This document provides an estimate for the construction of a goat shed located in Gaurishankar Rural Municipality-08, Khare, Dolakha, Nepal. It includes a detailed breakdown of materials, labor costs, and quantities needed for various construction tasks such as site clearance, earthwork, stonework, woodwork, and roofing. The total estimated cost of construction is NPR 2,33,834 (approximately $1,900 USD).
This document provides an estimate for the construction of a goat shed located in Gaurishankar Rural Municipality-08, Khare, Dolakha, Nepal. It includes a detailed breakdown of materials, labor costs, and quantities needed for various construction tasks such as site clearance, earthwork, stonework, woodwork, and roofing. The total estimated cost of construction is NPR 2,33,834 (approximately $1,900 USD).
This document provides an estimate for the construction of a goat shed located in Gaurishankar Rural Municipality-08, Khare, Dolakha, Nepal. It includes a detailed breakdown of materials, labor costs, and quantities needed for various construction tasks such as site clearance, earthwork, stonework, woodwork, and roofing. The total estimated cost of construction is NPR 2,33,834 (approximately $1,900 USD).
This document provides an estimate for the construction of a goat shed located in Gaurishankar Rural Municipality-08, Khare, Dolakha, Nepal. It includes a detailed breakdown of materials, labor costs, and quantities needed for various construction tasks such as site clearance, earthwork, stonework, woodwork, and roofing. The total estimated cost of construction is NPR 2,33,834 (approximately $1,900 USD).
Beneficiary Name:Sil Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.62 3.81 29.0322 Sqm 37.49 1088.41718 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.62 0.558 0.457 1.9431457
For Short Wall 3 2.896 0.558 0.457 2.2154921 Total Quantity 4.1586378 Cum 468.65 1948.94563 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.62 0.558 0.457 0.101
For Short Wall 3 3.81 0.558 0.457 0.101 For Floor 1 7.62 3.81 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46086
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 26..67 0.456 0.5 0.23
Long Wall 1 7.62 0.457 0.914 3.18 Short Wall 3 2.896 0.457 0.914 3.63 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 8.46 Cum 4277.65 36209.5329 5 PCC Work (1:2:4) for band
Providing, laying compacting and
curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 37.987 0.46 0.101 1.76 Total Quantity 1.76 cum 16330.09 28820.5842 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Sil Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.896 0.101 0.076 0.22 Purlin(3"x3") 8 8.53 0.076 0.076 0.39
Along length,Bottom Tie beam(7"x7") 2 7.16 0.177 0.177 0.45
Along length,Bottom Tie beam(4"x4") 2 7.16 0.101 0.101 0.15
Along Breadth,Bottom Tie beam(4"x4") 3 2.896 0.101 0.101 0.09 For Horizontal Beam(4"x3") 1 22.86 0.101 0.076 0.18 For Wall For long wall 2 7.62 0.04 1.67 0.97 For short wall 3 2.90 0.04 1.67 0.55 For gable portion 2 0.04 1.74 0.13 For Wooden Flooring For room1, wood (3"x2") 14 3.81 0.076 0.05 0.20 For room2, wood (3"x2") 14 3.81 0.076 0.05 0.20 Total Quantity 3.77 Cum 25000.00 94237.73 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 8.07 2.77 44.7078 Sqm 977.92 43720.6518 Total Amount 206932.321 VAT(13%) 26901.2018 Grand Total Amount 233834 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name: Sil Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.31 3.81 27.8511 Sqm 37.49 1044.13774 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.31 0.558 0.457 1.8640939
For Short Wall 3 3.81 0.558 0.457 2.9147186 Total Quantity 4.7788124 Cum 468.65 2239.59045 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.31 0.558 0.457 0.101
For Short Wall 3 2.694 0.558 0.457 0.101 For Floor 1 7.31 3.81 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46086
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 22.25 0.45 0.5 5.00625
Long Wall 1 7.31 0.457 0.914 3.05 Short Wall 3 2.896 0.457 0.914 3.63 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 13.11 Cum 4277.65 56095.3166 5 PCC Work (1:2:4) for band
Providing, laying compacting and
curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 37.5 0.46 0.101 1.74 Total Quantity 1.74 cum 16330.09 28451.0993 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name: Sil Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.896 0.101 0.076 0.22 Purlin(3"x3") 8 8.23 0.076 0.076 0.38
Along length,Bottom Tie beam(7"x7") 2 6.85 0.177 0.177 0.43
Along length,Bottom Tie beam(4"x4") 2 6.85 0.101 0.101 0.14
Along Breadth,Bottom Tie beam(4"x4") 3 3.35 0.101 0.101 0.10 For Horizontal Beam(4"x3") 1 22.86 0.101 0.076 0.18 For Wall For long wall 2 7.31 0.04 1.67 0.93 For short wall 3 3.50 0.04 1.67 0.67 For gable portion 2 0.04 1.74 0.13 For Wooden Flooring For room1, wood (3"x2") 13 3.81 0.076 0.05 0.19 For room2, wood (3"x2") 13 3.81 0.076 0.05 0.19 Total Quantity 3.79 Cum 25000.00 94766.98 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 8 1.72 27.52 Sqm 977.92 26912.3584 Total Amount 210415.946 VAT(13%) 27354.0729 Grand Total Amount 237770 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Krishna Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.31 3.65 26.6815 Sqm 37.49 1000.28944 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.31 0.558 0.457 1.8640939
For Short Wall 3 3.65 0.558 0.457 2.7923157 Total Quantity 4.6564096 Cum 468.65 2182.22634 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.31 0.558 0.457 0.101
For Short Wall 3 2.534 0.558 0.457 0.101 For Floor 1 7.31 3.65 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46086
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 21.95 0.456 0.5 5.00
Long Wall 1 7.31 0.457 0.914 3.05 Short Wall 3 2.736 0.457 0.914 3.43 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 12.91 Cum 4277.65 55230.6109 5 PCC Work (1:2:4) for band
Providing, laying compacting and
curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 36.585 0.46 0.101 1.70 Total Quantity 1.70 cum 16330.09 27756.8925 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Krishna Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.591 0.101 0.076 0.20 Purlin(3"x3") 8 8.23 0.076 0.076 0.38
Along length,Bottom Tie beam(7"x7") 2 6.85 0.177 0.177 0.43
Along length,Bottom Tie beam(4"x4") 2 6.85 0.101 0.101 0.14
Along Breadth,Bottom Tie beam(4"x4") 3 3.2 0.101 0.101 0.10 For Horizontal Beam(4"x3") 1 14.65 0.101 0.076 0.11 For Wall For long wall 2 7.31 0.04 1.67 0.93 For short wall 3 3.65 0.04 1.67 0.70 For gable portion 2 0.04 1.67 0.13 For Wooden Flooring For room1, wood (3"x2") 12 3.65 0.076 0.05 0.17 For room2, wood (3"x2") 12 3.65 0.076 0.05 0.17 Total Quantity 3.68 Cum 25000.00 91981.37 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 8 2.65 42.4 Sqm 977.92 41463.808 Total Amount 220521.659 VAT(13%) 28667.8156 Grand Total Amount 249189 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Kalake Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.31 3.65 26.6815 Sqm 37.49 1000.28944 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.31 0.558 0.457 1.8640939
For Short Wall 3 3.65 0.558 0.457 2.7923157 Total Quantity 4.6564096 Cum 468.65 2182.22634 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.31 0.558 0.457 0.101
For Short Wall 3 2.534 0.558 0.457 0.101 For Floor 1 7.31 3.65 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46086
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 21.90 0.46 0.50 4.99
For support back side 1 7.31 0.45 0.30 0.99 Long Wall 1 7.31 0.457 0.914 3.05 Short Wall 3 2.736 0.457 0.914 3.43 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 13.89 Cum 4277.65 59403.2446 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 36.58 0.46 0.101 1.70 Total Quantity 1.70 cum 16330.09 27753.099 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Kalake Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.591 0.101 0.076 0.20 Purlin(3"x3") 8 8.23 0.076 0.076 0.38
Along length,Bottom Tie beam(7"x7") 2 6.85 0.177 0.177 0.43
Along length,Bottom Tie beam(4"x4") 2 6.85 0.101 0.101 0.14
Along Breadth,Bottom Tie beam(4"x4") 3 3.2 0.101 0.101 0.10 For Horizontal Beam(4"x3") 1 14.65 0.101 0.076 0.11 For Wall For long wall 2 7.31 0.04 1.67 0.93 For short wall 3 3.65 0.04 1.67 0.70 For gable portion 2 0.04 1.67 0.13 For Wooden Flooring For room1, wood (3"x2") 12 3.65 0.076 0.05 0.17 For room2, wood (3"x2") 12 3.65 0.076 0.05 0.17 Total Quantity 3.68 Cum 25000.00 91981.37 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 8 2.65 42.4 Sqm 977.92 41463.808 Total Amount 224690.499 VAT(13%) 29209.7649 Grand Total Amount 253900 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Dal Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.62 4.115 31.36 Sqm 37.49 1175.54769 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.62 0.558 0.457 1.94
For Short Wall 3 4.115 0.558 0.457 3.15 Total Quantity 5.09 Cum 468.65 2385.98844 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.62 0.558 0.457 0.101
For Short Wall 3 2.999 0.558 0.457 0.101 For Floor 1 7.62 4.115 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46086
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 21.95 0.46 0.50 5.00
Long Wall 1 7.62 0.457 0.914 3.18 Short Wall 3 3.201 0.457 0.914 4.01 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 13.62 Cum 4277.65 58277.0467 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 36.585 0.46 0.101 1.70 Total Quantity 1.70 cum 16330.09 27756.8925 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Dal Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.65 0.101 0.076 0.20 Purlin(3"x3") 8 8.52 0.076 0.076 0.39
Along length,Bottom Tie beam(7"x7") 2 7.16 0.177 0.177 0.45
Along length,Bottom Tie beam(4"x4") 2 7.16 0.101 0.101 0.15
Along Breadth,Bottom Tie beam(4"x4") 3 3.6 0.101 0.101 0.11 For Horizontal Beam(4"x3") 1 23.47 0.101 0.076 0.18 For Wall For long wall 2 7.62 0.04 1.67 0.97 For short wall 3 3.75 0.04 1.67 0.72 For gable portion 2 0.04 1.75 0.13 For Wooden Flooring For room1, wood (3"x2") 14 4.115 0.076 0.05 0.22 For room2, wood (3"x2") 14 4.115 0.076 0.05 0.22 Total Quantity 3.97 Cum 25000.00 99311.62 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 8.54 2.85 48.678 Sqm 977.92 47603.1898 Total Amount 237416.75 VAT(13%) 30864.1775 Grand Total Amount 268281 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Dil Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.16 3.65 26.13 Sqm 37.49 979.76366 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.16 0.558 0.457 1.83
For Short Wall 3 3.65 0.558 0.457 2.79 Total Quantity 4.62 Cum 468.65 2164.30006 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.16 0.558 0.457 0.101
For Short Wall 3 2.534 0.558 0.457 0.101 For Floor 1 7.16 3.65 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46086
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 21.64 0.46 0.50 4.93
Long Wall 1 7.16 0.457 0.914 2.99 Short Wall 3 2.738 0.457 0.914 3.43 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 12.78 Cum 4277.65 54670.9723 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 36.3 0.46 0.101 1.69 Total Quantity 1.69 cum 16330.09 27540.6641 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Dil Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.65 0.101 0.076 0.20 Purlin(3"x3") 8 8.07 0.076 0.076 0.37
Along length,Bottom Tie beam(7"x7") 2 6.5 0.177 0.177 0.41
Along length,Bottom Tie beam(4"x4") 2 6.5 0.101 0.101 0.13
Along Breadth,Bottom Tie beam(4"x4") 3 3.2 0.101 0.101 0.10 For Horizontal Beam(4"x3") 1 21.646 0.101 0.076 0.17 For Wall For long wall 2 7.16 0.04 1.67 0.91 For short wall 3 3.65 0.04 1.67 0.70 For gable portion 2 0.04 1.67 0.13 For Wooden Flooring For room1, wood (3"x2") 13 3.65 0.076 0.05 0.18 For room2, wood (3"x2") 13 3.65 0.076 0.05 0.18 Total Quantity 3.71 Cum 25000.00 92741.81 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 8.07 2.65 42.771 Sqm 977.92 41826.6163 Total Amount 220830.592 VAT(13%) 28707.977 Grand Total Amount 249539 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Thir Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.16 3.96 28.35 Sqm 37.49 1062.97646 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.16 0.558 0.457 1.83
For Short Wall 3 3.96 0.558 0.457 3.03 Total Quantity 4.86 Cum 468.65 2275.44302 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.16 0.558 0.457 0.101
For Short Wall 3 2.844 0.558 0.457 0.101 For Floor 1 7.16 3.96 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46086
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 22.25 0.46 0.61 6.18
Long Wall 1 7.16 0.457 0.914 2.99 Short Wall 3 3.048 0.457 0.914 3.82 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 14.41 Cum 4277.65 61658.3131 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 38.1 0.46 0.101 1.77 Total Quantity 1.77 cum 16330.09 28906.3169 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Thir Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.75 0.101 0.076 0.21 Purlin(3"x3") 8 8.07 0.076 0.076 0.37
Along length,Bottom Tie beam(7"x7") 2 6.25 0.177 0.177 0.39
Along length,Bottom Tie beam(4"x4") 2 6.25 0.101 0.101 0.13
Along Breadth,Bottom Tie beam(4"x4") 3 3.14 0.101 0.101 0.10 For Horizontal Beam(4"x3") 1 22.25 0.101 0.076 0.17 For Wall For long wall 2 7.16 0.04 1.67 0.91 For short wall 3 3.96 0.04 1.67 0.76 For gable portion 2 0.04 1.81 0.14 For Wooden Flooring For room1, wood (3"x2") 14 3.96 0.076 0.05 0.21 For room2, wood (3"x2") 14 3.96 0.076 0.05 0.21 Total Quantity 3.83 Cum 25000.00 95748.72 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 8.07 2.794 45.09516 Sqm 977.92 44099.4589 Total Amount 234657.69 VAT(13%) 30505.4997 Grand Total Amount 265163 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Damini Sherpa Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.012 3.353 23.51 Sqm 37.49 881.436238 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.012 0.558 0.457 1.79
For Short Wall 3 3.353 0.558 0.457 2.57 Total Quantity 4.35 Cum 468.65 2040.13066 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.012 0.558 0.457 0.101
For Short Wall 3 2.237 0.558 0.457 0.101 For Floor 1 7.012 3.353 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46086
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 20.73 0.46 0.50 4.73
Long Wall 1 7.012 0.457 0.914 2.93 Short Wall 3 2.441 0.457 0.914 3.06 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 12.14 Cum 4277.65 51926.9958 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 34.146 0.46 0.101 1.59 Total Quantity 1.59 cum 16330.09 25906.433 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Damini Sherpa Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.59 0.101 0.076 0.20 Purlin(3"x3") 8 7.92 0.076 0.076 0.37
Along length,Bottom Tie beam(7"x7") 2 6.09 0.177 0.177 0.38
Along length,Bottom Tie beam(4"x4") 2 6.09 0.101 0.101 0.12
Along Breadth,Bottom Tie beam(4"x4") 3 2.8 0.101 0.101 0.09 For Horizontal Beam(4"x3") 1 24 0.101 0.076 0.18 For Wall For long wall 2 7.01 0.04 1.67 0.89 For short wall 3 3.35 0.04 1.67 0.64 For gable portion 2 0.04 1.53 0.12 For Wooden Flooring For room1, wood (3"x2") 11 3.353 0.076 0.05 0.14 For room2, wood (3"x2") 1 3.353 0.076 0.05 0.01 Total Quantity 3.38 Cum 25000.00 84405.54 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 7.92 2.55 40.392 Sqm 977.92 39500.1446 Total Amount 205567.137 VAT(13%) 26723.7278 Grand Total Amount 232291 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Griha Bahadur Magar Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.012 3.353 23.51 Sqm 37.49 881.44 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.012 0.558 0.457 1.79
For Short Wall 3 3.353 0.558 0.457 2.57 Total Quantity 4.35 Cum 468.65 2040.13066 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.012 0.558 0.457 0.101
For Short Wall 3 2.237 0.558 0.457 0.101 For Floor 1 7.012 3.353 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 21.95 0.46 0.50 5.00
Long Wall 1 7.012 0.457 0.914 2.93 Short Wall 3 2.441 0.457 0.914 3.06 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 12.42 Cum 4277.65 53116.87 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 36.585 0.46 0.101 1.70 Total Quantity 1.70 cum 16330.09 27756.89 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Griha Bahadur Magar Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.59 0.101 0.076 0.20 Purlin(3"x3") 8 7.92 0.076 0.076 0.37
Along length,Bottom Tie beam(7"x7") 2 6.09 0.177 0.177 0.38
Along length,Bottom Tie beam(4"x4") 2 6.09 0.101 0.101 0.12
Along Breadth,Bottom Tie beam(4"x4") 3 2.8 0.101 0.101 0.09 For Horizontal Beam(4"x3") 1 24 0.101 0.076 0.18 For Wall For long wall 2 7.01 0.04 1.67 0.89 For short wall 3 3.35 0.04 1.67 0.64 For gable portion 2 0.04 1.53 0.12 For Wooden Flooring For room1, wood (3"x2") 11 3.353 0.076 0.05 0.14 For room2, wood (3"x2") 11 3.353 0.076 0.05 0.14 Total Quantity 3.50 Cum 25000.00 87590.89 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 7.92 2.65 41.976 Sqm 977.92 41049.17 Total Amount 213341.843 VAT(13%) 27734.4396 Grand Total Amount 241076 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Nigmar Lhamu Sherpa Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.012 4.26 29.87 Sqm 37.49 1119.87 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.012 0.558 0.457 1.79
For Short Wall 3 4.26 0.558 0.457 3.26 Total Quantity 5.05 Cum 468.65 2365.31346 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.012 0.558 0.457 0.101
For Short Wall 3 3.144 0.558 0.457 0.101 For Floor 1 7.012 4.26 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 22.00 0.46 0.50 5.02
Long Wall 1 7.012 0.457 0.914 2.93 Short Wall 3 3.348 0.457 0.914 4.20 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 13.57 Cum 4277.65 58027.42 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 39 0.46 0.101 1.81 Total Quantity 1.81 cum 16330.09 29589.14 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Nigmar Lhamu Sherpa Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.8 0.101 0.076 0.21 Purlin(3"x3") 8 7.6 0.076 0.076 0.35
Along length,Bottom Tie beam(7"x7") 2 5.792 0.177 0.177 0.36
Along length,Bottom Tie beam(4"x4") 2 5.792 0.101 0.101 0.12
Along Breadth,Bottom Tie beam(4"x4") 3 3.35 0.101 0.101 0.10 For Horizontal Beam(4"x3") 1 22 0.101 0.076 0.17 For Wall For long wall 2 5.79 0.04 1.67 0.74 For short wall 3 3.35 0.04 1.67 0.64 For gable portion 2 0.04 1.53 0.12 For Wooden Flooring For room1, wood (3"x2") 12 4.26 0.076 0.05 0.19 For room2, wood (3"x2") 12 4.26 0.076 0.05 0.19 Total Quantity 3.43 Cum 25000.00 85859.83 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 7.6 2.89 43.928 Sqm 977.92 42958.07 Total Amount 220826.104 VAT(13%) 28707.3935 Grand Total Amount 249533 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Bhukal Khadka Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 6.859 3.658 25.09 Sqm 37.49 940.63 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 6.859 0.558 0.457 1.75
For Short Wall 3 3.658 0.558 0.457 2.80 Total Quantity 4.55 Cum 468.65 2131.19618 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 6.859 0.558 0.457 0.101
For Short Wall 3 2.542 0.558 0.457 0.101 For Floor 1 6.859 3.658 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 21.00 0.46 0.50 4.79
Long Wall 1 6.859 0.457 0.914 2.86 Short Wall 3 2.746 0.457 0.914 3.44 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 12.52 Cum 4277.65 53551.84 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 35.67 0.46 0.101 1.66 Total Quantity 1.66 cum 16330.09 27062.69 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Bhukal Khadka Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.85 0.101 0.076 0.22 Purlin(3"x3") 8 7.77 0.076 0.076 0.36
Along length,Bottom Tie beam(7"x7") 2 5.945 0.177 0.177 0.37
Along length,Bottom Tie beam(4"x4") 2 5.945 0.101 0.101 0.12
Along Breadth,Bottom Tie beam(4"x4") 3 3.35 0.101 0.101 0.10 For Horizontal Beam(4"x3") 1 21.2 0.101 0.076 0.16 For Wall For long wall 2 5.95 0.04 1.67 0.76 For short wall 3 3.35 0.04 1.67 0.64 For gable portion 2 0.04 1.67 0.13 For Wooden Flooring For room1, wood (3"x2") 11 3.353 0.076 0.05 0.14 For room2, wood (3"x2") 11 3.353 0.076 0.05 0.14 Total Quantity 3.37 Cum 25000.00 84371.12 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 7.77 2.64 41.0256 Sqm 977.92 40119.75 Total Amount 209083.698 VAT(13%) 27180.8807 Grand Total Amount 236265 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Man Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.926 4.87 38.60 Sqm 37.49 1447.10 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.926 0.558 0.457 2.02
For Short Wall 3 4.87 0.558 0.457 3.73 Total Quantity 5.75 Cum 468.65 2693.24495 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.926 0.558 0.457 0.101
For Short Wall 3 3.754 0.558 0.457 0.101 For Floor 1 7.926 4.87 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 18.50 0.46 0.24 2.02
Long Wall 1 7.926 0.457 0.914 3.31 Short Wall 3 3.958 0.457 0.914 4.96 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 11.72 Cum 4277.65 50134.32 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 41.5 0.46 0.101 1.93 Total Quantity 1.93 cum 16330.09 31485.88 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Man Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 12 1.829 0.101 0.076 0.17 Vertical Post1(4"x3") 6 2.43 0.101 0.076 0.11 Rafter(4"x3") 12 3.2 0.101 0.076 0.29 Purlin(3"x3") 8 8.5 0.076 0.076 0.39
Along length,Bottom Tie beam(7"x7") 2 7.1 0.177 0.177 0.44
Along length,Bottom Tie beam(4"x4") 2 7.1 0.101 0.101 0.14
Along Breadth,Bottom Tie beam(4"x4") 3 4.1 0.101 0.101 0.13 For Horizontal Beam(4"x3") 1 21.5 0.101 0.076 0.17 For Wall For long wall 2 7.10 0.04 1.67 0.90 For short wall 3 4.10 0.04 1.67 0.78 For gable portion 2 0.04 2.23 0.17 For Wooden Flooring For room1, wood (3"x2") 15 3.96 0.076 0.05 0.23 For room2, wood (3"x2") 15 3.96 0.076 0.05 0.23 Total Quantity 4.16 Cum 25000.00 103890.73 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 3.1 6.2 Sqm 977.92 6063.10 Total Amount 196620.837 VAT(13%) 25560.7089 Grand Total Amount 222182 S.N Name Length Breadth a, breadth breadth,b length, c length, d 1 Sil bdr Tamang 25 12.5 11 13.2 11.9 11.9 2 Sil bdr Tamang 24 12.5 11 13.2 11.424 11.424 3 Krishna Bahadur Tamang 24 12 10.56 12.672 11.424 11.424 4 Kalake Tamang 24 12 10.56 12.672 11.424 11.424 5 Dal Bahadur Tamang 25 13.5 11.88 14.256 11.9 11.9 6 Dil Bahadur Tamang 23.5 12 10.56 12.672 11.186 11.186 7 Thir Bahadur Tamag 23.5 13 11.44 13.728 11.186 11.186 8 Dhamini Sherpini 23 11.5 10.12 12.144 10.948 10.948 9 Griha Bahadur Tamang 24 12 10.56 12.672 11.424 11.424 10 Ningmar Lhamu Sherpa 22 14 12.32 11.616 10.472 10.472 11 Bhukal Khadka 22.6 12 10.56 12.672 10.7576 11.424 12 Man Bahadur Tamang 26 16 14.08 16.896 12.376 12.376 13 Bishwo Nath Khadka 23 12 10.56 12.672 10.948 10.948 14 Ramesh Magar 24 14 12.32 14.784 11.424 11.424 15 Ram Bahadur Tamang 23.5 13 11.44 13.728 11.186 11.186 16 Tirtha Bahadur Gurung 24 13 11.44 13.728 11.424 11.424 17 Udab Magar 23.5 12.5 11 13.2 11.186 11.186 18 Panche Tamang 19 length, e 25.8 24.768 24.768 24.768 25.8 24.252 24.252 23.736 24.768 22.704 23.3232 26.832 23.736 24.768 24.252 24.768 24.252 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Bisho Nath khadka Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.012 3.658 25.65 Sqm 37.49 961.61 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.012 0.558 0.457 1.79
For Short Wall 3 3.658 0.558 0.457 2.80 Total Quantity 4.59 Cum 468.65 2149.48099 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.012 0.558 0.457 0.101
For Short Wall 3 2.542 0.558 0.457 0.101 For Floor 1 7.012 3.658 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 21.34 0.46 0.50 4.87
Long Wall 1 7.012 0.457 0.914 2.93 Short Wall 3 2.746 0.457 0.914 3.44 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 12.66 Cum 4277.65 54157.80 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 35.975 0.46 0.101 1.67 Total Quantity 1.67 cum 16330.09 27294.09 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Bisho Nath khadka Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 12 3.2 0.101 0.076 0.29 Purlin(3"x3") 8 7.92 0.076 0.076 0.37
Along length,Bottom Tie beam(7"x7") 2 6.097 0.177 0.177 0.38
Along length,Bottom Tie beam(4"x4") 3 6.097 0.101 0.101 0.19
Along Breadth,Bottom Tie beam(4"x4") 3 2.74 0.101 0.101 0.08 For Horizontal Beam(4"x3") 1 29.5 0.101 0.076 0.23 For Wall For long wall 2 6.10 0.04 1.67 0.78 For short wall 3 3.35 0.04 1.67 0.64 For gable portion 2 0.04 1.67 0.13 For Wooden Flooring For room1, wood (3"x2") 12 3.65 0.076 0.05 0.17 For room2, wood (3"x2") 12 3.65 0.076 0.05 0.17 Total Quantity 3.65 Cum 25000.00 91218.57 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 7.92 2.71 42.9264 Sqm 977.92 41978.59 Total Amount 218666.595 VAT(13%) 28426.6573 Grand Total Amount 247093 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Tirtha Bahadur Gurung Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.31 3.96 28.95 Sqm 37.49 1085.25 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.31 0.558 0.457 1.86
For Short Wall 3 3.96 0.558 0.457 3.03 Total Quantity 4.89 Cum 468.65 2293.3693 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.31 0.558 0.457 0.101
For Short Wall 3 2.844 0.558 0.457 0.101 For Floor 1 7.31 3.96 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 18.60 0.46 0.50 4.24
Long Wall 1 7.31 0.457 0.914 3.05 Short Wall 3 3.048 0.457 0.914 3.82 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 12.54 Cum 4277.65 53635.75 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 37.4 0.46 0.101 1.74 Total Quantity 1.74 cum 16330.09 28375.23 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Tirtha Bahadur Gurung Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 3.2 0.101 0.076 0.25 Purlin(3"x3") 8 8.079 0.076 0.076 0.37
Along length,Bottom Tie beam(7"x7") 2 6.4 0.177 0.177 0.40
Along length,Bottom Tie beam(4"x4") 3 6.4 0.101 0.101 0.20
Along Breadth,Bottom Tie beam(4"x4") 3 2.896 0.101 0.101 0.09 For Horizontal Beam(4"x3") 1 21.95 0.101 0.076 0.17 For Wall For long wall 2 6.26 0.04 1.67 0.80 For short wall 3 3.20 0.04 1.67 0.61 For gable portion 2 0.04 1.74 0.13 For Wooden Flooring For room1, wood (3"x2") 12 3.65 0.076 0.05 0.17 For room2, wood (3"x2") 12 3.65 0.076 0.05 0.17 Total Quantity 3.58 Cum 25000.00 89490.96 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 8.079 2.81 45.40398 Sqm 977.92 44401.46 Total Amount 220188.48 VAT(13%) 28624.5024 Grand Total Amount 248813 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Udab Magar Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.16 3.81 27.28 Sqm 37.49 1022.71 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.16 0.558 0.457 1.83
For Short Wall 3 3.81 0.558 0.457 2.91 Total Quantity 4.74 Cum 468.65 2221.66417 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.16 0.558 0.457 0.101
For Short Wall 3 2.694 0.558 0.457 0.101 For Floor 1 7.16 3.81 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 18.57 0.46 0.50 4.23
Long Wall 1 7.16 0.457 0.914 2.99 Short Wall 3 2.898 0.457 0.914 3.63 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 12.28 Cum 4277.65 52534.44 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 37.1 0.46 0.101 1.72 Total Quantity 1.72 cum 16330.09 28147.62 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Udab Magar Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.98 0.101 0.076 0.23 Purlin(3"x3") 8 8.06 0.076 0.076 0.37
Along length,Bottom Tie beam(7"x7") 2 6.25 0.177 0.177 0.39
Along length,Bottom Tie beam(4"x4") 3 6.25 0.101 0.101 0.19
Along Breadth,Bottom Tie beam(4"x4") 3 2.896 0.101 0.101 0.09 For Horizontal Beam(4"x3") 1 22.05 0.101 0.076 0.17 For Wall For long wall 2 6.25 0.04 1.67 0.80 For short wall 3 3.15 0.04 1.67 0.60 For gable portion 2 0.04 1.74 0.13 For Wooden Flooring For room1, wood (3"x2") 12 3.62 0.076 0.05 0.17 For room2, wood (3"x2") 12 3.62 0.076 0.05 0.17 Total Quantity 3.54 Cum 25000.00 88377.48 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 8.02 2.77 44.4308 Sqm 977.92 43449.77 Total Amount 216660.14 VAT(13%) 28165.8182 Grand Total Amount 244826 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Ram Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.16 3.96 28.35 Sqm 37.49 1062.98 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.16 0.558 0.457 1.83
For Short Wall 3 3.96 0.558 0.457 3.03 Total Quantity 4.86 Cum 468.65 2275.44302 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.16 0.558 0.457 0.101
For Short Wall 3 2.844 0.558 0.457 0.101 For Floor 1 7.16 3.96 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 19.00 0.46 0.50 4.33
Long Wall 1 7.16 0.457 0.914 2.99 Short Wall 3 3.048 0.457 0.914 3.82 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 12.57 Cum 4277.65 53757.86 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 38.1 0.46 0.101 1.77 Total Quantity 1.77 cum 16330.09 28906.32 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Ram Bahadur Tamang Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 10 1.829 0.101 0.076 0.14 Vertical Post1(4"x3") 5 2.43 0.101 0.076 0.09 Rafter(4"x3") 10 2.92 0.101 0.076 0.22 Purlin(3"x3") 8 8.08 0.076 0.076 0.37
Along length,Bottom Tie beam(7"x7") 2 6.26 0.177 0.177 0.39
Along length,Bottom Tie beam(4"x4") 3 6.26 0.101 0.101 0.19
Along Breadth,Bottom Tie beam(4"x4") 3 3.05 0.101 0.101 0.09 For Horizontal Beam(4"x3") 1 22.2 0.101 0.076 0.17 For Wall For long wall 2 6.27 0.04 1.67 0.80 For short wall 3 3.20 0.04 1.67 0.61 For gable portion 2 0.04 1.74 0.13 For Wooden Flooring For room1, wood (3"x2") 12 3.6 0.076 0.05 0.16 For room2, wood (3"x2") 12 3.6 0.076 0.05 0.16 Total Quantity 3.55 Cum 25000.00 88708.18 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 8.07 2.76 44.5464 Sqm 977.92 43562.82 Total Amount 219180.056 VAT(13%) 28493.4073 Grand Total Amount 247673 Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Ramesh Magar Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks 1 Site Clearance Site clearance work including collection of all construction debris, water, removal of bushes, tree and disposal to the designated place as directed by Engineer. 1 7.317 4.26 31.17 Sqm 37.49 1168.58 2 Earthwork Earthwork in excavation in ordinary soil upto the required depth and disposal of excavated materials upto 50m lead and 1.50m lift including dressinfg of sides, ramming the bottom as per drawing, specification and approval of site engineer
For Long Wall 1 7.317 0.558 0.457 1.87
For Short Wall 3 4.26 0.558 0.457 3.26 Total Quantity 5.12 Cum 468.65 2401.76357 3 Stone Soling Work Providing and laying randam rubble stone soling including all materials, labor, as per drawing, specification and approval of engineer
For Long Wall 1 7.317 0.558 0.457 0.101
For Short Wall 3 3.144 0.558 0.457 0.101 For Floor 1 7.317 4.26 0.152 0.101 Total Quantity 0.303 Cum 2991.62 906.46
4 Stone masonry work
Providing stone masonry work with mud mortar in thickness at all heights, places and position above plinth including raking out joints, scaffolding etc as per drawings, specification and instruction of engineer all complete.
For Foundation 1 25.40 0.46 0.50 5.79
Long Wall 1 7.317 0.457 0.914 3.06 Short Wall 3 3.348 0.457 0.914 4.20 For Access Way Step-1 1 1 0.75 0.8 0.60 Step-2 1 1 0.5 0.65 0.33 Step-3 1 1 0.5 0.55 0.28 Step-4 1 1 0.5 0.45 0.23 Total Quantity 14.47 Cum 4277.65 61888.42 5 PCC Work (1:2:4) for band Providing, laying compacting and curing 1:2:4 PCC bands above soling portion with approved level line and dimensions all complete as per specifications, drawings and instruction of site engineer PCC Band 1 40.1 0.46 0.101 1.86 Total Quantity 1.86 cum 16330.09 30423.71 6 Wooden Work Name of Sub-Project :Construction of Goat Shed Location: Gaurishankar Rural Municipality-08, Khare, Dolakha Beneficiary Name:Ramesh Magar Details Estimate S.N Description of Item No Length Breadth Height Quantity Unit Rate Amount Remarks Providing, making and fixing well seasoned local wood for roof, window and wall of room as per specification all complete For Roof Vertical Post1(4"x3") 12 1.829 0.101 0.076 0.17 Vertical Post1(4"x3") 6 2.43 0.101 0.076 0.11 Rafter(4"x3") 12 2.92 0.101 0.076 0.27 Purlin(3"x3") 8 8.08 0.076 0.076 0.37
Along length,Bottom Tie beam(7"x7") 2 6.4 0.177 0.177 0.40
Along length,Bottom Tie beam(4"x4") 3 6.4 0.101 0.101 0.20
Along Breadth,Bottom Tie beam(4"x4") 3 3.35 0.101 0.101 0.10 For Horizontal Beam(4"x3") 1 23.17 0.101 0.076 0.18 For Wall For long wall 2 6.40 0.04 1.67 0.81 For short wall 3 3.35 0.04 1.67 0.64 For gable portion 2 0.04 1.74 0.13 For Wooden Flooring For room1, wood (3"x2") 14 3.85 0.076 0.05 0.20 For room2, wood (3"x2") 14 3.85 0.076 0.05 0.20 Total Quantity 3.80 Cum 25000.00 94901.62 Providing and fixing plane 26 gauge CGI sheet and ridge plane sheet for roofing works as per specification and 7 drawing 26 gauge CGI sheet 2 8.2 2.89 47.396 Sqm 977.92 46349.50 Total Amount 238040.052 VAT(13%) 30945.2067 Grand Total Amount 268985