Group 7 RCV Lever: 1. Removal and Install
Group 7 RCV Lever: 1. Removal and Install
Group 7 RCV Lever: 1. Removal and Install
2) INSTALL
(1) Carry out installation in the reverse order
to removal.
(2) Confirm the hydraulic oil level and check
the hydraulic oil leak or not.
8-111
2. DISASSEMBLY AND ASSEMBLY
1) STRUCTURE
8-112
1 Case 11 Plug 21 O-ring
2 Plug 12 Rod seal 22 Handle connector
3 Plug 13 O-ring 23 Nut
4 O-ring 14 Push rod 24 Insert
5 Spool 15 Plate 25 Boot
6 Shim 16 Bushing 26 Handle
7 Spring 17 Joint assembly 27 Switch assembly
8 Spring seat 18 Swash plate 28 Screw
9 Stopper 19 Adjusting nut 29 Switch assembly
10 Spring 20 Lock nut 30 Switch cover
40 Boot
8-113
2) TOOLS AND TIGHTENING TORQUE
(1) Tools
Allen wrench 6 B
22
Spanner
27
(+) Driver Length 150
(-) Driver Width 4~5
Torque wrench Capable of tightening with the specified torques
Torque
Part name Item Size
kgf・m lbf・ft
Plug 2 PT 1/8 3.0 21.7
Joint 18 M14 3.5 25.3
Swash plate 19 M14 5.0±0.35 36.2±2.5
Adjusting nut 20 M14 5.0±0.35 36.2±2.5
Lock nut 21 M14 5.0±0.35 36.2±2.5
Screw 29 M 3 0.05 0.36
8-114
3) DISASSEMBLY
(1) Clean pilot valve with kerosene.
※ Put blind plugs into all ports
(2) Fix pilot valve in a vise with copper(or
lead) sheets.
(3) Remove end of boot(26) from case(1)
and take it out upwards.
8-115
(6) Loosen adjusting nut(20) and plate(19)
with spanners on them respectively, and
remove them.
8-116
(8) Remove plate(16).
8-117
(12) For disassembling reducing valve section,
stand it vertically with spool(5) bottom
placed on flat workbench. Push down
spring seat(8, 31) and remove two pieces
of semicircular stopper(9) with tip of small
minus screwdriver.
※ Pay attention not to damage spool
surface.
※ Record original position of spring seat(8,
31).
※ Do not push down spring seat more than
6mm.
8-118
(16) Remove lock nut(21) and then boot(26).
8-119
(17) Cleaning of parts
① Put all parts in rough cleaning vessel
filled with kerosene and clean them
(Rough cleaning).
※ If dirty part is cleaned with kerosene just
after putting it in vessel, it may be
damaged. Leave it in kerosene for a
while to loosen dust and dirty oil.
※ If this kerosene is polluted, parts will be
damaged and functions of reassembled
valve will be degraded.
Therefore, control cleanliness of
kerosene fully.
② Put parts in final cleaning vessel filled
with kerosene, turning it slowly to clean
them even to their insides(Finish
cleaning).
※ Do not dry parts with compressed air,
since they will be damaged and/or rusted
by dust and moisture in air.
(18) Rust prevention of parts.
Apply rust-preventives to all parts.
※ If left as they after being cleaned, they will
be rusted and will not display their
functions fully after being reassembled.
8-120
4) ASSEMBLY
(1) Tighten hexagon socket head plug(2) to
the specified torque.
※ Tighten two bolts alternately and slowly.
8-121
(5) Assemble O-ring(13) onto plug(11).
8-122
(9) When return spring is strong in force,
assemble 4 sets at the same time,
utilizing plate(16), and tighten joint(18)
temporarily.
8-123
(14) Fit boot(40) to plate.
8- 124
(17) Assemble bushing(17) to plate and pass
cord and tube through it.
※ Provide margin necessary to operation.
8-125