Bill of Material
Bill of Material
Bill of Material
: 015/BOM/ENG/VIII/2022
BILL OF MATERIAL
Date : 22 Agustus 2022
SEWAGE TREATMENT PLANT Prepare : HANDIKA P.
CAPACITY : 80 M3/D Checked : M FIKRI A.
PT. HANDA TEKNOLOGI INDONESIA PT GREENTEX INDONESIA UTAMA II Aprroved : TATANG S.
Spesification
No Item Description Quantity Price Checklist Remarks
/ Dimension
1 PIPING INTERCONECTION Rp. 00.000.000
Pipe PVC AW 2 Inch 65 Batang
Elbow PVC AW 2 Inch 20 Pcs
Tee PVC AW 2 Inch 3 Pcs
Check Valve 2 Inch 3 Pcs
Watermur PVC 2 Inch 20 Pcs
Ball Valve PVC 2 Inch 4 Pcs
U-Bolt 2 Inch 50 Pcs
Siku Mild Steel 50 x 30 x 3 x 6000 mm 15 Pcs
Dynabold m8x400 mm 1 Dus
ANOTHER
Pompa Submersible 1 Unit
Panel Sumpit ip 55 1 Unit
Doc No. : 015/BOM/ENG/VIII/2022
BILL OF MATERIAL
Date : 18 Agustus 2022
SEWAGE TREATMENT PLANT Prepare : M. FIKRI A.
CAPACITY : 80 M3/D Checked :
PT. HANDA TEKNOLOGI INDONESIA PT GREENTEX INDONESIA UTAMA II Aprroved :
Spesification
No Item Description Quantity Price Checklist Remarks
/ Dimension
1 PIPING INTERCONECTION Rp. 00.000.000
Pipe PVC AW 4 Inch 515 Pcs
Pipe PVC AW 3 Inch 180 Pcs
Reducer AW 4x3 Inch 110 Pcs
Reducer AW 4x2 Inch 20 Pcs
Equal Tee AW 4 Inch 100 Pcs
Elbow PVC AW 4 Inch 70 Pcs
Ball Valve PVC 4 Inch 5 Pcs
Check Valve 4 Inch 18 Pcs
Watermur PVC 4 Inch 170 Pcs
Watermur PVC 3 Inch 110 Pcs
U-Bolt 4 Inch 50 Pcs
Siku Mild Steel 50 x 30 x 3 x 6000 mm 4 Pcs
120 120
120 120
106 4 424
118 118
120 120
18
120 120
106 4 424
70 70
112 3 336
24 24
67 67
219 219
78 78
84 4 336
2576
386.4
2962.4
740.6
Doc No. : 015/BOM/ENG/VIII/2022
BILL OF MATERIAL
Date : 18 Agustus 2022
SEWAGE TREATMENT PLANT Prepare : M. FIKRI A.
CAPACITY : 80 M3/D Checked :
PT. HANDA TEKNOLOGI INDONESIA PT GREENTEX INDONESIA UTAMA II Aprroved :
Spesification
No Item Description Quantity Price Checklist Remarks
/ Dimension
1 PIPING INTERCONECTION Rp. 00.000.000
Pipe PVC AW 4 Inch 180 Pcs
Pipe PVC AW 3 Inch 35 Pcs
Reducer AW 4x3 Inch 80 Pcs
Reducer AW 4x2 Inch 15 Pcs
Equal Tee AW 4 Inch 80 Pcs
Elbow PVC AW 4 Inch 45 Pcs
Ball Valve PVC 4 Inch 5 Pcs
Check Valve 4 Inch 15 Pcs
Watermur PVC 4 Inch 60 Pcs
Watermur PVC 3 Inch 80 Pcs
U-Bolt 4 Inch 50 Pcs
Siku Mild Steel 50 x 30 x 3 x 6000 mm 4 Pcs
36
100 120
90 120
44 4 176
230 118
125 120
625
93.75 4 375
718.75 70
179.6875 3 539.0625
24
67
219
78
4 0
2026.063
303.9094
2329.972
582.493
Doc No. : 013/BOM/ENG/VIII/2022
BILL OF MATERIAL
Date : 10 AGUSTUS 2022
SEWAGE TREATMENT PLANT Prepare : M. FIKRI A.
CAPACITY : 80 M3/D Checked : Handika
PT. HANDA TEKNOLOGI INDONESIA PT GREENTEX INDONESIA UTAMA II Aprroved : Tatang S
Spesification
No Item Description Quantity Price Checklist Remarks
/ Dimension
1 TANK MILD STEEL STP Rp. 00.000.000
Plate Mild Steel 5 mm 43 Pcs
Plate Bordes 3 mm 7 Pcs
UNP Mild Steel 150 x 75 x 6.5 mm 13 Pcs
UNP Mild Steel 100 x 50 x 5 mm 11 Pcs
Hollow Mild Steel 50 X 50 x 3 mm 30 Pcs
2 RESIN FIBER LINNING
FIBER LINNING DALAM
Resin 450 @2 play 704.6 Kg
Katalis 2.0 Liter
Mat 450 @30kg 66m 4.1 Rol
Bak 6 Intermediate
Doc No. : 013/BOM/ENG/VIII/2022
BILL OF MATERIAL
Date : 09 November 2022
SEWAGE TREATMENT PLANT Prepare : M. FIKRI A.
CAPACITY : 80 M3/D Checked :
PT. HANDA TEKNOLOGI INDONESIA PT GREENTEX INDONESIA UTAMA II Aprroved : Tatang S
Spesification
No Item Description Quantity Price Checklist Remarks
/ Dimension
1 TANK MILD STEEL STP Rp. 00.000.000
Plate Bordes 1200 x 2400 x 5 mm 2 pcs
Siku Mild Steel 50 x 50 x 3 x 6000 mm 8 pcs
Steel Pipe 1 inch 6000 mm 12 btg
UNP Mild Steel 100 100 x 50 x 5 mm 3 btg
Plate Mild STeel 200 x 200 x 5 mm 5 pcs
Plate Streep 50 x 5 x 6000 mm 12 pcs
CLIENT :
CONTRACTOR :
PROJECT :
CONTRACT NO.
TITLE :
BILL OF MATERIAL
NOTE :
BILL OF MATERIAL
2 WALKWAY
Siku Mild Steel 50 x 50 x 3 mm 5 pcs
Plate Bordes MildSteel 3 mm 3 pcs
UNP Mild Steel 100 x 50 x 3 mm 5 pcs
Pipe Mild Steel 1 Inch 8 pcs
Plate Strip 50 x 4 mm 4 pcs
`
Doc No. : 019/BOM/ENG/VI/2021
BILL OF MATERIAL
Date : 13 Desember 2021
SEWAGE TREATMENT PLANT Prepare : M. Fikri A.
CAPACITY : 10 M3/D Checked : Tatang S.
PT. HANDA TEKNOLOGI INDONESIA PT. SAKA FARMA Aprroved :
Spesification
No Item Description Quantity Price Checklist Remarks
/ Dimension
1 RANGKA CANOPY Rp. 00.000.000
Canal C Baja Ringan 100x50x1x6000 mm 9 Pcs
Canal C Baja Ringan 75x50x0,75x6001 mm 10 Pcs
Paku Roofing 2 mm 9
Paku Roofing 12x50 mm 4 Lot
Base Plate 250x250x5 mm 6 Pcs
Dynabolt 14x100 mm 9 Pcs
2 mm 30
Spandex Zincalum 3600x1000x0,4 mm 20 Pcs
Sekrup Baja Ringan 10x19 mm 3 Lot