Gujarat Technological University: Semester - IV Subject Name
Gujarat Technological University: Semester - IV Subject Name
Gujarat Technological University: Semester - IV Subject Name
Rationale: To understand the water supply and sewage collection systems in cities
Content:
w.e.f. AY 2018-19
GUJARAT TECHNOLOGICAL UNIVERSITY
ENVIRONMENTAL ENGINEERING (13)
Subject Code: 3141312
analysis of complex pipe networks-Hard cross method.7
Note: This specification table shall be treated as a general guideline for students and teachers. The actual
distribution of marks in the question paper may vary slightly from above table.
Page 2 of 4
w.e.f. AY 2018-19
GUJARAT TECHNOLOGICAL UNIVERSITY
ENVIRONMENTAL ENGINEERING (13)
Subject Code: 3141312
Reference Books:
1. Water supply and sewege system – G. S. Birdie
2. Water Supply & Sewage Systems - K.N. Duggal
3. Water Supply & Sewage Systems – S. K. Garg
4. Water Supply and Sanitary Engineering – Rangwala
Course Outcomes:
Sr. No. CO statement Marks % weightage
CO-1 Identify the sources of water considering the quantity and quality. 20
CO-2 Explain the components of water supply scheme including intakes, 30
pipes, pumping systems, distribution system, valves and fittings.
CO-3 Design construction and maintenance of the sewers considering the 25
quantity of storm water and sewage.
CO-4 Describe the concept of sewers, sewer systems, sewer appurtenances, 25
drains and plumbing.
Following activities shall be performed during laboratory hours: (minimum 10 need to be carried
out)
1. To collect drinking water samples and check drinking water quality parameters as per IS
:10500.
2. To determine residual chlorine from tap water.
3. To compute daily/seasonal water demand of institute/society/industry.
4. To conduct a survey of leakages from pipelines and water taps
5. To find out sewage quantity of village/city (based on sewage pumping data).
6. To determine the quantity of storm water of village/city.
7. To prepare report on water distribution system based on survey.
8. To visit & prepare a detailed report on water treatment plant of the city.
9. To prepare sketches of plumbing fittings and sewer appurtamces.
10. To prepare sketches of valves and pipe fittings.
11. To prepare sketches of distribution system.
12. The students will have to solve examples based on pumps.
13. The students will have to solve examples based on reservoir capacity.
14. The students will have to solve examples based on design of pipe network (Hardy cross
method)
15. The students will have to solve examples based on design of sewers.
Page 3 of 4
w.e.f. AY 2018-19
GUJARAT TECHNOLOGICAL UNIVERSITY
ENVIRONMENTAL ENGINEERING (13)
Subject Code: 3141312
1. NPTEL - https://nptel.ac.in
Page 4 of 4
w.e.f. AY 2018-19