LD Policy Guidelines Final
LD Policy Guidelines Final
LD Policy Guidelines Final
Department of Education
Region V
SCHOOLS DIVISION OF CAMARINES SUR
November 8,2021
I. RATIONALE
The Schools Division Office of Camarines Sur situated at San Jose, Pili,
Camarines Sur is one of the very large divisions in the country with 19,271
personnel serving 424,252 learners all around the province. With the demands on
the competencies needed by each employee and in every job group ranging from
casual employees to teaching and non-teaching personnel , middle managers,
school heads, utility workers and all, there is the need to help them grow
professionally through the operationalization of the L&D System.
The SDO of Camarines Sur, though there are efforts of providing trainings in its
employees has apparently no localized policy on L&D. Policies being cascaded by
the national and regional offices, and other in placed training development
initiatives of the human resource are primarily considered in providing the training
to its employees. Along this context, employees just solely rely on what are given to
them rather than what they actually need.
The operationalization of the L&D system to SDO Camarines Sur shall seek to
successfully achieve the following objectives:
a. determine the learning and development needs of all teaching and non-
teaching personnel of SDO Cam Sur as basis for identifying
intervention towards improving the quality of performance.
b. provide direction to planning and designing learning intervention and
activities to close competency gaps, improve performance and achieve
educational goals
1
c. identify and map propose activities and their implementation
requirements to address priority needs as specified in the learning and
development needs analysis report.
d. identify context responsive L&D interventions that will address all SDO
Cam Sur employees learning needs.
e. conceptualize and map out elements of the specific programs or
interventions that will address the enabling objectives of the L&D.
f. provide processes for formulating and ensuring comprehensiveness of
various design elements such as formal learning (face to face), LAC
session, virtual trainings, etc.
g. provide processes for identifying, conceptualizing, producing and
evaluating quality and responsive resource package based on the L&D
intervention designs.
h. Provide processes and standards for implementing the various tasks
before, during and after the conduct of a responsive L&D interventions.
II. Scope
ACRONYMS
2
IDP Individual Development Plan
IPCRF Individual Performance Commitment and Review Form
JEL Job-embedded Learning
LAC Learning Action Cell
L&D Learning and Development
LDD Learning and Development Program Delivery
LDNA Learning and Development Needs Assessment
LDP Learning and Development Planning
DepEd Department of Education
DO Department Order
DO-SPPD Division Office Strategic Plan for Professional Development
EPD Employees Professional Development
GEM Governance and Enabling Mechanisms
GEDSI Gender Equality, Disability, and Social Inclusion
IDP Individual Development Plan
IPCRF Individual Performance Commitment and Review Form
JEL Job-embedded Learning
LAC Learning Action Cell
L&D Learning and Development
LDD Learning and Development Program Delivery
LDNA Learning and Development Needs Assessment
LDP Learning and Development Planning
LDPD Learning and Development Program Design
LDRPD Learning and Development Resource Package Development
LRMDS Learning Resource Management and Development System
LSP Learning Service Provider
MC Memorandum Circular
M&E Monitoring and Evaluation
NCBSSH National Competency-based Standards for School Heads
NEAP National Educators Academy of the Philippines
NEAP-RO National Educators Academy of the Philippines- Regional
Office
OPCRF Office Performance Commitment and Review Form
PAL Peer-assisted Learning
PDC Personnel Development Committee
PMG Program Management Group
PPST Philippine Professional Standards for Teachers
QAD Quality Assurance Division
QAME Quality Assurance and Monitoring and Evaluation
RO Regional Office
RO-SPPD Regional Office Strategic Plan for Professional Development
RPMS Results-based Performance Management System
3
SDO Schools Division Office
SDO-SPPD Schools Division Office Strategic Plan for Professional
Development
S-SPPD School Strategic Plan for Professional Development
SIP School Improvement Plan
TA Technical Assistance
WAP Workplace Application Project
WDO Workplace Development Objectives
WFP Work and Financial Plan
A. Definition
Governance and Enabling Mechanisms (GEM) is the subsystem that establishes
the policies and standards, structure and staffing, roles and responsibilities,
budgets, and other support elements for managing and overseeing the Learning
and Development (L&D) System for SDO Employees Professional Development
(EPD).
B. Purpose
This subsystem defines the organizational arrangements and accountability in
every L&D subsystem that ensures equal opportunity and active participation of
women and men in the Personnel Development Group (PMG) and Program
Management Group (PMG). It also ensures the provision of necessary financial and
other support for effective and efficient implementation of the L&D System for EPD.
C. Elements
The GEM subsystem consists of ten elements that work together to create the right
conditions for the L&D system to function effectively and efficiently. These include:
i) Policies, ii) Structure, Functions, Roles and Responsibilities in EPD, iii)
Capability Building for L&D Implementers, iv) Technical Assistance, v) Recognition,
vi) System Audit, vii) Partnership Management, viii) Budget, ix) DepEd Operational
Resource Management, and, x) Information System.
1. Policies
In the conduct of EPD, the school and SDO functional units shall be guided by the
set of principles, guidelines, processes, procedures, and standards that govern the
L&D functions to maintain consistency of practices across the DepEd bureaucracy,
quality of outputs, sustainability of gains and outcomes, and compliance with
existing rules and regulations. It shall adhere to relevant DepEd policies on
professional development programs for school heads, teachers, and non-teaching
4
personnel. The DepEd policies on EPD shall be consistent with relevant
Memorandum Circulars (MC) of the Civil Service Commission (CSC).
The SDO PDC and PMG include , Assistant Schools Division Superintendent and the
Learning and Development team of the PRIME HRM.
1Following are links on policy issuances from DepEd, CSC and DBM related to
EPD:
https://www.deped.gov.ph/category/issuances/deped-orders/
http://www.csc.gov.ph/2014-02-21-08-22-34/2014-02-21-08-22-57.html
https://www.dbm.gov.ph/index.php/compendium-of-issuances-on-organization-
staffingposition-classification-and- compensation
The school may also tap external resource persons or coaches to provide
specialized technical assistance support.
5
Figure 2 Illustrates the school PPD organizational structure in the
Division level.
SDS
PMG
6
The PDC recommends to the superintendent/school heads to convene
and organize a PMG which shall be composed of members who have expertise
to lead and facilitate activities related to the implementation of the EPD
program. The team is assigned to implement a system, e.g., LDNA or several
subsystems, or the whole L&D system. The PMG also manages the conduct of
a specific learning modality (i.e., job-embedded learning, relationship and
discussion-based learning, learning action cell, and formal training). For small
schools (with less than 9 teachers), the PDC may designate 2-3 individuals to
perform the functions of the PMG.
The following table presents the roles and responsibilities of the implementers
of the L&D System.
Table 1. Roles and Responsibilities of the PMG, PDC, and other L&D System Implementers
Roles and
Subsystem Responsibilities
PM PDC Learning Teachers
Modality Lead
Governan ▪ Together with ▪ Participate
ce and School Head/ in all
Enabling Principal, aspects of
Mechanis cascades the L&D
ms School System
Improvement EPD
Plan (SIP)
directions and
priorities which
will serve as
anchor for all
L&D
programs/
initiatives of
school or
learning center
▪ In SDO
together with
supervisors
and heads of
functional
units, the
superintendent
cascades the
Division
Educational
Development
Plan (DEDP) as
basis for L&D
program,
initiatives of all
functional
units of SDO
Camarines
7
Sur.
▪ Recommends
L&D policy
improvements
▪ Develops
and/or
implements
guidelines for
the selection of
nominees for
L&D and
scholarship
programs, in
accordance
with DepEd
policies
▪ Serves as the
Scholarship
Committee that
screens and
endorses
nominees from
the schools for
scholarship
programs for
approval by the
Schools
Division
Superintendent
(SDS).
▪ Recommends
assignment of
L&D PMG, if
needed.
Roles and
Subsystem Responsibilities
PMG PDC Learning Employees
Modality
Lead
implement
one or more
L&D
subsystems
LDNA ▪ Conducts needs ▪ Reviews and ▪ Participate
assessment; approves in individual
LDNA plan, needs
and direct assessments
the L&D PMG activity
to proceed ▪ Prioritize
with the
8
conduct of individual
the LDNA needs
▪ Reviews and assessment
endorses for
LDNA report submission to
to PMG
Superintendent
/School Head/
Principal for
Approval
Planning ▪ Consolidates ▪ Reviews and ▪ Prepare
IPDPs and endorses Individual
develops Group Individual, Professional
and School PDP, Group, and, S- Development
S- SPPD SPPD to Plan and
▪ In SDO Superintendent OPPD.
Organizational /School
Plan for Head/Principal
Professional for approval
Development
(OPPD)
Designing ▪ Manages the ▪ Reviews and ▪ Participate in
development approves the
of designs and designs for development
resource L&D of designs, if
packages interventions, requested by
developed by the PMG with
assigned PMG, the approval
for approval by of the
Superintendet/ Superintende
School t/School
Head/Principal Head/Principal
Resour ce ▪ Leads in ▪ Reviews and ▪ Participate in the
Packagi adoption, approves development
ng adaption learning of resource
and/or resource packages, if
development packages for requested by
L&D the PMG with
of learning
interventions, the approval of
resource
developed by the
packages assigned PMG, Superintenden
for approval by t/School
Superintendent Head/Principa
/School l
Head/Principal
Delivery ▪ Administers and ▪ Tracks progress ▪ Leads and ▪ Apply the KSAs
implements the of facilitates in the in the
conduct of L&D program delivery of workplace/CLC
various learning delivery and specific learning and assess its
modalities; update modality (e.g. effectiveness to
Superintendent JEL, formal the clients;
/School learning,
9
Head/Principal relationship ▪ Share
discussionbased knowledge and
learning, and expertise to
LAC) by peers and
following the personnel who
guidelines and may need
standards set. assistance;
3.3. Together with the PDC and PMG, the school head during the need
assessment, planning, and designing phases of the L&D
activities shall identify a list of required competencies that need
specialized expertise not available internally. Having this
information will guide the school head on what, where, and
when to access the TA support needed.
4. Recognition
10
4.2 DepEd Order (DO) No. 001, s. 2020 provides opportunities on
any professional development activities to be developed and
implemented at the school level.
4.3 A specific provision in the said DO (Item 46) states that, “The
NEAP shall determine a specific number of credit units to be
allocated for professional development activities developed and
implemented by the schools including through Learning Action Cell
(LACs). The guidelines for quality assurance and recording of such
professional development activities shall be issued in a separate
Guidelines.”
6.1.2 The areas for partnership that may be explored are local
scholarship opportunities, learning service provider engagement, facility
utilization, expertise and technology sharing, and resource generation.
7. L&D Budget
11
7.1 Allocating financial resources is a crucial element for the
successful implementation of L&D programs as mapped out and
aligned to the Strategic and Annual Plans for Organizational/School
Professional Development.
7.2 DO No. 21, s. 2018 provides the “Implementing Guidelines on the
Allocation and Utilization of the Human Resource Development (HRD)
Funds for Personnel in Schools and Learning Centers.” It serves as
guide on eligible activities, availment, release, utilization, and
liquidation of HRD Funds as well as monitoring and evaluation of
programs.
9.2. From time to time, the schools will be requested to submit data
and information to the SDO, RO and CO for purposes of
planning and budgeting.
A. Definition
Learning and Development Needs Assessment (LDNA) for EPD is the
subsystem for determining the learning and development (L&D) needs of
teachers as basis for identifying interventions towards improving the quality
of teaching and learners’ performance. LDNA is a basic requirement for any
L&D program, the results of which inform subsequent L &D subsystems
across governance levels.
12
B. Purpose
This subsystem provides processes for identifying the L&D gaps of
employees/teachers. It establishes baseline data on relevant personal,
family, and work-related circumstances and their competency levels as
bases for identifying responsive L&D interventions and for tracking
progress towards desired levels of proficiency. It gives direction to planning
and designing learning interventions and activities to close competency
gaps, improve performance, and achieve educational goals.
The outputs of the LDNA subsystem are the LDNA Plan and the LDNA
Report.
The following are guidelines covering the timeline, levels, elements, and conduct of LDNA:
1. Timeline
▪ Individual LDNA shall be done for all employees/teachers at
least once a year through the accomplishment of the Self-
Assessment Tool (SAT)Results-based Performance
Management System (RPMS). This is done in the last quarter
of the year through the RPMS Phase III: Performance Review
and Evaluation and Phase IV: Performance Development
Planning, which produces the Individual Development Plan
(IDP).
▪ LDNA is also done when an employee/teacher assumes a
position, is promoted, is experiencing a performance problem,
or when there are changes in management or strategic
priorities. This is to ensure that learning needs are addressed
in a timely manner to facilitate effective performance.
▪ The individual LDNA is a basis for the Individual Development
Plan (IDP) which identifies the unique and, collectively, the
common learning needs of employees/teachers.
▪ The common learning needs are collated at the end of the
school year as basis for L&D planning, designing, and delivery
for a 1-to-3-year time period.
▪ The preparation of the LDNA Plan and Report is included in
the Annual Implementation Plan (AIP) which is adjusted at
the beginning of the calendar/fiscal/school year.
▪ The LDNA Plan and the LDNA Report are bases for monitoring
whether the L&D interventions respond to L&D needs at the
end of a calendar/fiscal/school year.
2. Levels of LDNA
13
▪ Individual needs are identified through the SAT-RPMS as
well as other assessment and data gathering methods.
▪ Part IV of the Individual Performance Commitment and
Review Form (IPCRF)-IDP contains the identified individual
learning needs and development action plan.
▪ The IDP is an input to the LDNA for the whole
organization/school or a group of employees/teachers within
the organization/school.
14
▪ Implementation details. Specifies activities, persons responsible,
timelines, resources, and budget needed
▪ Profile of employees/teachers.
▪ Assessment results. Presents findings and data in a coherent
manner, such as in the following:
15
5. Conduct of the LDNA
6. Relevant Documents
The figure below illustrates the process for LDNA Plan preparation.
16
Figure 2. LDNA Plan Preparation Process
The assessment of needs at one level is used as input to the analysis at the
other levels. The process for each of the levels is as follows:
1.3. Endorse the findings to the PMG for consolidation into the group
LDNA Report. The Report will be an input to L&D planning and
designing.
2.1. Identify the purpose of the group level LDNA, such as, but not
limited to any of the following:
18
c. Identify common and unique learning needs of teachers for
the purpose of planning for individual and group learning
interventions.
2.2. Gather and assess other performance data.
2.3. Study Part IV of the RPMS to cull out Individual Development
needs* and Teachers demographic data** of the school teachers
to focus the object and subject of the LDNA identifying
common and unique needs for certain groups.
2.5. Prepare an action plan for LDNA conduct (See Annex G).
process.
19
Figure 4. Simplified Process for Group LDNA for EPD
3.2 Initiatives usually emanate from the Central Office and arise
from national policy changes, such as the shift to the K to 12
Basic Education Program. This resulted, for instance, in
changes in the roles and demands on school heads, which
required competency enhancement. The Central Office
downloaded the “School Heads Development Program: Advanced
Course” nationwide to respond to their learning needs and
prepare them to install the K to 12 curriculum reforms.
A. Definition
B. Purpose
The outputs of the LDP subsystem are: a) a 2–3-year EPD Plan aligned to the
Strategic Plan for Professional Development (SPPD) and Annual Plan for
Professional Development (APPD), and b) the reviewed M&E Plan that was
initially formulated during the annual L&D planning.
1.2. L&D Plans are harmonized with the office performance commitment
planning and school improvement planning processes.
1.3. L&D Plans are aligned with the School Planning and Budgeting
Cycle.
21
circumstances, such as number and age of children, distance
of school from residence, means of transportation from
residence to school, and presence and strength of
interconnectivity at residence and in school.
1.9. The L&D Plan for EPD is reviewed by the PDC and approved by the
Superintendent/School Head before subsequent subsystems are
executed (e.g., design, resource package development, delivery, etc.).
2.1. L&D Plans are made for unique and common learning needs and
are bases for quality assurance and monitoring.
2.2. L&D Plan is integrated into the School Strategic Plan for
Professional Development (SPPD) and APPD (Annual Plan for
Professional Development).
2.3. The APPD is integrated into the Annual Implementation Plan (AIP)
and Work and Financial Plan (WFP) of the school and the SDO.
22
2.5. L&D Plan integrates the promotion of inclusive education that
embraces the philosophy of accepting all children regardless of
race, size, shape, color, ability or disability and situation and
providing a responsive and culture-based but global quality
education.
D. Key Processes
1. School head/PMG reviews the unique learning needs of individual
employees/teachers and translate these into performance and learning
objectives. (See Annex A for Planning Template of Learning Interventions
for Individual Teachers).
2. School head/PMG reviews the common learning needs of groups and
translate these into performance and learning objectives. (See Annex B
for Planning Template of Learning Interventions for Groups).
3. PMG utilizes a template to map out individual and group learning need
and
the appropriate learning interventions (Annex C)
4. PMG consolidates unique and learning needs for the Annual
Development
23
24
Subsystem-IV Learning and Development Program Designing (LDPD)
A. Definition
L&D Program Designing (LDPD) for EPD is the subsystem for conceptualizing and
mapping out the elements of the specific program or intervention 3 that will address
a set of identified enabling objectives in the L&D plan in response to unique and
common learning and non-learning needs of employees/teachers.
B. Purpose
▪ Intervention design which serves as the blueprint for developing learning resource
packages, implementing the intervention, and establishing follow through
mechanisms to ensure learning application.
▪ Reviewed M&E Plan that was initially formulated during the annual L&D planning.
C. General Guidelines
1. LDPD standards and processes apply to all L&D modalities (JEL, RDL, LAC,
formal training).
2. Intervention design in all L&D modalities shall contain the following key
elements:
3. Formal Learning and LAC designs shall contain the following elements:
▪ Title of the Program / Intervention
▪ Background and Rationale Objective/s / Outcome/s
▪ Program / Intervention Description ▪ Professional Development Priorities
▪ Professional Standards Covered (PPST, PPSSH or PPSS domain/s,
strand/s, learning domains or indicator/s)
25
4. LDPD processes are collaborative, involving the school head, the PDC, and
the assigned LDPD PMG (or Design Team), subject matter experts, and
where feasible and practicable, a sampling of target learners and/or their
leaders. At the minimum, design should be validated with offices where
target clients/learners are coming from.
7.L&D designs may build on existing designs and may be applied if these are
fully aligned to the enabling objectives of the unique and common learning
needs of the target employees/teachers.
8. Designs of L&D interventions that are rolled out by higher governance level
to the field may be contextualized and aligned to the enabling objectives of
the target employees/teachers.
▪ All learning objectives are stated in behavioral terms, and aligned with the
behavioral indicators of the competencies for development.
▪ All learning objectives (terminal, enabling, and session) are stated from
the learners’ point of view.
▪ Terminal objective is directly aligned with competency identified in the
Workplace Development Objectives (WDO).
26
▪ Session objectives are small enough to be covered in a learning unit,
relevant, sufficient to contribute towards achieving the enabling and
terminal objectives and specify what learners can realistically do by the
end of a learning unit or session.
▪ Terminal and session outputs are relevant to the competencies for
development, and can be realistically produced by learners within
available time.
13.The JEL, WAP, RDL or LAC can be realistically completed within six
months using available resources in the workplace.
Designing L&D interventions takes inputs from the L&D planning subsystem and
follows the following process:
1. The school head/PMG takes the list of unique and common learning and
development interventions for individuals and groups.
▪ School Head/ PMG identifies the doable activity that can meet the
learning objective of the teacher following the description and
program structure in (Annex A)
▪ School Head/PMG uses form proposed in Annex A to document
the agreed upon activity.
3. School Head works with PMG on the interventions addressing common needs:
3.2.1. School Head meets with PMG and members of the group that will
undergo the LAC to achieve their learning need.
3.2.2. School Head/ PMG and LAC members representative plan out the
LAC activity and documents this using a LAC planning form (See
Annex C and D)
28
Figure 6. Simplified Process of L&D Program Designing
A. Definition
B. Purpose
The subsystem provides processes for identifying, conceptualizing, producing,
and evaluating quality and responsive learning resource packages based on the L&D
intervention design.
Outputs of this subsystem are resource packages for the different learning modalities.
2. Content
.3.
1 Non-print materials observe the following technical
specifications: 12 ▪ Audio
30
2.10 Learning resource package is fully accessible to target individual learners
regardless of their circumstances and their school location.
DepEd’s Service Marks Manual recommended font styles for body text:
Garamond Bookman Old Style Helvetica Neue Arial
31
Clear and easy-to-
interpret non-text visual
presentations Highly interesting
▪ User support material with adequate and clear instructions
▪ Highly compatible with all platforms using the following
minimum system requirements:13
33
▪ Filled out JELand RDL
forms for unique PMG supportsSDO/school head in Resourcepackages to address
needs preparingresource packages for unique learningneeds
unique needs
34
A. Definition
L&D Program Delivery (LDD) is the subsystem for implementing the intervention for
employees/teachers considering their personal, family or work-related
circumstances and based on the approved design using the learning resource
package that has been developed to achieve their learning/enabling objectives for
unique and common needs.
B. Purpose
The subsystem provides processes and standards for implementing the various
tasks before, during, and after the conduct of a responsive L&D intervention to
ensure employees/teachers access and active participation, realization of their
learning/enabling objectives, and use of resources in the most equitable, efficient
and effective manner.
The key processes in the delivery of any learning intervention are clustered into
three phases: pre- delivery, delivery, and post-delivery. Tasks on management of
the intervention, resources, and learning are carried out along these three phases.
The following processes guide the conduct of any learning and development
intervention (JEL, RDL, LAC, or formal training) to address the unique and
common needs of employees/teachers: (Annex A presents the implementation of
each of the four learning modalities in phases.)
1. Pre-delivery
Based on the approved design and resource learning package, set the
schedule of the intervention, prepare logistics and resources, coordinate
with participants, and ensure briefing of resource persons (for LAC and
formal training).
2. Delivery
JEL/RDL LAC Formal Training
Implement JEL or Conduct LAC based on Conduct formal
RDL with the LAC plan. training and monitor
employees/teachers progress along
objectives.
Help the Plan activities in the Prepare W/CAP plan
employees/teachers classroom for the or its equivalent
identify next steps for application of learning
further development, and identify what to
applying and sustaining present in the next
learning through the session to assess the
Workplace/Classroom outcome of
Application Project instruction (W/CAP
(W/CAP) plan)
Plan
3. Post-delivery
JEL/RDL LAC Formal Training
Accomplish and have the After completing all
coach/mentor/facilitator sessions based on the
certify the L&D modality LAC implementation
form to be noted by the plan, have the
SH and submit to PMG completion form
certified by the LAC
leader and noted by
the SH, and submit to
PMG.
36
Prepare Prepares post-
postintervention report intervention
report (including
evaluation
results and
financial report)
37
38
Subsystem VII- L&D Quality Assurance
1. Definition
Quality Assurance (QA) is the process of ensuring compliance to quality standards.
It outlines the processes used to meet those standards. QA is one of the functions
of the quality management system. 19 It builds confidence that L&D programs will
meet quality requirements and the needs of L&D stakeholders. 20
2.
L&D System QA Monitoring and Evaluation Framework
The L&D system shall be consistent with the National Quality Assurance
Accountability Framework (QAAF)23 as a roadmap for building a culture of quality
which is conceptually derived from Quality Management (QM) as a management
approach. It is considered as a “method for ensuring that all activities necessary to
design, develop, and implement a product or service are effective and efficient with
respect to the system and its performance.” (2008)
The L&D system shall follow thorough processes of quality assurance and
monitoring and evaluation to ensure that desired outcomes for the EPD programs
and interventions of the school are achieved. Quality planning and implementation
as suggested must be embedded in three major phases of development as shown in
Figure 9.24
39
Figure 9: L&D Quality Management System
Quality
Control
The school QA and M&E framework is designed for the L&D system to cover each
sub system for needs assessment, planning, program designing, resource package
development, and program delivery. Each subsystem contributes and supports the
integration of outputs and outcomes to achieve the overall objectives and goal of
the entire L&D system.
While the framework is the basis for the internal quality assurance of the system,
its results also inform external Quality Assurance of the system’s adherence to
guidelines, standards, and specifications set for the school L&D system.
Thus, quality assurance plays a key role in seeing to it that quality standards and
guidelines are complied with by the schools. Annex 1 shows the quality assurance
and M&E framework containing the standards for each of the system levels such
as: input, process, output, and outcome for each subsystem covering the L&D
operations at the school level. Corresponding means of verification (MoVs) and type
of M&E for corresponding system level are assigned. Annex 2 shows the QA M&E
specific functions for each subsystem.
The framework incorporates the result chain as the main focus of QA and M&E.
This means that achieving the desired outcome and impact originates from the
correct inputs transformed through appropriate processes, thus resulting in the
preferred outputs. The school head/PMG and other L&D system implementers have
to carefully track the progress and results of each subsystem. This is to ensure that
the inputs and processes are aligned and coherent to the desired results envisioned
by the school (Figure 10).
40
Figure 10. Results Chain
The elements of the result chain shall observe the following operational definitions
Process are procedures and/or steps to be carried out to deliver the required outputs.
Inputs are resources in the form of people’s expertise, time, fund, learning
materials, and policies required to implement the process in every subsystem.
3. Purpose
This abridged version of the QAME subsystem introduces QAME essentially from
the SDO/school perspective. Relationship of its roles and functions with RO and
NEAP Central were excluded to provide focus to the reader’s attention to the
SDO/school QA M&E sub system.
The data and information that will be generated by the subsystem shall guide the
PMG/school head and EPD implementers to maintain the efficiency, effectiveness,
and continuous improvement of the L&D system. It shall also provide data and
information that will trigger timely intervention to ensure immediate action or
assistance in implementing the L&D system. The M&E processes shall set into
motion a series of managerial actions by the teachers, school heads, and other
education leaders for ascertaining if set objectives are met. This is to guide the
PMG/school head and L&D implementers on the standards that are to be observed,
such as the quality assurance mechanism and descriptions of tools and templates
of every subsystem of the L&D system.
This subsystem aims to help the PMG/school head and L&D implementers prevent
or minimize errors during the implementation of the EPD programs by following the
standards and guidelines. In this case, the DepEd NEAP sets the overall quality
standards and guidelines. The SDO/school’s main duties and responsibilities are to
comply with these quality standards and guidelines.
41
4. General Guidelines
The general guidelines provide direction for the school head and the L&D
implementers in performing
4.1. The school head, PDC, PMG, and various modality group leads and
employees/teachers shall be oriented and trained to enhance their
competencies to effectively and efficiently perform their roles for QAME.
4.3. Each subsystem shall have a QAME plan to ensure that inputs, processes,
outputs and outcomes are tracked, assessed and accounted for. (The QAME
plans outlined in the main L&D system manual can be found in Annex 3).
4.4. The M&E shall track and assess the inputs, processes, outputs and
outcomes using the quality standards set for every L&D subsystem.
4.5. The M&E shall ensure that adequate and timely inputs are in place and
ready for deployment. It should be aligned with appropriate processes to be
employed to produce outputs and desired outcome.
4.6. To put in place the quality assurance mechanism, the M&E Plan is
established to ensure that outputs in each of the subsystems: i) are delivered
within a specific period of time, ii) meet the set specifications of the quality
standards defined in every sub system, and iii) will lead toward the achievement
of desirable outcomes.
4.7. The conduct of progress and results M&E shall be timely for the quarterly
and annual Monitoring, Evaluation, and Adjustment (MEA) conference and
review of the school. The M&E plan duration shall be three years to
coincide with the Strategic Plan for Professional Development (SPPD) and
the School Improvement Plan (SIP) cycle.
4.8. It shall comply with gender equality, disability, and social inclusion (GEDSI)
principles embedded in each of the sub-systems.
4.9. Women and men shall be given equal opportunity to participate in the
decision-making process for QAME.
4.10. The M&E mechanism shall make it certain that ownership of EPD
programs are established, and shared accountability of results are
mutually agreed by all L&D implementers.
4.13. Funding for M&E activities shall be incorporated in the Annual School
Professional Development Plan.
4.15. Results and findings of the external M&E shall input into the division
technical assistance plan and inform decision-making and policy
development for L&D.
4.16.
The employees/teacher’s performance in EPD programs and application of
learning in the classroom/community learning center (CLC) have direct
effect to the achievement of the learners’ learning outcomes. The
classroom observation event is one way to directly assess how the teacher
performs. The main L&D System Manual suggests to adopt the
Kirkpatrick’s model of evaluation with four level indicators, namely:
43
Appropriate processes are described in Annex 3b – L&D QAME Plan.
4.17. Three types of M&E events shall be undertaken in the course of IPDP and
Group PDP implementation. This is to ensure that PMG/school head has
robust data and information to assess progress and results and make
appropriate decisions and plans for the SDO/school EPD programs.
4.18. The outputs of the M&E plan implementation are: PME Report, Initial
Gains
Monitoring and Evaluation Report, and RME Reports. The frequency of
reporting shall follow the quarterly DMEA/SMEA and School Annual
Review and Planning. It should also be timely for the annual IPCR/OPCR
preparation and assessment.
44
4.21. Every subsystem has corresponding tools, templates and forms found in
the Appendices of the Main L&D System Manual. The school head may
authorize the PMG to modify/revise or develop templates/forms for
specific data requirements. The List of Tools, Templates and Forms are
found in Annex 4.
The L&D delivery plan implementation timeline could vary by learning modality
(e.g., JEL, RDL, Formal, and LAC). Thus, monitoring and evaluation activity will
be conducted upon delivery of specific learning modality.
Diagram 2 illustrates a detailed M&E plan for the L&D Delivery containing the
Year 1 timeline of QAME activities and points. The L&D QAME activities are
timely for the 3rd and 4th quarterly school MEA and performance review
happening during the last months of June–July for one school yea
45
46
Diagram 2. Detailed M&E Plan for L&D Delivery Sub System
LD Delivery Plan Implementation Points
It should be noted that during the first year of implementation, the planning and
establishment points are estimated to take five months starting from May until
September. Hence, each subsystem has already been established and
preparatory work could be shorter during the second and third year of its
implementation.
Results M&E, particularly for Level 3 and Level 4, shall be collected and analyzed
by the PMG to inform the PMG/school head and L&D implementers of the
progress of Year 1 L&D interventions and projects. This will further inform the
teachers and PMG if there is still need to further continue or shift to other
priority learning needs of the teachers.
47
Impact Evaluation could be conducted after three years of implementation to
measure the effects of the teachers’ participation in L&D programs vis-à-vis
positive improvement of the L&D system and learners’ outcomes.
Diagram 3. Annual L&D Implementation Review and Adjustments, and Results M&E
48
4. Steps in Conducting QAME
The following are suggested steps that the school head shall follow when
organizing and mobilizing SDO/school personnel in QAME for the L&D system
implementation. The assigned timeframe in hours are indicative. The
timeframe shall depend on the most affordable time the PMG/school head will
allocate per step (Figure 10).
For SDO, membership int the QAME team shall include at least five (5)
members: HRTD head, HRMO head, section representatives.
For medium and large schools, membership in the School QAME Team
(SQT) shall include at least 5 members: department head/master teacher as
chairperson, school M&E coordinator, school ICT coordinator, and a member
of the PTCA. For small school, the school head shall serve as the chairperson
with the school M&E coordinator, school ICT Coordinator, and a member of
the PTCA as members. There should be an equal representation of women and
men in the team.
Activities for the preparatory work for the MEA conference may include:
▪ Review/modify/adapt existing tools and templates and/or
develop new ones
▪ Agree on data to gather and its sources
▪ Assemble and organize data, e.g., individual
employees/teachers plans, issue log, performance indicators,
reports, outputs, and other evidences (MoVs)
49
▪ Review documents, e.g., JEL/RDL/LAC/F2F plans for the
quarter, individual teacher’s records and report comparing
actual output against standards and/or actual outputs
against targets
▪ Conduct interviews or focused group discussions to validate
data, gather issues and concerns, bottlenecks,
promising/good practices, lessons learned, suggestions and
recommendations,
▪ Take photos and/or video clips (Consent Form needed)
▪ Prepare dash boards, charts, graphs, diagrams, whenever
appropriate
▪ Take note and summarize observations and findings, e.g.
narratives and stories
50
Part V. Preparing Plans and Budget
51
Part VI. Executing the Plan
An M&E plan of the abridged manual of project SERG( Sustaining education Reform
Gains ) shall be adapted by the SDO L&D team to measure the extent of the
implementation of the L&D system to all elementary, secondary ALS learning centers and
SDO functional units. The Learning and Development Team of the PRIME HRM of SDO
shall be responsible in the conduct of M&E to be assisted by the PSDS, school heads and
heads of functional units.
A regular review of the implementation of the L&D system to determine its strength
and weakness for improvement and policy review shall be done after the operationalization
of the entire cycle of the L&D subsystem, the SDO L&D team shall conduct periodic policy
review to further enhance its provision and effectiveness.
52
IX. EFFECTIVITY
The SDO Camarines Sur Learning and Development System Guidelines shall
become effective after final evaluation of the Top Management and by the Civil Service
Commission (CSC). Subsequent amendments shall likewise be submitted to CSC for
evaluation and shall take effect immediately.
X. COMMITMENT
I hereby submit and abide by the provision of the DepEd Schools Division Learning
and Development System Guidelines of Camarines Sur.
CSC Action:
I have evaluated the herein DepEd Schools Division of Camarines Sur Learning and
Development System Guidelines found to be in accordance with the provisions of CSC
Memorandum Circular No. 10 s. 2002 & CSC MC No. 19, s. 2019 and may now be
implemented.
DAISY P. BRAGAIS
CSC Regional Director
Date: ___________________
53