BAB III

PERENCANAAN STRUKTUR

3.1 Perencanaan Kuda - Kuda

Gambar 3.1 Kuda-kuda

3.1.1 Perencanaan Gording

1. Data rangka atap

Bentang kuda-kuda = 6,40 m

Jarak kuda-kuda = 3,30 m

Sudut kemiringan atap = 45 °

2. Perhitungan panjang batang

Bl=B2=B3=B4=l,6m

tg45° =V2/3,0

V2= 3,2 m

tg45° =V1/1,5
31

VI = 1,6 m

Cos 45" = 1,5/Al

A 1=2,263 m

Tabel 3.1 Panjang Batang Kayu


Batang Panjang (m)
A1-A4 2,263
B1-B4 1,6
V1=V3 1,6
V2 3,2

3 Pembebanan gording

Kayu kelas I = 1 gr/cm3 = 1000 kg/m3

Jarak antar gording = 2,263 m

Jarak kuda-kuda = 3,30 m

o „ = 1 . 150. 5/4= 187,5 kg/cm2

a. Beban angin (W)

Bangunan di daerah angin daratan W=25 kg/m:

Angin tekan (Wt) a < 65 °

CI =0,02 . a-0,4

= 0,02 . 45 - 0,4 = 0,5

Wt = Clx W x jarak gording

= 0,5x25x2,263

= 28,2875 kg/m
32

Angin Hisap (Wh)

C2= -0,4

Wh = C2 x W x jarak gording

= -0,4 x 25 x 2,263

= 22,63 kg/m

b. Beban orang

p = 100 kg

Px = P Cos a

= 100 Cos 45° =70,71 kg

Py=100Sin45°

= 70,71 kg

c. Beban atap

q=50 kg/m2

qx = q . L . Cos a = 50 . 2,263 . Cos 45 ° = 80,0 kg/m

qy = q. L . Sin a = 50 . 2,263. Sin 45 ° = 80,0 kg/m

d. Berat gording

Kayu kelas kuat I, E = 125.000 kg/cm2

dimensi gording 8/12 , Bj = 1000 kg/m3

q = b. h. Bj = 0,08 . 0,12. 1000 = 9,6 kg/m

qx = q . Cos a = 9,6 . Cos 45 " = 6,79 kg/m

qy = q . Sin a = 9,6 . Sin 45 ° = 6,79 kg/m


33

4 Tegangan Tetap

q tetap = q atap + q gording

qx tetap = 80,0 + 6,79 = 86,79 kg/m

qy tetap = 80,0 + 6,79 = 86,79 kg/m

Mx= 1/8 . qx. L2 + 1/4 . Px. L

= 1/8. 86,79 2,263 2+ %. 70,71. 2,263 = 95,5625 kg m

My = 1/8 . qy. L2+V4.Py. L

= 1/8. 86,79 2,263 2+ V* . 70,71. 2,263 = 95,5625 kg m


Wx = 1/6 . b. h2= 1/6 . 8. 122 = 192 cm3

Wy =l/6.b2h=l/6. 12. 82 =128 cm3

Mx My
alt = + —-<alt
Wx Wy

95,5625x100 95,5625x100
= ^ + ^ =124,430kg /cm2 <187,5kg / cm2
5. Tegangan Sementara I

qx si = qx tetap + ql angin

= 86,79 + 28,28755 =115,0775 kg/m

qy si = qy tetap = 86,79 kg/m

Mx si = 1/8 qx si L+ Va .Px. L

= 1/8 . 115,0775 . 2,263 + %. 70,71. 2,263 = 113,6706 kg m


My si = 1/8 . 86,79 . 2,263 + %. 70,71. 2,263 = 95,5625kg m
34

Mx.sl My. si _

113,6706x100 95,5625x100
;- + 12g <187.5kg/cm'
133,8616 kg/cm2 < 187,5 kg/cm2

6. Tegangan Sementara II

qx s2 = qx tetap + q2 angin

= 86,79 + (-22,63) = 64,16 kg/m

qy s2 = qy tetap

Mxs2= l/8qxs2L2

= 1/8 . 64,16. 2,263 2= 41,072 kg m

Mys2=l/8qys2L2

=1/8 . 86,79. 2,263 2= 55,5583 kg m

_ Mx.s2 My.s2 _
ahs2-_wx_+^T-CT'«
41,072x100 55,5583x100
—iST- +—i^— S187,5kg W

64,7966 kg/cm2 < 187,5 kg/cm2


7. Kontrol Lendutan

384 EI +48 EI <200 L


1= 1/12 . b. h

1/12. 8,123= 1152cm4


35

E= 125.000 kg/cm2

L= 330 cm (jarak kuda-kuda)

5 86,79x3304 1 70,71x3403 1
Fx = + < .340
384 125.000x1152x100 48 125.000x1152 200

0,9307 + 0,3676 = 1,3 cm < 1,7 cm

5 86,79x(340/2)4 1 70,71x3403 1
Fy = - '— + - < 340
384 125.00x1152x100 48 125.000x1152 200

0,0582 + 0,3676 =0,4258 cm < 1,7 cm

Fmax = JFx2 +Fy2 < ——.L


v 200

Jl,32 +0,42582 < 340


^ ' 200

1,368 cm < 1,7 cm Amaan !!

3.1.2 Perencanaan Dimensi Kuda-Kuda

1. Pembebanan

a. Beban Genteng (PPI 1983 ) = 50 kg/m2

P0 = V2 . 2,263 . 3,3 . 50 = 186,6975 kg

PI = V2 . 3,3 2,263. 50 .2 = 360,4 kg

b. Beban eternit (PPI 1983 ) = 11 kg/m2

P0' = V2. 1,6.3,3 . 11 =29,04 kg

VV = V2. 1,6.3,3. 11 .2 = 58,08 kg

c. Beban Plafond (PPI 1983 ) = 7 kg/m2

PO"^. 1,6.3,3 . 7 =18,48 kg


36

V\" = V*. 1,6.3,3 .7.2 = 36,96 kg

d. Berat Kuda-Kuda

ditaksir = 20 kg/m

PO"'^. 1,6. 20= 16 kg

PI'" = p2'» - P3'» = i/2. i>6 20. 2 = 32kg

e. Beban gording

dimensi gording 8/12

Kelas kuat II mutu A, Bj = 1,00 gr/cm3

PO - IV = 0,08 . 0,12 . 3,3 . 1000 = 31,68 kg

f. Beban Tak Terduga

Beban diatas rangka:

PO V-I = 10% . ( PO + PO-III + PO-IV)

= 10% . ( 186,6975 + 16+ 31,68 ) = 23,438 kg

PI V-I = P2 V-I = P3 V-I = P5 V-I

= 10% . ( PI + Pl-III + Pl-IV )

= 10% . (373,395+ 32 +31,68 ) = 43,7075 kg

Beban dibawah rangka :

PO V-2 = 10% . ( PO-I + PO-II )

= 10% . ( 29,04 + 18,48 ) = 4,752 kg

PI V-2 = P2 V-2 = P3 V-2

= 10%. (PI 11 +PI HI)

= 10% . (58,08+36,96) = 9,504 kg


37

Muatan Tetap :

diatas rangka

PO = 234,38 + 23,438 = 257,818 kg ~ 258 kg

PI = 437,075 + 43,7075 = 480,7825 kg ~ 481 kg

P2 = 468,76+ 46,876 = 515,636 kg ~ 516 kg

dibawah rangka :

PO = 47,52 + 4,752 = 52,272 Kg ~ 53 kg

PI = P2 = P3 = 95,04 + 9,504 = 104,544 kg ~ 105 kg


g. Beban Angin

Beban angin ( W ) = 25 kg/m2

Kemiringan atap = 45 °

Koefisien lereng atap menurut PPI 1983 untuk < 60 ° :

Angin datang .

D= W . ( 0,02 . - 0,4 )

= 25. (0,02. 45-0,4) =12,5 kg/m2

Angin pergi:

P= -0,4 . Wn

= -0,4. 25 = -10 kg/m2

Muatan angin datang :

PdO = >/2 . 2,263 . 3,3 .12,5 = 46,67 kg ~ 47 kg

Pdl = V2 . ( 2,263 + 2,263 ) . 3,3 . 12,5 = 93,35 kg ~ 94 kj


Pd2 = V2.( 2,263 + 2,263 ) . 3,3 . 12,5 = 93,35 kg ~ 94 ks
38

Muatan angin pergi :

PpO = V2 . 2,263 . 3,3 . 10 = 37,34 kg ~ 38 kg

Ppl = V2 . ( 2,263 + 2,263 ) 3,3 . 10 = 74,679 kg ~ 76 kg

Pp2 = Vi . ( 2,263 + 2,263 ) 3,3 . 10 = 74,679 kg ~ 76 k

(118 eg y

Gambar 3.2 Pembebanan tetap

A c
-640 —

Gambar 3.3 Pembebanan angin tekan

Gambar 3.4 Pembebanan angin hisap


39

2. Hitungan Dimensi Batang

Jenis kayu :

Kayu kelas II mutu A , Bj = 0,8 gr/cm3

beban tetap dan terlindung, (3 = 1

beban tetap dan tekanan angin, y = 5/4

alt = 1 . 5/4. 100= 125 kg/cm2

a* // = ah // = 1 . 5/4 . 85 = 106,25 kg/cm:

ads± = 1. 5/4 . 25 = 31,25 kg/cm2

xll =1. 5/4. 12 =10 kg/cm2

dengan Bj = 0,8 gr/cm3

alt =170. 0,8 = 136kg/cm2

^dS // = ah // = 150. 0,8 = 120 kg/cm2

adsl =40. 0,8 = 32 kg/cm2

xll =20. 0,8= 16 kg/cm2

dipakai nilai yang terkecil !!

-Batang atas

batang tekan :

gaya tekan maksimum = -1440,515 kg

panjang batang = 2,263 m

balok tunggal = 8/12

i min = 0,289 . b
40

= 0,289. 8 = 2,312 cm

1
\ =
lmin

••-TT7Z =97,88-98 kg/cm2


2,312 &

dicari faktor tekuk ( co )= 2,88

P.W
adslI=

_ 1440,515x2,88
12x8

= 43,215 kg/cm2 < = 106,25 kg/cm2

-Batang bawah

Batang tarik

Gaya tarik maksimum = 1138,806 kg

Panjang batang = 1,6 m

Balok tunggal = 6/8

Sambungan dengan baut, perlemahan 20%

P
crtr
0,8. F

1138,806
= 19,77 kg/cm2 < 106,25 kg/cm:
0,8.6.8

-Batang vertikal

Batang tarik

Gaya tarik maksimum = 759 kg


41

Panjang batang = 3,2 m

Balok ganda = 6/8

P
atr =
0,8. F

759
6,5885kg/cm2 < 106,25 kg/cm:
2x0,8x6x8

-Batang diagonal

batang tekan :

gaya tekan maksimum = 547,255 kg

panjang batang = 2,263 m

balok tunggal = 6/8

i min = 0,289 . b

= 0,289 . 6 = 1,734 cm

lmin

226,3
r^- B0,5 kgW
dicari faktor tekuk ( co )= 5,525

P.W
ods// =

547,225x5,525
6x8

42 kg/cm 2< 106,25 kg/cm:


42

3.1.3 Perencanaan Sambungan

1. Sambungan Join A

Gaya batang AI = - 1440,515kg

Gaya batang B1 = 1138,806 kg

Hubungan AI dengan Bl, menggunakan sambungan gigi

a = 45' Sin 1/2 a = 0,383 Sin a = 0,707

Cos 1/2 a = 0,924 Cos a = 0,707

adsl / 2a = ads / / - (ads / / - adsl)Sinl / 2a

75-(75-18,75). Sinl/2. 45

53,48 kg/cm:

S.Cos2l/2a 1440,505x0,8538
tv = =-L = . _. .. = 2,87 * 3
b.al/2a 8x53,48

S.Cosa 1440,505x0,707
Lv = —=— = . = 12,73 « 13cm
b.xll 8x10

syarat Lv > 15 cm
43

tv < % h = 3 cm

jadi Lv = 15 cm, tv = 2,4 cm

2. Sambungan Join B

Gaya batang Vl= 106,00 kg

Gaya batang Bl = 1138,806 kg

Gaya batang B2 = 1138,806 kg

Hubungan VI dengan B menggunakan sambungan baut, 0 5/8" = 1,59 cm

Sambungangolongan III tampang dua :

P = 60.d.m.(l-0,6.Sina)

= 60.1,59.6.( l-0,6.Sin 90° ) = 228,96 kg

P=120.d.l.(l-0,6.Sina)

= 120.1,59.6.(1-0,6.Sin 90°) = 457,92 kg

P = 340.d2.(l-0,35.Sina)

= 340.1,592.( 1-0,35.Sin 90°) = 558,7101kg


nilai yang terkecil P = 228,96 kg
44

106
Jumlah baut 0,463 * 105/8'
228,96

J&l 8
1

— 1
1
o 1
1
H

3. Sambungan Join F

Gaya batang AI = -1352,995 kg

Gaya batang A2 = -927,317 kg

Gaya batang VI =106,00 kg

Gaya batang DI = -515,778 kg

Sambungan golongan II tampang dua :

P = 60.d.m.( l-0,6.Sin«)

= 60.1,59.6 ( l-0,6.Sin 45 ° ) = 329,5512kg

P = 120.d.l.(l-0,6.Sina)

= 120.1,59.6.( l-0,6.Sin 45 ° ) = 659,1025 kg

P = 340 d2. (1-0,35.Sina)

= 340.1,592.( 1-0,35.Sin 45 °) = 646,825 kg


nilai terkecil P=329,551kg
45

106
jumlah baut = 0,322 « 105/8"
329,5512

Sambungan DI dengan A menggunakan sambungan gigi

adsl / 2a = ads / / - (ads / / - adsl)Sinl / 2a

= 75 - (75-18,75). Sinl/2.90°

= 35,225 kg/cm2

S.Cos2l/2a 547,225x0,8538
tv = 2,2cm
b.al/2a 6x35,225

syarat tv < lA h = 3 cm

tv = 2,2 cm

4. Sambungan Join G

adsl / 2a = ads / / - (ads / / - adsl)Sinl / 2a

= 75-(75- 18,75). Sinl/2. 45

= 53,48 kg/cm2
46

S.Cos2l/2a 987,260x0,8538
tv = 1,97 * 2
b.al/2a 8x53,48

S.Cosa 987,260x0,707
Lv = —= = = 8,73cm
b.xl I 8x10

syarat Lv > 15 cm

tv < lA h = 3 cm

jadi Lv = 15 cm, tv = 2,0 cm

5. Sambungan Join C

Gaya batang V2 = 759,728 kg ' ^


Gaya batang DI = 547,225 kg

Gaya batang D2 = 547,225 kg

Gaya batang B2 = 1138,806 kg

Gaya batang B3 = 1018,598 kg

Hubungan B2, B3, dan V2 menggunakan plat U tebal 0,4 cm,

759 728
a = 18,75kg / cm2 ,lebar plat yang dibutuhkan L= = 675* 7cm
6x1875
47

Baut yang dibutuhkan untuk batang vertikal menggunakan sambungan

golongan III tampang satu :

P=25.d.m.( l-0,6.Sina)

=25.1,59.6.( l-0,6.Sin 0 ° ) = 238,5 kg

P=170.d2.m.( 1-0,35.Sum)

= 170.1,592.6.( l-0,35.SinO°) = 429,777 kg

nilai yang terkecil P = 238,5 kg

kekuatan baut dinaikkan 25%, P= 238,5 x 1,25 = 298,125 kg

759,728
Jumlah baut = —— = 2,55 * 3 buah baut
298,125

Hubungan antara D1,D2 dan V2 menggunakan sambungan gigi

adsl 12a = adsl/- (ads / / - ads±)Sinl / 2a

= 75-(75-18,75). Sinl/2. 45°

= 53,48 kg/cm2

S.Cos2l/2a 547,225x0,8538
tv = =-f- = = 1,456 « 1,5
b.al/2a 6x53,48

S.Cosa 547,225x0,707
Lv = —= = = 6,5cm
b.xll 6x10

syarat Lv > 15 cm

tv < Vi h = 3 cm

jadi Lv = 15 cm, tv = 1,5 cm


49

2. Daftar Kebutuhan Baut

Tabel 3.3 Kebutuhan Baut

Join 0 baut Jumlah

A = E — —

B = D 205/8 2

F = H 205/8 2

G 3 05/8 3

C 3 05/8 3

jumlah = lObuah

3. Kontrol berat kuda - kuda terhadap berat taksiran awal

Berat total kayu = 0,1007 ton = 100,7 kg

Berat baut + begel = 15% x berat total kayu

= 15% x 100,7

= 15,105 kg

Berat kuda - kuda /m = (15,105 + 100,7 )/ 6,4


= 18,1 kg < 20 kg Amaan!
57

3.2 Perencanaan Pelat

3.2.1 Analisa pembebanan

Beban tetap = beban mati + beban hidup

a. Beban mati

Beban mati lantai Basement

-Tebal pelat diambil = 20 cm

-Berat sendiri pelat =0,20 . 2400 = 480 kg/m2

-Berat pasir tebal 10 cm = 0,10 . 1600 = 160 kg/m:

-Berat ubin tebal 2 cm = 0,02 . 2400 = 48 kg/m2

-Berat spesi tebal 1 cm = 0,01 . 2100 = 21 kg/m2

qd =709 kg/m:

Beban mati lantai Groundfloor s/d Topfloor

-Tebal pelat diambil = 12 cm

-Berat sendiri pelat = 0,12 . 2400 = 288 kg/m2

-Berat pasir tebal 10 cm = 0,10 . 1600 =160 kg/m2

-Berat ubin tebal 2 cm = 0,02 . 2400 = 48 kg/m2

-Berat spesi tebal 1cm = 0,01 . 2100 =21 kg/m2

qd =517 kg/m:
58

b. Beban hidup

Beban hidup atau beban berguna menurut Peraturan Pembebanan Indonesia

untuk Gedung 1983 adalah sebagai berikut:

Ruang kantor =250 kg/cm2

Ruang serbaguna = 400 kg/cm2

Ruang Taman Kanak - Kanak = 250 kg/cm2

Pertokoan / koperasi = 250 kg/cm2

Gudang , ruang mesin = 400 kg/cm2

Musholla = 250 kg/cm2

Kamar sewa = 250 kg/cm2

Tabel 3.4 Spesifikasi Pembebanan


P,
Lantai Ruang Beban Mati (qd) Beban Hidup (ql) l,2.qd+ l,6.ql
ai (kg/m2) (kg/m2) (kg/m2)
Basement Parkir 709 800 2130,8
R.Pengelola 709 250 1250,8
RSampah 709 250 1250,8

Ground Floor R.Sewa 517 250 1020,4


Toko 517 250 1020,4
Taman Kanak 517 250 1020,4
RSerba Guna 517 400 1260,4
Musholla 517 250 1020,4
Gudang 517 400 1260,4

I R. Kamar Sewa 517 250 1020,4

II R. Kamar Sewa 517 250 1020,4

III R.Kamar Sewa 517 250 1020,4

IV RKamar Sewa 517 250 1020,4

Topfloor R.Kamar Sewa 517 250 1020,4


61

R« = MniX/(b.d2)

= 8,0975E6/(1000.96 2) = 0,879
2m.Rn
P perlu ~ 1~ - /1
m fy

1 2.11,294.0,879
1-Jl = 0,00374
**" 11,294 400

P per^P maka dipakai p min =0,00583

As = p , . b d

= 0,00593.1000. 96 =559,68 mm2

As0 = Va. k .D2 = Va. tc .82 = 50,265 mm2

jarak tulangan = ( 50,265. 1000 )/ 559,68 = 89,81 ~ 80 mm


dipakai 08-80

arah Y

Mnx = Mly/(() = 3,5536/0,8 = 4,441 KN.m

0,85.fc'.p1 600
pb =
fy 600 +fy
0,85.2.0,85 600
Pb 0,05376
240 600 + 240

P min = M/fy

= 1,4/240 = 0,00583
Pmax =0^5. pb

= 0,75. 0,05376 = 0,04032

m =fy/(0,85.fc)

=240/(0,85.25)= 11,294
Rn =Mmax/(b.d2)

= 4,441E6/(1000.88 2) = 0,5734
62

1 2m.Rn
perlu 1-
m
V "fy~

1 2.11,294.05734
perlu U294 1-Jl- 0,0024
400

r per/w r maka dipakai p min =0,00583

As = p , b d

= 0,00583.1000. 88 = 513,128 mm2

As 0 = y4. %.D2 = V4.7T ,82 = 50,265 mm2

jaraktulangan = ( 50,265. 1000 )/513,128 = 97,95 mm ~ 80 mm


dipakai 08-80

Perencanaanpenulangan tumpuan

arahx

Mnx = Mtx/<|>= 6,478/0,8 = 8,0975 KN.m

0,85.fa'. Bt 600
pb
fy 600 +fy
u 0,85.2.0,85 600
pb = o 05376
240 600 + 240

P „*, = 1,4/fy

= 1,4/240 = 0,00583
P max =0,75. pb

= 0,75. 0,05376 = 0,04032

m =fy/(0,85.fc)

=240/(0,85.25)= 11,294
^ =Mmax/(b.d2)

= 8,0975E6/(1000.96 2) = 0,879
63

2m.Rn
perlu I-"
m
fy~

1 2.11,294.0,879
1-Jl 0,00374
**"" 11,294 400

r1 perlu r min maka dipakai p min =0,00583

As pcriu. = Fp perlu
_,„.• b. d
= 0,00593.1000. 96 =559,68 mm2

As0 = Va. k .D2 = Va. k .82 = 50,265 mm2

jaraktulangan = ( 50,265. 1000 )/ 559,68 = 89,81 ~ 80 mm


dipakai 08-80

Perencanaan tulangan tumpuan

arahy

Mnx = Mty/<|>= 3,5536/0,8 = 4,441 KN.m

0,85.fc'.B1 600
pb
fy 600 +fy
u 0,85.2.0,85 600
Pb = = 0 05376
240 600 + 240 u'U3J/0
P min = 1,4/fy

= 1,4/240 = 0,00583
PmiX=0,75. pb

= 0,75. 0,05376 = 0,04032

m =fy/(0,85.fc)

=240/(0,85.25)= 11,294
^ =Mmax/(b.d2)

= 4,44lE6/( 1000.88 2) = 0,5734


64

2m.Rn
P perlu 1 Jl
m

2.11,294.05734
0,0024
perlu ] l2g4 1-Jl 400

P per^V mm -> maka dipakai p min =0,00583

AsPBh=P^'«- bd
= 0,00583.1000. 96 = 559,68 mm2

As0 = Va. ti .D2 = Va. k .82 = 50,265 mm2

jarak tulangan = ( 50,265. 1000 )/559,68 = 89,81 mm ~ 80 mm

dipakai 08-80

Perhitungan tulangan bagi

As bagi= (0,0018. 400. b.h)/fy

= ( 0,0018. 400. 1000. 120 )/240

= 360 mm2

dipakai A0 6 =28,26 mm2

jarak tulangan = (28,26 . 1000 )/360

= 78,5 mm~75 mm

pakai 0 6-75

Kontrol kapasitas momen

Lapangan arah x

C = 0,85 . fc'. b.a

= 0,85 . 25 . 1000. a = 21250 a


J.L

SSs!i^^^tsS£QB3s32

- . tf4-f j-Mff ?%
2X &fc
^ ^hfr
^^*i <d-
I I 1 __ __ ; * -r j *t~

UM-. ^^L SB|J ^g^z-cfiJ£Sl2SS 4jEEH£E!r3E; <-

MMR 4ir M^iy


n i II1 i E

UNIT FIAT SK~ p '. - v en c u i;: Jin; -"la:

320 I __500 400 izo, 6G0 __66Q. i 66Q_ __.;'- 66G_. „^0o..400. 1 600 320
i
£
(' 6 ©0 : 7 f 9 ; »'
3 )0 ©

Gambar 3.11 Potongan membujur


SuBJUipiu UB3U0)0J ZVZ JBqiUBQ
000'
TifiP^
r
S-
w ?* \-
if.; %
.£#%•••>• :>••'••]&:*•
ajf'r^^u^y.?
-a
c
•a
6
jo
•sc
c
Q
Q
••ill ••——>-P
la
13
.1' :' ri'fc'pt»
.cc;
'if. *'
7ti: 4?
;tfctttol
53

Gambar 3.15 Denah lantai I & II

Gambar 3.16 Denah lantai III


54

—P
1
'
i

yffifV

Gambar 3.17 Denah lantai IV

".ZL.

Q—- ^qk-L'
mWr->, •i-

m
i- -l.iit:™J^*, JH_.l.jf -.11'

v » o - ~i--o •- •

^ r.
i'. _

-^i- Lrr'-y t*— tU


TO—r n r—c? «-j

•c
•TJ-.. '"N

••Ta»U

xfb
JJr
Gambar 3.18 Denah lantai atas
55

Gambar 3.19 Perencanaan pelat lantai Basement

Gambar 3.20 Denah pelat lantai dasar

-j 660- -6fc0--

"T
la

-J-..L L

Gambar 3.21 Denah pelat lantai 1=lantai 2

= Balok induk
= Balok anak
56

— bf-0 — — - ' r n

lo !a 1 lo la ' 1q la ' la

6 40
1
i , 1
] 1 1 1 1 1
1

1 y ^ 9 1 9 9 I 9
GOO

[
1.
1— 1

Gambar 3.22 Denah pelat lantai 3

I 1
34 , 37 35 | 37 | 34
I I
1 1

36 ' 3 4
I

150 i 510 , £10 ,150.


, 150 | £10 | 510 | 150 ,

Gambar 3.23 Denahpelat lantai 4

Gambar 3.24 Denah pelat lantai atas


59

3.2.2 Penulangan Pelat Lantai

Mutu beton dan baja yang digunakan:

fc' = 25 Mpa

fy = 240 Mpa , tulangan pokok = (j) 8

tulangan bagi = (j) 6

Tipe 1

Distribusi momen

Lx = 3,3 m

3,3 Ly =4 m
"''/'j * *;".'rs"*'""*• ***VV \y«C -

Ly/Lx= 1,212

Gambar 3.25 Pelat tipe 1

Tabel 3.5 Distribusi Momen Pelat


M C
M= 0,001.qu.Lx2 .C ( KN.m)
Mix 46 5,112

Mly 38 4,223

Mtx 46 5.112

Mty 38 4,223

Kontrol Tebal Pelat

Lx 0,8 +
1500
h . =-
36+9p
60

240
3300. 0,8 +
1500/
58,67 mm < 120 mm
36 + 9..2

Kontrol terhadap geser

Vu=l,15. V2. qu.Lx

= 1,15 . V2. 10,204.3,3

= 19,3621 KN

penutup beton pb = 20 mm

d = h - pb - 1/2D

d= 120 - 20 - Vi 8 = 96 mm

Vc= VlV. b.d/6

Vc = V25 . 1000 . 96/2 = 80 KN > Vu Ok

Perencanaan tulangan lapangan

arahx

Mnx = Mlx/<j> = 5,112/0,8 = 6,39KN.m

0,85. fc'. ft, 600


pb
fy 600 + fy
0,85.2.0,85 600
pb 0.05376
240 600 + 240

Pmn = l,4/fy

= 1,4/240 = 0,00583
P™x=0,75. pb

= 0,75.0,05376 = 0,04032
m =fy/(0,85.fc)

=240/(0,85.25)= 11,294
Rn =Mmix/(b.d2)

= 6,39E6/( 1000.96 2) = 0,6934


1 2.m.Rn
P perlu = — 1--/1
m
fy

1 2.11,294.0,6934
perlu j U94 1- Jl = 0,00294
400

P penu<P mi, -> maka dipakai p miD =0,00583

As^=p^;u. b.d
= 0,00593.1000. 96 =559,68 mm2

As 0 = Va. k .D2 = Va. 71.82 = 50,265 mm2

jarak tulangan =( 50,265. 1000 )/ 559,68 =89,81 ~ 80 mm


dipakai 08-80

arah Y

Mnx = Mly/(j> = 4,223/0,8 = 5,2788 KN.m

0,85.fc'. ft, 600


pb =
fy 600 +fy
0,85.2.0,85 600
Pb = = 0 05376
240 600 + 240 u'u^/0
P „*, = 1,4/fy

= 1,4/240 = 0,00583
Pmax =0,75. pb

= 0,75. 0,05376 = 0,04032

m =fy/(0,85.fc)

=240/(0,85.25) = 11,294
^ =Mmsx/(b.d2)

= 5,2788E6/(1000.88 2) = 0,6816
62

2m.Rn
^ perlu
m
'-V fy J

1 2.11,294.0,6816
r perlu 1-Jl 0,0029
11,294 400

P per^P mm -> maka dipakai p mm =0,00583

As^Pre*,- b.d
= 0,00583.1000. 88 = 513,128 mm2

As0 = Va. k D2 = Va. k .82 = 50,265 mm2

jarak tulangan =( 50,265. 1000 )/513,128 =97,95 mm ~ 80 mm


dipakai 08-80

Perencanaan pemdangan tumpuan

arahx

Mnx = Mtx/<j> = 5,112/0,8 = 6,39 KN.m

0,85.fc'.p, 600
pb =
fy 600 +fy
0,85.2.0,85 600
pb=^r~6^+^=0'05376
P min = 1,4/fy

= 1,4/240 = 0,00583
Pm,x=0,75. pb

= 0,75. 0,05376 = 0,04032

m =fy/(0,85.fc)

=240/(0,85.25)= 11,294
^ =Mraax/(b.d2)

= 6,39E6/(1000.96 2) = 0,6934
? m Rn
P perlu
,m- 1-Jl-
m fy

1 2.11,294.0,6934
0,0029
perlu
11,294 '-V1 400

P p^P ^ -> maka dipakai p min =0,00583

As = p . b d

= 0,00593.1000. 96 =559,68 mm2

As0 = Va. %.D2 = Va. tt.82 = 50,265 mm'

jarak tulangan =( 50,265. 1000 )/ 559,68 == 89,81 ~ 80 mm

dipakai 08-80

Perencanaan tulangan tumpuan

arah y

Mnx = Mty/<)> = 4,223/0,8 = 5,2787KN.m

0,85. fc'. p. 600


pb =
fy 600 + fy
0,85.2.0,85 600
Pb =~^0— 6^+1^ =°'05376
P mm = 1,4/fy

= 1,4/240 = 0,00583
Pmax=0,75. pb

= 0,75.0,05376 = 0,04032

m =fy/(0,85.fc)

=240/(0,85.25)= 11,294
Rn =Mmax/(b.d2)

= 5,2787E6/(1000.88 2) = 0,6816
64

2.m.Rn
r perlu
per -Jl-
m
fy

2.11,294.0,6816
H patlu 1-Jl = 0,0029
11,294 400

P periu <P min -> maka dipakai p ^=0,00583

As puiu
= Kp perlu
, b" • "d

= 0,00583.1000. 96 = 559,68 mm2

As0 = Va. k D2 = Va. k 82 = 50,265 mm2

jarak tulangan = ( 50,265. 1000 )/559,68 = 89,81 mm ~ 80 mm


dipakai 08-80

Perhitungan tulangan bagi

As bagi= (0,0018. 400. b. h)/fy

= (0,0018.400. 1000. 120)/240

= 360 mm2

dipakai A0 6 =28,26 mm2

jarak tulangan = (28,26 . 1000 )/360

= 78,5 mm~75 mm

pakai 0 6-75

Kontrol kapasitas momen

Lapangan arah x

C = 0,85 fc'. b.a

= 0,85.25. 1000. a = 21250 a


65

T = As.fy

= 559,68 . 400 = 223872 N

keseimbangan gaya C =T

21250 a = 223872

a= 10,5352 mm

Mn ,„, = Ts . ( d - a/2 )

= 223872.(96- 10,5352/2) E-6

= 20,3124KNm>5,112KNm

Tumpuan arah x

C = 0,85 . fc'. b.a

= 0,85 .25. 1000. a = 21250 a

T = As.fy

= 559,68 . 400 = 223872 N

keseimbangan gaya C =T

21250 a = 223872

a= 10,5352 mm

Mntot = Ts.(d-a/2)

= 223872. (96-10,5352/2) E-6

= 20,3124 KNm> 5,112 KNm

Lapangan arah y

Cc = 0,85 . fc'. b.a

= 0,85.25. 1000. a = 21250 a


66

Ts = As.fy

= 513,128 . 400 = 205251,2 N

keseimbangan gaya C =T

21250 a = 205251,2

a= 9,6589 mm

Mnlol = Ts.(d-a/2)

=205251,2. (88-9,6569/2) E-6

= 17,701 KNm> 4,223 KNm

Tumpuan arah y

C = 0,85 . fc'. b.a

= 0,85 . 25 . 1000. a = 21250 a

T = As.fy

= 559,68 . 400 = 223872 N

keseimbangan gaya C =T

21250 a = 223872

a= 10,5352 mm

Mn tot = Ts . ( d - a/2 )

= 223872. (96-10,5352/2) E-6

= 20,3124 KN m > 4,223 KN, m


67

Tabel 3.6Penulangan Pelat Tipe12

Daerah Tulangan Pokok Tulangan


arahX arahY
Tumpuan 08-80 08-80 08-75
Lapangan 08-80 08-80

hasil dari penulangan tipe pelat yang lain ditabelkan


Tabel 3.7 Penulangan Pelat Terpasang
TIPE LY(m) LX(m) M(KN.m) Rn As(mnv) Jarak.TuI Pakai

3.3 46 MLX=5.111592 0.693304 0.00583 0.002937 559.68 89.81025 D8-80


3.3 38 MLY=4.222619 0.681595 0.00583 0.002887 559.68 89.81025 D8-80
3.3 46 MTX=5.111592 0.693304 0.00583 0.002937 559.68 89.81025 D8-80
3.3 38 MTY=4.222619 0.572729 0.00583 0.002419 559.68 89.81025 D8-80

1a 3.3 2.4 53 MLX=3.115077 0.422509 0.00583 0.001778 559.68 89.81025 D8-80


2.4 38 MLY=2.233452 0.360513 0.00583 0.001515 559.68 89.81025 D8-80
2.4 53 MTX=3.115077 0.422509 0.00583 0.001778 559.68 89.81025 D8-80
2.4 38 MTY=2.233452 0.302931 0.00583 0.001271 559.68 89.81025 D8-80

2.6 61 MLX=4.207721 0.570709 0.00583 0.002411 559.68 89.81025 D8-80


2.6 51 MLY=3.517931 0.567848 0.00583 0.002399 559.68 89.81025 D8-80
2.6 61 MTX=4.207721 0.570709 0.00583 0.002411 559.68 89.81025 D8-80
2.6 51 MTY=3.517931 0.47715 0.00583 0.002011 559.68 89.81025 D8-80

6.6 59 MLX=9.632576 1.306502 0.00583 0.005622 559.68 89.81025 D8-80


36 MLY=5.877504 0.948719 0.00583 0.004045 559.68 89.81025 D8-80
59 MTX=9.632576 1.306502 0.00583 0.005622 559.68 89.81025 D8-80
36 MTY=5.877504 0.797188 0.00583 0.003386 559.68 89.81025 D8-80

6.6 2.4 54 MLX=3.173852 0.430481 0.00583 0.001812 559.68 89.81025 D8-80


2.4 19 MLY= 1.116726 0.180257 0.00583 0.000754 559.68 89.81025 D8-80
2.4 54 MTX=3.173852 0.430481 0.00583 0.001812 559.68 89.81025 D8-80
2.4 56 MTY=3.291402 0.446425 0.00583 0.00188 559.68 89.81025 D8-80
ON
00
62 MLX=10.12237 1.372934 0.00583 0.005918 568.1621 88.46947 D8-80
34 MLY=5.550976 0.896012 0.00583| 0.003816
62
559.68 89.81025 D8-80
MTX=10.12237 1.372934 0.00583 0.005918 568.1621 88.46947
34 MTY=5.550976 D8-80
0.752899 0.00583 0.003195 559.68 89.81025 D8-80
3.2 61 MLX=6.373827 0.864506 0.00583
3.2
0.003679 559.68 89.81025
35 MLY=3.657114 D8-80
0.590314 0.00583 0.002495
3.2 61 559.68 89.81025 D8-80
MTX=6.373827 0.864506 0.00583
3.2 0.003679 559.68 89.81025 D8-80
35 MTY=3.657114 0.496028 0.00583 0.002091 559.68 89.81 f)75 D8-80
3.2 _2_ 58 MLX=2.367328 0.321089 0.00583
_2_ 0.001348 559.68 89.81025 D8-80
36 MLY=1.469376 0.23718 0.00583 0.000994 559.68
_2_ 58 89.81025 D8-80
MTX=2.367328 0.321089 0.00583
2 0.001348 559.68 89.81025
36 MTY=1.469376 D8-80
0.199297 0.00583 0.000834 559.68 89.81025 D8-80
_4_ 56 MLX=9.142784 1.240069 0.00583 0.005327 559.68
_4_ 37 89.81025 D8-80
MLY=6.040768 0.975072 0.00583
_4_ 0.004161 559.68 89.81025
56 MTX=9.142784 D8-80
1.240069 0.00583 0.005327
4 37 MTY=6.040768
559.68| 89.81025 D8-80
0.819332 0.00583 0.003482 559.68 89.81025 D8-80
9 3.3 60 MLX=6.667294 0.90431 0.00583
3.3 0.003852 559.68 89.81025 D8-80
35 MLY=3.889255 0.627785 0.00583 0.002656
3.3 60 559.68 89.81025 D8-80
MTX=6.667294 0.90431 0.00583
3.3 0.003852 559.68 89.81025 D8-80
35 MTY=3.889255 0.527514 0.00583 0.002226 559.68 89.81025 D8-80
10 2.4 46 MLX=1.877536 0.254657 0.00583 0.001068 559.68 89.81025 D8-80
38 MLY=1.551008 0.250356 0.00583 0.001049 559.68
_2_ 46 MTX=1.877536 89.81025 D8-80
0.254657 0.00583 0.001068 559.68
2 38 89.81025 D8-80
MTY=1.551008 0.210369 0.00583 0.000881 559.68 89.81025 D8-80
11 3.2 48 ON
MLX=5.01547 0.680?fi7 0.00583I 0.002881 559.681 89.81025 D8-80
3.2 38 MLY=3.97058 0.640912 0.00583 0.002712 559.68
3.2 48 89.81025 D8-80
MTX=5.01547 0.680267 0.00583 0.002881 559.68 89.81025 D8-80
3.2 38 MTY=3.97058 0.538544 0.00583 0.002273 559.68 89.81025 D8-80
12 6.6 3.2 62 MLX=6.478316 0.878678 0.00583 0.00374 559.68 89.81025 D8-80
3.2 34 MLY=3.552625 0.573448 0.00583 0.002423 559.68
3.2 62 89.81025 D8-80
MTX=6.478316 0.878678 0.00583 0.00374 559.68 89.81025 D8-80
3.2 34 MTY=3.552625 0.481856 0.00583 0.002031 559.68 89.81025 D8-80
13 56 MLX=9.142784 1.240069 0.00583 0.005327 559.68 89.81025 D8-80
37 MLY=6.040768 0.975072 0.00583 0.004161 559.68
56 89.81025 D8-80
MTX=9.142784 1.240069 0.00583 0.005327 559.68 89.81025 D8-80
37 MTY=6.040768 0.819332 0.00583 0.003482 559.68 89.81025 D8-80
ground
15 6.6 2.4 63 MLX=3.702828 0.502228 0.00583 0.002118 559.68 89.81025 D8-80
2.4 13 MLY=0.764076 0.123333 0.00583 0.000515 559.68
2.4 63 89.81025 D8-80
MTX=3.702828 0.502228 0.00583 0.002118 559.68 89.81025 D8-80
2.4 38 MTY=2.233452 0.302931 0.00583 0.001271 559.68 89.81025 D8-80
16 6.6 _6_ 42 MLX=15.42845 2.092617 0.00583
6
0.009197 882.9001 56.9317 D8-50
37 MLY=13.59173 2.193913 0.00583 0.009669 928.2497
42 54.1503 D8-50
MTX= 15.42845 2.092617 0.00583 0.009197 882.9001 56.9317 D8-50
37 MTY=13.59173 1.843496 0.00583 0.008047 772.5015 65.06783 D8-60
serbaguna17 6.6 42 MLX=18.78509 2.547891 0.00583 0.011343 1088.903 46.16113 D8-40
37 MLY=16.54877 2.671224 0.00583 0.011934 1145.703
42 43.87264 D8-40
MTX=18.78509 2.547891 0.00583 0.011343 1088.903 46.16113 D8-40
37 MTY=16.54877 2.24457 0.00583 0.009907 951.0311
gudang18 6.6 59 52.85316 D8-50
MLX=11.72826 1.590747 0.00583 0.006897 662.0839 75.91938 D8-70
36 MLY=7.156224 1.155124 0.00583 0.004951 559.68 89.81025
59 D8-80
MTX=11.72826 1.590747 0.00583 0.006897 662.0839 75.91938
36 D8-70
MTY=7.156224 0.970625 0.00583 0.004141 559.68 89.81025 D8-80
pengurus19 62 MLX=5.693832 0.772275 0.00583 0.003279 559.68 89.81025 D8-70
35 MLY=3.21426 0.518831 0.00583 0.002189 559.68
62
89.81025 D8-80
MTX=5.693832 0.772275 0.00583 0.003279 559.68 89.81025 D8-70
35 MTY=3.21426 0.435962 0.00583 0.001836 559.68 89.81025 D8-80
hall20 3.6 59 MLX=9.499887 1.288505 0.00583 0.005542 559.68
3.6 36
89.81025 D8-70
MLY=5.796541 0.93565 0.00583 0.003988 559.68 89.81025 D8-80
3.6 59 MTX=9.499887 1.288505 0.005830.005542 559.68
3.6 36
89.81025 D8-70
MTY=5.796541 0.786206 0.00583 0.003339 559.68 89.81025 D8-80
basement
parkir21 6.4 3.3 61 MLX=13.16623 0.537397 0.00583 0.002268 1020.25 76.98015 D8-70
3.3 35 MLY=7.554393 0.34685 0.00583 0.001457 961.95
3.3 61 81.64562 D8-80
MTX=13.16623 0.537397 0.00583 0.002268 1020.25 76.98015 D8-70
3.3 35 MTY=7.554393 0.308343 0.00583 0.001294 1020.25 76.98015 D8-70
22 3.3 60 MLX=12.95039 0.528587 0.00583 0.002231 1020.25 76.98015 D8-70
3.3 35 MLY=7.554393 0.34685 0.00583 0.001457 961.95
3.3 60
81.64562 D8-80
MTX=12.95039 0.528587 0.00583 0.002231 1020.25 76.98015 D8-70
3.3 35 MTY=7.554393 0.308343 0.00583 0.001294 1020.25 76.98015 D8-70
23 6.6 3.2 62 MLX=12.58332 0.513605 0.00583 0.002167 1020.25 76.98015 D8-70
3.2 34 MLY=6.900531 0.316829 0.00583 0.00133 961.95
3.2 81.64562 D8-80
62 MTX=12.58332 0.513605 0.00583 0.002167 1020.25 76.98015
3.2 34 D8-70
MTY=6.900531 0.281654 0.00583 0.001181 1020.25 76.98015 D8-70
30 6.6
MLX=4.86985~ 0.1987691 0.00583 0.000832!
2.4 13 MLY=1.00489
1020.25 76.980151 D8-70
0.046138' 0.00583 0.000192'
2.4 63 961.95 81.64562" D8-80
MTX=4.86985 0.198769
2.4
0.00583' 0.000832' 1020.25' 76.98015"
38 MTY=2.93737 D8-70
0.119893 0.00583' 0.000501' 1020.25" 76.98015"
D8-70
31 2.4 59 MLX=4.560653 0.186149 0.00583" 0.000779" 1020.25" 76.98015"
36 MLY=2.782771 D8-70
0.127767
2.4
0.00583" 0.000534" 961.95' 81.64562"
59 MTX=4.560653 D8-80
0.186149
2.4
0.00583" 0.000779 " 1020.25" 76.98015"
36 MTY=2.782771 D8-70
0.113582' 0.00583 0.000475 " 1020.25
76.98015" D8-70
32 6.6 2.4 63 MLX=7.192282 0.293563 0.00583 0.001232 " 1020.25"
2.4 13 MLY=1.484122 76.98015" D8-70
0.068141
2.4
0.00583' 0.000284 ~ 961.95" 81.64562"
63 MTX=7.192282 D8-80
0.293563' 0.00583 0.001232" 1020.25"
2.4 38 76.98015 D8-70
MTY=4.338202 0.177069' 0.00583 0.000741 1020.25" 76.98015 D8-70
33
63 MLX=3.38184 0.138034' 0.00583 0.000577 ~ 1020.25"
13 MLY=0.69784 76.98015 D8-70
0.03204 0.00583 0.000134
63 961.95 81.64562" D8-80
MTX=3.38184 0.138034 0.00583' 0.000577 1020.25 76.98015"
38 MTY=2.03984 D8-70
fourth 0.083259' 0.00583" 0.000348 1020.25' 76.98015"
D8-70
34 32 MLX=2.938752 0.398594 0.00583" 0.001677 ~ 559.68" 89.81025"
18 MLY=1.653048 D8-80
0.266827" 0.00583" 0.001119' 559.68 89.81025" D8-80
70 MTX=6.42852 0.871924 0.00583" 0.003711
57 559.68 89.81025" D8-80
MTY=5.234652 0.709995' 0.00583 0.003009 559.68' 89.81025" D8-80
35 2.1 40 MLX=1.799986 0.244139 0.00583' 0.001023'
2.1 12 559.68" 89.81025" D8-80
MLY=0.539996~ 0.087164 0.00583" 0.000364'
2.1 83 559.68" 89.81025 D8-80
MTX=3.73497 0.506588' 0.00583" 0.002137"
2.1 57 559.68" 89.81025 D8-80
MTY=2.564979 0.347898' 0.00583" 0.001462"
36I 3.2 2.1 36 559.68" 89.81025 D8-80
MLX=1.619987 0.219725 0.00583 " 0.00092" 559.68' 89.81025' D8-80
75

3.2.3 Penulangan pelat pendukung sebagai balok


Untuk menahan tembok yang mempunyai beban seberat 750 kg/m
diperlukan balok pendukung dengan pertimbangan artistik. Maka diambil lebar
50 cm dibawah tembok yang dianggap menahan beban tembok.

Gambar 3.26 Pelat sebagai pendukung balok


qu= 1,2. 750 =900 kg/m

M(+)=1/I6.qu. L2

= 1/16. 900. 3,3 2

= 612,5625 kg.m = 6,1256 KN.m

M(-)=l/ll . qu. L2

= 1/11 .900. 3,3 2

= 891kg.m = 8,91 KN.m

Vu= 1/2. 900. 3,3 . 1,15

= 1707,75 kg = 17,0775 KN

Penulangan Tumpuan

/>_= 0,02432 ; d= 120 - 20 - 1/2.10 = 95mm


77

3.2.4 Perencanaan pelat tangga


1 Tangga Lantai - IV

i'10

\l LANTAI-IV
I/-

h --25C .V hi?
«~

r
150
j L_
J_ Qptrede = 20 en
Antrede = £5 -n
18 0

Gambar 3.27 Tangga lantai -IV

Berdasar tebal minimum, pelat tangga atas:


L 326,7
= 16,335cm * 20cm
20 20

Berdasar tebal minimum, plat tangga bawah:


L 131,26
= 6,563cm « 10cm
20 20

Penutup beton diambil pb = 2cm ; 012

d=20-2 -0,5.1,2= 17,4 cm (atas)


d=10-2-0,5.1,2 =7,4cm(bawah)

hb=17,4. 32,015 + 0,5 optrede


25

32,2824 cm (atas)
78

hb = 7,4. .32,015 +0,5 optrede


25

= 19,4764 cm (bawah)
Beban pada tangga atas :

-Beban tangga =0,323 .0,75. 2400 =581,4 kg/m


-Bebanspesi =0,02.0,75.2100 =31,5 kg/m
-Beban tegel =0,03.0,75.2400 =54 kg/m
qd = 666,9 kg/m

-Beban hidup =200 kg/m2

-Beban pagar besi = 50 kg/m2

ql =250 kg/m2 =250. 0,75 =187,5 kg/m


qu = 1,2 . qd + 1,6 . ql

=1,2 . 666,9 +1,6 . 187,5 =1100,28 kg/m


Bebanpada bordes:

-Berat bordes =0,1. 0,75. 2400 =180 kg/m


-Beban spesi =0,02 .0,75. 2100 =31,5 kg/m
-Beban tegel =0,03 .0,75. 2400 =54 kg/m
qd =265,5 kg/m
qu=l,2.qd+ 1,6 ql

= 1,2 . 265,5 + 1,6. 187,5= 618,6 kg/m


79

Beban tangga bawah :

-beban tangga =0,195 .0,75. 2400 =351 kg/m


-Beban spesi =0,02 . 0,75. 2100 =31,5 kg/m
-Beban tegel =0,03 .0,75. 2400 = 54 kg/m
qd = 436,5 kg/m

qu=l,2.qd+l,6. ql

= 1,2 . 436,5 +1,6. 187,5 =823,8 kg/m


♦Penulangan Tangga Bawah*

Penulangan Momen Lapangan

M+ = 59,505 Kg m= 59,505 104Nmm


Mutu beton dan baja . fc' =30 Mpa
fy = 400 Mpa

0,85.fc'. p 600
pb =
fy '600 + fy

_ 0,85.25.0,85 600
400 600 +400 =°'033
P m,k = 0,75. pb = 0,75. 0,033 = 0,025

L4 ]>4
fy 400

m =
fy 400

0,85. fc' 0,85.30 = 15,6863

Rn =
Mn _ 59,505E4
b.d2 "" O^.IOOOT? =°'128
2m.Rn
pperlu = — 1-Jl
m ~Fy~
80

1 2.15,6863.0,128
1-Jl = 0,0003
15,6863 400

pakai/> ^ = 0,0035

As=/7perIu . b. d

= 0,0035. 1000 .74 = 259 mm2

A012= 113,097 mm2

•r , , .
jarak tulangan < 113,097.1000
— =436j667 mm

dipakai 012 - 25 ; As = 452,4 mm2 >259 mm2


Penulangan Momen Tumpuan
M = 109,25 kg m = 109,25 E4 Nmm

Rn =
Mn_ 109,25£4
0,235
b.d2 ~ 0,85.1000.742

Pmak =0,025

pmia = 0,0035

Pp^u^ 0,0017

PakaiPmin= 0,0035

As = 0,0035 . 1000 . 74 =259 mm2

jarak«u,a„ga„,ili^ =436>667mm
dipakai 012-25 As =452,4 mm2 >259 mm2
81

Tulangan bagi

As bagi = ( 0,0018 . 400 . b . h )/ fy

=( 0,0018 . 400 . 1000 . 100 )/400

= 180 mm2

A08 = 50,2655 mm2

. , 4, 50,2655.1000
jarak tulangan < — = 279,25 mm
IoO

pakai 08-25

Cek tahanan momen:

As.fy 452,4.400
(0,85.fc').b ~(0,85.30).1000 =7,lmm
z = d-a/2 = 74 - 7,1/2 =70,45 mm

Mn = As. fy . z

=452,4 . 400 . 70,45 = 12748632 N.mm = 1274,86 Kg.m


MR =0,8 Mn = 1019,89 Kg m>Mu = 109,25 Kg m
PenulanganTangga Atas *

Penulangan Momen Lapangan

M+=320,82 Kg m = 320,82 104Nmm

pmA =0,025

pmm = 0,0035

/Vm= 0,0003

P^^ P mm = 0,0035
82

As = 0,0035 . 1000 . 174 = 609 mm2

. . . 113,097.1000
jarak tulangan < — = 185,71 mm

dipakai 012-18 As = 628 mm2 > 609 mm2

Penulangan Momen Tumpuan

M =646,39 Kg m = 646,39. 10 4Nmm

PmA =0,025

^ ^ = 0,0035

/?perlu= 0,0006

P^^ P ^=0,0025

As = 0,0035 . 1000 . 174 = 609 mm2

• ., ,
jarak tulangan < 113,097.1000
— = i85)71 n^

dipakai 012 - 18 As = 628 mm2 > 609 mm:


Tulangan Bagi

As bagi = ( 0,0018 . 400 . b . h)/fy


=( 0,0018 . 400 . 1000 . 200 )/400
= 360 mm2

A08 = 50,2655 mm2

iaraW i
jarak tulangan < 50,2655.1000
— = 139,625mm

pakai 08-13
83

Cek lahanan momen:

As.fy 628.400
(0,85. ft"), b=(0,85.30).1000 =9'85mm
z = d-a/2 = 174 - 9,85/2 =169,075 mm

Mn = As. fy . z

= 628 . 400 . 169,075= 42471640 Nmm = 4247,164 Kg.m

MR = 0,8 . Mn = 3397,73 Kg m > Mu = 646,39 Kg m

Balok Bordes

coba 30/40

Pembebanan:

q. balok = 0,3 . (0,4 - 1). 2400 . 1,2 =259,2 kg/m

q.bordes = = 659,84 kg/m

q. tangga = = 2383 kg/m

3302,04 kg/m

M(+)=l/ll .3158,04. 1,5 2= 645,963 kg.m

M (-) =1/16 . 3158,04 . 1,52 =444,1 kg.m

Penulangan balok

Penulangan momen lapangan

M=645,963 kg m

balok 30/40

selimut beton 40 mm, d = 400 -60 = 340 mm

P«* =0,025

pmm= 0,0035
/Vh,= 0,001 , pakai pmm = 0,0035

As = 0,0035 . 300 . 340 = 357 mm2

Pakai 2 019 As=567 mm2 >As perlu =357 mm2

Penulangan momen tumpuan

sama dengan hitungan diatas, didapat 2019

Penulangan geser

Vu = (3302,04 x 1,5 )/2 = 2476,53

Vu dari muka kolom sejauh d = 693,43 kg

<j>Vc = 0,6. VfcVbw. d

= 0,6. V30 . 300 . 340

= 55867,7 N = 5586,77 kg > 693,43 kg

maka pakai tulangan geser minimum

Av = 20 10= 157 mm2

s = (3 . Av. fy)/bw

= (3. 157. 400 )/300 = 628 mm

syarat :s < d/2 = 170 mm atau s < 600 mm ; pakai DlO-160

2019

201O-36U
400l

?0G-

Gambar 3.28 Potongan balok bordes tangga lantai -IV


85

Pelat Bordes

150 cm

80 cm

M += 126,35 Kg m= 126,35 104Nmm

M =466,08 Kg m = 466,08 104Nmm

tebal pelat = 10 cm

mak 0,025

p
i
•= 0,0035
mm "

Pperiu= 0,0007

Pakai ,0,^=0,0035

As = 0,0035 . 1000 . 74 = 259 mm:

. , , 113,097.1000
jarak tulangan < — = 436,67 mm

dipakai 012-25 As = 452,388 mm2 > 259 mm:

Pada daerahmomen negatif

M ~= 466,08 Kg m = 466,08 104N mm

Pm* =0,025

pmm= 0,0035

/V.u= 0,0011
86

pakai pmm= 0,0035

As = 0,0035 . 1000 . 74 = 259 mm'

113,097.1000
jarak tulangan < —-—— = 436,67 mm

dipakai 012 - 25 As = 452,388 mm2 > 259 mm2

Tulangan Bagi

As bagi = ( 0,0018 . 400 . b . h)/ fy

=( 0,0018 . 400 . 1000 . 100 )/400

= 180 mm2

A08 = 50,2655 mm2

50,2655.1000
jarak tulangan < — = 279,25 mm

pakai 08-2

Cek torsi balok bordes

dari momen tumpuan plat:

400 M=466,08Kg m =Tu =4,6608 KN.m

300

Ex y= 3002.400 +400.1002 = 40E6mm3

0\ —VfcTJZx2y =0,6.—V25.40 =5,48KNM >4,6608 KN.M

-» maka akibat torsi diabaikan


87

2.Lantai tangga luar ( basement > groundfloor)

1 \^
ijP

t
i
1

'

/
J ' V

200

J
C^+recJe •= 19 c-
;9-J^--"i ,h^trede = 30 cr

IOC

fc
50
;T Cctrede = c5 cr
Art rede = 30 c.^

Gambar 3.31 Tangga luar basemen-lantai dasar


Berdasar tebal minimum, plat tangga atas:

L 282,84
= 14,142cm « 15cm
20 20

Penutup beton diambil pb = 2cm ; 012

d= 15-2-0,5.1,2=12,4 cm

hb = 7,4. 39,015 + 0,5 .25 (optrede )


30

= 28,64 cm

Beban pada tangga :

-Beban tangga = 0,2864 . 0,75. 2400 = 515,52 kg/m

-Beban spesi = 0,02 . 0,75. 2100 =31,5 kg/m

-Beban tegel = 0,03 . 0,75. 2400 = 54 kg/m

qd = 601,02 kg/m
88

-Beban hidup = 200 kg/m2

-Beban pagar besi =50 kg/m2

ql = 250 kg/m2 =250. 0,75 = 187,5 kg/m

qu= 1,2 . qd+ 1,6 . ql

= 1,2 . 601,02 + 1,6 . 187,5 =1021,244 kg/m

Beban pada bordes:

-Berat bordes = 0,12. 0,75. 2400 = 216 kg/m

-Beban spesi = 0,02 .0,75. 2100 = 31,5 kg/m

-Beban tegel = 0,03 .0,75. 2400 =54 kg/m

qd =301,5 kg/m

qu = 1,2 . qd + 1,6 ql

= 1,2 . 301,5 + 1,6. 187,5= 661,8 kg/m

*Penulangan Tangga bawah*

Penulangan Momen Lapangan

M += 1079,3 Kg m= 1079,3 104Nmm

Mutu beton dan baja : fc' = 30 Mpa

fy = 400 Mpa

0,85.fc'.p 600
pb =
fy '600 + fy

0,85.30.0,85 600
0,033
400 600 + 400

P max = 0,75. pb = 0,75. 0,033 = 0,025


89

1,4 1,4
= 0,0035
fy 400

fy 400
m = 15,6863
0,85. fc' 0,85.30

Mn 1079,3E4
Rn 0,82
b.d2 0,85.1000.12,42

2m.Rn
r perlu i-ji
m Fy

i 2.15,6863.0,82
1-Jl = 0,0021
15,6863 400

pakai p ^=0,0035

As = p . b. d

= 0,0035 . 1000 .124 = 434 mm2

A012= 113,097 mm2

. , , 113,097.1000
jarak tulangan < = 260,6 mm
434

dipakai 012-25 ; As = 452,4 mm2 >434 mm:

Penulangan Momen Tumpuan

M=1011,4Kgm=1011,4E4 Nmm

Mn 1011,4E4
Rn = —-r = - = 0,77
b.d2 0,85.1000.1242

Pmik= 0,025

Pmia =0,0035

V = 0,002
90

pakai pmm = 0,0035

As = 0,0035 . 1000 . 124 =434 mm2

. , , 113,097.1000
jarak tulangan < = 260,6 mm
5 434

dipakai 012-25 As = 452,4 mm2 >434 mm2

Tulangan bagi

As bagi = ( 0,0018 . 400 . b . h )/ fy

=( 0,0018 . 400 . 1000 . 150 )/ 400

= 270 mm2

A08 = 50,2655 mm2

. , , 50,2655.1000
jarak tulangan < = 186,17 mm
270

pakai 08-18

Cek tahanan momen:

As.fy 452,4.400
3" (0,85.fc').b ~(0,85.30)1000 =7'lmm
z = d-a/2 = 124 - 7,1/2 =120,45 mm

Mn = As. fy . z

= 452,4 . 400 . 120,45 = 21796632 N.mm = 2179,6632 Kg.m

MR = 0,8 . Mn = 1743,7305 Kg m > Mu = 1079,3 Kg m

* Penulangan Tangga Atas*

Penulangan Momen Lapangan

M+=715,l Kgm = 715,l 104Nmm


91

P ™x = 0,025

Pmia =0,0035

PpeHo =0,0014

pakai z?^ 0,0035

As = 0,0035 . 1000. 124 = 434 mm:

. , , 113,097.1000
jarak tulangan < = 260,6 mm
434

dipakai 012-18 As = 452,4 mm2 > 434 mm2

Penulangan Momen Tumpuan

M"= 1453,7Kg m =1453,7. 104Nmm

pm*= 0,025

P min =0,0035

/?perIu = 0,0028

Pakai ^^=0,0035

As = 0,0035 . 1000. 124 = 434 mm2

. , , 113,097.1000
jarak tulangan < — = 260,6 mm

dipakai 012-25 As = 452,4 mm2 > 434 mm2

TulanganBagi

As bagi = ( 0,0018 . 400 . b . h )/ fy

=( 0,0018 . 400 . 1000 . 150)/400

270 mm2
92

A08 = 50,2655 mm:

50,2655.1000
jarak tulangan < zzz = 186,17 mm
270

pakai 08-18

Cek tahanan momen:

As.fy 452,4.400
a = = 7,1mm
(0,85.fc').b (0,85.30).1000

z = d-a/2 = 124 - 7,1/2 =120,45 mm

Mn = As. fy . z

= 452,4 . 400 . 120,45= 21796632 N.mm = 2179,6632 Kg.m

MR = 0,8 . Mn = 1743,7305 Kg m > Mu = 1453,7 Kg m

Pelat Bordes

240 cm

100 cm
Gambar 3.32 Tipe pelat bordes
M"= 1297,4 Kgm= 1297,4 104Nmm

tebal plat = 12 cm

P^= 0,025

Pmia =0,0035

PperhI= 0,0045

As = 0,0045 . 1000 . 94 = 423 mm2


93

. , , 113,097.1000
jarak tulangan < — = 267,37 mm

dipakai 012-25 As = 452,388 mm2 > 423 mm2

Tulangan Bagi

As bagi = ( 0,0018 . 400 . b . h )/ fy

=(0,0018 . 400 . 1000 . 120)/400

= 216 mm2

A08 = 50,2655 mm2

. , , 50,2655.1000
jarak tulangan < — = 232,71 mm
216

pakai 08-20

2.Lantai tangga luar (first floor > second floor)

Berdasar tebal minimum, plat tangga atas:

L 250
- = — = 12,5cm « 13cm

Penutup beton diambil pb = 2cm ; 012

d= 13 -2-0,5.1,2= 10,4cm

hb = 7,4. 35,51 + 0,5 .19 (optrede )


30

= 21,81 cm

Bebanpada tangga:

-Beban tangga = 0,2181 . 0,75. 2400 = 392,58 kg/m

-Beban spesi = 0,02 . 0,75. 2100 =31,5 kg/m


94

-Beban tegel =0,03.0,75.2400 =54 kg/m

qd =478,08 kg/m

-Beban hidup = 200 kg/m2

-Beban pagar besi = 50 kg/m2

ql = 250 kg/m2 =250. 0,75 = 187,5 kg/m

qu=l,2. qd + 1,6 . ql

= 1,2 . 478,08+ 1,6 . 187,5 =873,696 kg/m

Beban pada bordes:

-Berat bordes = 0,12. 0,75. 2400 = 216 kg/m

-Beban spesi = 0,02 .0,75. 2100 = 31,5 kg/m

-Beban tegel = 0,03 .0,75. 2400 =54 kg/m

qd =301,5 kg/m

qu=l,2.qd+l,6ql

= 1,2 . 301,5 + 1,6. 187,5= 661,8 kg/m

"Penulangan Tangga bawah*

Penulangan Momen Lapangan

M+ = 563,66 Kg m = 563,66 104Nmm

Mutu beton danbaja : fc' = 30 Mpa

fy = 400 Mpa

0,85. fc'. p 600


pb
fy 600 + fy

0,85.30.0,85 600
0,033
400 '600 + 400
95

P mu = 0,75. pb = 0,75. 0,033 = 0,025

1,4 1,4
Pm»=— = ~ = 0,0035
fy 400

fy 400
m : = 15,6863
0,85. fc' 0,85.30

Mn 563,66E4
Rn = 0,613
b.d2 0,85.1000.1042

1 I. 2.m.Rn
^ perlu 1-- 1 -
m Fy

1 2.15,6863.0,613
1-Jl- 0,0015
15,6863 400

Pakai /? ,^=0,0035

As=/?perlD.b. d

= 0,0035 . 1000.104 = 364 mm:

A012= 113,097 mm:

. , , 113,097.1000
jarak tulangan < — = 310,7 mm
364

dipakai 012-25 ; As = 452,4 mm2>364 mm2

Penulangan Momen Tumpuan

M= 1157,9 Kg m= 1157,9 E4 Nmm

Mn 1157,9E4
Rn = 1,26
b.d2 0,85.1000.1042

Pm*= 0,025

pmm =0,0035
96

ppcrla = 0,0032

Pakai pmin = 0,0035

As = 0,0035 . 1000 . 104 =364 mm:

. , , 113,097.1000
jarak tulangan < — = 310,71mm
364

dipakai 012-25 As = 452,4 mm2>364 mm2

Tulangan bagi

As bagi = ( 0,0018 . 400 . b . h )/ fy

=( 0,0018 . 400 . 1000 . 130 )/400

= 234 mm2

A08 = 50,2655 mm2

. , , 50,2655.1000
jarak tulangan < — = 214,81mm

pakai 08-20

Cek tahanan momen:

As.fy 452,4.400
(0,85.ft').b " (0,85.30)1000 =?'lmm
z = d-a/2 = 104 - 7,1/2 =100,45 mm

Mn = As. fy . z

= 452,4 . 400 . 100,45 = 18177432 N.mm = 1817,7432 Kg.m

MR= 0,8 . Mn = 1454,1946 Kg m > Mu = 1157,9 Kg m


97

Pondasi tangga

Beban total:

-Beban tangga = 4428,3 Kg

-balok (30/40) = 0,3 . 0.4.2400 .1,2/2 = 172,8 Kg

-berat pondasi = (0,4 + 0,8)/2. 1,5. 2200. 1,2/2 = 1188 kg


Pu = 5789,1 kg

kontrol tegangan:

tegangan izin tanah a =2E4 Kg/m2

A = Pu/a

= 5789,1/ 2E4 = 0,289-0,3 m2

lebar pondasi (B) =^0$

= 0,547 m~ 0,55 m

B = 55 cm
98

3.3 Gaya- Gaya yang Bekerja Pada Portal

3.3.1 Pemerataan beban

Beban Trapesium

Gambar 3.33 Distribusi beban trapesium


Ra = (q, +0,5.q2)

M = (q, +0,5.q2 ). (a+0,5.b) - q, (l/3.a + 0,5.b)-0,5.q2,0,25.b

= 0,5.a2 .t + 0,25.a.t.b + 0,5.t.b+ 0,25.b2 l/6.t - a2 t - 0,25.ab - 0,125.b2 t

= l/3.a2t + 0,125.b2.t + 0,25.a.t.b

= l/3t3 + 0,125.(L - 2t )2 .t + 0,5.t2 .(L- 2t)

= l/3t3 + 0,125.(L2 - 4.L.t - 4.t2 ).t + 0,5.L.t2 - t3

= -l/6 +3+ l/8.L2.t

1/8.L2= l/8.L2.t- l/6.t3

f a\
8/6 ,
h=t--^.t3 = 1-4/3.
L V L2J

Leq 1-4/3.^-1.t.qpI
99

Beban Segitiga

Gambar 3.34 Distribusi beban segitiga


Ra = 1/2L . l/2.t

Mmax= l/4Lt. 1/2L- 1/4LM/3.1/2L

= l/8L.t - 1/24.L t

l/8h.L = 1/12 Lt

h = 2/3t

q.,=2/3.1. qpl

Tipe beban 3
6.G

Gambar 3.35 Distribusi tipe beban 3


beban pelat/m akibat beban mati =517 kg/m2

Beban merata ekivalen bentuk trapesium

qcq: 1-4/3.: •t.q,


L2J
100

q«q
( 1-4/3.-2-1,6.517
^ =762,3811 kg/m
V 6,6 J

berat sendiri balok= 0,3 . 0,6. 2400= 432 kg/m

Beban merata ekivalen bentuk segitiga

qcq=2/3.t. qpl

qeq = 2/3.3. 517= 1034 kg/m

qeq(,o,a.)= 762,3811 + 551,4667 + 432 = 2228,3811 kg/m

Beban merata pelat/m akibat beban hidup = 250 kg/m2

koefisien reduksi = 0,7 ; beban hidup = 0,7. 250 =175 kg/m:

beban merata ekivalen bentuk trapesium

r 1,62^
1-4/3.— .1,6. 175
*°4 V 6,6Z

= 258 kg/m

beban merata ekivalen bentuk segitiga

qeq = 2/3.3. 175= 350 kg/m

qeq(,o,ai)= 258+ 350 = 608 kg/m

qtotal = 2228,3811 +608 = 2836,3811 kg/m

Tipe pembebanan yang lain ditabelkan !!


101

Tabel 3.8 Pola Pembebanan

No Pola Pembebanan Q ekivalen

[ekiv,ien =651,466 kg/m (beban mati)

1,5 ,=266,667 kg/m (beban hidup)

' ekivalen =862,381 kg/m (beban mati)

Lekivalen =368,656 kg/m (beban hidup)


1,5

6,6

I ekivalen =2228,38 lkg/m (beban mati)

Lekivalen =608 kg/m (beban hidup)

qefcvien=1134 kg/m (beban mati)


3,3
q ekh,ien =500 kg/m (beban hidup)

t ekivalen =2168 kg/m (beban mati)


3,3
q ekiv,ie„ =1000 kg/m (beban hidup)
3,3

Lekivalen =2041,4kg/m (bebanmati)

3,3 q ek.va.en =938,781 kg/m (beban hidup)

2
102

L ekivalen =2300 kg/m (beban mati)

I ekivalen =1000 kg/m (beban hidup)

P = 21,4 ton

qekiv.ien =1200 kg/m (beban mati)

1,2
qek,vaien =533,33 kg/m (beban hidup)
2.4
P= 10,7 ton

q ekivaien =2659,78 kg/m (beban mati)

1,65
q ekivaien =918,656 kg/m (beban hidup)

1/6
P = 9,9 ton

qekivaien =1517,34 kg/m (beban mati)

10 165 q ekivaien =370,906 kg/m (beban hidup)

q ekivaien =2284 kg/m (beban mati)

11 1,65
q ekivai™ =740 kg/m (beban hidup)
1,65

q ekivaien =3266 kg/m (beban mati)


1,65
qekivaien =1160 kg/m (beban hidup)
1.65
P= 15,7 ton
103

l ekivalen =1623,1 lkg/m (beban mati)


12
13 =518,91 kg/m (beban hidup)
I ekivalen

2A
P = 15 ton

I ekivalen
=2896,2 kg/m (beban mati)

14 =1360 kg/m (beban hidup)


I ekivalen

P = 30 ton

q ekivaien =1276,02 kg/m (beban mati)

15 12 q ekivaien =255,13kg/m (beban hidup)


33 33
P = 2,3 ton

qekiv^en =1887,4 kg/m (beban mati)

16
q ekivaien =550 kg/m (beban hidup)
3.3 33
P = 9,9 ton

qekivaien =1789,7 kg/m (beban mati)

17 1,5 =502,78 kg/m (beban hidup)


i ekivalen

4S

I ekivalen =1267 kg/m (beban mati)


15
Lekivalen =250 kg/m (beban hidup)

q ekivaien =2651,4 kg/m (beban mati)

19 qekiv,.e„ =920 kg/m (beban hidup)


PI = 6,6 ton , P2 = 9,2 ton

2,1 1,5
104

20 q ekivaien =16g3,5 kg/m (beban mati)

1,05
q ekivaien=500 kg/m (beban hidup)
1,05

q ekiv,ien =2600 kg/m (beban mati)

21
qek>v,ien =895 kg/m (beban hidup)

P= 18,4 ton

qekivaiea -1793,7 kg/m (beban mati)

22
q ekivaien =504,69kg/m (beban hidup)

P= 16,8 ton

qekiv,ien =2578 kg/m (beban mati)


P2
23 ,05 i q ekivaien =850 kg/m (beban hidup)
,05
2,1 15 .3 PI = 12,756 ton ;P2 = 7 ton

q euv,ien =2810 kg/m (beban mati)

24
qekivaien =1000 kg/m (beban hidup)

P = 3,5 ton

qekivaien =1850 kg/m (beban mati)


25 1,05
qekivaien =528 kg/m (beban hidup)
1,05
6,4.,
105

q ekivaien 1129,13 kg/m (beban mati)

26
I ekivalen =183,33 kg/m (beban hidup)

q e^ien=1946 kg/m (beban mati)

q ekivaien =558,3 kg/m (beban hidup)

Pl = 12 ton , P2 = 7 ton
106

3.3.2 Perhitungan Gaya Geser Dasar Horisontal Total Akibat Gempa dan

Distribusinya ke Sepanjang Tinggi Gedung

A. Berat bangunan total (Wt)

a. Berat Atap Topfloor

1) Beban mati:

Atap = ( 9 x 20 x 6,4 ) + ( 6 x 10 x 3 ) = 1332 kg

balok = ( 10 x 6,6 x 0,3 x 0,4 x 2400 ) + ( 4 x 6,4 x 0,3 x 0,4 x 2400 )

( 4 x 3 x 0,3 x 0,4 x 2400 ) = 29836,8 kg

kolom = 14 x 0,3 x 1,5 x 2400 = 4536 kg

dinding = 103,4x 1,5 x 250 = 38775 kg

plafond = ( 26,4 x 6,4x 50 ) + (2 x 3 x 6,6 x 50) = 10428 kg

Wm= 84907,8 kg

2) Beban hidup

qh atap = 100 kg/cm2

koefisien reduksi untuk beban hidup menurut Peraturan Pembebanan

Indonesia - 1983 (PPI-1983) sama dengan 0,3 sehingga :

Wh = 0,3 x 100 x (26,4 x 6,4 + 2 x 3 x 6,6 ) = 6256,8 kg

Jadi berat total lantai atap topfloor = Wm + Wh

= 84907,8+6256,8

=91164,6 kg
107

b.Berat lantai Topfloor

l)Beban mati:

plat = ( 26,4 x 6,4 x 0,12 x 2400 ) + ( 2 x 3 x 6,6 x 0,12 x 2400 )


= 60065,28 kg

balok induk = ( 4 x 6,6 x 0,3 x 0,58 x 2400 ) + ( 5 x 6,4 x 0,3 x 0,48 x

2400)+ ( 6 x 3 x 0,3 x 0,28 x 2400 ) + ( 4 x 0,5 x 0,68 x 6,6

x2400 )

= 50929,92kg

balok anak = 4 x 0,3 x 0,4 x 6,4 x 2400 = 7372,8 kg

kolom = ( 10 x 1,5 x 0,5 x 0,5 x 2400 ) + ( 10 x 1,5 x 0,3 x 0,3 x 2400 )


( 6 x 1,5 x 0,3 x 0,3 x 2400 ) + ( 6 x 1,5 x 0,5 x 0,5 x 2400 )
= 19584 kg

dinding = 103,4 x 0,3x 250 = 77550 kg

plafond = ( 26,4 x 6,4 x 50) + ( 2 x 3 x 6,6 x 50 ) = 10428 kg

spesi = ( 26,4 x 6,4 x 21) + ( 2 x 3 x 6,6 x 21 ) = 4379,76 kg

tegel = ( 26,4 x 6,4 x 24) + ( 2 x 3 x 6,6 x 24 ) = 5005,44 kg

tangga luar = 2500 kg

Wm = 237815,2 kg
2) Beban hidup

qh atap = 250 kg/cm2

koefisien reduksi untuk beban hidup menurut Peraturan Pembebanan

Indonesia - 1983 (PPI-1983) sama dengan 0,3 sehingga :

Wh = 0,3 x 250 x (26,4 x 6,4 + 2 x 3 x 6,6 ) = 15642 kg


108

Jadi berat total lantai topfloor = Wm + Wh

=237815,2+ 15642

=253457,2 kg

c. Berat lantai 4

1) Beban mati:

plat = ( 9,4 x 26,4 x 0,12 x 2400 ) = 71470,08 kg

balok induk = ( 5 x 6,4x 0,4 x 0,58 x 2400 ) + ( 4 x 6,6 x 0,3 x 0,48 x

2400) + ( 8 x 0,5 x 0,68x 6,6 x 2400 )

= 70026,24 kg

balok anak = (4 x 0,3 x 0,6x 6,6 x 2400) + (5 x 0,3 x 0,4x 7 x 2400 )


= 21484,8 kg

kolom = ( 15 x 1,5 x 0,5 x 0,5 x 2400 ) + ( 15 x 1,5 x 0,6 x 0,6 x 2400 )

( 4 x 1,5 x 0,5 x 0,5 x 2400 ) + ( 4 x 1,5 x 0,6 x 0,6 x 2400 )


= 41724 kg

dinding = 127,7 x 0,3x 250 = 95775 kg

plafond = ( 9,4 x 26,4 x 50) = 12408 kg

spesi = ( 9,4 x 26,4 x 21 ) = 5211,36 kg

tegel = ( 9,4 x 26,4 x 24 ) = 5955,84 kg

tangga luar = 2500 kg

Wm = 326555,32 kg
2) Beban hidup

qh atap = 250 kg/cm2


109

koefisien reduksi untuk beban hidup menurut Peraturan Pembebanan

Indonesia - 1983 (PPI-1983) sama dengan 0,3 sehingga :

Wh = 0,3 x 250 x 9,4 x 26,4 = 18612 kg

Jadi berat total lantai 4 = Wm + Wh

=326555,32+ 18612

=345167,32 kg

d. Berat lantai 3

1) Beban mati:

plat = ( 12,4 x 26,4 x 0,12 x 2400 ) = 94279,68 kg

balok induk = ( 4 x 6,6 x 0,3 x 0,48 x 2400 ) + ( 8x 6,6 x 0,4 x 0,58 x2400
( 5 x 6,4 x 0,4 x 0,58 x 2400 ) + ( 5 x 6,4 x 0,5 x 0,68 x
2400 ) = 82452,48 kg

balok anak =( 4 x 0,3 x0,4 x6x2400 ) + ( 4x0,3 x 0,4 x6,4 x2400 )


( 4 x 0,3 x 0,4 x 6,6 x 2400 ) = 25344 kg

kolom = ( 15 x 1,5 x 0,6 x0,6 x 2400 ) +( 15 x 1,5 x 0,7 x0,7 x2400 )


= 45900 kg

dinding = 194 x 3x 250 = 145500kg

plafond = 12,4 x 26,4 x 50 = 16368 kg

spesi = ( 12,4 x 26,4 x 21 ) = 6874,56 kg

tegel = ( 12,4 x 26,4 x 24 ) = 7856,64 kg

tangga luar = 2500 kg

Wm = 427075,36 kg
110

2) Beban hidup

qh lantai = 250 kg/cm2

koefisien reduksi untuk beban hidup menurut Peraturan Pembebanan

Indonesia - 1983 (PPI-1983) sama dengan 0,3 sehingga :

Wh = 0,3 x 250 x 12,4 x 26,4 = 24552 kg

Jadi berat total lantai 3 = Wm + Wh

=427075,36 + 24552

=451627,36 kg

d. Berat lantai 2

l)Bebanmati

plat = ( 15,6x 26,4 x 0,12 x 2400 ) = 118609,92 kg

balok induk = ( 8 x 6,6 x 0,3 x 0,48+ 8x 6,6 x 0,4 x 0,58+

5x6,4x 0,4 x 0,58+ 5 x 6 x 0,4 x 0,58+

5 x 3,2 x 0,3 x 0,28 )x 2400 = 204003,84 kg

balok anak = ( 4 x 0,3 x 0,4 x 6 x 2400 ) + ( 4 x 0,3 x 0,4 x 6,4 x 2400 )

( 4 x 0,3 x 0,4 x 6,6 x 2400 ) = 25344 kg

kolom = ( 15 x 3 x 0,7 x 0,7 x 2400 ) + ( 5 x 1,5 x 0,7 x 0,7 x 2400 )


= 61740 kg

dinding = 177,2 x 3x 250 = 132900kg

plafond = 12,4x 26,4 x 50 = 16368 kg

spesi = ( 15,6 x 26,4 x 21 ) = 8648,64 kg


ill

tegel = ( 15,6 x 26,4 x 24 ) = 9884,16 kg

tangga luar = 2500 kg

Wm = 579998,56 kg

2) Beban hidup

qh atap = 250 kg/cm2

koefisien reduksi untuk beban hidup menurut Peraturan Pembebanan

Indonesia - 1983 (PPI-1983) sama dengan 0,3 sehingga :

Wh = 0,3 x 250 x 15,6 x 26,4 = 30888 kg

Jadi berat total lantai 2 = Wm + Wh

=579998,56 + 30888

=610886,56 kg

d. Berat lantai 1

l)Beban mati

plat = ( 15,6 x 26,4 x 0,12 x 2400 ) = 118609,92 kg

balok induk = ( 8 x 6,6 x 0,3 x 0,48+ 8x 6,6 x 0,4 x 0,58+ 5 x 6,4 x 0,4x

0,58 + 5 x 6 x 0,4 x 0,58+ 5 x 3,2 x 0,3 x 0,28 )x 2400

=204003,84 kg

balok anak = ( 4 x 0,3 x 0,4 x 6 x 2400 ) + ( 4 x 0,3 x 0,4 x 6,4 x 2400 )


( 4 x 0,3 x 0,4 x 6,6 x 2400 ) = 25344 kg

kolom = ( 20 x 1,5 x 0,7 x 0,7 x 2400 ) + ( 20 x 2 x 0,8 x 0,8 x 2400 )


= 96720kg

dinding = 177,2 x 3,5x 250 = 132900kg


112

plafond = 12,4 x 26,4 x 50 = 16368 kg

spesi = ( 15,6 x 26,4 x 21) = 8648,64 kg

tegel = ( 15,6 x 26,4 x 24) = 9884,16 kg

tangga luar = 2800 kg

615278,56 kg

2) Beban hidup

qh atap = 250 kg/cm2


koefisien reduksi untuk beban hidup menurut Peraturan Pembebanan

Indonesia - 1983 (PPI-1983) sama dengan 0,3 sehingga :

Wh = 0,3 x 250 x 15,6x 26,4 = 30888 kg

Jadi berat total lantai 1 = Wm + Wh

=615278,56 + 30888

=646166,56 kg

d. Berat Groundfloor

1) Beban mati:

plat = ( 15,6x 26,4 x 0,12 x 2400 ) = 118609,92 kg

balok induk = ( 8 x 6,6 x 0,3 x 0,48 + 8x 6,6 x 0,3 x 0,48 +

5x6,4x 0,4x0,58+ 5x6x0,4x0,58 +

5 x 3,2 x 0,3 x 0,28 )x 2400 = 204003,84 kg

balok anak = 4 x 0,3 x 0,4 x 6,6 x 2400 = 7603,2 kg

kolom =( 20 x 10 x 0,8 x 0,8 x 2400 ) = 307200 kg

dinding = 183,6 x 4x 250 = 183600 kg


113

plafond = 15,6 x 26,4 x 50 = 16368 kg

spesi = ( 15,6 x 26,4 x 21) = 8648,64 kg

tegel = ( 15,6 x 26,4 x 24 ) = 9884,16 kg

tangga luar =3100 kg

Wm = 859017,76 kg

2) Beban hidup

ruang sewa = toko = taman kanak - kanak = musholla = qh lantai

= 250 kg/cm2

koefisien reduksi untuk beban hidup menurut Peraturan Pembebanan

Indonesia - 1983 (PPI-1983) sama dengan 0,3 sehingga :

Wh = 0,3 x 250 x 15,6 x 26,4 = 30888kg

Jadi berat total lantai 4 = Wm + Wh

=859017,76 + 30888

=889905,76 kg

maka berat total bangunan (Wt):

Wt = 91164,6 + 253457,2 + 345167,32 + 451627,36 + 610886,56

= 646166,56 + 889905,76 = 3288375,36 kg

B. Waktu getar bangunan

dengan menggunakan persamaan : Tx = Ty = 0,06.H3/4

= 0,06 x 27 3/4= 0,71 dt

Dengan menggunakan waktu getar 0,71 dt, untuk daerah gempa 3 dan kondisi

tanah lunak diperoleh koefisien gempa dasar C sama dengan 0,07


114

Gaya geser horisontal total akibat gempa besarnya gaya geser dasar horisontal

akibat gempa yang harus ditahan Oleh struktur dengan berat total Wt dan

koefisien gempa dasar C dengan I dan K ditentukan berdasarkan ketentuan yang

ada dalam Peraturan Perencanaan Tahan Gempa Indonesia untuk Gedung


(PPTGIUG-1981), maka diperoleh :

V = C.I.Wt.K

=0,07 . 1. 3288375,36. 1 = 230186,2752 kg

Distribusi gayageser horisontal total akibat gempa

a) arah sumbu x

kontrol H/A atau H/B < 3

dari batasan masalah tersebut diketahui H =27 m ; A=26,4 m ; B=15,6 m

27/15,6= 1,73 < 3

W.h;
F jv
IX'
=F •*• TV
V V
SW.h; " y

Tabel 3.9 Ditribusi Gaya Geser Horisontal


tingkat hi Wi Wi.hi Fix,y untuk tiap portal
(i) (m) (ton) (ton.m) (ton) 1/4Fix (ton) 1/5Fiy(ton)
7 27 91.1646 2461.444 11.8141 2.953526 2.362821
6 24 253.4576 6082.982 29.19627 7.299067 5.839254
5 21 345.1673 7248.513 34.79043 8.697606 6.958085
4 18 451.6274 8129.293 39.01787 9.754468 7.803575
3 15 610.8866 9163.299 43.98075 10.99519 8.796151
2 12 646.1666 7753.999 37.21659 9.304147 7.443318
1 8 889.9058 7119.246 34.16999 8.542497 6.833998
£=47958.78
115

3.4 Perencanaan Balok

-Balok As H (5-6)

Momen rencana tumpuan = 1,39E8 Nmm = 139 KN m

Momen rencana lapangan = 3,95E7 Nmm = 39,5 KN m

Balok = 30/50

Mutu beton (fc') = 30 Mpa

Mutu baja (fy) = 400 Mpa

diasumsikan d = 500 - 70 = 430 mm

Perencanaan tulangan tumpuan

Mu = 139 KNm

0,85.fc\0, 600
Pb
fy 600 +fy
0,85.30.0,85 600
pb = = o 033
400 600 + 400 '

P min = 1,4/fy

= 1,4/400 = 0,0035

Pm« =0,75. pb

= 0,75.0,033 = 0,025

m = fy/ (0,85.fc)

=400/ (0,85.30) =15,6863


^ =Mm.x/(b.d*)

= l,39E8/(300.4302) = 2,948
_ l_ 2m.Rn
r perlu 1-1-
^ m
116

2.15,6863.2,948
perlu I-,/1 = 0,0079
15,6863 V 400

AS =P verlu- bd
= 0,0079. 300 . 430 = 1019,1mm2

pakai 3D22 ( As = 1140,399 mm2)

d ak,ua, = 500 - (40 + 10 + »/2.22) = 439 mm > 430 mm (Ok)

Menentukan momen nominal aktual balok

Anggab baja tarik telah mencapai regangan leleh saat beton tekan mencapai
regangan hancur 0,003

Gaya dalam:

C = 0,85 . fc'. b.a

= 0,85 . 30 . 300. a = 7650 a

T = As.fy

= 1140,399 . 400 = 456159,6 N

keseimbangan gaya C =T

7650 a = 456159,6

a= 59,6287 mm

x = a/p,

=59,6287/0,85 = 70,1514 mm

periksa regangan baja tarik :

8 y = fy/Es = 400/200000 = 0,002


117

d-x 439-62,6898
£s= ecu = .0,003
x 62,6898

=0,0158 > 0,002 (Ok)

Mn = T.(d - a/2)

= 456159,6 .(439 - 53,2863/2 ).10 6

= 186,654 KNm

MR= 0Mn = O,8 . 186,654= 149,323 KNm > 139 KNm

Perencanaan tulangan lapangan

Mu = 39,5 KNm

0,85.fc'.p, 600
pb =
fy 600 +fy
pb =
f 0,85.30.0,85 600 _ QQ33
400 600 + 400 '

P min = 1,4/fy

= 1,4/400 = 0,0035
Pmax=0,75. pb

= 0,75. 0,033 = 0,025

m =fy/(0,85.fc)

=400/(0,85.30) =15,6863
Rn =Mraax/(b.d2)

= 3,95E7/(300.4302) = 0,8378
2m.Rn
r perlu •*'
m
fy

1 2.15,6863.0,8378
perlu 1-Jl 0,0021
15,6863 400
118

P penu < P mm maka dipakai p mm= 0,0035

As p^u = K
p ,
perlu bu- du

= 0,0035. 300 . 430 = 451,5 mm2

pakai 2D22 ( As = 760,266 mm2)

d,kn»i= 500 - (40 + 10 + V2.22) =439 mm >430 mm (Ok)


Menentukan momen nominal aktual balok

Anggab baja tarik telah mencapai regangan leleh saat beton tekan mencapai
regangan hancur 0,003

Gaya dalam ;

C = 0,85 . fc'. b.a

= 0,85 . 30 . 300. a = 7650 a

T = As.fy

= 760,266 . 400 = 304106,4 N

keseimbangan gaya C =T

7650 a = 304106,4

a= 39,7525 mm

x = a/ P,

=39,7525/0,85 = 46,7676 mm

periksa regangan baja tarik :

s y = fy/Es = 400/200000 = 0,002


119

d-x 439-46,7676
s s= ecu = .0,003
x 46,7676

=0,0252 > 0,002 (Ok)

Mn = T.(d - a/2)

=304106,4 .(439 - 39,7525/2 )10"6

= 127,4582 KNm

MR = 0 .Mn = 0,8 . 127,4582 = 101,967 KNm > 39,5 KNm... .(Ok)


Penulangan tulangan geser

Gaya geser maksimum sejauh d (430 mm ) dari perietakan :

Vu = 55,83697 (KN) (dari SAP90)

I/2.0.Vc = 36,0675 KN

Vi. 0.Vc < Vu <0 .Vc perlu tulangan geser minimum

digunakan sengkang D10 ; Av= 2 %102 = 157 mm2

Luas tulangan geser minimun :

1 bw.s 3.Av.fy
Av = —>• s =
3 fy bw

3.157.400
—££- =628 mm

spasi sengkang maksimum: s < d/2 atau s < 600 mm

s<219,5mm

dipakai D10-215
Kontrol terhadap torsi

Gambar 3.6 Balok pada kontrol torsi

Mtx =Tu = 3,7028 KNm

lx 2y =3002.500 +360.1202 =50,2E6mm3

0[—Vfc"J Sx2y =0,6.-^30.50,2 =6,871KNm >3,7028 KNm


maka tidak perlu tulangan torsi

• »

Gambar 3.37 Potongan balok As H (5-6)

Hasil tulangan balok yang lain di tabelkan !!


Tabel 3.11 PenulanganBalok Induk

Mu Tulangan Atas Tulangan Bawah Mn


Lantai Balok Dimensi (KN.m) (mm2) (mm2) (KN.m)
Negatif Positif Perlu Terpasang Perlu Terpasang Negatif Positif
ground as H 5-6 30x50 139 39.5 1016.44 3D22 (1140.399) 451.5 2D22(760.266) 146 99.8
as J 5-6 30x60 249 88.4 1494.335 5D22(1900.665) 556.5 2D22(760.266) 292 124
as K 5-6 30x60 212 83.7 1254.615 4D22(1520.S32) 556.5 2D22(760.266) 239 124
as L 5-6 30x50 102 39.7 727.455 3D22(1140.399) 451.5 2D22(760.266) 146 99.8
as 5 H-J 30x60 241 118 1437.374 5D22(1900.665) 556.5 2D22(760.266) 292 124
as 5 J-K 30x50 110 42.4 451.5 3D22(1140.399) 451.5 2D22(760.266) 146 99.8
as 5 K-L 30x40 24.5 8.50 346.5 2D22(760.266) 346.5 2D22(760.266) 75.45 75.45
as 6 H-J 40x70 440 218 2204.851 6D22(2280.79B) 1050.45 3D22(1140.399) 427 222
as 6 J-K 30x60 158 69.2 556.5 3D22(1140.399) 556.5 3D22(1140.399) 183 183
as 6 K-L 30x40 47.8 19.8 441.2445 2D22(760.266) 346.5 2D22(760.266) 75.45 75.45

1=2 as H 5-6 30x50 180 68.7 1340.432


4 D22(1520.532) 451.5 2 D22(760.266) 190 99.8
as J 5-6 40x70 425 285 2126.179
6 D22(2280.798) 1388.429 4 D22(1520.532) 427 292
as K 5-6 40x70 319 204 1567.148 5 D22(1900.665) 984.1106 3 D22(1140.399) 361 222
as L 5-6 30x50 100 39.6 451.5 3 D22(1140.399) 451.5 2 D22(760.266) 146 99.8
as 5 H-J 30x60 308 151 1882.459 6 D22(2280.798) 878.7091 3 D22(1140.399) 343 183
as 5 J-K 30x50 122 48.5 881.8198 3 D22(1140.399) 451.5 2 D22(760.266) 146 99.8
as 5 K-L 30x40 26.5 6.02 346.5 2 D22(760.266) 346.5 2 D22(760.266) 75.45 75.45
as 6 H-J 40x70 521 291 2651.435 8D22(3041.064) 1421.581 4 D22(1520.532) 555 292
as 6 J-K 30x60 162 69.4 942.0568 3 D22(1140.399) 556.5 2 D22(760.266) 183 124
as 6 K-L 30x40 34.1 9.65 346.5 2 D22(760.266) 346.5 2 D22(760.266) 75.45 75.45

3 as H 5-6 30x50 155 69.4 1140.429 4 D22(1520.532) 451.5 2 D22(760.266) 1.9E+08 99.8
as J 5-6 40x70 425 287 2122.521 6 D22(2280.796) 1401.159 4 022(1520.532) 4.27E+08 292
as K 5-6 30x60 220 180 1306.637 4 D22(1520.532) 556.5 3 D22(1140.399) 239 183
as 5 H-J 30x60 290 146 1764.515 5 D22(1900.665) 556.5 3 D22(1140.399) 292 183
as 5 J-K 40x70 256 291 1244.517 4 D22(1520.532) 1422.042 4 D22(1520.532) 292 292
as 6 H-J 40x70 560 278 2871.925 8D22(3041.064) 1357.29 4 D22(1520.532) 555 292
as 6 J-K 50x80 546 661 2313.745 7 D22(2660.931) 2835.68 8 022(3041.064) 586 664

4 as H 5-6 30x50 107 39.4 767.0289 3 D22(1140.399) 451.5 2 D22(760.266) 146 99.8
as J 5-6 40x70 321 234 1574.392 5 D22(1900.665) 882 4 D22(1520.532) 361 292
as J' 5-6 40x70 425 196 2126.771 6 D22(2280.798) 882 3 D22(1140.399) 427 222
as 5 H-J 30x60 284 202 1722.626 5 D22(1900.665) 1191.506 4 D22(1520.532) 292 239
as 5 J-J' 30x40 91.0 45.5 871.0752 3 D22(1140.399) 419.1789 2 D22(760.266) 110 75.45
as 6 H-J 40x70 532 351 2714.542 8D22(3041.064) 1731.029 5 D22(1900.665) 555 361
as 6 J-J' 30x40 108 56.0 1052.353 3 D22(1140.399) 520.0928 2 D22(760.266) 110 75.45

TopFloor as H 5-6 30x60 294 225 1788.806 6 D22(2280.798) 1335.863 4 022(1520.532) 343 239
as J 5-6 40x70 406 345 2021.168 6 D22(2280.798) 1703.22 5 D22(1900.665) 427 361
as 5 H-J 30x60 147 234 852.8003 3 D22(1140.399) 1394.093 4 D22(1520.532) 183 239
as 6 H-J 30x60 145 136 837.4832 3 D22(1140.399) 782.4773 3 D22(1140.399) 183 183
as K 5'-6 30x40 39.3 66.3 346.5 2 D22(760.266) 621.3136 2 D22(760.266) 75.45 75.45
as 5' J-K 30x40 142 40.2 1432.2 4 D22(1520.532) 346.5 2 D22(760.266) 141 75.45
as 6 J-K 30x40 44.8 43.2 413.1676 2 D22(760.266) 397.1671 2 D22(760.266) 75.45 75.45

Atap as H 5-6 30x40 21.7 43.4 346.5 2 D22(760.266) 399.0696 2 D22(760.266) 75.45 75.45
as J 5-6 30x40 42.8 51.7 393.3638 2 D22(760.266) 479.2476 2 D22(760.266) 75.45 75.45
as 5 H-J 30x40 43.4 32.2 398.9745 2 D22(760.266) 346.5 2 D22(760.266) 75.45 75.45
as 6 H-J 30x40 55.6 37.9 516.5001 2 D22(760.266) 346.5 2 D22(760.266) 75.45 75.45
asK 5'-6' 30x40 32.7 29.8 346.5 2 D22(760.266) 346.5 2 D22(760.266) 75.45 75.45
as 5' J-K130x40 52.9 490.7366 2 D22(760.266) 2 D22(760.266) 75.45
Tabel 3.12 Penulangan Balok Anak

Balok Dimensi Mu Tulangan Atas Tulangan Bawah Mn Sengkang


(KN.m) (KN.m)
(mm2) (mm2)
Negatif Positif Perlu Terpasang Perlu Terpasang Negatif Positif
ba-1 25x30 4.10 1.63 201.25 2D22(760.266) 201.25 2D22760.266 50.15 50.15 010-110
ba-2 30x40 46.4 21.4 428.0641 2D22(760.266) 346.5 2D22760.266 75.45 75.45 010-160
ba-3 30x40 39.9 17.4 366.6199 2D22(760.266) 346.5 2D22760.266 75.45 75.45 0IO-I6O
ba-4 30x40 233 128 2622.331 8D22(3041.064 1269.363 4D221520.53 244 141 010-120
ba-5 25x30 19.6 9.79 259.5743 2D22(760.266) 201.25 2D22760.266 50.15 50.15 010-110
ba-6 30x40 118 58.9 1155.076 4D22(1520.532 548.5443 2022760.266 141 75.45 010-160
Tabel 3. 13 Penulangan Geser Balok Induk
Vu kritis Vs Tulangan Geser
Lantai Balok Dimensi (KN) (KN) Dalam Luar
Jarak d Jarak d
ground as H 5-6 30x50 55.837 101.902 010-265 010-265
as J 5-6 30x60 117.0565 125.6 010-265 010-265
as K 5-6 30x60 107.1886 125.6 010-265 010-265
as L 5-6 30x50 53.0451 125.6 010-215 010-215
as 5 H-J 30x60 136.0794 144.71304 010-230 010-265
as 5 J-K 30x50 65.2085 125.6 010-215 010-215
as 5 K-L 30x40 22.0164 125.6 010-165 010-165
as 6 H-J 40x70 235.9875 263.76 010-150 010-315
as 6 J-K 30x60 103.9485 125.6 010-265 010-265
as 6 K-L 30x40 40.7813 125.6 010-165 010-165

1=2 as H 5-6 30x50 87.3679 125.6 010-215 010-215


as J 5-6 40x70 245.5499 125.6 010-150 010-315
as K 5-6 40x70 190.5169 125.6 010-315 010-315
as L 5-6 30x50 53.1275 125.6 010-215 010-215
as 5 H-J 30x60 209.4098 221.893 010-150 010-250
as 5 J-K 30x50 71.5175 125.6 010-215 010-215
as 5 K-L 30x40 188.4218 125.6 010-165 010-165
as 6 H-J 40x70 390.3944 439.6 010-90 010-150
as 6 J-K 30x60 110.5387 125.6 010-265 010-265
as 6 K-L 30x40 12.499 125.6 010-165 010-165

3 as H 5-6 30x50 82.14612 125.6 010-215 010-215


as J 5-6 40x70 252.1003 263.76 010-150 010-315
as K 5-6 30x60 160.5593 166.42 010-200 010-265
as 5 H-J 30x60 187.9525 221.893 010-150 010-265
as 5 J-K 40x70 193.5608 197.82 010-200 010-300
as 6 H-J 40x70 345.0511 359.673 010-110 010-300
as 6 J-K 50x80 412.9627 416.764 010-110 010-130

4 as H 5-6 30x50 59.4994 125.6 010-215 010-215


as J 5-6 40x70 193.1191 197.82 010-150 010-200
as J' 5-6 40x70 304.3461 329.7 010-120 010-180
as 5 H-J 30x60 207.8974 208.25 010-160 010-240
as 5 J-J' 30x40 40.1476 125.6 010-165 010-165
as 6 H-J 40x70 363.8165 395.64 010-100 010-300
as 6 J-J' 30x40 48.38 125.6 010-165 010-165

TopFloor as H 5-6 30x60 220.6451 229.5448 010-145 010-200


as J 5-6 40x70 258.0893 263.76 010-150 010-315
as 5 H-J 30x60 159.9318 166.42 010-200 010-200
as 6 H-J 30x60 111.6981 125.6 010-265 010-265
as K 5'-6 30x40 11.75448 125.6 010-165 010-165
as 5' J-K 30x40 58.2667 125.6 010-165 010-165
as 6 J-K 30x40 42.9333 125.6 010-165 010-165

Atap as H 5-6 30x40 32.0713 125.6 010-165 010-165


as J 5-6 30x40 36.555 125.6 010-165 010-165
as 5 H-J 30x40 30.9406 125.6 010-165 010-165
as 6 H-J 30x40 31.13706 125.6 010-165 010-165
asK 5'-6' 30x40 19.9327 125.6 010-165 010-165
as 5' J-K 30x40 21.6384 125.6 010-165 010-165
3.5 Perencanaan Kolom

-Kolom As-C

4 0/4 C

" 0 / 4 H

4 0/40 j
4 0/70
50/60!

60/60

40/70

60/60

40/70

10

e: c e

P Z - ~ A_ MELINTANG CI n ~t

Gambar 3 T8 Portal melintang

Portal as 7

eleraen trtik MDfT.M) ML(T.M) MEfT.M) PD (Ton) PL (Ton) PE (Ton)

30 1 -6,694 -0,106 13,772 -391,043 -57,976 -2,806

2 8,855 0,811 -13,607 -384,899 -57,976 -2,806


124

*Kelangsingan Kolom 30*

-Kekakuan kolom

Ec= 4700 . Vf' c = 4700 . V30 =25742,9602 Mpa

Ig= 1/12. b.h= 1/12 . 600. 6003 = 1.08E10mm4

1,2MD 1,2.8,855
(3 = = —- = 0,8922
K 1,2MD + 1,6ML (1,2.8,855 +1,6.0,8110)

(Ec.Ig)/2,5 (25742,9602.108E10)/2,5 ____„_ 2


EIk= = = 5.88E13Nmm
1+ P 1+ 0,8922

r = 0,3 .h = 0,3 . 600 =180 mm

-Kekakuan Balok :

Ec= 4700 .*JFc = 4700 .V30 =25742,9602 Mpa

Igl= 1/12. b . h = 1/12 . 400.7003 = 1,143 E10 mm4

Ig2 = 1/12 . b. h = 1/12 .300.5003 = 3,125 E9 mm4

B = 0,8922

(Ec.Ig)/5 (25742,9602.1,143E10)/5 _„_„__ 2


EI°= —:—^— = ;—^~rZr7ZZ = 3»! lE13Nmm
1+ p 1+ 0,8922
(Ec.Ig)/2,5 (25742,9602.3,125E9)/2,5 2
EIb= = = 8,5E12Nmm
1+ p 1+ 0,8922

-Menentukan nilai k:

(EDc/ Lk,) + (Elk / Lk2) (5,88E13 / 4E3) + (5,88E13 / 3E3)


^ ~ (Elb /Lb).+(EIb2 / Lb2) ~(3,11E13/6,4E3) +(8,5E12/6E3) ~
Vi =¥2

dari grafik dan tabel dari perhitungan beton bertulang (Gideon jilid 4,hal 106)untuk

harga vj/, = vj/2 =5,46 struktur tanpa pengaku didapat k=2,29


125

( kl. Lk)/r = ( 2,29.4000/ 180 ) = 50.889 > 22 kolom langsing

7t2.EIk 7i2.5,88E13
Pc -.E-3 = 6906,27KN
(k,.l)2 (2,29.4E3):

*Pembesaran Momen*

-Pembebanan pada Kolom elemen 30:

Pu = 1,05. (-391,043 - 57,976 -2,806) = -474,4163 Ton

Mbl = (1,2 . -6,694 + 1,6 . -0,106 ) = -8,2024 T.M

Mb2 = ( 1,2 . 8,855 + 1,6 . 0,811 ) = 11,9236 TM

ME1 = 13,772 T.M

ME2 = -13,607 T.M

Pc = 6906,27 KN

Tabel 3.13 Perhitungan Pc PortalMelintang

Elemen Pu(Ton) Mbl(T.M) Mb2(T.M) MElfT.M) ME2(T.M) PC(KN)


10 538,418 1,1496 5,3424 20,313 -5,381 35130

30 474,4163 8,2024 11,9236 13,772 -13,607 6906,27


50 379,2075 11,3316 16,7692 5,661 -10,109 10850,78
68 288,3395 3,192 20,1204 1,612 -6,233 20667,82
83 165,2522 11,502 30,2536 -3,161 3,350 8517,899
96 90,1247 8,8624 11,0468 9,215 -8,3 3630.682

112 12,4835 3,042 1,2796 1,669 -1,932 1597.716

-Pembesaran Momenpada elemen 30:

Cm = 0,6 + 0,4 .( 6,694/8,855 ) = 0,9024

Cm 0,9024
Sb =
1- (Pu / 0Pc) 1- (4744,163 / 0,65.6906,27)
126

Cm 0,9024
1,3058
l-(IPu/E0Pc) 1-(19482,417/0,65.97017,7)

Mcx = Mb + ME =1. 11,9236 + 1,3058 . 13,772

=29,994 T.M = 299,94 KN.m

30/40 30/4 0
i
i ;'

! 40/70 ; 40/70 1
*
1 j 1
| 40/4C; 1

j 40/7Q ! " 40/7C 1

{-
j 1P3
1 10/70 40/70
i
60/60
68
I
40/70 40/70

60/60
1
40/70 40/70

60/60 30
*

40/70 40/70

10

70/70 6

I c <-
1
1

7 S

;DR" •"iZMBUJUR

Gambar 3.39 Portal membujur

Portal as C

elemen titik MD(T.M) ML (T.M) ME (T.M) PD (Ton) PL (Ton) PE (Ton)

30 1 0,001 0,00 14,848 -391,043 -57,976 -0,007

2 0,00 0,00 -14,798 -384,899 -57,976 -0,007


127

*Kelangsingan Kolom 30*

-Kekakuan kolom

Ec= 4700 . Vf' c = 4700 . V30 =25742,9602 Mpa

Ig= 1/12. b.h= 1/12. 600. 6003 = l,08E10mm4

B=\

(Ec.Ig)/2,5 (25742,9602.1,08E10)/2,5 _.„^XT 2


EIk= — = = 5,56E13Nmm
1+P 1+1

r = 0,3 .h = 0,3 . 600 =180 mm

-Kekakuan Balok :

Ec= 4700 .jTc =4700 .V30 =25742,9602 Mpa

Igl= 1/12. b . h = 1/12 . 400.7003 = 1,143 E10 mm4

Ig2 = 1/12 . b. h = 1/12 .400.7003 = 1,143 ElOmm4

B=l

(Ec.Ig)/5 (25742,9602.1,143^10)/5 .-.„.... 2


EIbl= —-—-— = = 2,94El3Nmm
\+P 1+1
2
EIb2= EIbl= 2,94E13 Nmm

-Menentukan nilai k

(EDc / Lk,) + (EDc / Lk2) (5,56E13 / 4E3) + (5,56E13 / 3E3)


Wl ~~ (EIb/Lb).+(EIb2/Lb2) _(2,94E13/6,6E3) +(2,94E13/6,6E3) =3'H8
Vi = ¥2

dari grafik dan tabel dari perhitungan beton bertulang (Gideon jilid 4,hal 106)untuk

harga vj/, = vj/2 =3,118 struktur tanpa pengaku didapat k=l,85


128

( kl. Lk)/r = (1,85.4000/180) = 41,11> 22 => kolom langsing

7i2.EDc 7i2.5,56E13
Pc .E-3 = 10011,71KN
(k,.l)2 (1,85.4E3)2

*Pembesaran Momen*

-Pembebanan pada Kolom elemen 30:

Pu = 1,05. (-391,043- 57,976 -0,007) = -471,4773 Ton

Mbl =(1,2.0+ 1,6 . 0) = 0 T.M

Mb2 = ( 1,2 .0 + 1,6 .0 ) = 0 TM

ME1 = 14,848 T.M

ME2 = -14,978 T.M

Pc= 10011,71 KN

Tabel 3.14 Perhitungan Pc Portal Membujur


Elemen Pu(Ton) Mbl(T.M) Mb2(T.M) ME1(T.M) ME2(T.M) PC(KN)
10 535,1398 0,00 0,00 24,163 -6,154 18801,13
30 471,4773 0,0012 0,00 14,848 -14,798 10011,71
50 376,682 0,0012 0,00 6,186 -10,956 12585,88
68 286,076 0,0024 0,0036 2,821 -7,018 12585,88
83 163,769 0,0024 0,0024 0,532 -2,112 108294,5
96 87,1742 0,0084 0,018 3,867 -3,876 21391,51
112 11,9249 0,0072 0,0048 1,861 -1,914 1525,088

-Pembesaran Momenpada elemen 30:

Cm=l

Cm
4 3,63
\-(Pul0Pc) 1-(4714,773/0,65.1011,71) '
129

Cm 1
4 = = 1,1976
\-Q:PuI£0Pc) ~~ 1-(19322,432/0,65.102080,1)

Mcy = Mb + ME = 3,63 . 0,0012+ 1,1976 . 14,848

= 17,787 T.M =177,87 KN.M

*Perencanaan Tulangan Kolom

Kolom 1 (elemen 30)

600

Mn/
600 -y f
| (Mny

i
Pu = 474,4163 Ton = 4744,163 KN

Pn = 4744,163/0,65 = 7298,712 KN

Mcx = 299,94 KN M

Mnx = 299,94/0,65 = 460,144 KN M

Mcy =177,87 KNM

Mny = 177,87/0,65 = 273,6494KN M

h/b = 600/600 = 1 ; B = 0,75

Mox ekivalen = Mnx + Mny . h/b. ( \-p)l B

= 460,144+273,65. 1 (l-0,75)/0,75

= 551,3309 KNM

Dari grafik interaksi kolom dengan Mn = 551,3309 KN M dan

Pn =7298,712 KN
130

didapat nilai p = 1% ( kolom menaalami patah desak)

As = 0,01. 600.510 =3060 mm2 -»A's = 1530 mm2

dipasang tulangan kolom = 4 D25 (1963,5 mm2)^ satu sisi

cek patah desak:

A's.fy b.h.fc
Pn = ———r2 +
[el (d-d')] + 0,5 (3he/d2) + l,18

e=Mox / Pn = 551,3309 / 7298,871 = 0,07538 m

1963,5.400 600.600.30
Pn = + = 7497 324KN
[75,538/(510-90)]+ 0,5 (3.600.75.538/5102) +1,18 /H*''^HJV1N

jadi Pn=7298,71 KN < 7497,324 KN- OK

Perencanaan Sengkang

s < 16x diameter tulangan memanjang = 16x 25 = 400 mm

48x diameter tulangan sengkang = 48 x 10 = 480 mm

ukuran kolom terkecil = 600 mm

maka dipasang sengkang = D10-400


131

Tabel 3.14 Penulangan Kolom

Lantai Kolom Dimensi Pu/0,65 As tarik As total PN Tul. Geser


(KN) (KN)
Basement Exterior 60/60 3350.598 4D25 12D25 5195.97 D10-400
Interior 70/70 8283.35 5D25 18D25 9911.459 D10-400
Ground Exterior 60/60 2863.9 4D25 12D25 4204.119 D10-400
Interior 60/60 7306.124 4D25 12D25 7497.324 D10-400
First Exterior 60/60 2268.437 4D25 12D25 5661.082 D10-400
Interior 60/60 5833.96 4D25 12D25 6219.038 D10-400
Second Exterior 60/60 1707.462 4D25 12D25 5293.183 D10-400
Interior 60/60 4435.99 4D25 12D25 6837.174 D10-400
Third Exterior 40/40 1217.5 3D25 8D25 1535.511 D10-400
Interior 40/40 2542.34 4D25 12D25 5505.89 D10-400
Fourth Exterior 40/40 719.7831 3D19 8D19 4808.109 D10-300
Interior 40/40 1386.53 4D19 12D19 1548.438 D10-300
Topfloor Exterior 30/30 122.2369 2D19 4D19 2734.313 D10-300
Interior 30/30 192.05 3D19 8D19 2918.129 D10-300
132

3.6 Perencanaan Pondasi

-Pondasi C7

Data.

Daya dukung tanah = 300 KN/m2

Berat volume tanah =20,5 KN/m2

Ukuran kolom : 70/70

Beban aksial kolom = 439,365 ton

Berat sendiri TieBeam = ((6,6+3,2+3)2,4.0,4.0,7 ) = 8,6016 ton

Berat kolom pondasi = 0,7. 0,7. 4 . 2,4 = 4,704 ton

Berat tanah sepanjang kolompondasi = 0,7.0,7. 4. 2.05 = 4,018

Beban mati PD = 439,365 + 8,6016 + 4,704 - 4,018 = 448,65 ton =4486,5KN


Beban hidup PL=70,253 ton =702,53 KN

Momen = 1,2.Md + 1,6 ML =1,2.0,422 + 1,6.0,402 =l,1496Tm

Momen gempa (ME) = 20,313 TM=203,13 KNm

q tanah = (4 -0,2 - 0,9). 20,5=59,45 KN/ m2

q pondasi = 0,9.24. =21,6 KN/m2

q basement = 19,82 KN/m2

*Menentukan dimensi pondasi*

daya dukung tanah eflctif o^ = 300 -59,45 - 21,6- 19,82 = 198,78 KN/ m2

A = Pu/ aef= ((1,2.4486,5 + 1,6. 702,53)/198,78)=32,898 m2

Pondasi direncanakan bujur sangkar, sehingga :


13:

A = bxb * b=V/f =5,735 m~5,9m

e = M/Pu = (11,496+203,13)/6732,11 = 3,28E-2 m

tegangan dengan memperhitungakan momen yang terjadi

Pu
i+\¥

6539,458 '6.0,0328^
1+ 194,13 KN/m'
5,92 ^ 5,9

a = Pu / A < a ef

= 6539,458/5,92= 187,86 KN/m2 <194,13 KN/m:

-Cek kuat geser beton

Cek geser pons


5,9 M

^ ^^^g
0,7 '^d
5,9 M n 0,? B1

!£d ,•
////
////
I ^ZYl
V2d
yA
}^d
Gambar 3.40 Daerah kritis geser pons
Bl=0,7 + 2. (0,5.d )

= 0,7+ 2.(0,5.0,92)=!,62m

B2=0,7 + 2. (0,5 d )

= 0,7+ 2.(0,5 .0,92) =1,62 m


gaya geser total pada penampang kritis

Vu= a . (5,92-Bl.B2)

Vu= 187,86 (5,92-1,62. 1,62) =6397,854 KN

Kuat geser beton

0 Vc = 0,6.(4. A/77c)2(Bl+B2). d

=0,6.(4. V30)2.3240.920.E-3 = 78367,27 KN>Vu aman

Cek geser balok


S ..CJ 0 7

1M • 5,9 M

59M
Gambar 3.41 Daerah kritis geser balok

Vu = a .b.s

s=(5,9 - 0,7)/2 -0.92 =1,68 m

Gaya geser total pada penampang kritis tiap lm panjam


Vu = a b.s

= 187,86. 1 .1,68 = 326,1411 KN

Kuat geser beton tiap lm panjang

0Vc = 0,6.(1/6. ^TO-b.d.


135

=0,6.(1/6 . V30 ) 1000 920.E-3 =503,905 KN > Vu

Penulangan

S ,

IIP 0,7
5,9

il -5.9 M-
Gambar 3.42 Daerah momen

^i

Q9

r\ \ ~A I A—TT-X
Ci

Gambar 3.43 Gaya dari bawah pondasi

momen diambil selebar b = lm

s = (5,9-0,7)/2 =2,6 m

M= a .b.s. 1/2. s

=187.86. 1.2,6. 1/2. 2.6 = 656,1649 KNm

Mn = 656,1649 / 0,8 =820,2061 KN m

jd = 0,9 d = 0,9 .920 = 828 mm


136

Mn 820,2061
As = ——" = nnn „ = 2476,468mm2
jd.fy 828.400

dipakai D25 dengan A10 = 490,873 mm2

. , , 40.1OOO 490,873.1000
jarak tulangan = x = —^ = = 198 2154mm
5 As 2476,468 iyo^1^mm

dipasang tulangan pokok D25-150

As paka,^ (A10 1000)/150 = 3272,493 mm:

As^ 1,4/(400.1000.920) = 3220 mm2


Tabel 3.15 Penulangan Pondasi

PONDASI Pd PL PE PU Tebal ° .i B ° t.rj.di Dua arah Satu arah


(ton) (ton) (ton) (ton) (mm) (KN/m2) (m) (KN/nv) (KN/m2) VU(KN) 0VC(KN) VU(KN) 0VC(KN)
AS-E5 186.2033 19.076 12.691 2666.566 600 196.08 3.7 228.2497 194.782 2392.49 33357.62 223.6847 284.8157
AS-E7 317.447 35.897 13.021 4513.926 700 195.73 4.9 202.6815 188.0019 4358.437 43032.59 299.9686 339.588
AS-B7 209.3694 34.604 0 3066.097 600 196.08 4 211.6514 191.6311 2845.435 33357.62 239.166 284.8157
AS-A7 61.0329 10.64 0 902.6348 400 196.78 2.5 210.9457 144.4216 1025.145 17162.56 122.3485 175.2712
As-C7 448.65 70.253 3.161 6539.458 1000 198.78 5.9 194.1316 187.8615 6397.854 78367.27 326.1411 503.9048

M Mn AS As terpakai As min DIPAKAI


(KN.m) (KN.m) (mm2) (mm2) (mm2)
256.7809 320.9762 1714.616 1963.496 1820 D25-250
446.9127 558.6409 2502.872 2583.547 2170 D25-190
288.1104 360.138 1923.814 1963.496 1820 D25-250
85.43302 106.7913 927.0076 1227.185 1120 D25-400
656.1649 820.2061 2476.468 3272.493 3220 D25-150
138

Perencanaan Balok Ikat (Tie Beam)

Balok ikat dengan bentang 6,6 m (40/50)

Pu = 5384,118 KN

Pu=10%PU =538,4118 KN

- Terhadap gaya aksial tarik :

Pu'/0 538,4118.E3/0,65
As0eriu
perlu = —,—
fy = 400 — = 2070mm2

dipasang tulangan 5D25 dengan As= 2454 mm2 > As lu

- Terhadap gaya aksial desak :

Pu' = 538,4118 ; fc'= 30 Mpa

Agr = 400 x 500 =200000 mm2

Pu' 538,4118E3
0,162
0. Agr.0,85. fc' 0,65. .200000.0,85.30

Mu = 0 > et=0

et ^=(15+0,03.11)

=(15+ 0,03.500)= 30 mm

et/h = 30/500 = 0,06

d'/h = 70/500 =0,14

Pu' et
—-———— — = 0,162.0,06 = 0,00972
0. Agr.0,85. fc' h

dari grafik halaman 90 (Gideon #4) didapat nilai r =0,02;/?=1,2,p =0,024

As ^ =0,024 x 400 x 500 =4800 mm2