SECTION 01580
ENGG CERT

PROJECT IDENTIFICATION AND SIGNS

SUBSECTION INDEX

PART 1 - GENERAL

1.01 Requirements
1.02 Related Sections
DESCRIPTION

1.03 Project Identification Sign


1.04 Informational Signs
1.05 Quality Assurance

PART 2 - PRODUCTS

2.01 Sign Materials

PART 3 - EXECUTION
JO/EWO

3.01 Project Identification Sign


3.02 Information Signs
DATE

3.03 Maintenance
3.04 Removal
NO.
REV

DISCIPLINE
ENGINEER PART 1 - GENERAL

DATE:
1.01 Requirements
PROJECT
ENGINEER

A. Furnish, install, and maintain project identification sign.


DATE:
CERTIFIED
B. Provide temporary on-site informational signs to identify key elements of construction
facilities.
DATE:
CONSTRUCTION
AGENCY C. Remove signs upon completion of construction.
DATE:
D. Allow no other signs to be displayed.
OPERATIONS

1.02 Related Sections


DATE:
CONTROL NUMBER

A. Section 01500 - Contractor’s Temporary Facilities


VERIFICATION
EDSD

1.03 Project Identification Sign


DATE:
BY:

A. Contractor shall provide at each separate approved work location a sign indicating the
CERTIFCATION

APPROVAL/CERTIFICATION REQUIREMENTS,

presence of the individual Contractor. Only one sign will be allowed at each site
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

location. Individual signs shall be 1.2 m high x 2.4 m wide. Free standing signs may
10-00167-0007-001 _
(DCC) NO. ____________________
REVISIONCERTIFI

Section 01580

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specifications DOC 1


Shaybah Industrial Support Facilities
B54 A CS-10-00167
of 00
Shaybah SAUDI ARABIA BI / JO: 10-00167-0007 3
EDSD/2616-0399.doc
669B: KH1134 Specs
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
be single-faced. Information on the sign shall be limited to: Company name,
address, logo, Saudi Aramco project and contract number. The sign shall be in
ENGG CERT

Arabic and English. The Contractor shall submit the design and location for approval
prior to installation.

Contractor shall maintain the sign in good repair and condition, and upon completion
of the Work shall remove and dispose of the sign. Except for warnings and other
signs required by law and ordinance, Contractor shall place no other signs or
advertisements on the premises.

B. Graphic Design, Style of Lettering, and Colors: As designated by Saudi Aramco.


DESCRIPTION

C. Erect on the site at a lighted location of high public visibility, adjacent to main entrance
to site, as approved by Saudi Aramco.

1.04 Informational Signs

A. Painted signs with painted lettering.

1. Size of signs and lettering as required by regulatory agencies, or as


appropriate to usage.
JO/EWO

2. Colors as required by regulatory agencies, otherwise of uniform colors


DATE

throughout Project.

B. Erect at appropriate locations to provide required information.


NO.
REV

DISCIPLINE
ENGINEER 1.05 Quality Assurance

DATE:
A. Sign Painter: Professional Experience in type of work required.
PROJECT
ENGINEER

B. Finishes, Painting: Adequate to resist weathering and fading for scheduled


DATE: construction period.
CERTIFIED

DATE:
CONSTRUCTION
PART 2 - PRODUCTS
AGENCY

2.01 Sign Materials


DATE:
OPERATIONS
A. Structure and Framing: May be new or used, wood or metal, in sound condition
structurally adequate to work, and suitable for specified finish.
DATE:
CONTROL NUMBER

B. Sign Surfaces: Exterior softwood plywood with medium density overlay, standard
VERIFICATION

large sizes to minimize joints.


EDSD

DATE:

Thickness: As required by standards to span framing members, to provide even,


BY:

smooth surface without waves or buckles.


CERTIFCATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

C. Rough hardware: Galvanized.


10-00167-0007-001 _
(DCC) NO. ____________________
REVISIONCERTIFI

Section 01580

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specifications DOC 2


Shaybah Industrial Support Facilities
B54 A CS-10-00167
of 00
Shaybah SAUDI ARABIA BI / JO: 10-00167-0007 3
EDSD/2616-0399.doc
669B: KH1134 Specs
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
D. Paint: Exterior quality.
ENGG CERT

1. Use Bulletin colors for graphics.

2. Colors for structure, framing, sign surfaces and graphics: As selected by


Saudi Aramco Representative.

PART 3 - EXECUTION
DESCRIPTION

3.01 Project Identification Sign

A. Paint exposed surfaces of supports, framing and surface material; one coat of primer
and one coat of exterior paint.

B. Paint graphics in styles, sizes, and colors selected.

3.02 Information Signs

A. Paint Exposed Surfaces: One coat of primer and one coat of exterior paint.
JO/EWO

B. Paint graphics in styles, sizes, and colors selected.


DATE

C. Install at a height for optimum visibility; on ground mounted poles or attached to


temporary structural surfaces.
NO.
REV

DISCIPLINE
ENGINEER 3.03 Maintenance

DATE:
A. Maintain signs and supports in a neat, clean condition; repair damages to structure,
PROJECT
ENGINEER framing or sign.

DATE: B. Relocate informational signs as required by progress of the work.


CERTIFIED

3.04 Removal
DATE:
CONSTRUCTION
AGENCY A. Remove temporary signs, framing, supports, and foundations at completion of project.
DATE:
OPERATIONS
- END OF SECTION -

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
CERTIFCATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


10-00167-0007-001 _
(DCC) NO. ____________________
REVISIONCERTIFI

Section 01580

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specifications DOC 3


Shaybah Industrial Support Facilities
B54 A CS-10-00167
of 00
Shaybah SAUDI ARABIA BI / JO: 10-00167-0007 3
EDSD/2616-0399.doc
669B: KH1134 Specs