Height of fill at top of box = 4.

35 m
Height of earth at bottom of box = 12.55 m
Density of soil = 2 Mt/m3
CALCULATION OF LOADS
Number of tracks = 1
Value of cofficient of active earth pressure 'Ka' = 0.251
Value of cofficient of static earth pressure 'Ks' = 0.426

DEAD LOAD CALCULATIONS


1. SELF WEIGHT OF BOX.

Density of concrete = 2.5 Mt/m3

2. DEAD LOAD OVER Top MEMBER.

Thickness of Wearing Coat = 0.15 m


Density of Wearing Coat = 2.2 Mt/m3
Dead Load of Wearing coat over Top member = 0.33 Mt/m
Dead load of FILL blanket = 8 Mt/m
3. DEAD LOAD OVER Bottom MEMBER.

3.7

0.738 m

3.086

a). Dead load of rails/m

No. of rails = 2
Weight of each rail = 0.062 Mt/m
Dead load of rails = 0.124 Mt/m

b). Dead load of sleeper/m

Sleeper density per meter run = 1.6 sleepers/meter


3
Volume of sleeper = 0.145 m
3
Unit weight of concrete = 2.5 Mt/m
Dead load of sleeper/m = 0.58 Mt/m
c). Dead load of ballast/m

3
Unit weight of ballast = 2 Mt/m
Height of ballast = 0.336 m
3
Volume of ballast/m = 1.299648 m /m
Dead load of ballast/m = 2.599296 Mt/m
Total dead load of formation/m = 3.303296 Mt/m
But minimum value of dead load/m = 6.8 Mt/m

Dead load of ballast over a width of 1m,


= (Max(Total DL of ballast OR 6.8Mt)/3.086m )= 2.2035 Mt/m

d). Dead Load of FILL or Blanket incl. boulder layer/m


3
Unit weight of blanket material for meter run = 2 Mt/m
Height of fill = 0 m
Dead load of FILL blanket = 0 Mt/m

Therefore total dead load intensity = 2.20 Mt/m

4. EARTH PRESSURE (Active case)


Value of ka = 0.251
Height of earth fill at top of box = 4.35 m
Height of earth fill at bottom of box = 12.55 m

Ordinate at top of box = ka x Υ x h1 = 2.182 Mt/m


Ordinate at bottom of box = ka x Υ x h2 = 6.296 Mt/m

4.35

2.182384 2.182384
12.55

6.296 6.296
5. EARTH PRESSURE (Static case)
Value of ks = 0.426
Height of earth fill at top of box = 4.35 m
Height of earth fill at bottom of box = 12.55 m

Ordinate at top of box = ks x Υ x h1 = 3.71 Mt/m


Ordinate at bottom of box = ks x Υ x h2 = 10.703 Mt/m

4.35

3.71 3.709885
12.55

10.703 10.703

6. Dead load surcharge (Active case)


Dead load surcharge 'V' 0.33 Mt/m

Width of uniform distribution of surcharge at form. Level, B = 1 m


Therefore, width of uniform distribution of surcharge top, B' = 7.35 m
Dead load surcharge V= 0.33 Mt/m
Live load surcharge, S = 0 Mt/m
Ordinate at top of box= ka x V = 0.083 Mt/m
Ordinate at top of box= ka x V = 0.083 Mt/m

0.083 0.083

0.083 0.083
7. Dead load surcharge (Static case)
Dead load surcharge V= 0.33 Mt/m
Live load surcharge, S = 0 Mt/m
Ordinate at top of box= ks x V = 0.141 Mt/m
Ordinate at top of box= ks x V = 0.141 Mt/m

0.141 0.141

0.141 0.141

AS per IRC 6

8. Live load+DL surcharge (Active case), one side only.


Dead load surcharge V= 0.33 Mt/m
Live load surcharge, S = 2.4 Mt/m

Ordinate at top of box= ka x (S+V) = 0.685 Mt/m


Ordinate at top of box= ka x (S+V) = 0.685 Mt/m

0.685 1.370

0.685 0
9. Live load+DL surcharge (Static case), one side only.
Dead load surcharge V= 0.33 Mt/m
Live load surcharge, S = 2.4 Mt/m

Ordinate at top of box= ks x (S+V) = 1.164 Mt/m


Ordinate at top of box= ks x (S+V)/(B+H) = 1.164 Mt/m

1.164 2.328

1.164 0

10. Live load+DL surcharge (Active case), both sides.


Dead load surcharge V= 0.33 Mt/m
Live load surcharge, S = 2.4 Mt/m

Ordinate at top of box= ka x (S+V) = 0.685 Mt/m


Ordinate at top of box= ka x (S+V)/(B+H) = 0.685 Mt/m

0.685 0.685

0.685 0.685
11. Live load+DL surcharge (Static case), both sides.
Dead load surcharge V= 0.33 Mt/m
Live load surcharge, S = 2.4 Mt/m

Ordinate at top of box= ks x (S+V) = 1.164 Mt/m


Ordinate at top of box= ks x (S+V)/(B+H) = 1.164 Mt/m

1.164 1.164

1.164 1.164

12. Live load surcharge on Bottom member

Live load surcharge due to 25 t Railway Loading, S = 13.7 Mt for 3m width of uniform
distribution at formation level

LL surcharge per unit loaded length = 4.57 t/m