TCN Journal 2022 March Edition
TCN Journal 2022 March Edition
TCN Journal 2022 March Edition
33
March 2022
FG Confirms
Engr. Dr. Sule Ahmed Abdulaziz
As Managing Director/ Chief Executive Officer, TCN
EDITIONS OF
TCN TRANSMISSION NEWS
PUBLISHED IN 2021/2022
ber 2021
Decem
32
Issue No.
r,
of Powe
Minister
CEO TCN, cts
Ag. MD/
Power Proje
Inspect
na State
in Katsi
North
Complete
WAPP to smission Line
Core Tran ria and 3
Nige
Linking by 2023
Countries
March 2022
33
Issue No.
CONTENTS March 2022 / ISSUE 33
05 07
10
FG Approves N1.4bn
23 Ukrainian Varsity Seeks
07 Partnership With TCN
For Power Transmission
Projects Honors TCN MD With 16
Award of Excellence
EDITOR’S NOTE
T
he first quarter of the year 2022 can be described as deployed to ongoing project sites nationwide. The West African
mixed grill, with the completion of several projects and Power Pool (WAPP) under the chairmanship of Engr. Dr. Sule
others ongoing under the flagship strategy of the Abdulaziz equally made landmark achievements with the
Nigerian Electricity Grid Maintenance Rehabilitation and groundbreaking ceremony of the WAPP North Core project by the
Expansion Program (NEGMERP). The Federal Government Presidents of Niger and Ghana, and the execution of the
intervened in very positive ways even as the West African Power International Coordination Center (ICC). The ICC would soon be
Pool (WAPP) recorded landmark achievements. The period also commissioned, kickstarting a more efficient power trade among
featured grid disturbance which stabilized by the end of the first WAPP member states.
quarter with TCN management presently exploring hi-tech
measures to stem this destructive tide. The Honorable Minister of Power, Engr Abubakar D. Aliyu, has
continued to encourage and positively impact the sector in
A new milestone record of 183 days system stability was diverse ways. This has helped TCN Management to surmount
achieved from 28th July, 2021 to 27th January, 2022. This is challenges and achieve new milestones; commissioning of the
unprecedented in TCN history, surpassing the period; 12th June, Lafia Transmission Substation by Mr. President and funding
2020 to 29th November, 2020 in which TCN also recorded total approvals by the Federal Government for projects execution are
grid stability under the current TCN Management. This was part of the products of his efforts.
however disrupted by chronic poor gas supply which caused
some generating plants to shut down, drastically reducing power TCN achievements since the inception of the present management
generated into the grid and left TCN system operators constantly under the leadership of Engr. Dr. Sule A. Abdulaziz has equally
struggling to stabilize the grid. The challenge lasted for over one attracted commendations and accolades leading to his
month, caused massive loadshedding, and of course darkness confirmation by the Federal Government and also the presentation
gave way to more vandalism of installations. of the Award of Excellence by a Ukrainian University.
Also, fault on generating units and unscheduled plants With the determination of Management and the staunch
maintenance all posed a great challenge to grid frequency, support of staff as well as the two in-house Unions, the year
management, stability and ultimately birthing system disturbance 2022 holds great hope that will light out challenges, and
during the period. Thankfully these have largely been resolved by ensure that our goal as the bulk transporter of electricity from
Federal Government intervention. The last grid collapse caused the generating companies to distribution load centers
by tower vandalism, left Akwa Ibom and Cross River states in the nationwide is seamlessly accomplished.
dark for over a month, even after grid restoration as the
connecting tower in Uyo had to be re-constructed from scratch. This publication promises to be interesting as it provides
It is imperative that solutions be found quickly to curb this insights beyond technical issues for in-depth industry
menace. perspective.
Happy reading !
Over the months, TCN has been on its toes, repairing vandalized
installations even as it continues to execute new substations and
lines projects. The projects were further boosted when TCN took
Ndidi Mbah
delivery of fifteen new transformers of 150MVA and 60MVA
Editor -in - Chief
capacities from the Lagos Port, Apapa. Most of them have been
PAGE 4
COMMISSIONING March 2022/Issue 33
I
n a major step to expand critical national power (NDPHC), is equipped with modern digital control and
infrastructure to boost power supply in the country, protection facilities with a fully functional Human-Machine-
President Muhammadu Buhari has commissioned the new Interface (HMI) that enhances real-time control of the
2X150MVA and 2X60MVA, 330/132/33 kilovolts (kV) substation's components.
Transmission Substation at Akurba, Lafia, Nasarawa State.
The substation has the capacity to meet the 240MW load
The President who was accompanied by the Nasarawa State demand of the Abuja Electricity Distribution Company (AEDC)
Governor, Engr. Abdullahi Sule, the Governors of Plateau State, which will enable it to enhance power supply to Nasarawa
Mr. Simon Lalong, Kebbi State, Abubakar Atiku Bagudu , Kogi State and also back-feed to the Federal Capital Territory (FCT).
State, Yahaya Bello as well as the Minister of Power, Abubakar
Aliyu, and other top government functionaries, performed the Speaking shortly after the epoch-making event, the Minister of
ceremony on Thursday, 24th February 2022, in Lafia, during his Power, Engr Abubakar Aliyu, commended the successful
two-day State visit to Nasarawa State. execution and commissioning of the project, describing it as
one of the legacy projects of the Federal Government in
The substation project which was funded by the Federal Nasarawa State that will significantly improve the electricity
Government through the National Integrated Power Projects supply in the State and environs.
(NIPP) and built by the Niger Delta Power Holding Company
PAGE 5
COMMISSIONING March 2022/Issue 33
The Minister while outlining some of the benefits of the He said the project was very strategic as Nasarawa State was
substation, said it would enhance rapid growth in socio- the only state in the country that was not connected to the
economic activities and also go a long way in wooing more National grid before the administration of President Buhari. He
foreign investors which will bring about the creation of job remarked that prior to the commissioning of the new project,
opportunities in the State. Nasarawa State received power supply through a single
distribution line from Akwanga, about 70km away which
“You know quality electricity can turn around so many things. negatively impacted the quality of supply and its usefulness.
It can support the industries, small scale enterprises, hospitals,
and many more, which have become moribund due to lack of Mr. Ugbo stated that due to the nature of the project, the
electricity,” he said. substation would become a transmission hub in the country as
TCN was already working on the 330kV transmission line from
According to him, government has injected huge resources Lafia to back-feed Abuja. He explained further that the station
into building the facility for the benefit of the people and was able to receive electricity from the Gas power plants in the
promised that the Federal Government, with key stakeholders Southern part of the country and also from the Hydropower
in the power sector such as TCN, and NDPHC, would ensure plant in Niger State.
routine maintenance of the facility.
According to him, “supply from the new substation can serve at
Earlier in his speech, the Managing Director and Chief Executive least 1 million consumers and Abuja Electricity Distribution
Officer of NDPHC, Mr. Chiedu Ugbo, expressed appreciation to Company (AEDC) has assured of efficient power evacuation of
President Buhari for the opportunity to deliver on the project electricity through the six feeders to consumers.”
as well as the Governor of Nasarawa State for the support with
the donation of free land, as well as the engagement and The ceremony which was performed amidst pomp and
cooperation of the entire community. pageantry was witnessed by dignitaries, including the TCN
team, led by the Managing Director and Chief Executive Officer
TCN, Engr. Dr. Sule Ahmed Abdulaziz.
The new 2X150MVA and 2X60MVA, 330/132/33 kilovolts (kV) Transmission Substation at Akurba, Lafia, Nasarawa State
PAGE 6
PROJECT FUNDING March 2022/Issue 33
T
he Federal Executive Council (FEC) has approved Meanwhile, Engr. Aliyu blamed the ongoing challenges
N1.4billion for the supply of more equipment for bedeviling the power sector, including the frequent grid
Transmission Company of Nigeria, to boost power collapse, on acts of sabotage by elements who do not mean
supply nationwide. well for Nigerians.
The Minister of Power, Engr. Abubakar Aliyu, made this known The Minister said the incidents, which include attacks and
when he briefed State House Correspondents on the outcome abduction of expatriates working on various power projects,
of the FEC meeting, presided over by President Muhammadu as well as other attacks on electrical installations had delayed
Buhari on Wednesday, 13th April, 2022 in Abuja. the completion of some projects, and subsequently led to
blackouts in parts of the country.
According to him, his two memos on variation of the sum of a
contract for 132/33 kV substation at Kafanchan, Kaduna State He lamented that these acts of sabotage had robbed the
with a line bay extension at Jos substation, in Plateau State in country of foreign investors, while appealing to Nigerians to
the sum of N132,705, 861.42, and the supply of handling join the Federal Government in confronting their criminal act .
equipment, haulage, and operational vehicles at
N1,338,159,080.88, for the Transmission Company of Nigeria “You can call it sabotage because, how can somebody go and
(TCN), were graciously approved by the council. pull down a 330kV tower to cause this havoc to the whole
country. What do you call that?” he pondered.
Engr. Aliyu said that the haulage vehicles were heavy duty
lifting machines/vehicles required to move heavy equipment He said, “You're all aware the nation is facing a lot of challenges.
such as transformers, tower members, etc to any of the TCN It's not only in the power sector, You must have heard about
stores or project site, while the operational vehicles are insecurity on the Railway lines and communities are also being
necessary for field work to minimize downtime. attacked. The power sector is not exempted.”
PAGE 7
ELECTRICITY BILL March 2022/Issue 33
By Grace Sambe-Jauro
S enate Committee on Power led by its Chairman, Sen. Acquisition (SCADA), System, and urged the lawmakers to focus
Gabriel Suswan held a two-day Public Hearing on the more on conditions precedent for an independent ISO.
proposed Electricity Bill, 2022, with stakeholders in the On the Land Acquisition and Access to Land, he raised concern
Nigerian Electricity Supply Industry (NESI), on Monday, 28th about the proposed bill where he disclosed that “the Acquisition of
st
February 2022, and Tuesday, 1 March 2022, at the National Land and Access Rights Section of the current EPSRA is more
Assembly Complex, Abuja. robust and effective than the proposed replacement in the new
bill. He explained that land acquisition is one of the biggest barriers
Making his submission at the hearing, the Managing Director/CEO to the timely and efficient implementation of Power projects. A lot
of the Transmission Company of Nigeria (TCN), Engr. Dr Sule of projects, he noted, have been delayed because of this, stating
Abdulaziz said that the company had extensively reviewed the Bill the case of power delivery to Kano and Ondo States that have
and observed certain key issues that needed further been seriously hampered because of land acquisition-related
consideration by the lawmakers. issues. He appealed that the Acquisition of Land and Access
Rights section of the current EPSRA should be further
According to him, before the new electricity bill is passed into law, strengthened.”
there is a need to conduct an Audit of the current Electric Power
Sector Reform Act, (EPSRA). He noted that the EPSRA, Market Earlier in his opening remarks, the Chairman Senate Committee on
Rules, and Grid Code are well-developed documents that meet Power, Sen. Gabriel Suswam, said the Public Hearing was designed
acceptable international standards but not to seek input from stakeholders towards
all the sections of these documents are the passage of the Bill which would
used or enforced.
... TCN is in the provide a uniform law for the sector, drive
process of procuring and promote investors' confidence and
He explained that under the new Bill, the ensure sustainable power sector in
a brand-new Supervisory Nigeria.
Incorporation and Licensing of the
Independent System Operator (ISO), has Control and Data
become inevitable but several Condition Acquisition (SCADA), It will be recalled that on Tuesday,
Precedents need to be met, such as September 28th, 2021, the “Electricity Bill,
technological and infrastructural 2021 (now Electricity Bill, 2022),
requirements necessary for ISO to be independent of the sponsored by Sen. Suswam, passed the
Transmission Service Provider (TSP). He noted also that the Second Reading in the Nigerian Senate and was referred to the
Condition Precedents are to be driven by the industry as a whole Senate Committee on Power for further legislative action. The
with peer bodies like the Initial Stakeholder Advisory Panel (ISAP) formulation of the Bill and its consequent introduction in the
and Grid Code Review Panel (GCRP), consisting of representatives Senate was preceded by a rigorous process involving an
of GenCos, DisCos, Eligible Customers, and TCN. industry-wide appraisal of extant operational and statutory lapses
confronting the Nigerian Electricity Supply Industry (NESI) since
Engr. Abdulaziz also revealed that presently, “It is only TCN that is the conclusion of the privatization exercise in 2013.
shouldering the burden of meeting the Condition Precedents for Stakeholders present at the public hearing include the Minister of
ISO to operate independent of TSP, with the proposed Power Engr. Abubakar Aliyu, Chairman, Nigerian Electricity
construction of two-brand new modern control centers in Regulatory Commission (NERC), Heads of Nigerian Electricity
Osogbo and Abuja, in addition to rehabilitating various substations Management Services (NEMSA), Energy Commission of Nigeria
control equipment and communication for remote controllability (ECN), Nigerian Bulk Electricity Trading (NBET), MDs, and
at the two new Control Centres. He also noted that TCN is in the representatives of Distribution as well as Generation Companies
process of procuring a brand-new Supervisory Control and Data (GenCos).
PAGE 8
The world is changed
by your example
not your opinion
-Paul Coelho
CONFIRMATION March 2022/Issue 33
THE FEDERAL
GOVERNMENT CONFIRMS
ENGR. DR. SULE
AHMED ABDULAZIZ
AS MANAGING DIRECTOR
/CHIEF EXECUTIVE OFFICER, TCN
T
he President of the Federal Republic of Nigeria, years of engineering experience and responsibility as a tested
Muhammadu Buhari has confirmed Engr. Dr. Sule Ahmed project manager.
Abdulaziz as the substantive Managing Director/Chief
Executive Officer of Transmission Company of Nigeria (TCN), TCN's numerous achievements in the areas of projects
with effect from 4th of April, 2022. execution and delivery during his tenure in acting capacity are
attributable to sound leadership and keen focus on grid
Until his confirmation, Engr. Dr. Sule Ahmed Abdulaziz was the expansion, rehabilitation, and maintenance as well as stability
Acting Managing Director of TCN from 19th May, 2020 to 4th and reliability in the transmission of bulk power across the
April, 2022, responsible for the overall supervision of the affairs country. This was achieved through systematic
of TCN, including transmission projects, transmission network implementation of the flagship strategy program- the Nigeria
operations and maintenance, system operations, market Electricity Grid Maintenance, Expansion and Rehabilitation
administration, human resources management and as the Chief Program (NEGMERP), which he put in place to guide the
Accounting Officer. execution of capital and reinforcement projects across the
transmission regions in the country. He equally gave priority to
Under his watch as the Ag. MD/CEO, TCN recorded milestone the maintenance of existing infrastructure with remarkable
achievements in projects execution and delivery, stable grid success.
management, and human resources management that
optimized personnel performance and productivity. Working Engr. Dr. Abdulaziz has demonstrated deftness in project
with an Executive Management consisting of four Executive execution and fund management by ensuring that all projects
Directors, Engr Abdulaziz embarked on projects initiatives and under donor-funded schemes are professionally supervised
execution that significantly transformed TCN from a faltering by specialized units of the company called Project
successor company in the post-privatization era to a viable Management Units (PMUs). The execution of the donor
national and sub-regional transmission company. This is hardly sponsored projects have progressed extensively and
surprising as Engr. Dr. Abdulaziz brought to bear his over 25- milestones delivery have been as scheduled. The Abuja
PAGE 10
CONFIRMATION March 2022/Issue 33
Feeding Scheme Project for instance which consists of one In his over 25 years of cognate experience in project
new 330kV line, two 330/132kV, and three 132kV management, administration, and fund management, the
transmission substations has progressed extensively and seasoned project engineer led the initiation and development
would be ready for commissioning by the end of the third of various strategic projects such as the construction of
quarter of 2022. The Nigeria Electricity Transmission Project 2x30/40MVA, 132/33kV Substations at Talata Mafara;
(NETAP) has also made remarkable progress as all construction of 2x60MVA, 132/33kV Substation at Keffi,
procurement processes have been concluded and most of the Daura and Kukwaba (Abuja Stadium), Kurfi, Malumfashi, Dustin-
packages are at the project implementation stage. Worthy of Ma, Kankara, Daura, Gagarawa, Lalante, and Igangan;
note is the recent delivery of 5 No 150MVA 330/132kV and construction of 1x150MVA 330/132kV Substation at
10 No 60MVA, 132/33kV Transformers at the same time to Maiduguri and construction of 2x150MVA, 330/132/33KV
TCN Central Stores at Ojo Lagos of which some have been Substation at Katsina; to mention a few.
moved to substation sites across the country for installation.
This is a very significant achievement in the history of the Since becoming the Ag MD/CEO of TCN, Engr. Dr. Abdulaziz
power sector in Nigeria. has been the Chairman of the Executive Board of the West
African Power Pool (WAPP) and under his guided leadership
His collaborative and non-coercive management approach of the sub-regional body, the groundbreaking ceremony to
has engendered synergy and consultation among sister mark the commencement of the North Core Project which is a
agencies and other sector players transmission project that is to
who TCN now recognizes as its interconnect Benin, Togo, Burkina
His collaborative and non-coercive
customers and partners in the Faso, Niger and Nigeria for cross-
Nigerian Electricity Supply management approach has engendered border electricity trade was recently
Industry (NESI). This marks a synergy and consultation among sister held in Niger Republic.
major paradigm shift from what agencies and other sector players who TCN
used to be the case. Special now recognizes as it customers and Engr. Dr. Sule Ahmed Abdulaziz is a
attention is now dedicated to partners in the Nigerian Electricity Supply thoroughbred professional who is a
resolving Disco-TCN interface registered Power Engineer with
Industry (NESI),
issues to ensure seamless delivery COREN and a Fellow of both the
of bulk power to the load centers Nigeria Society of Engineers (NSE)
nationwide. and the Nigeria Institute of Power Engineers (NIPE). He is also
a chartered member of the Nigeria Institute of Management
Engr. Abdulaziz has also distinguished himself as a skilled (NIM) and the Financial Reporting Council (FRC). He holds a
human resources manager who has brought industrial Master of Science in Electronics/Automation Engineering
harmony to TCN and has continued to maintain a non- from the Technical University in Sofia, Bulgaria. Engr. Abdulaziz
interference and non-divisive policy in dealing with labor has attended several trainings and self-developmental
unions and union matters. He has equally enhanced capacity courses in the general field of engineering and electrical
development by strategically investing in the training and engineering both in Nigeria and abroad in the following non-
retraining of staff to bridge skills gap among others. exclusive areas, Engineering Project Management and
Execution; Design, Operation, and Maintenance of High
Before becoming the Acting MD/CEO of TCN, Dr. Abdulaziz Voltage Power Equipment; System Planning and Analysis; and
was the General Manager (Projects) at the corporate Effective and Strategic Procurement.
headquarters, from where he subsequently became the
Regional Transmission Manager of Shiroro and Abuja Regions The confirmation of his appointment we believe, would
with responsibility for various operational and managerial positively impact the Power Sector and also entrench
functions including the wheeling of bulk power to the continuity in TCN.
Distribution Companies (DisCos). He also coordinated and
supervised equipment maintenance and repairs, transmission We at TCN are excited at this development and wish Engr. Dr.
network reliability, security and expansion; inventory and Sule Ahmed Abdulaziz a fruitful and successful tenure as we
stock management, maintaining fiscal responsibility and pledge our support and cooperation to his leadership.
accountability of the regional offices.
PAGE 11
PMO March 2022/Issue 33
By Uloma Osuagwu
In furtherance of the Federal Government's resolve to increase signing of an agreement with German technology firm,
the efficiency of power supply in the Nigerian Electricity SIEMENS, will be undertaken in three phases; Phase 1 is to
Supply Industry (NESI) through the Presidential Power quickly raise the operational capacity of the Nigerian
Initiative (PPI)-SIEMENS Project, the Minister of Power, Engr. Electricity Supply Industry (NESI) to 7,000MW, Phase 2 to
Abubakar Aliyu, FNSE, on Tuesday, 15th February 2022, 11,000MW, and Phase 3 to 25,000MW by 2025.
inaugurated a 10-man Project Management Office (PMO)
team to oversee the implementation of segments of the Explaining the composition of the members of the PMO who
Siemens Power Project at the Power House, Abuja. were carefully selected based on competence and technical
background, Engr. Aliyu stated that the team comprises three
The PMO, created to work with the Technical and Regulatory (3) independent experts and seven (7) other members drawn
Committee of the Ministerial Power Sector Working Group from the Transmission Company of Nigeria, (TCN), Ministry of
(MPSWG), is to undertake the technical aspect of the PPI, and Power, Federal Government of Nigeria Power Company,
among other things, ensure the free flow of information and (FGNPC), Ministry of Finance, Budget and National Planning, and
timely execution of projects approval without recourse to the Ministry of Works and Housing.
MPSWG board which sits every 2 to 3 months. This is to fast
track earlydelivery of PPI-SIEMENS Project. He charged the newly inaugurated team to be up and doing in
discharging its mandate, and assured them of his support as the
Engr. Aliyu said the PPI, an initiative of the President Chairman of the Technical and Regulatory Committee of the
Muhammadu Buhari administration which began with the Presidential Power Initiative.
Middle: Minister of Power, Engr. Abubakar Aliyu in a group photograph with the 10-Man Committee Memebrs
PAGE 12
PMO March 2022/Issue 33
PAGE 13
AFD FUNDING March 2022/Issue 33
By Stella Ejikonye
(Middle) AFD Country Director, Mr Xavia Murou with his Team being conducted around the 2x60MVA 132/33kV Gwarimpa Gas Insulated Substation
T
he French Development Agency, (AFD), has scored the words, “we are very impressed with the progress made in
Transmission Company of Nigeria (TCN) high on the executing the project because we know it had taken a lot of
implementation of five transmission projects and a time to start up, but now we can see a lot of work going on.
transmission line under the Abuja Ring Fence Transmission Hopefully, very soon, communities will start benefiting from it
Projects. The ongoing projects comprising two 330kV and that is exactly what we are aiming for. Being closer to
substations, three 132kV substations, and a 330kV achievement, it is important for us to make sure that the
transmission line is an intervention project that is aimed at project continues seamlessly.”
expanding transmission wheeling capacity in Abuja such that
it will not experience power transmission constraints in the Commenting on the delivery date for the project, Mr. Murou
next 20 years. said; “I was told the delivery day will be in the month of July
and if it coincides with the French National Day on the 14th, I
The AFD team led by its Country Director, Mr. Xavia Murou, will be happy to come that day with our flags so that we can
was conducted round by the TCN team for an on-the-spot celebrate with the communities and TCN of course.”
assessment tour of the five project sites in Abuja recently.
The AFD Energy Project Manager, Anne-Sophie Rakoutz, on
Speaking at the site of the 2x60MVA 132/33kV Gwarimpa her part, lauded TCN for the progress made so far, saying, “It's
Gas Insulated Substation (GIS), Mr. Murou expressed the great to see the projects being built up and almost completed.
team's satisfaction with the level of project execution. In his TCN is doing a very good job, given the fact that this kind of
PAGE 14
AFD FUNDING March 2022/Issue 33
job is quite complex. Also, the engineers have reported that At the 2x60MVA 132/33kV Kuje Transmission Substation,
this project will clearly reinforce the stability of the grid and work was also ongoing. Upon completion, the Substation will
contribute to reducing technical losses.” boost bulk power supply to distribution load centers at the
She expressed appreciation for their active participation and Kuje Area Council where more public, commercial and
persistence, noting that TCN has been a strong partner of AFD residential buildings were fast springing up. The inspection
in the last few years. team equally visited the 2x60MVA 132/33kV Wumba
Transmission Substation where the site had been cleared and
The inspection team also visited the 2x150MVA 132/33kV power equipment was already being delivered to the site.
Lugbe West Main Transmission Substation to assess the level
The AFD site visit was concluded at the
330/132kV New Apo Transmission
Substation. The New Apo 2x150MVA,
3x60MVA transmission Substation project, will
be the “Mother Substation” for the third source
of bulk power supply coming through Lafia,
from the Makurdi -Jos 330kV transmission line.
The other sources are the 330/132kV Shiroro
- Katampe Transmission Line, and the
330/132kV Geregu - Gwagwalada
Transmission Line.
PAGE 15
GROUND BREAKING March 2022/Issue 33
By Ndidi Mbah
(Middle) President of Niger Republic and Ghana, Mr. Mohammed Bazoum and Mr. Nana Dankwa Akuffo- Addo and
Ministers in-charge of Energy in ECOWAS Member States.
T
he West African Power Pool (WAPP), made history Niger's Minister of Petroleum, Energy and Renewable Energies,
recently, with the groundbreaking ceremony of the stated that the project was one of the most important in the
WAPP North Core transmission project at the site for ECOWAS sub-region because, once completed, it would
the construction of a high-voltage transmission substation in increase the sub-region's capacity by 500 megawatts, helping
Gorou Banda, Niamey, Niger Republic. The epoch-making to solve electricity deficit within the sub-region, while
event, which took place on 22nd February, 2022 signaled the strengthening the countries existing capacity. The increase in
commencement of the implementation stage of the North bulk power would equally improve accessibility, particularly in
Core Project, one of the priority projects of the West African rural areas, and help to standardize electricity rates.
Power Pool.
Addressing the gathering, the WAPP Chairman Engr. Dr. Sule
Mr. Oudou AMBOUKA, the Governor of Niamey Region, stated Abdulaziz, said that the 913km, 330kV high voltage
in his welcome speech that the launch of the North Core transmission line would emanate from Nigeria's Birnin Kebbi
project was a major step in the realization of the regional Substation through Niger's Zabori and Niamey to
electricity market. The transmission line, he said, would link Ouagadougou, Burkina Faso, with a bypass from Zabori to feed
five WAPP member states of Niger Republic, Nigeria, Burkina Malanville in Benin Republic.
Faso, Benin, and Togo to the WAPP transmission network.
The project he noted, is part of efforts to fulfill the mandate of
According to him, the project's scope comprises a 330kV WAPP which is to integrate the operations of national
high-voltage line, five new transformer substations, control electricity networks of WAPP member states into a unified
room and data acquisition system upgrades, and fiber optics regional electricity market.
installation along the transmission line route. He emphasized
that the volume, quality, viability, and cost of bulk power traded The Project financing, he explained, was concluded in 2016,
between WAPP member countries, which was a crucial while the establishment of the Project Management Unit that
concern in the project's design, will determine the project's would directly supervise the project, was concluded in 2019.
success. He disclosed that the contracts were awarded in 2021 and
contractors would soon mobilize to site.
PAGE 16
GROUND BREAKING March 2022/Issue 33
He stated that the total cost of the North Core project was USD The high point of the ceremony was the laying of the
568 million, to be co-financed by the Agence Française de foundation for the 330kV WAPP North Core transmission
Développement (AFD), the African Development Bank (ADB), project by the Presidents of the Niger Republic and Ghana, Mr.
the World Bank (WB), the European Union, and the Federal Mohammed Bazoum, and Mr. Nana Dankwa Akuffo-Addo. In
Government of Nigeria. attendance was the Prime Minister of the Republic of Niger,
Ministers in charge of Power/Energy and Defense, of Nigeria,
Dr. Abdulaziz however cautioned on the need to urgently find Niger, Burkina Faso, Benin, and Togo as well as the ECOWAS
a solution to the lingering challenge of insecurity in the area, to Commissioner for Mines and Energy.
enable timely project implementation.
Others include the Secretary-General of WAPP, members of
The ECOWAS Commissioner for Mines and Energy, Mr. Sadiko the Diplomatic Corps & International Organizations, Directors
Douka, who also spoke during the event, expressed the hope General and Heads of Utilities in the WAPP, and the WAPP
that the project would achieve the aspiration of increasing North Core Director. The high-profile attendance at the
cross-border trade in electricity as well as extend access to ground breaking ceremony was a reflection of the importance
populations along the transmission line routes. of the North Core Project to the electric power sector within
the West African sub-region.
He expressed satisfaction that despite numerous challenges
posed by the COVID 19 pandemic and insecurity within the The WAPP North Core project is a game-changer that will
sub-region, the project had recorded tremendous progress shape the energy landscape of the sub-region through
since the commencement of financing and inauguration of the effective cross border power trade, and allowing increased
Project Management Unit in 2016 and 2019 respectively. The access to electricity supply. The Project is part of the ECOWAS
North Core Project, he said, was planned for commissioning in 2019 – 2033 Master Plan for the Development of Regional
2024. Generation and Transmission Infrastructure.
(Middle) Minister of Petroleum, Energy and Renewable Energies, H. E. Mohamane Sani Mahamadou
flanked by the Secretary General of WAPP and Staff of WAPP Secretariat.
PAGE 17
WAPP March 2022/Issue 33
(L-R) MD/CEO, TCN, Engr. (Dr) Sule Abdulaziz, Minister of Power, Engr. Abubakar Aliyu and
Minister of Energy, Niger Republic, H.E. Mahamane Sani Mahamadou
The West African Power Pool held its second Joint He commended the World Bank, African Development Bank,
Ministerial Steering Committee (JMSC) meeting recently at French Development Agency, and the European Union for
the Centre International de Conference Mahatma Gandhi, their financial support thus far and the Ministers in charge of
Niamey, Niger on 21st February 2022. Power in the respective participating countries for granting
the request for a waiver to execute work contracts before
The meeting comprising Ministers in charge of Energy Power Purchase Agreements (PPA)and Transmission
/Power and Defense from Nigeria, Niger, Togo, Benin, and Service Agreements (TSA) are signed in line with the
Burkina Faso was convened by the West African Power resolution of the 1st Meeting of the Joint Ministerial Steering
Pool, to discuss the commencement of implementation of Committee (JMSC) on June 10, 2021, in Abuja, Nigeria.
the WAPP North Core Project that would transverse the According to him, the Waiver had enabled the Project
five WAPP member countries as well as strategize on the Monitoring Unit (PMU) to sign works contracts with the
execution of the Project amidst the current insecurity contractors and also to organize the groundbreaking
situation bedeviling the region. ceremony which would hold after the Ministerial meeting.
While declaring the meeting open, Minister of Petroleum, The Minister remarked that the Ministerial Meeting was a
Power, and Renewable Energy for Niger Republic, H.E. platform for participants to highlight progress recorded in
Mahamane Sani Mahamadou lauded the efforts of ECOWAS, the project implementation process and to make
WAPP, and the participating countries for their commitment recommendations that would impact its further execution
to the realization of the project, noting that it had become a to ensure timely delivery. He counseled on the need for all
model for successful regional integration. participating countries to implement actions and integrate
strategies that would ensure adequate security to enable
PAGE 18
WAPP March 2022/Issue 33
consolidation of the achievements made. In this regard, M. measures among which is the implementation of a
Mahamane called upon the Ministers of Defence and Resettlement Action Plan that would provide compensation
Security of the five countries to make concrete for persons and communities affected by the project.
commitment towards the establishment of peace which is Referring to the last meeting of the Joint Ministerial
sine qua non for the success of the North Core Project. Steering Committee in June 2021 in Abuja, Nigeria, the
WAPP Secretary-General said that significant progress had
In his remarks, the Secretary-General, West African Power been made towards procuring lines and substation works
Pool (WAPP), M. Siengui Apollinaire KI, lauded the efforts of and that processes for the commencement of the
the Ministers in charge of Power in the five countries for Environmental and Social Management Plans as well as the
collectively promoting the project which will facilitate Resettlement Action Plan had started, necessitating the
electricity trade among WAPP member countries, and official groundbreaking ceremony for the project.
promote socio-economic development.
M. Siengui KI disclosed that the first Joint Ministerial
Mr. KI expressed profound gratitude to the Ministers of Steering Committee meeting held in Abuja in 2021,
Defense for attending the Joint Ministerial Steering resolved that the countries should constitute their
Committee, noting that their presence showed support for respective National Committee comprising the various
the Project and that the meeting afforded them the armed security operatives to provide security for the
opportunity to have first-hand information regarding Project. He further disclosed that the Government of Niger
security challenges affecting the Project. had already set up its own outfit to provide security for the
construction of the 330 kV lines in its zone and urged
He explained that the North Core Project was one of the others to urgently set up their own security outfits.
priority projects of the ECOWAS Master Plan for the
Development of Regional Systems for the Generation and The JMSC meeting featured presentations by the Project
Transmission of Electricity involving the construction of Monitoring Unit (PMU) of the North Core Project which
transmission project of approximately 913 km of 330kV centered mainly on the Status of Project Implementation as
and 225kV transmission lines from Birnin Kebbi in Nigeria to of January 31, 2022, and issues of insecurity in the project
Ougadougou in Burkina Faso through Niger with a areas. Ministers in charge of security in the respective
diversion to Zabori to connect Benin. member states were also in attendance.
PAGE 19
WAPP ACTIVITIES March 2022/Issue 33
PICTURE SPEAK
Ground breaking ceremony of 913km, 330kV/225kV WAPP Northcore
Regional Interconnection Transmission Project that will connect
Nigeria, Niger, Benin/Togo to Burkina Faso
Groundbreaking ceremony performed by the President of Map showing the 330kV WAPP Northcore Regional Interconnection
Niger Republic, Mohammed Bazoum, and his Ghanian counterpart, H.E. Nana Project from Nigeria -Niger -Benin/Togo to Burkina Faso. In Niamey,
Addo Dankwa Akufo-Addo, Chairman of the Authority of Heads of Niger Republic.
State and Government of ECOWAS
(L-R) Late Engr. Joseph Makoju, ED TSP, Engr. Victor Adewumi and WAPP Photograph of Participants at the WAPP Finance Directors Meeting
Secretary General, Mr Seingui Appollonaire KI during the
Finance Directors Meeting
PAGE 20
WAPP ACTIVITIES March 2022/Issue 33
PICTURE SPEAK
2nd Joint Ministerial Steering Committee (JMSC) Meeting
of West African Power Pool, with Ministers of Energy and
Heads of Security of Nigeria - Niger- Burkina Faso, Benin and Togo
R-L;Minister of Energy, Niger Republic, Minister of Power, Nigeria, Engr. Heads of Security of Niger, and Benin Republic
Abubakar Aliyu, and Chairman WAPP, Engr. Sule Abdulaziz
Members of the WAPP Executive Board visiting the Rtd. Bampus for WAPP Executive Board on study tour of Europe, being received by the
Technological Excellence as well as the Rte Regional Control Center Management of Rtd. the French Transmission Company at their
in Lyon France in continuation of their study tour of Europe. headquarters in Paris France.
PAGE 21
NEW TRANSFORMERS March 2022/Issue 33
F
ifteen brand new power transformers comprising 5 No. Engr. Abdulaziz recalled that the World Bank had earlier in
number 150MVA 330/132kV and 10 No. 60MVA August 2021, also funded transformer supply contracts which
132/33kV capacity transformers have been delivered brought in 10 No 60MVA132/33kV transformers and 25 No
to TCN Central Store in Ojo from the Lagos Port, earlier in earthing transformers. Five (5) out of the ten (10) 60MVA
February, for onward delivery to various TCN project sites transformers, were installed in Karu and Gombe Substations,
nationwide. two (2 ) were installed in Kano, and the last one in Lagos State.
The delivery of the transformers’, which is unprecedented in In his words, “This is the first time in the history of TCN that it
TCN History, is part of efforts by TCN Management to ensure would be taking delivery of a large number of transformers at
the steady implementation of its transmission expansion the same time. This is a part of the milestone achievements of
strategy. Speaking on this, MD/CEO, TCN, Engr. Dr. Sule TCN as it strives to implement its short-term development plan
Abdulaziz disclosed that the contract for the supply of the under the Nigerian Electricity Grid Maintenance, Expansion, and
transformers was funded by the World Bank under the Nigerian Rehabilitation Programme (NEGMERP). The World Bank-
Electricity Transmission Project (NETAP), while their sponsored NETAP project is only one of the TCN donor-
deployment and installation would be at the discretion of funded projects aimed at expanding the transmission grid,
Management. while also prioritizing maintenance of the existing transmission
infrastructures.
He further disclosed that on installation and connection to the
grid, the 10 No. 60MVA 132/33kV power transformers and TCN is equally executing several projects funded by the
the 5 No. 150MVA 330/132kV transformers would add Agence Français de Développement (AFD). Meanwhile,
510MW and 637MW respectively to the transmission processes for projects funded by the African Development
network, consequently increasing the capacity of the Bank (AfDB) are ongoing and contracts will soon be signed for
transmission system by 1147.5MW. The new transformers will the execution of 330kV & 132kV Substations. Again, the
also ensure N-1 reliability criteria in the substations where procurement of consultants for projects funded by the Japan
they will be installed, which is strategic in enhancing grid International Cooperation Agency (JICA) will soon commence.
stability.
PAGE 22
AWARD March 2022/Issue 33
PAGE 23
WAPP March 2022/Issue 33
By Ndidi Mbah
He said, “This is an important step in the implementation of Regarding the status of the contribution of WAPP member
the competitive phase of the Regional Market. We need a utilities to the WAPP Budget, he noted that more member
competent and experienced consultant who can propose utilities were beginning to respond, with some making part
an appropriate restructuring plan for our consideration.” payments while nine (9) had fully paid up. During the
“When the regional market comes on stream, he noted, meeting, two new members were inducted into the
power operators in the member countries will be able to sell Executive Board, namely the Director-General of Sonabel,
excess electricity to utility firms across countries and earn (SBEE) Mr. Gerand Zagrodink, and the Director-General of
foreign exchange”, he added Nigerien Electricity Company (NIGELEC), Engr. Alhassane
Halid.
Abdulaziz, who is also the Managing Director of the
Transmission Company of Nigeria (TCN), said the Executive On the sidelines of the meeting, the Executive Board paid an
Board meeting was coming five months after the previous inspection visit to the WAPP Information and Coordination
session in Ouagadougou, Burkina Faso. He seized the Center (ICC), which is expected to be completed by the
opportunity of the meeting to reiterate the need for timely third quarter of 2022. The ICC will serve as the main center
payment of dues, by members of the Pool. for regional grid coordination and electricity market
management including billing and settlement.
According to him, “If we keep in mind that we are putting in
place critical infrastructure which is of paramount It was noted that the deployment of necessary equipment
importance for our sub-region, I mean the Regional such as Supervisory and Data Acquisition (SCADA), and
Electricity Market, then we should continue to strive to pay Energy Management System (EMS) at the Center, and
our dues on time for a few more years.” linking systems of national utilities to the ICC had advanced
substantially.
In his remarks, the Secretary-General of WAPP, Siengui
Apollinaire Ki, gave an update on some WAPP projects The ICC will serve as the regional System Market Operator,
especially those relating to the regional market. He said, ensure transparency and Market neutrality, enforce
“installation of network and market management common operating rules, harmonize protection schemes,
equipment is about 94% complete and progressing without and calculate net transfer capacity among others.
PAGE 24
ISO March 2022/Issue 33
PAGE 25
FINANCE DIRECTOR March 2022/Issue 33
L-R - Chairman Finance Committee, Secretary General WAPP, Group Photograph of Participants
Executive Director TSP-TCN and Honorary Member Executive
Board WAPP
The Directors of Finance of Electric Utility Companies of the member utilities about the activities of WAPP and the
West African Power Pool (WAPP) member countries imperative for funding of the organization. He stressed that
converged in Abuja, Nigeria for its third forum meeting, such sensitization would enable them to have insight into
February 28 to March 2, 2022, to strategize on the funding projects being implemented by WAPP as well as other
expenditure details. He commented that the maiden edition
of WAPP priority projects in the region.
of the forum was held in Senegal, while the second was in
Bamako.
The Chairman of the West African Power Pool (WAPP)
Executive Board and MD/CEO of TCN, Engr. (Dr) Sule
The Chairman, Finance Committee of WAPP, Ebenezer
Ahmed Abdulaziz, who declared the forum open, cautioned
Tagoe, who also spoke on the need for prompt payment of
members on the need to pay their dues to enable the
dues, said that the meeting would avail member countries
organization effectively run its activities, noting that no
the opportunity to brainstorm on avenues for revenue
meaningful work can be achieved without adequate
generation, especially from subscriptions. He said there is a
financing.
need to showcase more purposefully the activities and
operations of WAPP to enable financiers/contributors to
Dr. Abdulaziz, who was represented by the Executive
appreciate the need to act promptly when demand for
Director, Transmission Service Provider (TSP) in TCN, Engr.
payment of contributions is made.
Victor Adewumi appealed to participating countries to
make payments promptly as the funds were strategic to the
An honorary member of the organization and also former
entire process of advancing the building of a robust power
Managing Director of defunct Nigeria's National Electric
pool for the West African region.
Power Authority (NEPA), Engr. Joseph Makoju, in his
remarks, lamented that the greatest challenge faced by the
According to him, without adequate financing for the
industry today was that consumers see electricity as a
Secretariat, WAPP cannot ensure the proper supervision of
ongoing projects in the Pool, neither can it recruit and retain public good that they should enjoy for free.
a qualified and educated workforce that is essential to
running the system. He noted that this mentality has brought about illiquidity in
the system, distorting the activities of Distribution
The General Secretary of WAPP, Mr. Siengui Appolinaire Ki, Companies (DisCos), and called on the regional
stated that the meeting which is held biannually is aimed at organization to take up the responsibility of sensitizing
educating financial players who are not engineers in WAPP citizens of the sub-region in this regard.
PAGE 26
EKO March 2022/Issue 33
T
he Management of EKO Distribution Company led about a quantum increase in demand for power.
by its Chairman, Mr. Oritsedere Otubu, paid a visit on
Wednesday, 16th February 2022, to the TCN Responding, the Managing Director of TCN, Engr. Dr. Sule
Corporate Headquarters in Abuja. to discuss important Abdulaziz acknowledged the important role of Lagos as the
issues of mutual interest, including substations and lines commercial hub of Nigeria, noting that TCN has always
projects as well as other issues of collaboration that would given priority to Lagos, in terms of bulk power supply
positively impact bulk power supply to EKO DisCo. Mr. allocation. He however assured the Management of EKO
Otubu who was accompanied by the Managing Director of DisCo of TCN's commitment to increasing the quantum of
EKO Disco, Mr. Adeoye Fadeyibi, and the technical team, power allocated to Lagos as well as delivering more
transmission projects that will
improve bulk power supply
within the state.
PAGE 28
MAN March 2022/Issue 33
n the pursuit of the objectives for the take advantage of the NERC Eligible Customers Regulations
PAGE 29
VANDALISM March 2022/Issue 33
AGM (Transmission) Engr. Charles Iwuamadi led other TCN Officials of Visit to the site.
The New Haven/Otukpo 132kV Tower 50 transmission Consequently, arrangements were made and with a
line which evacuates power from Enugu to Benue State complement of armed security operatives, the lines men
was recently vandalized. The site of the incident was and TCN team led by AGM (Transmission), Engr Charles
discovered while conducting a line trace to ascertain the Chidi Iwuamadi visited the site of the vandalized tower.
cause of a breach in communication sky wire by some of According to Engr. Amadi, what was left of the tower had
the linesmen of TCN, Enugu Region, on Friday 4th February to be brought down for a complete tower reconstruction.
2022.
The incident which was discovered in Onyoho village, a However, nemesis caught up with one of the vandals
boundary between Onyoho and Ohumu in Enugu-East whose body was found burnt beyond recognition close to
Local Government Area of Enugu State, revealed that the the vandalized transmission tower. Meanwhile, the
vandals chopped off the tower legs with the upper part of community has been left without electricity. It would be
the tower left dangling, and held together only by the recalled that the particular tower had been vandalized about
conductors. 2 years ago, which also resulted in outage in the same area.
Attempts by the TCN patrol team and some Management Engr. Charles Chidi Iwuamadi who led the team to the site
staff to immediately access the location to attempt repair described the incident as a big lesson would-be vandals.
works proved abortive as the team had received According to him, safeguarding TCN properties nationwide
information about a recent kidnap of two indigenes of the should be a collective responsibility that will help ensure
community around the location of the vandalized tower that bulk power generated is transmitted to distribution
before the arrival of the patrol team. load centers nationwide for onward delivery to consumers.
TCN Officials and some Residents of the area at the Site of the incident.
PAGE 30
VANDALISM March 2022/Issue 33
R econstruction works on the vandalized transmission reconnect the line to the national grid.
Tower Number 104 on Odukpani - Ikot Ekpene 330kV He noted that the collapsed tower was not the only one
double-circuit transmission line in Akwa Ibom State vandalized and that restringing the transmission line involves
has been completed, while work is ongoing to fortify other bringing down the 330kV DC line on some suspension towers,
towers minimally vandalized along the same line route, to that were minimally vandalized, up to the nearest tension
enable the restringing and tensioning of the 330kV DC towers on both sides of the collapsed tower and fortifying the
transmission line, before it is energized. suspension towers before restringing the lines to ensure
quality work is done,” he noted.
The Executive Director, Transmission Service Provider (TSP)
at TCN, Engr. Victor Adewumi made this known during an He noted that work has reached 70% completion and that TCN
inspection visit to the site of the incident at Oku Iboku is working hard to ensure that the 330kV DC transmission line
Community in Uyo on the 10th of May, is completed and reconnected to
2022. The visit which was at the the national grid in one week, to
instance of the Minister of Power, Engr. ensure the evacuation of over
Abubakar D. Aliyu was principally to 400MW stranded power at the
assess the level of repair works on the Odukpani Power Plant near Calabar
tower and fast track any process that as well as the restoration of power
would ensure a more timely supply to Cross River State.
reconnection of the DC line to the grid.
Engr. Adewumi appealed to the
Adewumi, who briefed newsmen at the public to help TCN in the fight
site, said the tower has been against the vandalism of power
reconstructed and work has reached an infrastructure, saying that such acts
advanced stage after three weeks, even are detrimental to Nigerians and
with difficulties posed by the terrain. the expansion of power
In his words, “The tower has been fully infrastructure in Nigeria. He also
reconstructed, restringing has to be assured residents of Cross River
done with the utmost care after other State and parts of Akwa Ibom
towers that were also tampered with State that the company was fast-
have been fortified, to avoid the tracking the completion and
collapse of more towers. We are restoration process.
however doing everything possible to Reconstructed Tower Stringing of line Ongoing
PAGE 31
POWER March 2022/Issue 33
By Maimuna Isah-Laden
T
he Transmission Company of Nigeria (TCN) has been In his welcome remarks, the Regional Transmission Manager
commended for the improved quality of power supply (RTM), Engr. Aminu Haruna, appreciated the good gesture and
in Kaduna State. gave the assurance that TCN would continue to put in every
effort to ensure uninterrupted power supply to the NAF and
Kaduna State as a whole.
The Commander 453 Base Services Group, Nigerian Air Force
Base (NAF), Kaduna, Air Commodore A.A Adedoyun, gave the
commendation on Monday 24th January 2022 during a
courtesy visit to TCN's Kaduna Regional Office.
L-R Air Commodor Adedogun and RTM Kaduna, Engr. Aminu Haruna
PAGE 32
LABOUR March 2022/Issue 33
T he Executive management
team of the Senior Staff
Association of Electricity and
Allied Companies (SSAEC) has
commended the Management of
Transmission Company of Nigeria
(TCN) for exercising maturity and
wisdom in handling labour matters in
the last one and half years of the
present administration.
PAGE 33
LABOUR March 2022/Issue 33
T
he Managing Director/Chief Executive Officer of He continued,“TCN recently took delivery of 5 No. 150MVA
TCN, Engr Dr Sule Abdulaziz has commended TCN's and 10 No. 60MVA transformers from the Lagos port
in-house union for its efforts at maintaining under the World Bank NETAP project.” According to Engr
industrial peace and harmony in 2021, through regular (Dr) Abdulaziz, this is a record milestone in the history of
consultation and cooperation with Management. TCN. He called for continued cross-fertilisation of ideas for
collective improvement in the delivery of bulk electricity to
Engr. Dr. Abdulaziz made the commendation while Nigerians.
receiving the National Executive of the National Union of
Electricity Employees (NUEE), TCN Branch, during the first The MD lauded TCN Management for the tremendous
National Joint Advisory Committee meeting for the year progress in the area of synergy and harmonious
2022 between TCN Management and NUEE. He expressed relationships with other stakeholders in the electricity
the hope that such consultation would continue, noting that sector, especially the Distribution Companies (DisCos) with
Management will continue to interface and synergize with whom TCN previously had interface challenges.
the Union as a peaceful industrial climate is imperative for
efficiency and productivity. The commencement of the Service Level Agreement
(SLA) regime which aims at prioritising and executing
The MD/CEO also congratulated the Union on the interface projects between TCN and the DisCos to ensure
successful conduct of the local chapter elections as well as that power was delivered to the DisCos where needed for
the emergence of new officers nationwide. He emphasised consumers, he disclosed were ongoing with the DisCos.
Management's commitment to working with the new
leadership, saying that TCN was open to productive ideas He also stated that TCN was working closely with FGN
that were capable of promoting the corporate image of Power Ltd in support of the Presidential Power Initiative
TCN. through SIEMENS AG of Germany by making available
every support required to ensure the successful delivery of
He assured the Union of Management's commitment to the transmission components of the programme. He
staff welfare and well-being, as has been reflected in expressed satisfaction that the results of the strategy were
various staff welfare packages that were introduced the already impacting positively on the system as was evident
previous year to motivate staff for higher productivity. He in the consecutive peak energy/power delivery to
further stated that Management was equally addressing the Nigerians recorded last year.
complaints regarding the 2021 Promotion Exercise.
Responding, the Secretary General of NUEE, Comrade Joe
In the area of service delivery, the CEO stated, “TCN has Ajaero appreciated the Management’s cooperation thus far,
improved tremendously in performance through its pointing out that the Union's show of maturity meant that
flagship programme of Nigeria Electricity Grid Maintenance they want TCN to continue to work with the Union,
Expansion and Rehabilitation Programme (NEGMERP) cautioning however that such disposition did not mean that
which aims at expanding the grid network through the issues affecting our members would be ignored. He sought
diligent implementation of planned network expansion the Management’s support in promptly addressing staff
projects, (Federal Government and Donor-funded issues.
projects), rehabilitating existing transmission lines and
substations to further increase capacity, while also As partners-in-progress, the MD/CEO clearly assured the
prioritizing the maintenance and provision of spares in the Union that he would continue to maintain an open-door
stores to ensure that the grid is very stable while the policy.
expansion programmes are on-going.”
PAGE 34
GENERATION March 2022/Issue 33
Presently, the cumulative generation nationwide is low and More recently, from the 1st to 4th of March, 2022, there was
generation companies have attributed this to several factors generation shortfall due to water management in Shiroro and
including poor gas supply, fault in generating units of Jebba hydro plant with the loss of 307MW and 125MW
generating companies, as well as scheduled and unscheduled respectively from both stations. Within the same period, there
maintenance, all of which have caused most power generating were fault and technical problems in Egbin, causing 514MW
companies to limit their generation, and sometimes not shortfall and in Geregu causing a 230MW shortfall, while
generate at all. reported fault at Alaoji NIPP reduced generation from the
substation by 263MW.
A summary of the power generating profiles in the last two
months, for instance, clearly shows that fourteen (14) gas- Gas constraint alone in Olorunsogo gas generating plant
powered generating stations were either not generating at all reduced generation from the station by 104MW, in the same
or had limited generation at various times within the period, vein, Omotosho gas lost 102MW and Sapele NIPP lost
further depleting the quantum of power generation available 263MW. In Omotosho NIPP, there was generation shortfall of
for transmission into the grid on a daily basis. Power 233MW and in Omoku a shortfall of 112MW. Two units in Okpai
generating stations in this category include; Omotosho units 5 have limited generation due to technical problems causing a
& 6, Olorunsogo units 3, 4 & 6, Omoku units 3 & 6, Omotosho 204MW drop in generation and in Afam VI 511MW drop in
NIPP units 3 & 4, Delta units 15, 17, and 18, Afam VI units 11 & generation.
12, Olorunsogo NIPP unit 3, Ihovbor NIPP unit 2, Sapele Steam
unit 3, Sapele NIPP unit 1, Odukpani NIPP units 1 & 3, and Okpai Gas constraint and fault in Olorunsogo NIPP reduced
units 11, 12 & 18. generation by 240MW, Geregu NIPP by 435MW, and Ihovbor
by 142MW. Also, due to gas pipeline pigging, Odukpani NIPP
Similarly, within the same period, Jebba Hydro and Shiroro was shut down which caused a reduction of generation by
Power Generating Stations were either out or had limited 575MW.
generation, causing additional loss of 232MW from the grid,
while other power generating plants such as Omotosho units As TCN continues to work hard to ensure the efficient
3&4, Olorunsogo units 1, Delta units 10 &20, Afam VI unit 13, allocation of the total load generation it strives to ensure that
Ihovbor NIPP units 4, Geregu NIPP units 22&23 and Odukpani the national grid is stable despite the challenges posed by the
NIPP units 2, 4 & 5, have also been out either on fault or for insufficient load on the transmission grid.
scheduled maintenance, causing a further loss of about
3,180MW from the grid.
PAGE 35
SENSITIZATION March 2022/Issue 33
(Middle) AGM (T) Enugu Sub-region Engr. Charles Chidi Iwuamadi addressing residents
T
he Management of the Enugu Region of TCN has purchasing, to avoid demolition and waste of funds.
embarked on a sensitization campaign for residents
of Enugu State on the inherent dangers associated The AGM and his team also took the campaign to the site of
with building illegal structures and carrying on business the New Haven-Onitsha 330kV line, near New Artisan
under transmission lines and towers within the State. Market, where he addressed the community on health
hazards that could emanate from spending long hours
Speaking during the sensitization programme at Marshal under the transmission lines and towers due to the harmful
Point Road Avenue and New Artisan Market, the Assistant electromagnetic emissions from the high voltage
General Manager (Transmission), Enugu Sub Region, Engr. transmission lines.
Charles Chidi Iwuamadi, enjoined residents to desist from
building, living, or trading under transmission lines or base of Also speaking at the event, the Manager Lines, Engr. Obuma
transmission towers as these constitute an infringement of informed the public of the standard corridor for
TCN Right of Way (RoW), which has very dangerous health transmission lines and advised them to ensure that they
and safety consequences. comply for their safety and for the preservation of the lines.
PAGE 36
VANDALISM March 2022/Issue 33
VANDALISM
By Rufus Imafidon
T
may affect parts or the entire country. Similarly, the repair
he Delta State Command of the Nigeria Police Force damaged towers costs millions of naira , hence causing the
has pledged its readiness to partner with the Benin diversion of fund planned for grid expansion to the re-
Region of TCN in tackling incessant vandalism of its erection of vandalized and collapsed towers.
infrastructure, violation of Right of Way, construction of He said that TCN Benin Region would appreciate a close
illegal structures under transmission lines, and excavation of collaboration with security operatives, particularly the
sand near its tower bases in the State. Nigerian Police Force, to check the activities of the vandals
who were bent on destroying our collective national asset.
The State Commissioner of Police, Mr. Ari Muhammed Ali
gave this indication in his office while playing host to a team In attendance were the AGM (T/S) Benin region, Engr.
from TCN Benin Region led by the Regional Transmission Mohammed Abdulazeez, AGM (T) Benin Sub region, Engr.
Manager (RTM), Benin Region of TCN, Engr. Isaac Okpe on Isah Jimoh, AGM (T) Delta Sub region, Engr. A .Ademole, PM
Tuesday, January 2022, in Asaba. (T) Sapele Work Center, Engr .W. Asonmwonriri, PM
(System Lines) Benin Region, Engr. K.Akano, PM (HSE)
According to him, the State Police Command was already Benin Region, Mr. George Otaru.
working on modalities to checkmate transmission line Right
PAGE 37
SLA March 2022/Issue 33
SERVICE LEVEL AGREEMENT AND GRID CODE 3.2 The DisCo and TCN shall abide by the relevant Sections of
Within the context of transmission services, "Service Level the Grid Code on operational planning.
Agreement" (SLA), means the agreement between TCN and
the Distribution Companies (DisCos) which sets out the terms 3.3 The DisCO and TCN shall use the liquidated damage as
and conditions for the purpose of service improvement to calculated in Schedule 1 to the agreement to address non-
end-users of electricity. performance by both sides.
THE GRID CODE 3.4 TCN and the DisCo shall jointly establish VHF
"Grid Code" is the regulatory instrument put in place by the communication between TCN control rooms, System
Nigerian Electricity Regulatory Commission (NERC) that operators, and the DisCo Central load dispatch and injection
specifies the instructions, rules, procedures, guidelines, etc., for substation DSOs. This will help TCN and the Disco to carry out
the operation and planning of an interconnected power safe operations while carrying out maintenance or attending
system and accounting requirements relating thereto as to breakdowns for the safety of the workforce as well as
prepared by the System Operator. This can be amended from equipment.
time to time in accordance with the Market Rules with the
approval of the Commission. 3.5 TCN will communicate to the DisCo about new
technologies adopted, similarly DisCo will also share details so
PURPOSE OF THE AGREEMENT that both are educated and are in a Agreement. This includes
The purpose of this Agreement is to outline the performance the replacement of Protection Replays which are the most
commitments of each party with respect to the transmission critical equipment for a healthy electrical network.
network and system operation services provided by TCN in
furtherance of NERC's Order NERC/198/2020 dated 31st 3.6 TCN and the DisCos shall nominate a business relationship
March 2020 and DisCos' Performance Improvement Plans. manager to provide a monthly service delivery report,
A firm improvement in supply by DisCos would require availability report, and register of all forced outages and
investments in reinforcing feeders, transformers, and scheduled outages across all nominated delivery points and
protection equipment. TCN shall directly align its investments shall make entries of comment from both parties' service
with DisCos towards resolving transmission/distribution delivery into same and such operational logs, which shall be
interface bottlenecks and reducing the high incidence of duly endorsed for record purposes.
tripping at 132/33kV substations.
3.7 All TCN incomer and check meter accuracy shall be
SLA IN LINE WITH GRID CODE checked jointly by TCN and the DisCo at the request of either
Three clauses of the Grid Code highlighted for improved party within 30-days subject to Metering Code and Metering
service delivery of the SLA are: Procedure.
1) CLAUSE 3: JOINT OBLIGATIONS
2) CLAUSE 4: OBLIGATIONS AND RIGHTS OF TCN 3.8 TCN and the DisCo shall agree on relay coordination
3) CLAUSE 5: OBLIGATIONS AND RIGHTS OF THE setting jointly and the same shall be implemented within 60
DisCO days of the signing of the Agreement.
CLAUSE 3: JOINT OBLIGATIONS 3.9 TCN and the DisCo shall jointly monitor the relay setting
3.1 The operational performance of TCN shall be anchored on (including the under frequency relay settings) on monthly
firm agreements with the DisCo with key performance basis. TCN and the DisCo shall be able to download the relay
indicators and financial remedies for non-performance by data (setting and last three months historical fault level data)
either party. of the other party on monthly basis between the 1st and 5th of
PAGE 38
SLA March 2022/Issue 33
every month. Failure by either party to provide access for system security or emergency events shall be considered as
relay data download shall be considered as an attempt to outages due to TCN while calculating Liquidated Damage as in
tamper with the agreed range of setting and any outage due Schedule-1. Where TCN Final Report indicts a market
to relay setting coordination issue for such period shall be participant, such participant shall be liable to TCN.
considered as Liquidated Damage caused by either party as in
Schedule-1. 4.8 TCN shall authorize entry of DisCo authorized staff on a
twenty-four hours/ seven days basis to attend to
CLAUSE 4: OBLIGATIONS AND RIGHTS OF TCN breakdowns. A list of DisCo authorized staff along with their
official contact numbers will be submitted to TCN and would
OBLIGATIONS TO DELIVER MYTO CAPACITY TO DISCOS IN be promptly updated whenever there is a change. This is to
THE MANNER PRESCRIBED BY THE GRID CODE maintain discipline as well as harmony among the parties.
4.1 That TCN shall supply energy to the DisCo through Similarly, TCN shall provide the control room desk telephone
feeders radiating from substations shown in Column A and number.
Column B of Table 1 of Annex A respectively.
OBLIGATIONS TO OFFER RELIABLE SERVICE AND NON-
4.2 That the data submitted by the DisCo in Table 2 and Table PERFORMANCE PENALTIES
3 of Annex A shall be used by TCN to prepare its facilities to 4.9 That TCN shall keep the voltage level of the feeders in line
deliver energy to the Disco for the period of this agreement with limits specified in Section 10 of the Grid Code.
as stated in Clause 19
4.10 That TCN is committed to duration outage of each
4.3 That TCN shall give the DisCo load at the feeders at each feeder on a daily average not exceeding the numbers shown
24- hour period in line with the submitted load forecast as in Column E of Table 1 of Annex A, known as the 33kV feeder
required by Section 19.4.4 of the Grid Code. interruption duration hours allowable to TCN for feeder I (FI)
In a day.
4.4 If the DisCo does not submit a bi-weekly load forecast as
stated in Section 19.4.4 of the Grid Code, then TCN shall use 4.11 Outage and interruptions due to TCN include all the
the preceding (accepted) load forecast submitted by the events except for outage and interruption events caused due
DisCo to allocate the load to the DisCo. to DisCo.
4.5 TCN shall within fifteen (15) minutes inform DisCo about 4.12 That if TCN causes an outage on a feeder through its
tripping of 33kV feeder along with time, load, and relay action, it will restore such feeder in the Average Duration of
flagged (Type of Fault) along with fault current intensity. interruptions per Day.
4.6 Any planned shutdown shall be notified to the DisCo at 4.13 TCN shall grant access to DisCo to read its check meters
least one week in advance. Any change/rescheduling of on all 33kV feeders serving it in line with the Metering Code
planned shutdown shall be communicated at least 24 hours in and Metering Procedure.
advance subject to system security or emergency
considerations as defined in the Grid Code. In the event of 4.14 TCN shall grant access to DisCo to install AMR on all its
failure by TCN to intimate Disco 24 hours in advance of its 33kV feeders.
cancelation/change of planned outage, and the failure is not
due to system security or emergency considerations, such 4.15 TCN shall configure/upgrade its infrastructure to
outage even if not availed shall be considered as an outage remedy the identified interface constraints and challenges in
occasioned by TCN while calculating Liquidated Damage as in line with agreed timelines provided in Annexure-2 of the
Schedule 1. Agreement.
4.7 In the event of system security or emergency event, TCN RIGHTS OF TCN
shall comply with the system reporting compliance 4.16 TCN may at its discretion refuse restoration of feeders
procedure stipulated in the Grid Code. Failure by TCN to for a maximum of 2 hours for each of the following fault
provide preliminary reports within the stipulated time for all events which are considered dangerous to the life of
PAGE 39
SLA March 2022/Issue 33
equipment and personnel. This is to ensure that DisCos do a forecast as stated in section 19.4.4 of the Grid Code, then it
thorough patrol for fault identification before clearing the shall comply with what TCN allocates to it using its preceding
fault: acceptance submission.
1.1 After Close up faults and a very high magnitude fault OBLIGATIONS TO TAKE ENERGY FROM THE TCN GRID IN A
current. RELIABLE MANNER AND LIQUIDATE DAMAGES FOR
NON-PERFORMANCE.
1.2 After trial reclosure has failed two times. 5.6 That the DisCo shall commit to duration outage of each
Further trial restoration shall be subject to DisCo investigating, feeder on a daily average known as the 33kV feeder
clearing the fault, and notifying TCN. Any further restoration interruption duration hours allowable to DisCo for feeder (Fi
failure after the third trial shall be counted as an interruption )in a day.
event for the determination of liquidated damages.
5.7 The DisCo shall be allowed to install AMR-enable check
CLAUSE 5: OBLIGATIONS AND RIGHTS OF THE DISCO meters on all 33kV feeders.
OBLIGATION TO TAKE MYTO CAPACITY FROM THE GRID
IN THE MANNER PRESCRIBED BY THE GRID CODE 5.8 TCN shall allow the DisCo Liaison Officer access to its
5.1 The DisCo shall receive energy from TCN through feeders substation control room for communication outrage
radiating from Substations. requests, faulty clearance, and meter reading of 33kV feeders.
The interruption duration for DisCo shall be computed from
5.2 The DisCo shall submit the data to meet the the time of interruption to the time of DisCo Liaison Officers'
requirement of the Grid code on operational planning. submission of the Protection Guarantee Certificate at the TCN
desk. Any delay in restoration beyond 15 Minutes after DisCo
5.3 The DisCo shall submit a load forecast in line with submission of the ''Protection Guarantee Certificate'' shall be
Section 19.4.4 of the Grid Code. considered as outrage duration due to TCN while calculation
of liquidated damages shall be as in Schedule-1.
5.4 The DisCo shall ensure that the load forecast for each
feeder at each hour shall not exceed TCN transformer 5.9 The DisCo shall configure/upgrade its infrastructure to
capacity subject to its ability to maintain the tariff bands remedy the identified interface constraints and challenges in
specified by NERC. line with agreed timelines provided in Annexure-2 of the
Agreement.
5.5 That if the DisCo does not submit a bi-weekly load
PAGE 40
GRID CONNECTION March 2022/Issue 33
TOMATO JOS
SEEKS TCN
SUPPORT TO
GET
CONNECTED
TO THE
NATIONAL GRID
By Maimuna Isah -Ladan
The 2019 Annual Report of the Manufacturers Association desperate need of an alternate source of power supply to
of Nigeria (MAN) indicates that manufacturers in Nigeria their 707kva diesel electricity generator.
spent over N67.38 billion on self-generated electricity He explained that the Company's electrical load consisted
with energy accounting for a whopping 38 percent of their of irrigation pumps, boilers, and conveyor belts including
production cost. The report further indicated that power warehouses and staff quarters. According to Mr. Cardoso,
the total power demand at the facility was estimated at
supply has been undermining the activities of
approximately 1MW.
manufacturing companies in Nigeria for many years.
PAGE 41
ACTIVITIES March 2022/Issue 33
Photo Speak
Executive members of Institute of Chartered Accountant of Nigeria and UK District Society during their Courtesy Visit to TCN.
Training of TCN drivers at the National Control Center (NCC), Osogbo by FRSC Osogbo Command
NCC Security personnels training by Civil Defence Osogbo command at NCC Osogbo Auditorium
PAGE 42
FOCUS March 2022/Issue 33
PAGE 43
FOCUS March 2022/Issue 33
PAGE 44
FOCUS March 2022/Issue 33
VANDALISM
The Osogbo Region is not spared the pervasive challenge of Some of the ongoing projects being executed by in-house
vandalism that affects TCN operations nationwide. There are engineers include 30MVA, 132/33kV Transmission
numerous cases of vandalism of transmission lines and substation at Oyo, and installation of 60MVA, 132/33kV
towers throughout the region despite several measures to transformer in Osogbo Sub-Region.
discourage the perpetrators. The most recent occurred at the
new Osogbo-Akure-Ihovbor Double Circuit 330kV
transmission tower at Igbara-Oke along Ori-oke Gilgal in
Ondo State, which was constructed to carry supply from
Osogbo to Akure Transmission Substation. Management has,
through the regional office, engaged community leaders and
other stakeholders on the negative impact of illegal mining
near TCN facilities as well as vandalism of power
infrastructures; this has, however, had very little impact.
IN-HOUSE PROJECTS
TCN engineers in Osogbo Region have successfully installed
and repaired several transformers, replaced circuit breakers,
as well as undertaken line tracing and maintenance.
Engr. Olaniyi Gbadebo (ROM Osogbo)
PAGE 45
PHOTO SPEAK March 2022/Issue 33
TCN engineers replacing faulty Circuit Breakers during a routine maintenance exercise at the 4x150MVA, 2x60MVA, 1x30/40 MVA, Kumbotso
Transmission Sub-Station, Kano State
Ongoing works at the 2x60MVA 132/33kV transmission substation in Biliri, Gombe State.
TCN engineers in Ajah Sub-region carrying out annual preventive maintenance which entails replacing broken glass disc insulators with
composite insulators on Akangba - Amuwo - Ojo 132kV line
PAGE 46
NELMCO March 2022/Issue 33
PAGE 47
RETIREE CORNER March 2022/Issue 33
My Exceptional
Journey in TCN
By Hajiya Aisha Ahmadu (Rtd)
M
y sojourn in the defunct PHCN and later the TCN Lastly, I hope TCN staff still maintain the tradition of being
is one I will always cherish, having spent my their brothers' keepers both at work and in their personal
most active years in the service of the nation capacities. I recommend that Staff welfare should always
with colleagues with whom I bonded and have remained be given priority in decision-making while the staff, on the
friends even after leaving service. I proudly describe it as other hand, should reciprocate by working diligently and
exceptional and that is what it was for me. The team spirit selflessly for the growth of the company.
and commitment were truly outstanding.
T
WO FISH were swimming when they saw a piece
of meat dangling before them The younger fish
darted toward it with an open mouth.
The older fish cries out, Stop! "You can't see it, but there is a
le français?
"THE TRUTH is, if you eat the meat, the hook will catch in
your jaw and the man will pull you out of the water. He will
cut you open with a knife, roast you on fire, and eat you.
Do You Want to learn French? Then he will throw your remains to his cat.”
The young fish stopped. The two swam away. But when
ENGLISH FRENCH
the young fish was alone, he thought to himself, “Let me
I am an Engineer -Je suis ìngénieur
investigate the truth myself how accurate these lousy
I work in TCN -Je travail à TCN claims are.”
I repair Transmission Lines -je répare les lignes de
transmission He went back to the meat, and swam around it, above and
Do not build or stay under -Ne pas construire ou ne rester below it. He swam as far as he could in widening circles
transmission lines sous les lignes de transmission around the meat.
TCN transmits electricity in the –TCN transporte l'électricité de la "These must just be stories made up to limit our freedoms.”
most efficient and effective manner manière la plus efficace et la He went back to the meat and ate it.
plus efficiente possible.
TCN has 10 Regions across -TCN a 10 régions à travers le The hook caught in his jaw, and he felt himself being yanked
the country pays out of the water. For sure He saw a pole, a man, and a knife,
TCN is a member of WAPP -TCN est membre de l'EEEOA and a little further, he saw the man's cat sleeping in a shade,
but at that point his knowledge of THE TRUTH was useless.
The MD/CEO of TCN is Engr. -Le MD/PDG de TCN est
Dr. Sule Abdulaziz. He is also the l'ingenieur. Dr Sule Abdulaziz. Il
Chairman of WAPP Executive est gdement le President de It is exactly the story about some decisions we make on
Board conseil executive du l'EEEOA
this life's journey. Some are very selfish, others very
TSP oversees the development -TSP supervise le uninformed and yet some out of spite or just to
and maintenance of transmission développement et la intentionally make others suffer, so you can dominate and
infrastructure in Nigeria maintenance des infrastructures
de transport au Nigéria create relevance for yourself. Beware and exercise a bit of
caution for sometimes some of them may just have very
ISO coordinates generation and –L'ISO coordonne les pannes de
transmission outages in Nigeria production et de transmission au grave consequences.
Nigéria
Pause a little… wisdom is important in all things so that your
The Market Operator is responsible –L'operateur de marché est for
implementing Market Rules responsable de la mise en oeuvre decision does not turn out to be the hook that catches
des règles du marché your jaw !
culled
PAGE 49
CIRCUIT BREAKER March 2022/Issue 33
INTRODUCTION. - Circuit breakers (CB) are mechanical short circuit currents, it is subjected to mechanical and
devices designed to close or open contact members, thus, thermal stresses. (Switching during abnormal condition
closing and opening of an electrical circuit under normal and such as short circuits and interrupting the fault current.
abnormal conditions. Circuit breakers, which are usually Circuit breakers are classified according to the following
employed for the protection of electrical circuits, are equipped categories;.
with a trip coil connected to a relay or other means, designed - Rated voltage.
to open the circuit breaker automatically under abnormal - Arc extinction medium.
conditions such as over-current, earth-fault etc. The circuit - Type of operating mechanism.
- Type of construction
breaker performs the following functions;
- Structural form
- Carries the full-load current continuously without
overheating.
- Opens and closes the circuit on load, i.e., switching during ARC-EXTINCTION MEDIA EMPLOYED IN CBs-
normal operating conditions for the purpose of operational - AIR – (Atmospheric air/Compressed air).
maintenance. - Dielectric Oil (Transformer Oil)-
- Makes and breaks normal current. - Sulphur Hexafluoride (Sf6) Gas
- Makes and breaks short-circuit currents of magnitude up - Vacuum.
CURRENT INTERRUPTION MODES: -
to which it is designed for, i.e., when it is to make or break
- High Resistance Current Interruption mode is employed in
PAGE 50
CIRCUIT BREAKER March 2022/Issue 33
PAGE 51
SUBSTATION March 2022/Issue 33
APIR 330/132/34.5kV
TRANSMISSION SUBSTATION
T
he Apir 330/132/34.5kV Transmission Substation is one Through Yandev 132kV Transmission Line, the Substation feeds a
of the ultra-modern stations in the Nigerian grid today. It 40MVA 132/33kV Mobitra in Apir 132/33kV Transmission
is strategically located at 17KM from Makurdi Town in Substation. The same line runs to Yandev 132/33kV and Otukpo
Makurdi Local Government Area of Benue State. It is the TCN 132/33kV Transmission Substations. The same line can also
network's shortest power gateway between the Northern and receive supply the from New Haven substation, via New Haven-
Eastern Grids, and completes the ring circuit of the grid network. Otukpo 132kV Transmission line into Otukpo, Yandev and Apir
132kV Substations. While Apir 132kV line from Apir 330kV
The station supplies 3No. 132kV transmission substations namely:
Substation feeds a 60MVA 132/34.5kV Transformer in Apir
Apir, Yandev and Otukpo 132kV station, but was recently
132kV Transmission Substation.
connected to the newly built Kashmibilia Power Station,
Kashimbila, Wukari and Takum 132kV Transmission Substation in
From Yandev 132kV Transmission Substation, power is wheeled
Taraba State through Yandev-Wukari 132kV DC transmission line.
to many locations like Gboko, Katsina-Ala and the Dangote
Apir 330kV Transmission Substation is equipped with one
Cement Factory, all in Benue State. Other areas are Wukari,
150MVA, 330/132/34.5kV transformer and 75MVAR 330kV
Kashimbilla and Takum in Taraba State, Vandekya and Obudu in
Reactors
Cross River State.
The station has 4No. 330kV lines namely, the Ugwuaji 330kV
The Otukpo 132kV Transmission Substation, fed into Otukpo
Transmission Line one, Ugwuaji 330kV Transmission Line two, Jos
Metropolis and environs, Taraku and Oju Towns, all in Benue State.
330kV Transmission Line one and Jos 330kV Line two. The
Other areas being fed from Otukpo 132kV Transmission
substation also has 2No. 132kV transmission lines, namely, Yandev
Substation, are Ankpa Town and environs, in Kogi State.
132kV Transmission Line and Apir 132kV Transmission Line.
PAGE 52
POWER March 2022/Issue 33
The Necessity of A
T
meeting.
he power sector provides one of the most essential
services that aid human survival, development, and
Excerpts;
technological advancement. It impacts humanity
NERC CHAIRMAN
profoundly, from our day-to-day activity to technological
The NERC Chairman, Engr. Sanusi Garba noted that work was
advancement, which supports every facet of human existence,
ongoing to urgently restore supply and surpass last year's sector
from the farm and farm produce preservation to the factories, to
performance. According to him, gas pipeline supplying Okpai was
every kind of developmental effort hinged on technology. It is the
repaired and the power plant brought back on stream, discussions
bane of technological advancement.
were ongoing to secure gas for a new generation unit in Okpai.
In Nigeria, gas is the main fuel for power generation, while hydro
Pigging of the gas pipeline supplying Calabar has been completed,
takes second place. Therefore, any shortage in gas supply for
and gas supply resumed, restoring 455 megawatts into the grid.
power generation is bound to impact negatively on the power
He noted that part of the challenge of increasing generation has
supply to consumers. That was why recently, the nation's power
been bringing some level of certainty to gas supply.
supply plummeted to an all-time low, especially early in March
2022, when gas supply for generation hit the lowest in recent
He said that with NERC's approval, the Niger Delta Power Holding
times. This brought the nation to a near crisis situation save for
Company has secured gas supply from the Nigerian gas marketing
government intervention. Government intervention has to a large
company and eight power plants will be brought back on stream.
extent helped restore gas supply and consequently power
generation. This, though commendable, does not however deal
Before the recent gas incident, the Okpai power plant was
decisively with the long-term challenge of resolving the
generating up to 600-650MW. With the current intervention,
intractable issue of consistency in the payment of gas for power
however, Afam and other gas-fired power plants would soon
generation and proper pricing to ensure sustainability.
begin to generate optimally. A lot of work was being done to ramp
up generation beyond what it was before the gas saga, This is
In the case of the recent outage situation, several factors came
supported by investments happening in the entire value chain, he
into play from the shortage of gas to low water supply in the dam,
added.
lack of observance of the maintenance cycle by generators, and
plant fault. Plant fault can be managed, as other generators can
On the transmission network, he noted that several projects were
increase generation if the quantum of gas required is available.
currently being executed while the distribution companies
secured long-term funding to enable them invest towards
However, as part of Government intervention and to reassure
improving the distribution network and also provide meters to
Nigerians about its sincerity in pragmatically dealing with this, the
consumers.
PAGE 53
POWER March 2022/Issue 33
MD NDPHC Haruna said that the distribution companies were on their own,
Barr. Chiedu Ugbo said NDPHC contracted a long-term firm gas working hard to expand their capability, saying, as the last leg in
agreement with the Nigerian gas marketing company (NGC) to the value chain, we have looked at existing capability and are
enable it consistently generate at least 600MW. This has enabled working hard to ensure we can accommodate the increase in
the company begin to get gas from NGC. NDPHC he said will add power generation, through investment and regular maintenance.
over one thousand (1000) megawatts to the power pool. The regulatory commission is assessing and monitoring the
performance of each distribution company, and at the same time,
Gas supply, he noted will also increase significantly as soon as the DisCos have continued to identify areas of expansion to
Total Nigeria, lifts the force majore it invoked on the supply of gas accommodate more power. Modalities have also been put in place
to Alaoji Power plant, this will further add 337MW to the grid. to ensure that allocation to DisCos is paid for, even if they fail to
Completion of maintenance work on Geregu Power Plant will supply consumers.
enable NDPHC recover an additional 435MW in the month of April.
He affirmed that other efforts were ongoing and that the grid NERC, he continued, has put in place service-based tariffs to
would soon be back to normal and even better. monitor performance and ensure that customers received
electricity under categories A, B, C, and D to further help regulate
MD CEO TCN power supply.
Dr. Sule Abdulaziz apologized to Nigerians for the recent grid
collapse and load-shedding which lasted for almost a week, noting The Commission recently approved a 100 billion CAPEX
that at the same period last year the sector peaked at 5,700, expansion program for the DisCos to ensure that the expected
5,800, 5,200 respectively, noting that this year, the grid was more increase in electricity is efficiently delivered to end-users. DisCos
robust but for the poor gas supply which negatively
impacted generation and consequently grid stability.
PAGE 54
GIZ March 2022/Issue 33
The Managing Director, Transmission Company of Nigeria (TCN) and Chairman of WAPP, Engr. Dr. Sule Abdulaziz presenting one of the
Laptop Computers given to NAPTIN by GIZ, GmbH of Germany, to the Director General of NAPTIN Mr.Ahmed Bolaji Nagode.
A
s part of continued support to the National Power (WAPP), Engr. Dr. Sule Abdulaziz, at the Transmission
Training Institute of Nigeria (NAPITN), the Company of Nigeria (TCN), Headquarters, recently.
Deutsche Gesellschaft fur Internationale
Zusammenarbeit (GIZ) GmbH of Germany has provided While making the presentation, on behalf of GIZ, Germany,
Laptop Computer Systems to assist in bolstering the online Engr. Abdulaziz commended GIZ and advised NAPTIN to put
training programme of the training institute. the computers to good use.
The laptop computers which include: 3 HP ELITEBOOK Appreciating the laudable gesture, the Director-General of
840GB NOTEBOOK PC, 3 Logitech H600 wireless handsets, NAPTIN, Mr. Ahmed Bolaji Nagode thanked GIZ and West
and 3 ethernet cables were presented to the Director- African Power Pool for providing the equipment to NAPTIN
General of NAPTIN, Mr. Ahmed Bolaji Nagode by the and assured that the equipment will be used for the purpose
MD/CEO, TCN, and Chairman of the West African Power Pool for which they were provided.
PAGE 55
SUBSTATIONS March 2022/Issue 33
By Ogechukwu Uzor
T
CN has commenced the digitization of all old The digitization project is funded by the World Bank under
transmission substations in its network. The NETAP (Nigerian Electricity Transmission Project) and
digitization project is aimed at improving the managed by the Project Management Unit of TCN. In Port-
Harcourt Region alone, five substations would be digitized,
automation system of old transmission substations and
including Afam 1, Ahoada, Yenegoa, Owerri, and Uyo
their connectivity with the proposed TCN SCADA System.
substations.
The scope of work for the project includes the supply, A team from TCN-PMU and the General Manager
installation, configuration, testing, and commissioning of (Transmission) Port-Harcourt Region, Engr. Daniel Udofia,
Substation Automation Systems (SAS) as well as the formally handed the duly executed document on the
control and relay protection systems in the substations. digitization project to the contractor at the Afam 1
This project would further contribute to grid management Substation, marking the beginning of the digitization
and reduce system losses. process for old substations in the nation's transmission grid.
T
he Egbin 330/132/33kV Transmission Substation because TCN has decommissioned an old 30MVA
has been upgraded with the installation of a transformer within the substation, which will be serviced
60MVA 132/33kV power transformer. The and moved to other areas within its network that have a
transformer which was installed by TCN in-house history of minimal electricity demand.
engineers was energized on the 2nd of March 2022. This substation capacity upgrade will ensure that more
With the new 60MVA power transformer, the substation power is made available for IKEDC to take to its franchise
capacity to supply bulk electricity to Ikeja Electricity areas within Ijeda LCDA and Ikorodu Local Government
Distribution Company has increased by 24MW. This is Area axis.
PAGE 56
Public Affairs March 2022/Issue 33
T
he General Manager, Public Affairs, TCN, Mrs. Ndidi to bring participants up to speed on developments in the
Mbah has charged the staff of the Public Affairs sector.
Division to exhibit professionalism in discharging
…Visit to Transmission Substations
their duties as the image molding arm of the Company.
As part of the learning process, the participants visited the
Apo132/33kV Transmission Substation and
Mrs. Ndidi Mbah gave the charge during a five–day 330/132/33kV Gas Insulated Substation (GIS) in the
conference for staff of the department themed; “Raising PR Central Area of Abuja, to familiarize themselves with the
Professionals in a Dynamic World”, on Tuesday, 6th – 10th two types of substations operated within the nation's grid.
December 2021, in Abuja.
…Visit to NAPTIN and NELMCO
The high point of the conference was the visit to the
According to her, it is important for staff in the Public Affairs National Power Training Institute (NAPTIN), Abuja, where
Division to understand their critical role as Public Affairs Mr. Yusuf Khalil, a NAPTIN instructor gave an overview of
practitioners in projecting the image and accomplishments the power system in Nigeria and how electricity is
of TCN to the general public. When Public Affairs staff do generated, and the transmission process up to
their job professionally, she continued, electricity consumption. The MD/CEO, Nigerian Electricity Liability
consumers will not only come to appreciate the great Management (NELMCO), Mr. Bayo Fagbemi, on his part,
achievements in the power sector value chain, but the spoke on the role of NELMCO in the Nigerian Power
Company as well will better appreciate that Public Affairs is Industry.
a key component in the company's operations.
PAGE 57
POTPURRI March 2022/Issue 33
POTPURRI
SPORT CLUB
ENUGU REWARDS TCN
SPORTS LOVERS
PAGE 58
Sensitization March 2022/Issue 33
WB Organizes Sensitization on
Gender Based Violence
By Mary Phillip Udom
T
he World Bank has in collaboration with TCN under politically from one sexual exploitation of
its NETAP projects organized a one-day another.
sensitization programme on sexual abuse and
gender-based violence for staff of the Enugu Region of § rape, which means physically forced or otherwise
TCN. coerced penetration – (no matter how slight) of
the vagina or anus with an object. Rape includes
Speaking during the flag-off ceremony of the programme, marital rape and anal rape/ sodomy. Rape can be
the Enugu Regional Transmission Manager (TCN) Enugu by one person or a committed gang. Any
Region, Engr. (Dr) Emmanuel Nwani stated that the attempt to do so is known as attempted rape.
programme was intended to create awareness, to enable
participants to appreciate the negative impact of sexual § sexual assault, which means any form of non-
exploitation and abuse. He urged the participants to pay consensual contact that does not result in or
keen attention so as to understand the necessary attitudinal include penetration. This includes attempted
change that the sensitization was expected to engender. rape, unsolicited kissing, fondling or touching of
genitals and buttocks.
The programme dealt with topics such as “Understanding
Sexual Exploitation and Abuse”, “Gender-Based Violence” § engaging in any form of sexual activity with
Principles/Code of Conduct in Various Settings’’ and “Code individuals under the age of 18 except in case of
of Conduct Violation. Emphasis was also laid on the he root pre-existing marriage among others.
cause and types of Gender-based violence within and
outside the workplace. The programme also highlighted Participants were also charged to desist from any acts of
prohibitions including; Sexual Exploitation and Abuse (SEA) as such will henceforth
be subject to investigation in TCN and offenders punished
§ sexual exploitation including any actual or appropriately. Punishment may range from suspension to
attempted abuse of position, vulnerability or dismissal and even imprisonment prosecution and eventual
trust for sexual purposes, including but not imprisonment.
limited to profiting monetarily, socially or
PAGE 59
TRANSFORMERS March 2022/Issue 33
A
transformer is a mechanism or device designed to transformer must translate the electricity into a low voltage
transfer electrical energy from one circuit to another. and high current format. This is why one sees so many power
This is done to increase the electrical voltage as transformers at the top of electric power lines in both
electricity travels through long distances of wires or cabling. residential and commercial areas.
Wires have a certain amount of electrical resistance in them
and so as electricity travels through them, some are lost. The Presently, the Transmission Service Provider (TSP) has
amount of electricity lost depends on the length of wire it various power transformers in its network, ranging from
passes through. From an electrical substation where power is 60MVA to 300MVA at the 330kV voltage level, 7.5MVA to
routed to a person's home, electricity is then translated by a 100MVA at 132kV voltage level and various capacity mobile
transformer into high voltage, with conversely low current. substations also at 132kV voltage level. The 300MVA
This prevents energy loss over distance. transformer is the highest capacity power transformer in the
TSP network. Below is a summary of transformers in the TSP
For electricity to be of use for household appliances, another network.
PAGE 60
March 2022/Issue 33
TRANSFORMERS
Unlike the transformer we find in our homes, a power 3. Low Voltage Bushing-This is the terminal where the
transformer's appearance and construction are somewhat secondary windings of the transformer terminate and serve as
more complicated. It is not just a simple winding with a an insulator from the transformer tank. Low voltage bushing
primary and secondary terminal, although basically, any can be easily distinguished from its high voltage counterpart
transformer has one. The function that a power transformer since low voltage bushings are usually smaller in size
performs in an electrical system is very important and an compared to high voltage bushing.
electric utility cannot afford to lose it in the electricity
transmission process. Our discussion here will focus more on 4. Cooling Fins/Radiator - For a transformer to
the basic tangible parts of a power transformer. Although dissipate the heat generated in its oil insulation, cooling fins,
power transformers are not all identical, nonetheless they all and radiators are usually attached to the transformer tanks.
have the following parts: The capacity of the transformer is dependent on its
temperature, that is why it must have a cooling mechanism for
1. Transformer Tank - This holds the transformer better performance and higher efficiency.
windings and its insulating medium (oil-filled). Transformer
tanks must be air-tight for them to isolate their content from 5. Cooling Fans- Cooling fans can either be timer-
any atmospheric contaminants. controlled or winding/oil temperature-controlled. Cooling
fans help raise transformer capacity when the temperature of
2. High Voltage Bushing - This is the terminal where the transformer rises due to loading.
the primary windings of the transformer terminate and serve
as an insulator from the transformer tank. Its creep age Cooling fans used on the transformer are actuated with the
distance is dependent on the voltage rating of the transformer. help of a relaying device which enables the fan to
automatically run when it senses a relatively high temperature.
PAGE 61
THOUGHTS March 2022/Issue 33
PAGE 62
NSE March 2022/Issue 33
T
he Nigerian Society of Engineers (NSE), Maitama would further enhance the power sector as well as help in
Branch recently, Abuja paid a technical visit to the the effective implementation of its mandate.
Katamkpe 330/132kV Transmission Substation of
the Transmission Company of Nigeria (TCN). He emphasised the intensity of the voltage of transmission
lines and asserted that it was for this reason, that TCN
The Principal Manager, System Operations of the Katamkpe advises people to observe a safedistance from transmission
330/132kV Transmission Sub-station, Engr Thomas lines in order to avoid the dangers associated with
Oladeji-Ojo who received the visiting team on behalf of the violation of the right of wrong (ROW) corridor.
Management on Tuesday, 30th March, 2022, enlightened
them on the process of wheeling power from the national The Vice Chairman of the NSE Maitama Branch, Engr Okoye
grid to the distribution companies. U. Henry, MNSE, who represented the Chairman, Engr
Oladipupo Isiaka Mabogaje, FNSE, stated that the vision of
Engr Oladeji-Ojo who gave first hand view of the facility the NSE leadership was to promote the engineering
said that the visit which was a catalyst which TCN as an profession in Nigeria. Asserting that it was in this light that
engineering entity needed to have with professional the delegation visited TCN to see how they could rub minds
engineers. He said TCN welcome collaborative efforts that together and alleviate the challenges in the power sector.
PAGE 63
1. That The Oldest 330kv Lines In Transmission Grid Areas;
PAGE 64
AUDIT March 2022/Issue 33
Equipment is considered to be an asset to a business or may choose to recommend that the equipment be
personal holdings. A transformer can be considered to be immediately taken out of service.
equipment and an asset because it has value.
Impact of Equipment Audit on TCN Operational Efficiency
In order to make sure that equipment is being maintained to 1. Equipment auditing helps to verify a proper level of
the highest standards, an audit should be undertaken at least depreciation that is not above and beyond what one
once a year so that any issue(s) that may diminish the value of is to claim on that value.
the equipment/asset can be immediately resolved. This goes 2. Through equipment auditing, preventive
beyond value, as regular equipment checkups can also help to maintenance is planned; this reduces equipment
make equipment safer for use. downtime.
3. The longevity of equipment is increased with
Many organizations choose to do yearly equipment audits equipment auditing.
because they seek to ensure that they actually have all the 4. It aids Management with technical budget planning
equipment listed on their asset sheet. These audits help to and advises Management on equipment aging.
regulate employees' actions and ensure that the equipment is 5. It aids in efficient stocktaking and eliminates ghost
where it is supposed to be. The first step in many equipment equipment.
audits is to make sure that the equipment is at the physical 6. Optimizes store handling of company equipment.
location that it is assigned. 7. It enhances data gathering and improves the quality
of data for proper database management.
What Happens During an Equipment Audit? 8. Reduction of equipment downtime translates to an
Many audits begin with a visual inspection of the equipment; increase in revenue.
the auditor will carefully look at all the components of the 9. Equipment auditing will help in ascertaining the actual
equipment to make sure they are in good working condition. value of the company, thereby attracting investors.
This visual inspection will also note any repairs that may have 10. Annual equipment auditing will give a true reflection
been made, that need to be made, or upgrades that could be of the state of every piece of equipment
made to ensure the equipment runs more efficiently. If there 11. Annual equipment auditing is a key index for
are severe issues that would affect the operational efficiency organizational growth assessment.
or the safety of those operating the equipment, the auditor
Nwaoguegbe John Uzoma, Officer I (MVD), Samotu Salami Oyekanmi, Officer I (MVD), Micheal Ita Solomon, staff IV (Adim & CS),
Enugu Region Osogbo Region Uyo Work Center, Portharcourt Region
The journey of life is one we are never sure how and when it will end. By the way, does any of us know how it
started? Simply No! Your demise brought shock, tears, and for some regrets. God is however not taken by surprise for
He alone understands the end from the beginning.
Today memories of you are the real you we know, memories that are also a part of our own sojourn on this earth.
Adieu!
PAGE 65
ACCOMPLISHMENTS
HIGHLIGHTS OF SOME ACCOMPLISHMENTS
OCTOBER - MARCH 2022
· Installation of 60MVA 132/33kV power · Decommissioning and installation of a new
transformer at Egbin Transmission Substation. 132kV CB on 132kV Afam/PH line 2.
PAGE 66
CULTURE March 2022/Issue 33
The Obi of Onitsha, His Royal Majesty, Igwe Nnaemeka Alfred Achebe, celebrating Ofala Festival
A festival is a series of performances that include music, plays, events featuring spiritual cleansing, prayers, and honoring of
and cultural dances organized periodically. It is also a day or deserving kinsmen and women from within the community and
period of the year when people of a particular community
outside as well as friends of the Kingdom from other tribes,
suspend their routine work and other engagements to
celebrate a special event. races, and nationalities.
The great people of Ibagwa Nike, Enugu State, originated from The celebration of the Ofala Festival in Ibagwa Nike Kingdom of
Angwa (Igala), around the 7th Century, through a man named Enugu State is a seven-day affair. The first day is a day of
Enenwudala, the son of Ozizi Koko, a warlord of Angwa, Idah spiritual cleansing which features people praying for the
(Igala Kingdom). Ibagwa Aka, Ibagwa Ani and Ibagwa Alor Community while the Igwe (paramount ruler), prays indoors.
Communities in Enugu East of Enugu State are all from the same The community prayer lasts for three days and on the fourth
root. day, the Igwe and his cabinet make specific prayers for the four
market days of Eke, Orie, Afor, and Nkwo.
The Ibagwa Nike Kingdom is made up of five villages
representing the five sons of Enenwudala, namely; Oshimene, At night on the fifth day, which is regarded as a night of
Anekeode, Ogavene, Ezeneke and Aguode, in their order of retrospection, the Igwe and his cabinet deliberate on various
seniority. The Ibagwa community traced its roots to Igala tribe issues/challenges affecting the five communities and take
of Kogi State. important decisions. They also review their activities, and list
the people that are to be conferred with Chieftaincy titles.
Ofala Festival Celebration
The Ofala Festival is a hallowed event for the sons and The sixth day is solidarity visit day for in-laws and Umunna
daughters of Ibagwa Nike Kingdom. The festival consists of (Kinsmen) who pay a private visit to the Igwe in his Palace.
PAGE 67
CULTURE March 2022/Issue 33
After receiving the guests, the Igwe and his traditional ruling awardee who is not from the community is first adopted as a
council then arrive at the village square, where the Community citizen before conferment of the honour.
district heads and those expected to receive Chieftaincy titles
pay homage to the Igwe. During the 2014 Ofala festival, held from 26th to 29th of
December, the Attah Igala, HRM Michael Idakwo Ameh,
During every Ofala Celebration, the Ibagwa Community plays Agabaidu-Oboni II, led a large delegation of Igala traditional
host to massive crowds of cultural enthusiasts, comprising the authorities and cultural performers on a three-day visit to
political class, diverse businessmen and women, renowned Ibagwa Nike Kingdom, their ancestral kins-folk.
professionals, traditional rulers, and cultural troops, from within At the end of the ceremony, the Igwe and his Lolo (wife) are
and outside the Community. The masquerades also have a field accompanied back to his Palace from the village square amidst
day, displaying to the cheering crowd. another twenty-one-gun salute signifying the end of the
ceremonies. Cultural troops and masquerades however
The festival showcases the rich cultural heritage of the Ibagwa continue to entertain till sundown.
people, and is usually an occasion for public enlightenment,
PAGE 68
If we truly want to improve Electricity Supply,
We must stop Sand Excavators from Excavating near Transmission Towers.
Wedding
Galore
Mrs. Daughter of Asst General Manager, (HR) Alh Aminu Yau Mr. Noel Osaremen Rufus, Son of Mr. Rufus Imafidon.
and her husband Principal Manager (Public Affairs),and his wife
Engr. Obinna Anthony, Asst Manager, Engr. Ibrahim Ali Ma'aji, Officer I, (PC&M), Kano Region
(Substation Projects), CHQ, and his wife and his wife
PAGE 70
MOVING ON March 2022/Issue 33
Retirement
Engr. Geoffrey Nwokoye, General Manager, Engr. Uche Eleke, General Manager, (Corporate Planning) ISO
Engineering
Mr. Louis Ugwu, Principal Manager, (F&A), Enugu region Mr Bukar Kwami, Officer II (MVD), CHQ
Mr Yahaya Umar, Officer II (MVD) CHQ Engr. Haruna Isa Ado, Officer II (Admin), Kaduna RegionI
PAGE 71
AFRICAN COUNTRIES
ALGERIA LESOTHO
BOTSWANA MADAGASCAR
CAMEROON MAURITHANIA
CHAD NAMIBIA
DJIBOUTI RWANDA
EQUATORIALGUNIEA SIERRALEONE
GABON SOUTHSUDAN
GUNIEA TANZANIA
KENYA UGANDA
LIBYA BENIN
MALI BURUNDI
MOZAMBIQUE CENTRALAFRICANREPUBLIC
NIGERIA CONGO
SEYCHELLES EGYPT
SOUTHAFRICA ETHIOPIA
SWAZILAND GHANA
TUNISIA IVORYCOAST
ZIMBABWE LIBERIA
ANGOLA MALAWI
BURKINAFASO MOROCCO
CAPEVERDE NIGER
COMOROS SENEGAL
DRCONGO SOMALIA
ERITREA SUDAN
GAMBIA TOGO
GUNIEABISSA