATION SHOP WORK 2. USE FACE SHIELD WHILE DRILLING /
2. CAUGHT IN BETWEEN GRINDING WORKS.
PINCH POINT 3. USE COLOR CODED TOOLS &
3. ELECTRIC SHOCK INSPECTED BY COMPETENT
PRSONNEL.
4. HOUSE KEEPING AT WORK AREA.
4.0 LIFTING OF MATERIALS BY 1. FALLING OBJECTS. 1. INSTALL BARICADE AND SING BOARDS SUPERVISOR/FORMAN
CRANE/BOOM TRUCK. 2. FAILARE OF THE AROUND THE WORKING AREA.
LIFTING GEARS. 2. WORKERS ARE NOT ALLOWED TO
3. CRANE MAY OVER STAND NEAR THE LIFTING AREA.
TURN. 3. LIFTING AND RIGGING TOOLS
4. RISK BEING HIT BY (SHECKELS,SLINGS)ARE CURRENTLY
CRANE AND MATERIAL. INSPECTED AND COLOR CODED.
5. PINCH POINT. 4. CRANE SHOULD HAVE THEIR
COMPLETE DOCUMENTS AND
CERTIFICATES OF FITNESS.
SUPERVISOR TO BE PRESENT AT SITE
WHERE LIFTING WORK IS CARRIED
OUT.
5. OPERATOR SHALL KNOW THE WEIGHT
OF ALL LOADS BEING LIFTED AND
CHECK WITH LOAD CHART.
6. CRANE SHALL BE OPERATED BY
COMPETENT AND AUTHORIZED
OPERATOR.
7. OPERATORS TO FOLLOW THE ORDED
FROM THE RIGGER ONLY.
8. NO ONE SHOULD STAND UNDER THE
SUSPENDED LOAD DURING THE
LIFTING OPERATION.
5.0 SCAFFOLDING ERECTION 1.FALLING MATERIALS 1. SCAFFOLDERS IN APPROPIATE PPE
2.PROTRUDING MATERIALS INCLUDING SAFTEY HARNESS
3.FALL FROM HEIGHT 2. DAILY BREIFING TO SCAFFOLDERS
4.COLLAPSE OF SCAFFOLD BEFORE START OF WORK
3. SCAFFTAG SHOULD BE INSTALLED
4. SCAFFFOLD TO BE INSPECTED BY
SAFETY MANAGER OR NOMINATED
SAFETY TEAM MEMBER.