Deye Inverter Manual
Deye Inverter Manual
Hybrid Inverter
User Manual
Contents
1. Safety Introductions ………………………………………………… 01
2. Product instructions ………………………………………………… 01-04
2.1 Product Overview
2.2 Product Features
2.3 Basic System Architecture
3. Installation …………………………………………………………… 04-21
3.1 Parts list
3.2 Mounting instructions
3.3 Battery connection
3.4 AC Input/Output Connection
3.5 PV Connection
3.6 CT Connection
3.7 Earth Connection(mandatory)
3.8 WIFI Connection
3.9 Wiring System for Inverter
3.10 Single phase parallel connection diagram
3.11 Split phase parallel connection diagram
3.12 Three phase Parallel Inverter
3.13 Parallel connection for 120/208 three phase
4. OPERATION …………………………………………………………… 22
4.1 Power ON/OFF
4.2 Operation and Display Panel
5. LCD Display Icons …………………………………………………… 23-33
5.1 Main Screen
5.2 Solar Power Curve
5.3 Curve Page-Solar & Load & Grid
5.4 System Setup Menu
5.5 Basic Setup Menu
5.6 Battery Setup Menu
5.7 System Work Mode Setup Menu
5.8 Grid Setup Menu
5.9 Generator Port Use Setup Menu
5.10 Advanced Function Setup Menu
5.11 Device Info Setup Menu
6. Mode …………………………………………………………………… 33-35
7. Fault information and processing ………………………………… 35-38
8. Limitation of Liability ……………………………………………… 38
9. Datasheet ……………………………………………………………… 39-40
10. Appendix I …………………………………………………………… 41
1. Safety Introduc�ons
· This chapter contains important safety and opera�ng instruc�ons. Read and keep this manual
for future reference.
· Before using the inverter, please read the instruc�ons and warning signs of the ba�ery and
corresponding sec�ons in the instruc�on manual.
· Do not disassemble the inverter. If you need maintenance or repair, take it to a professional
service center.
· Improper reassembly may result in electric shock or fire.
· To reduce risk of electric shock, disconnect all wires before a�emp�ng any maintenance or
cleaning. Turning off the unit will not reduce this risk.
· Cau�on: Only qualified personnel can install this device with ba�ery.
· Never charge a frozen ba�ery.
· For op�mum opera�on of this inverter, please follow required specifica�on to select appropriate
cable size. It is very important to correctly operate this inverter.
· Be very cau�ous when working with metal tools on or around ba�eries. Dropping a tool may
cause a spark or short circuit in ba�eries or other electrical parts, even cause an explosion.
· Please strictly follow installa�on procedure when you want to disconnect AC or DC terminals.
Please refer to "Installa�on" sec�on of this manual for the details.
· Grounding instruc�ons - this inverter should be connected to a permanent grounded wiring
system. Be sure to comply with local requirements and regula�on to install this inverter.
· Never cause AC output and DC input short circuited. Do not connect to the mains when DC
input short circuits.
2. Product Introduc�on
This is a mul�func�onal inverter, combining func�ons of inverter, solar charger and ba�ery
charger to offer uninterrup�ble power support with portable size. Its comprehensive LCD display
offers user configurable and easy accessible bu�on opera�on such as ba�ery charging, AC/solar
charging, and acceptable input voltage based on different applica�ons.
- 01 -
2.1 Product Overview
1
2
3
4
6
5
7
8
9
10
11
12 16
13
14
15
- 02 -
2.2 Product Features
- Supports Split phase 120/240Vac, Three-phase 120/208Vac system.
- Self-consump�on and feed-in to the grid.
- Auto restart while AC is recovering.
- Programmable supply priority for ba�ery or grid.
- Programmable mul�ple opera�on modes: On grid, off grid and UPS.
- Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng.
- Configurable AC/Solar/Generator Charger priority by LCD se�ng.
- Compa�ble with mains voltage or generator power.
- Overload/over temperature/short circuit protec�on.
- Smart ba�ery charger design for op�mized ba�ery performance
- With limit func�on, prevent excess power overflow to the grid.
- Suppor�ng WIFI monitoring and build-in 2 strings of MPP trackers
- Smart se�able three stages MPPT charging for op�mized ba�ery performance.
- Time of use func�on.
- Smart Load Func�on.
AC cable DC cable
WiFI
GPRS
CT
- 03 -
3. Installa�on
3.1 Parts List
Check the equipment before installa�on. Please make sure nothing is damaged in the package.
You should have received the items in the following package:
User
manual
- 04 -
3.2 Moun�ng instruc�ons
Installa�on Precau�on
This Hybrid inverter is designed for outdoor use(IP65), Please make sure the installa�on site
meets below condi�ons:
· Not in direct sunlight
· Not in areas where highly flammable materials are stored.
· Not in poten�al explosive areas.
· Not in the cool air directly.
· Not near the television Antenna or antenna cable.
· Not higher than al�tude of about 2000 meters above sea level.
· Not in environment of precipita�on or humidity(>95%)
Please AVOID direct sunlight, rain exposure, snow laying up during installa�on and
opera�on. Before connec�ng all wires, please take off the metal cover by removing
screws as shown below:
- 05 -
≥500mm
≥500mm
For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and
approx. 50cm above and below the unit. And 100cm to the front.
- 06 -
14 mm
1 2 3
(0.55 in.)
52~60mm
[(2.05 in.)to(2.36 in.)]
For safe opera�on and compliance, a separate DC over-current protector or disconnect device is
required between the ba�ery and the inverter. In some applica�ons, switching devices may not
be required but over-current protectors are s�ll required. Refer to the typical amperage in the
table below for the required fuse or circuit breaker size.
- 07 -
All wiring must be performed by a professional person.
Connec�ng the ba�ery with a suitable cable is important for safe and efficient
opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for
recommended cables.
3. In case of children touch or insects go into the inverter, Please make sure the inverter
connector is fasten to waterproof posi�on by twist it clockwise.
- 08 -
Inverter
1 2 3 4 5 6 7 8 9 10 RS 485 CAN
- 09 -
3.3.2 Ba�ery temperature connec�on
1 2
Temp. CT
- 10 -
3.4 AC Input/Output Connec�on
· Before connec�ng to AC input power source, please install a separate AC breaker between
inverter and AC input power source. This will ensure the inverter can be securely disconnected
during maintenance and fully protected from over current of AC input. The recommended of AC
breaker is 50A for 5kw and 80A for 8KW.
· There are three terminal blocks with "Grid" "Load"and "GEN" markings. Please do not misconnect
input and output connectors.
Grid
(Region:US) (Region:EU)
- 11 -
Be sure that AC power source is disconnected before a�emp�ng to wire it to the
unit.
3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten
terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well.
4. Make sure the wires are securely connected.
5. Appliances such as air condi�oner are required at least 2-3 minutes to restart because it is
required to have enough �me to balance refrigerant gas inside of circuit. If a power shortage
occurs and recovers in short �me, it will cause damage to your connected appliances. To
prevent this kind of damage, please check manufacturer of air condi�oner if it is equipped with
�me-delay func�on before installa�on. Otherwise, this inverter will trigger overload fault and
cut off output to protect your appliance but some�mes it s�ll causes internal damage to the air
condi�oner
3.5 PV Connec�on
Before connec�ng to PV modules, please install a separately DC circuit breaker between
inverter and PV modules. It is very important for system safety and efficient opera�on to
use appropriate cable for PV module connec�on. To reduce risk of injury, please use the
proper recommended cable size as below.
To avoid any malfunc�on, do not connect any PV modules with possible current
leakage to the inverter. For example, grounded PV modules will cause current
leakage to the inverter. When using PV modules, please be sure NO grounding.
- 12 -
3.5.1 PV Module Selec�on:
When selec�ng proper PV modules, please be sure to consider below parameters:
1) Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of
inverter.
2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage.
Chart 3-5
- 13 -
3.6 CT Connec�on
(Region:EU)
N L N L N L
Inverter
N L
White wire Black wire
5 6
5 CT
6 L
N
Grid
(Region:US)
N L2 L1
Inverter
3
4
5
6 N L2 L1
White wire Black wire
3 4 5 6
CT2
L2
CT1
Grid
L1
- 14 -
Note:
When the inverter is in the off-grid state, the N line needs to be connected to the
earth.
- 15 -
(Region:EU)
+ + - - + + - - N L2 L1 N L2 L1 N L2 L1
Ground
Inverter
Ground
3.9 Wiring System for Inverter
CAN
Breaker
Load
- 16 -
Breaker
Breaker
Battery Solar
Breaker
PE Generator
or
N
L 5
6
Microinverter
Arrow
CT
pointing
to grid
Smart Load
Earth-BAR
(Region:US)
+ + - - + + - - N L2 L1 N L2 L1 N L2 L1
Ground
Inverter
Ground
CAN
Breaker
Breaker Load
- 17 -
Breaker
Smart Load
Earth-BAR
3.10 Single phase parallel connec�on diagram
(Region:EU)
Inverter
No.3 Grid GEN Load
(slave)
Inverter
Inverter
No.2
(slave)
PE wire
Inverter
N wire
No.1
(master)
L wire
L
N
+ - PE
CAN
Battery pack
Grid
Load
- 18 -
3.11 Split phase parallel connec�on diagram
(Region:US)
No.3
(slave)
Inverter
Inverter
No.2
(slave)
PE wire
Inverter
N wire
No.1
(master)
L wire
L1
L2
N
+ - PE
CAN
Battery pack
Grid
Load
- 19 -
CAN L wire N wire PE wire
Parallel box Parallel A Parallel B
CAN
L3
3.12 Three phase Parallel Inverter
L2
L1
+ - N
- 20 -
PE
Battery pack
L1
L2
L3
N
PE
Load
Grid
CAN L wire N wire PE wire
CAN
L1(L1 L2')
L2(L1' L2'')
L3(L1'' L2)
N
+ - PE
- 21 -
Battery pack
3.13 Parallel connec�on for 120/208 three phase
Load
L1(L1 L2')
L2(L1' L2'')
L3(L1'' L2)
N
PE
Up To go to previous selec�on
- 22 -
5. LCD Display Icons
5.1 Main Screen
The LCD is touchscreen, below screen shows the overall informa�on of the inverter.
05/28/2019 15:34:40
0 8.30 12 0 -3.00 8
KW KW
ON
25%
0 -2.00
KW
8 0 3.00
KW
8
1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it
turns into "comm./F01~F64" , it means the inverter has communica�on errors or other errors,
the error message will display under this icon(F01-F64 errors, detail error info can be viewed in
the System Alarms menu).
3.System Setup Icon, Press this set bu�on,you can enter into the system setup screen which
including Basic Setup, Ba�ery Setup, Grid Setup, System Work Mode, Generator port use,
Advanced func�on and Li-Ba� info.
4.The main screen showing the info including Solar, Grid, Load and Ba�ery. Its also displaying the
energy flow direc�on by arrow. When the power is approximate to high level, the color on the
panels will changing from green to red so system info showing vividly on the main screen.
Inverter Page
Main Screen
Battery Page BMS Page
Battery Setting
Grid Setting
System Setup
Gen Port Use
Basic Setting
Advanced Function
Device info
- 24 -
5.2 Solar Power Curve
Energy Press the “Energy “bu�on will enter into the power
curve page.
Energy
Energy Press the “Energy “ bu�on will enter into the power
curve page.
- 25 -
Li-BMS
U:50.50V
I:-58.02A
Li-BMS
Power: -2930W Volt Curr Temp SOC Energy Charge Fault
Volt Curr
1 50.38V 19.70A 30.6C 52.0% 26.0Ah 0.0V 0.0A 0|0|0
Temp:30.0C
Li-BMS
2 50.33V 19.10A 31.0C 51.0% 25.5Ah 53.2V 25.0A 0|0|0
3 50.30V 16.90A 30.2C 12.0% 6.0Ah 53.2V 25.0A 0|0|0
Sum
4 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Data
5 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
6 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
7 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
8 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
This is Ba�ery detail page. 9 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
10 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Details
11 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Data
if you use Lithium Ba�ery, you can enter BMS page. 12
13
0.00V
0.00V
0.00A
0.00A
0.0C
0.0C
0.0%
0.0%
0.0Ah
0.0Ah
0.0V
0.0V
0.0A
0.0A
0|0|0
0|0|0
14 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
15 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
CANCEL Day Month Year Total CANCEL Day Month Year Total
CANCEL Day Month Year Total CANCEL Day Month Year Total
Solar power curve for daily, monthly, yearly and total can be roughly checked on the LCD, for more
accuracy power genera�on, pls check on the monitoring system. Click the up and down arrow to
check power curve of different period.
- 26 -
5.4 System Setup Menu
System Setup
This is System Setup page.
Basic Advanced
Setting Function Device Info.
Basic Setting
Factory Reset: Reset all parameters of the inverter.
Time Syncs Beep Auto Dim Lock out all changes: Enable this menu for se�ng
Year Month Day Basic parameters that require locking and cannot be set up.
2019 03 17
Set Before performing a successful factory reset and locking
the systems, to keep all changes you need to type in a
Hour Minute password to enable the se�ng.
24-Hour 09 15 The password for factory se�ngs is 9999 and for lock
out is 7777.
Factory Reset Lock out all changes
PassWord
Factory Reset PassWork: 9999
X--X--X--X DEL Lock out all changes PassWork: 7777
1 2 3
4 5 6
7 8 9
CANCEL 0 OK
- 27 -
5.6 Ba�ery Setup Menu
Battery Setting
Ba�ery capacity: it tells Deye hybrid inverter to know
Batt Mode your ba�ery bank size.
Lithium Batt Capacity 400Ah
Batt
Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V).
Use Batt V Max A Charge 40A
Mode Use Ba� %: Use Ba�ery SOC for all the se�ngs (%).
Use Batt % Max A Discharge 40A Max. A charge/discharge: Max ba�ery charge/discharge
No Batt
current(0-115A for 5KW model, 0-90A for 3.6KW model).
Activate Battery
For AGM and Flooded, we recommend Ah ba�ery
size x 20%= Charge/Discharge amps.
. For Lithium, we recommend Ah ba�ery size x 50% =
Charge/Discharge amps.
. For Gel, follow manufacturer' s instruc�ons.
No Ba�: �ck this item if no ba�ery is connected
to the system.
Ac�ve ba�ery: This feature will help recover a
ba�ery that is over discharged by slowly charging
from the solar array or grid.
Battery Setting
Lithium Mode: This is BMS protocol.Please reference
the document(Approved Ba�ery).
Lithium Mode 00
Shutdown 10%: It indicates the inverter will shutdown
Batt
Shutdown 10% Set3 if the SOC below this value.
Low Ba� 20%: It indicates the inverter will alarm if the
Low Batt 20%
SOC below this value.
Restart 40% Restart 40%: Ba�ery voltage at 40% AC output will
resume.
- 28 -
Battery Setting There are 3 stages of charging the Ba�ery . ①
Float V ① 53.6V Shutdown ③ 20%
This is for professional installers, you can keep it
Low Batt 35% if you do not know. ②
Absorption V 57.6V Batt
Restart 50% Set3
Shutdown 20%: The inverter will shutdown if the SOC
Equalization V 57.6V TEMPCO(mV/C/Cell)
below this value.
Equalization Days 30 days
② -5
Low Ba� 35%: The inverter will alarm if the SOC
③
Batt Resistance below this value.
Equalization Hours 3.0 hours
25mOhms Restart 50%: Ba�ery SOC at 50% AC output will resume.
- 29 -
5.7 System Work Mode Setup Menu
System Work Mode Work Mode
Selling First: This Mode allows hybrid inverter to sell
Selling First 8000 Max Solar Power back any excess power produced by the solar panels to
Zero Export To Load Solar Sell
Work the grid. If �me of use is ac�ve, the ba�ery energy also
Mode1
can be sold into grid.
Zero Export To CT Solar Sell The PV energy will be used to power the load and charge
the ba�ery and then excess energy will flow to grid.
Max Sell Power 8000 Zero-export Power 20
Power source priority for the load is as follows:
Energy pattern BattFirst LoadFirst 1. Solar Panels.
Grid Peak Shaving 8000 Power 2. Grid.
3. Ba�eries (un�l programable % discharge is reached).
Zero Export To Load: Hybrid inverter will only provide power to the backup load connected. The hybrid
inverter will neither provide power to the home load nor sell power to grid. The built-in CT will detect
power flowing back to the grid and will reduce the power of the inverter only to supply the local load and
charge the ba�ery.
Battery
Zero Export To CT: Hybrid inverter will not only provide power to the backup load connected but also give
power to the home load connected. If PV power and ba�ery power is insufficient, it will take grid energy
as supplement. The hybrid inverter will not sell power to grid. In this mode, a CT is needed. The installa�on
method of the CT please refer to chapter 3.6 CT Connec�on. The external CT will detect power flowing back
to the grid and will reduce the power of the inverter only to supply the local load, charge ba�ery and home
load.
CT
Battery
- 30 -
Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus
energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load
consump�on and charge ba�ery and feed into grid.
Max. sell power: Allowed the maximum output power to flow to grid.
Zero-export Power: for zero-export mode, it tells the grid output power. Recommend to set it as 20-100W
to ensure the hybrid inverter won' t feed power to grid.
Energy Pa�ern: PV Power source priority.
Ba� First: PV power is firstly used to charge the ba�ery and then used to power the load. If PV power is
insufficient, grid will make supplement for ba�ery and load simultaneously.
Load First: PV power is firstly used to power the load and then used to charge the ba�ery. If PV power is
insufficient, grid will make supplement for ba�ery and load simultaneously.
Max Solar Power: allowed the maximum DC input power.
Grid Peak-shaving: when it is ac�ve, grid output power will be limited within the set value. If the load
power exceeds the allowed value, it will take PV energy and ba�ery as supplement. If s�ll can’t meet the
load requirement, grid power will increase to meet the load needs.
System Work Mode Time of use: it is used to program when to use grid or
Grid
generator to charge the ba�ery, and when to discharge
Time Of Use
Charge Gen
the ba�ery to power the load. Only �ck "Time Of Use"
Time Power Batt
Work then the follow items (Grid, charge, �me, power etc.)
01:00 5:00 8000 49.0V Mode2 will take effect.
05:00 9:00 8000 50.2V Note: when in selling first mode and click �me of use,
the ba�ery power can be sold into grid.
09:00 13:00 8000 50.9V Grid charge: u�lize grid to charge the ba�ery in a �me
13:00 17:00 8000 51.4V period.
17:00 21:00 8000 47.1V
Gen charge: u�lize diesel generator to charge the ba�ery
in a �me period.
21:00 01:00 8000 49.0V Time: real �me, range of 01:00-24:00.
Power: Max. discharge power of ba�ery allowed.
Ba�(V or SOC %): ba�ery SOC % or voltage at when the
ac�on is to happen.
For example:
System Work Mode
During 01:00-05:00, when ba�ery SOC is lower than 80%, it will
Grid Time Of Use
use grid to charge the ba�ery un�l ba�ery SOC reaches 80%.
Charge Gen Time Power Batt During 05:00-08:00 and 08:00-10:00, when ba�ery SOC is higher
Work
01:00 5:00 8000 80% Mode2
than 40%, hybrid inverter will discharge the ba�ery un�l the SOC
reaches 40%.
05:00 8:00 8000 40%
During 10:00-15:00, when ba�ery SOC is higher than 80%, hybrid
08:00 10:00 8000 40% inverter will discharge the ba�ery un�l the SOC reaches 80%.
10:00 15:00 8000 80% During 15:00-18:00, when ba�ery SOC is higher than 40%, hybrid
15:00 18:00 8000 40% inverter will discharge the ba�ery un�l the SOC reaches 40%.
18:00 01:00 8000 35% During 18:00-01:00, when ba�ery SOC is higher than 35%, hybrid
inverter will discharge the ba�ery un�l the SOC reaches 35%.
- 31 -
5.8 Grid Setup Menu
Grid Setting
Please select the correct Grid Mode in your local area.
Grid Mode General Standard
If you are not sure, please choose General Standard.
UL1741& IEEE1547
Grid
CPUC RULE21 Set1 Please select the correct Grid Type in your local area,
SRD-UL-1741 otherwise the machine will not work or be damaged.
Grid Type 220V Single Phase
120/240V Split Phase
120/208V 3 Phase
120V Single Phase
Grid Setting
For California only.
Q(V) FW VW
Grid Setting
For California only.
L/HVRT L/HFRT
- 32 -
5.9 Generator Port Use Setup Menu
GEN PORT USE Generator input rated power: allowed Max. power from diesel
generator.
Mode GEN connect to grid input: connect the diesel generator to the
Generator Input GEN connect to Grid input
grid input port.
Rated Power PORT
Set1
Smart Load Output: This mode u�lizes the Gen input connec�on
8000W
as an output which only receives power when the ba�ery SOC
SmartLoad Output On Grid always on and PV power is above a user programmable threshold.
Power AC Couple Fre High e.g. Power=500W, ON: 100%, OFF=95%: When the PV power
500W 52.00Hz exceeds 500W, and ba�ery bank SOC reaches 100%, Smart Load
OFF 95%
Port will switch on automa�cally and power the load connected.
Micro Inv Input ON 100% When the ba�ery bank SOC < 95% or PV power < 500w, the
Ml export to Grid cutoff Smart Load Port will switch off automa�cally.
- 31 -
5.10 Advanced Func�on Setup Menu
Advanced Function Solar Arc Fault ON: This is only for US.
Solar Arc Fault ON Backup Delay
System selfcheck: Disable. this is only for factory.
0S
Gen Peak-shaving: Enable When the power of the
Clear Arc_Fault Func generator exceeds the rated value of it, the inverter will
Set1 provide the redundant part to ensure that the generator
System selfcheck Gen peak-shaving will not overload.
DRM: For AS4777 standard
DRM CT Ratio
Backup Delay: Reserved
Signal ISLAND MODE
2000:1
BMS_Err_Stop: When it is ac�ve, if the ba�ery BMS failed
to communicate with inverter, the inverter will stop
BMS_Err_Stop working and report fault.
Signal island mode: when the inverter connects grid,
the ATS port will output 230Vac and it is used to cuts off
Inverter Earth-Neutral(load port N line) bond via connect external
load port relay. When the inverter disconnects from the grid, ATS
shell port voltage will be 0 and the Earth-Neutral bond keeps
L N ATS on. More details, please refer to le� picture.
Ground cable
230V
external relay
coil
closed
contact
Advanced Function
Ex_Meter For CT: when in Three phase system with CHNT
Parallel Modbus SN
A Phase Three phase energy meter (DTSU666), click corresponding
Master 00 B Phase phase where hybrid inverter is connected. e.g. when the
Paral.
Slave C Phase Set3
hybrid inverter output connects to A phase, please click A
Phase.
Ex_Meter For CT
A Phase
B Phase
C Phase
Advanced Function
This is for Wind Turbine
DC1 for WindTurbine DC2 for WindTurbine
Note: This interface is not available for some firmware
V1 0V 0.0A V7 0V 0.0A
Wind version
Set2
V2 0V 0.0A V8 0V 0.0A
V3 0V 0.0A V9 0V 0.0A
- 32 -
5.11 Device Info Setup Menu
Li-BMS
Device Info.
Volt Inverter
Curr Temp SOCID: 1601012001
Energy Charge Flash
Fault
This page show Inverter ID, Inverter version and alarm
HMI: Ver0302 MAIN:Ver2138
Volt Curr codes.
1 50.38V 19.70A 30.6C 52.0% 26.0Ah 0.0V 0.0A 0|0|0
Alarms Code31.0C 51.0% 25.5Ah
Occurred
2 50.33V 19.10A 53.2V 25.0A 0|0|0 Device
Sum
3 F64 Heatsink_HighTemp_Fault
50.30V 16.90A 30.2C 12.0% 6.0Ah2019-03-11 15:56
53.2V 25.0A 0|0|0
4 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
Info
Data
5 F64 Heatsink_HighTemp_Fault
0.0Ah2019-03-08
0.0A 10:46
0.00V
0.00V
6 F64
0.00A
0.00A
0.0C
0.0C
0.0%
0.0%
0.0V
0.0Ah2019-03-08
Heatsink_HighTemp_Fault 0.0V
0|0|0
0.0A 10:45
0|0|0 HMI: LCD version
7 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
8 0.00V 0.00A
9 0.00V 0.00A
0.0C
0.0C
0.0%
0.0%
0.0Ah
0.0Ah
0.0V
0.0V
0.0A 0|0|0
0.0A 0|0|0
MAIN: Control board FW version
10 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Details
11 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Data
12 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
13 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
14 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
15 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
6. Mode
Mode I:Basic
AC cable DC cable COM cable
Solar
CT
Battery
Grid
AC cable DC cable
Wind
Grid
CT
Battery
- 33-
Mode III: With Generator
AC cable DC cable
Grid
CT
Battery
Generator
AC cable DC cable
Grid
CT
Battery
Smart Load
Mode V: AC Couple
Grid
Battery
On-Grid Inverter
- 34 -
The 1st priority power of the system is always the PV power, then 2nd and
3rd priority power will be the ba�ery bank or grid according to the se�ngs.
The last power backup will be the Generator if it is available.
If any of the fault messages listed in Table 6-1 appear on your inverter and the
fault has not been removed a�er restar�ng, please contact your local dealer or
service center. You need to have the following informa�on ready.
- 35 -
Error code Description Solutions
1. When the grid type and frequency changed it will report F13;
2. When the battery mode was changed to “No battery” mode,
it will report F13;
3. For some old FW version, it will report F13 when the system
F13 Working mode change work mode changed;
4, Generally, it will disappear automatically when shows F13;
5. If still same, and turn off the DC switch and AC switch and
wait for one minute and then turn on the DC/AC switch;
6. Seek help from us, if can not go back to normal state.
AC side over current fault
1. Please check whether the backup load power and common
AC over current fault
F18 load power are within the range;
of hardware 2. Restart and check whether it is in normal;
3. Seek help from us, if can not go back to normal state.
DC side over current fault
1. Check PV module connect and battery connect;
2. When in the off-grid mode, the inverter startup with big power
F20 DC over current fault of load, it may report F20. Please reduce the load power connected;
the hardware 3. Turn off the DC switch and AC switch and then wait one
minute,then turn on the DC/AC switch again;
4. Seek help from us, if can not go back to normal state.
Remotely shutdown
1. it tells the inverter is remotely controlled and is in off status;
2. it will stay in "OFF " status until the unlock command reaches.
F22 Tz_EmergStop_Fault 3. When the number of inverters the parallel system less than 5pcs,
all inverter' s DIP switch (1&2) need be ON position. If the
number of inverters in parallel system exceeds 7pcs, the master
inverter DIP switch (1&2) needs be ON position and other
inverter' s DIP switch (1&2) needs to be OFF position.
Leakage current fault
AC leakage current is 1. Check PV side cable ground connection.
F23
transient over current 2. Restart the system 2~3 times.
3. If the fault still exists, please contact us for help.
PV isolation resistance is too low
DC insulation impedance 1. Check the connection of PV panels and inverter is firmly and
F24 correctly;
failure 2. Check whether the PE cable of inverter is connected to ground;
3. Seek help from us, if can not go back to normal state.
1. Please wait for a while and check whether it is normal;
2. When the hybrid in split phase mode, and the load of L1 and
The DC busbar is load of L2 is big different, it will report the F26.
F26
unbalanced 3. Restart the system 2~3 times.
4. Seek help from us, if can not go back to normal state.
1. When in parallel mode, check the parallel communication cable
connection and hybrid inverter communication address setting;
F29 Parallel CANBus fault 2. During the parallel system startup period, inverters will report F29.
when all inverters are in ON status, it will disappear automatically;
3. If the fault still exists, please contact us for help.
- 36 -
Error code Description Solutions
No Utility
1. Please confirm grid is lost or not;
F35 No AC grid 2. Check the grid connection is good or not;
3. Check the switch between inverter and grid is on or not;
4. Seek help from us, if can not go back to normal state.
1. Check the hybrid inverter working status. If there's 1 pcs
hybrid inverter is in OFF status, the other hybrid inverters
F41 Parallel system stop may report F41 fault in parallel system.
2. If the fault still exists, please contact us for help.
Grid voltage fault
1. Check the AC voltage is in the range of standard voltage in
specification;
F42 AC line low voltage
2. Check whether grid AC cables are firmly and correctly
connected;
3. Seek help from us, if can not go back to normal state.
- 37 -
Under the guidance of our company, customers return our products so that our company can
provide service of maintenance or replacement of products of the same value. Customers need to
pay the necessary freight and other related costs. Any replacement or repair of the product will
cover the remaining warranty period of the product. If any part of the product or product is
replaced by the company itself during the warranty period, all rights and interests of the
replacement product or component belong to the company.
Factory warranty does not include damage due to the following reasons:
· Damage during transporta�on of equipment;
· Damage caused by incorrect installa�on or commissioning;
· Damage caused by failure to comply with opera�on instruc�ons, installa�on instruc�ons or
maintenance instruc�ons;
· Damage caused by a�empts to modify, alter or repair products;
· Damage caused by incorrect use or opera�on;
· Damage caused by insufficient ven�la�on of equipment;
· Damage caused by failure to comply with applicable safety standards or regula�ons;
· Damage caused by natural disasters or force majeure (e.g. floods, lightning, overvoltage, storms,
fires, etc.)
In addi�on, normal wear or any other failure will not affect the basic opera�on of the product.
Any external scratches, stains or natural mechanical wear does not represent a defect in the
product.
8.Limita�on of Liability
In addi�on to the product warranty described above, the state and local laws and regula�ons
provide financial compensa�on for the product's power connec�on (including viola�on of implied
terms and warran�es). The company hereby declares that the terms and condi�ons of the
product and the policy cannot and can only legally exclude all liability within a limited scope.
- 38 -
9. Datasheet
Model SUN-5K-SG01LP1 SUN-6K-SG01LP1 SUN-7.6K-SG01LP1 SUN-8K-SG01LP1
-US -US -US/EU -US/EU
Battery Input Date
Ba�ery Type Lead-acid or Li-lon
Ba�ery Voltage Range(V) 40-60V
Max. Charging Current(A) 120A 135A 190A 190A
Max. Discharging Current(A) 120A 135A 190A 190A
Charging Curve 3 Stages / Equaliza�on
External Temperature Sensor Op�onal
Charging Strategy for Li-lon Ba�ery Self-adap�on to BMS
PV String Input Data
Max. DC Input Power(W) 6500W 7800W 9880W 10400W
PV Input Voltage(V) 370V (100V~500V)
MPPT Range(V) 125~425V
Start-up Voltage(V) 150V
PV Input Current(A) 11A+11A 22A+11A 22A+22A 22A+22A
No. of MPPT Trackers 2
No. of Strings Per MPPT Tracker 1+1 2+1 2+2 2+2
AC Output Data
Rated AC Output and UPS Power(W) 5000 6000 7600 8000
Max. AC Output Power(W) 5500 6600 8360 8800
Peak Power(off grid) 2 �mes of rated power, 10 S
AC Output Rated Current(A) 20.8A 25A 31.7A / 33A 33.4A / 35A
Max. AC Current(A) 22.9A 27.5A 34.9A / 36.3A 36.7A / 38.5A
Max. Con�nuous AC Passthrough(A) 35A 40A 50A 50A
Power Factor 0.8 leading to 0.8 lagging
50 / 60Hz; 120 / 240Vac (split phase),
Output Frequency and Voltage
208Vac (2 / 3 phase), 230Vac (single phase)
Grid Type Split phase; 2 / 3 phase; Single Phase
Current Harmonic Distor�on THD<3% (Linear load<1.5%)
Efficiency
Max. Efficiency 97.60%
Euro Efficiency 97.00%
MPPT Efficiency 99.90%
Protection
PV Arc Fault Detec�on Integrated
PV Input Lightning Protec�on Integrated
An�-islanding Protec�on Integrated
PV String Input Reverse Polarity Protec�on Integrated
Insula�on Resistor Detec�on Integrated
Residual Current Monitoring Unit Integrated
Output Over Current Protec�on Integrated
Output Shorted Protec�on Integrated
Surge Protec�on DC Type II / AC Type II
- 39 -
Model SUN-3.6K-SG01/03LP1-EU SUN-5K-SG01/03LP1-EU
Certifications and Standards
UL1741, IEEE1547, RULE21, VDE 0126, AS4777, NRS2017,
Grid Regula�on
G98, G99, IEC61683, IEC62116, IEC61727
Safety Regula�on IEC62109-1, IEC62109-2
EMC EN61000-6-1, EN61000-6-3, FCC 15 class B
General Data
Opera�ng Temperature Rande(℃) -25~60℃, >45℃ Dera�ng
Cooling Smart cooling
Noise(dB) <30 dB
Communica�on with BMS RS485; CAN
Weight(kg) 32
Size(mm) 420W×670H×233D
Protec�on Degree IP65
Installa�on Style Wall-mounted
Warranty 5 years
- 40 -
10. Appendix I
Approved ba�ery brand from Deye
GenixGreen ● RS485 6
Murata ● RS485 11
GS10000 ● RS485 3
BPE ● CAN 0
AOBOET ● CAN 0
Alpha ● CAN 0
- 41 -
Add: No.26-30, South Yongjiang Road, Beilun, 315806, Ningbo, China
Tel: +86 (0) 574 8622 8957
Fax: +86 (0) 574 8622 8852
E-mail: service@deye.com.cn
Web: www.deyeinverter.com
502012022 Ver: 2.0, 2020-12