Calculation of Loads: 1. Self Weight of Box
Calculation of Loads: 1. Self Weight of Box
35 m
Height of earth at bottom of box = 12.55 m
Density of soil = 2 Mt/m3
CALCULATION OF LOADS
Number of tracks = 1
Value of cofficient of active earth pressure 'Ka' = 0.251
Value of cofficient of static earth pressure 'Ks' = 0.426
3.7
0.738 m
3.086
No. of rails = 2
Weight of each rail = 0.062 Mt/m
Dead load of rails = 0.124 Mt/m
3
Unit weight of ballast = 2 Mt/m
Height of ballast = 0.336 m
3
Volume of ballast/m = 1.299648 m /m
Dead load of ballast/m = 2.599296 Mt/m
Total dead load of formation/m = 3.303296 Mt/m
But minimum value of dead load/m = 6.8 Mt/m
4.35
2.182384 2.182384
12.55
6.296 6.296
5. EARTH PRESSURE (Static case)
Value of ks = 0.426
Height of earth fill at top of box = 4.35 m
Height of earth fill at bottom of box = 12.55 m
4.35
3.71 3.709885
12.55
10.703 10.703
0.083 0.083
0.083 0.083
7. Dead load surcharge (Static case)
Dead load surcharge V= 0.33 Mt/m
Live load surcharge, S = 0 Mt/m
Ordinate at top of box= ks x V = 0.141 Mt/m
Ordinate at top of box= ks x V = 0.141 Mt/m
0.141 0.141
0.141 0.141
AS per IRC 6
0.685 1.370
0.685 0
9. Live load+DL surcharge (Static case), one side only.
Dead load surcharge V= 0.33 Mt/m
Live load surcharge, S = 2.4 Mt/m
1.164 2.328
1.164 0
0.685 0.685
0.685 0.685
11. Live load+DL surcharge (Static case), both sides.
Dead load surcharge V= 0.33 Mt/m
Live load surcharge, S = 2.4 Mt/m
1.164 1.164
1.164 1.164
Live load surcharge due to 25 t Railway Loading, S = 13.7 Mt for 3m width of uniform
distribution at formation level