ITP - Fire Hydrant Installation
ITP - Fire Hydrant Installation
ITP - Fire Hydrant Installation
ACTIVITY : DATE :
INSPECTION LEVEL
METHOD OF
NO. ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING DOCUMENT TIME INSPECTION/ FREQUENCY
INSPECTION Owner Contractor Consultant
B Implementation Work
1 Install pipe Visual Daily
MS-ME-MECH-003, CAI-DWG-ME-DD-FF
3 Install the accessories Visual QC-ME-INS-008 Daily M W SW
Visual, CAI-DWG-ME-DD-FF-P1-2001
4 Install pump Daily
Measurement
5 Cleaning material after working Visual Place should be clean from residual material - Daily SW SW SW
C TESTING
SW : Spot Witness Spot Witness, This activity may perform during perform during construction where interim measurements, and/or witness of activity normally take place, prior to final measurement or inspection being done
NAME : NAME :
SIGN : SIGN :
DATE: DATE:
PROJECT NAME PROJECT SYMBOL
ACTIVITY : DATE :
INSPECTION LEVEL
METHOD OF
NO. ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING DOCUMENT TIME INSPECTION/ FREQUENCY
INSPECTION Owner Contractor Consultant
FMR-QCL-09/R1
ECT SYMBOL
REMARK
0A
006-ITP-ME-2022
Inspection & Test Plan of Fire Hydrant Installation CHECKED Sheet: Of:
Project No. : MD - 2408 DATE PREPARED APPROVED BY
QC
Project : Cainiao Smart Logistic Warehouse 5/25/2022 Site QC Project Manager
Manager
Responsbility*
No Item Description/Inspection Activity & Test Plan Method of Inspection Acceptance Criteria / Reference Verifying Document Time Inspection / Frequency Remarks
Murinda BNBV CN
Fire Hydrant Installation
A Prepare Material
1 Electric Fire Pump Review, Visual
2 Diesel Fire pump Review, Visual CAI-DWG-ME-DD-FF-GE-6001
3 Jockey pump Review, Visual
4 Fire pump controller Review, Visual
5 Alarm check valve c/w alarm gong and retard chamber Review, Visual
CAI-DWG-ME-DD-FF-GE-7001
6 Safety Valve (Pressure Relief Valve) Review, Visual
7 Flowmeter Review, Visual QC-ME-GEN-002 Per as execution M W SW
8 Gate Valve Visual
CAI-TS-PL-01
9 Check Valve Visual
10 Pipes Visual
11 Fittings & Flanges buttweld Visual
CAI-DWG-ME-DD-FF-GE-7001
12 Fitting threaded Visual
13 Mechanical Groove Joint Visual
B Implementation Work
1 Install pipe Visual Daily
MS-ME-MECH-003, CAI-DWG-ME-DD-FF
3 Install the accessories Visual QC-ME-INS-008 Daily M W SW
4 Install pump Visual, Measurement CAI-DWG-ME-DD-FF-P1-2001 Daily
5 Cleaning material after working Visual Place should be clean from residual material - Daily SW SW SW
C TESTING
Review, Visual, Pressure test on Fire Hydrant pipe is 1.5 x 11.5 bar =
1 Pressure Test QC-ME-TST-002 Per as execution SW W W
Measurement 17,25 bar = 18 bar
-, Review
2 Continuity & megger test CAI-TS-EP-01, MS-ME-EL-009, MS-ME-EL-010 QC-ME-TST-004, 005, 006 Per as execution SW W W
-, Visual
-, Visual QC-ME-COM-005 & QC-ME-
3 Testing commissioning of Fire Pump CAI-TS-PL-01 Per as execution SW W W
-, Measurement COM-006
* Legend :
Subject : Fire Hydrant Installation (Using BS, GI Pipe) Project No. MD2408
Location :
Ref. Drawing :
RESULT
No. ITEM TO CHECKED REMARKS
YES NO
Installation
1 Brand, dimensions and installation according to specifications
2 The installation of the pipe spar & sleeve is according to the drawing.
3 Installation of piping does not leak, straight and parallel.
4 BOP and piping sloping are according to the drawing.
5 Installation & flange dimensions are according to specifications.
6 Valve installation (Gate valve, Check valve etc.)
7 The position of the pressure gauge has been installed properly and correctly
8 Installation of air venting is done
9 Installation of hanger/pipe support is sturdy and safe.
10 Painting / labeling the pipe is correct.
11 Joint welding based on visual inpection
Notes :
NAME
SIGNATURE
DATE
Attached : Date:
QC-ME-TST-002
CAINIAO SMART LOGISTIC WAREHOUSE
PROJECT Doc.No. : Page: 00 of 00
Location :
Ref. Drawing :
Start Finish
Installation : Installation :
Location : Location :
Date : Date :
Duration : Duration :
Time : WIB Time : WIB
Pressure : Bars Pressure : Bars
Weather : Weather :
Media test : Media test :
Note: Note:
Comments Conclusions:
Approved
Approved w/ comments
Not approved
Commented & Resubmitted
Signature
Date
Attached : Date:
QC-ME-TST-004
CAINIAO SMART LOGISTIC
WAREHOUSE PROJECT Doc.No. : Page: 00 of 00
Reference Drawing :
Result Result
No. Cable No. Remark No. Cable No. Remark
Pass Fail Pass Fail
Signature
Date
Attached : Date:
QC-ME-TST-005
CAINIAO SMART LOGISTIC WAREHOUSE PROJECT
Doc.No. : Page: 00 of 00
Subject : Insulation Resistance Test / Megger Test Insulation - 1 Phase Project No. MD2408
Location :
Ref. Drawing :
Signature
Date
Attached : Date:
QC-ME-TST-006
CAINIAO SMART LOGISTIC WAREHOUSE PROJECT Doc.No. : Page: 00 of 00
Subject : Insulation Resistance Test / Megger Test Insulation - 3 Phase Project No. MD2408
Location :
Reference Drawing :
Signature
Date