SECTION 01580
ENGG CERT
SUBSECTION INDEX
PART 1 - GENERAL
1.01 Requirements
1.02 Related Sections
DESCRIPTION
PART 2 - PRODUCTS
PART 3 - EXECUTION
JO/EWO
3.03 Maintenance
3.04 Removal
NO.
REV
DISCIPLINE
ENGINEER PART 1 - GENERAL
DATE:
1.01 Requirements
PROJECT
ENGINEER
A. Contractor shall provide at each separate approved work location a sign indicating the
CERTIFCATION
APPROVAL/CERTIFICATION REQUIREMENTS,
presence of the individual Contractor. Only one sign will be allowed at each site
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL
location. Individual signs shall be 1.2 m high x 2.4 m wide. Free standing signs may
10-00167-0007-001 _
(DCC) NO. ____________________
REVISIONCERTIFI
Section 01580
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
be single-faced. Information on the sign shall be limited to: Company name,
address, logo, Saudi Aramco project and contract number. The sign shall be in
ENGG CERT
Arabic and English. The Contractor shall submit the design and location for approval
prior to installation.
Contractor shall maintain the sign in good repair and condition, and upon completion
of the Work shall remove and dispose of the sign. Except for warnings and other
signs required by law and ordinance, Contractor shall place no other signs or
advertisements on the premises.
C. Erect on the site at a lighted location of high public visibility, adjacent to main entrance
to site, as approved by Saudi Aramco.
throughout Project.
DISCIPLINE
ENGINEER 1.05 Quality Assurance
DATE:
A. Sign Painter: Professional Experience in type of work required.
PROJECT
ENGINEER
DATE:
CONSTRUCTION
PART 2 - PRODUCTS
AGENCY
B. Sign Surfaces: Exterior softwood plywood with medium density overlay, standard
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL
Section 01580
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
D. Paint: Exterior quality.
ENGG CERT
PART 3 - EXECUTION
DESCRIPTION
A. Paint exposed surfaces of supports, framing and surface material; one coat of primer
and one coat of exterior paint.
A. Paint Exposed Surfaces: One coat of primer and one coat of exterior paint.
JO/EWO
DISCIPLINE
ENGINEER 3.03 Maintenance
DATE:
A. Maintain signs and supports in a neat, clean condition; repair damages to structure,
PROJECT
ENGINEER framing or sign.
3.04 Removal
DATE:
CONSTRUCTION
AGENCY A. Remove temporary signs, framing, supports, and foundations at completion of project.
DATE:
OPERATIONS
- END OF SECTION -
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
CERTIFCATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL
Section 01580
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION