Appendix "A1": (1) Testing at Dubai Municipality - Central Laboratory Department (Dubai DCLD)
Appendix "A1": (1) Testing at Dubai Municipality - Central Laboratory Department (Dubai DCLD)
1.1 All transportation of personnel and material on site and to/from the
DCL shall be borne by the Contractor. Suitable approved transport
with driver shall be maintained for this specific use by the
Contractor.
1.2 The Contractor shall pay for all the tests carried out by the DCL.
1.3 Any testing which is required under the contract which cannot be
carried out by DCL shall be carried out at Contractor’s expense at
an Independent Laboratory in accordance with Appendix “A2”.
Copy of such sampling and testing reports shall be forwarded to the
DCL and to the DM Department concerned for information not
later than a week from the date of the issuance of the reports.
1.4 The testing of the works by the DCL shall in no way absolves the
Contractor from his responsibilities to carry out his own job control
testing of the quality of his work and the materials used.
1.6 DCL will not be held liable for interpreting test data, since this will
be the responsibility of the Consultant.
A1.1
CONTINUATION OF APPENDIX “A1”
1.7 All sampling for such tests shall be carried out by the Consultant’s
Representative and labeled as per relevant standard sampling
requirements and submitted by the Consultant to DCL.
1.9 Minimum twenty four (24) hours notice shall be given to DCL
before any test are scheduled to be carried out.
A1.2
APPENDIX “A2”
2.1 Any testing which is required under the contract and as detailed in
DM Administrative Decision No. (160) for year 2000 may be
carried out at the Contractor’s expense at an approved Independent
Laboratory, provided this laboratory meets the following
requirements:
2.2 All sampling for such tests shall be carried our by the Consultant’s
Representative and labeled as per relevant standard sampling
requirements and submitted by the Consultant to the independent
laboratory along with sampling reports.
A2.1
CONTINUATION OF APPENDIX “A2”
A2.2
LABORATORY TESTS WHICH MAY BE CARRIED OUT BY
INDEPENDENT LABORATORIES ACCREDITED IN
ACCORDANCE WITH DCL ACCREDITATION
REQUIREMENTS AND DM ADMINISTRATIVE DECISION NO.
(160) FOR YEAR 2000.
*For road works, the above tests (1), (2), (3) and (4) may be carried out at
an independent accredited laboratory only for earthworks and filling
outside the road corridor.
A2.3
APPENDIX “A”
LABORATORY TESTING
A1