GENERAL DESCRIPTION
TABLE 1 Dimension L
ORDER LENGTH MIN MAX
A 18.25" 39.50"
B 36.00" 60.50"
Fig. B 225IPAB
Fig. C 225WMIP
225IPAB & 225WMIP Data & Installation Sheet
INSTALLATION INSTRUCTIONS
Post Targets must be positioned for use with the appropriate number of turns to open the post
indicator valve. Improper positioning of the targets can result in an erroneous indication of the
open or shut position of the valve.
NOTE: The targets for the 225IPAB or 225WMIP indicator post have been factory set for
use with a 6” gate valve.
7. Using the wrench (25) or hand wheel (21), open and close the valve and check to see that
the “SHUT” and “OPEN” targets are clearly in view in the windows, at their respective
positions, and that there is no feeling of binding of the upper or lower stem assemblies. It is
recommended that the turns to open/close be counted and compared to the valve
manufacturer’s specification, in order to verify full valve opening.
NOTE: If there is any indication of binding of the internal operating parts, the vertical
alignment of the indicator post must be corrected.
225IPAB & 225WMIP Data & Installation Sheet
If the target plates are not properly in view, completely close the PIV and then repeat Steps 5.
8. Loosen the two bolts (13) at the base of the upper barrel (11) and then slide the post head
up until the bury line of the post head coincides with the planned finished grade. Tighten the
two bolts (13) with a torque of 40 to 60 ft.lbs. When properly installed, the centerline of the
target windows will be 30 inches above the finish grade.
1. The post head, upper barrel, and windows have not been damaged.
2. The targets indicate that the valve is open.
3. The wrench is in place on the indicator post, and it is properly locked in the “open” position.
In addition, on a quarterly basis, the indicator post should be closed two turns and then
reopened tight to verify that the PIV is in the full open position and properly engages with the
post and, that the supervisory switch contacts (if applicable) properly change position. Any
damaged parts must be immediately replaced. The indicator post should also be physically
tried to be sure that the valve is in the fully-open position, if there are any damaged parts, sign
of tampering, or the position of the valve is questionable.
NOTE: Before closing a fire protection system main valve for maintenance work on either the
indicator post or fire protection systems which it controls, permission to shut down the affected
fire protection systems must first be obtained from the proper authorities and all personnel who
may be affected by this decision must be notified.