JHA PROJECT For BOLTING TORQUING
JHA PROJECT For BOLTING TORQUING
JHA PROJECT For BOLTING TORQUING
JHA 002
JHA WORKSHEET Revision No. 0
Step
Step Description Potential Hazards/Consequence Control / Recovery Measures
No.
1. Not all hazards are addressed, 1. Boilermech Personnel to be present during PTW preparation
1 PTW Preparation 2. Communication breakdown between BM and Plant 2. Share PTW with plan operator.
Operator
1. All work leaders must attend effective toolbox training,
2. All work leaders must ensure all workers have correct PPE
1. Communication breakdown, resulting workers not 3.Communication must be clear using agreed understandable
2 Pre job briefing
understand step and hazards at site, language
4. To provide and use wireless radio if long distance