G-Low Dvor
G-Low Dvor
G-Low Dvor
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
कायो की सूची
LIST OF WORK
सटेशन का नाम :
Station Name : MOPA(Goa)
इक्विपमें ट: डी.वी.ओ.आर
Equipment: DVOR
P a g e 1 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
149
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
1.0 INTRODUCTION
a) DVOR is to be, installed at the approved site at a location as approved/ communicated
to you by CHQ/NOC Directorate.
b) The detailed drawings are listed in Annexure -IV for carrying out Civil and Electrical works
c) The listed below are for carrying out Civil and Electrical works.
d) This List of Works issued by RCDU is Generic in nature and is issued for detailed
estimates site preparation/readiness against identified Civil, Electrical, CNS related works.
This is for implementing works at site after requisite financial concurrence.
e) Any additional works identified with relation to project at station may, also be
estimated, assimilated, included, carried out, as per recommendation/approval of Airport
/ CNS -In-Charge/RCDU/RHQ/CHQ.
b) The site up to a radius of 100 Meter shall be, generally cleared of vegetation such as
trees, plants, and bushes.
c) The DVOR/DME site shall be leveled up to a minimum radius of 65 Mtr, within 1-
5°gradient falling below/above the horizon to meet the minimum siting criteria of DVOR,
from the center of the building.
d) Normally counterpoise level is about 4.5 meter above vicinity ground level, however
wherever site does not meet the referred gradient clearances then counterpoise plinth
level height adjustments needs to be, explored. Such changes in plinth level shall be,
brought to notice of RCDU/NOC accorded by CHQ, before start of plinth works.
e) The site shall have 300 mm hard paved area below the DVOR counterpoise up to a
radius of 18Mtr.
f) The hard pavement/standings works shall be done in coordination with CNS-In-
Charge/RCDU after the 11 no’s cable trenches for laying minimum 120-150 mm OD
Concrete Hume/HDPE pipes, is complete.
g) All these 11 trenches concrete /HDPE pipes shall extend radially out towards the
Openings shown for cable entry exit in shelter drawing.
h) These laid Hume/HDPE pipes along with guy wires shall terminate in a covered manhole.
i) All the Concrete Hume/HDPE pipes shall be, laid in around shelter, below the hard
standing/paved area, along with 3-6mm guide wires, & shall extend radially out, towards
the Openings shown for cable entry exit; tentative lay out drawing is enclosed.
j) 02 cable trenches with Concrete Hume/HDPE along with 3-6mm guide wires shall be
exclusively constructed for laying monitor RF / Power associated Cables on either side of
P a g e 2 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
150
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
& along the monitor path of width about 3ft, constructed from Hard standing to monitor
plinth.
k) This trench shall have regular openings/ covered manhole at every 30 meter.
l) Hard paved area shall be, constructed after laying of HDPE/HUME pipes of 120-150mm
as per drawing for laying of requisite communication armored/non armored cables,
monitor RF cable, Electrical cables, electrical Earth & CNS Equipment, and counterpoise
Earth interconnect etc. For this purpose, about 600m of 150mm HDPE/Concrete Hume
pipe shall be required.
m) The casting of the counterpoise (CP) plinths shall be, completed before starting the DVOR
building works using the referred drawings & Supplied template by CP manufacturer.
n) All measurements for determining location of CP plinths shall be from the center of the
CP structure only and shall not be disturbed until plinths measurements are complete.
p) The maximum permissible error for CP Centre and Plinths, as per OEM, shall be ± 1cm.
q) The orientation of the CP plinths shall be correct and shall be as per enclosed drawings,
so that the horizontal trusses of CP shall exactly fall in place for CP structure
erection and the load of CP Structure shall evenly fall on the CP plinths.
r) The erected surface/base level of all the CP plinths shall be exactly at the same elevation
level (at water level )so that CP columns gets erected properly.
s) All measurements between the CP plinths shall be, taken from the center of the
cross section each of the anchor bolts.
t) During casting of anchor bolts in each CP plinth, separate template shall be, used
and shall be left over in the CP plinths until final curing of the casting of counterpoise
plinths is complete. This shall ensure anchor bolts to be in right/correct position
until curing is complete.
u) Provision of a cement concrete plinth of size as in 2019/05 (depth) for fixing of ladder
within the periphery of counterpoise is to be made. This plinth shall be above the vicinity
ground level. The location can be, decided in consultation with RCDU at the time of
installation.
v) Monitor Antenna plinth shall be in a direction where minimum 100-110 meter clear
from all obstructions from center of CP is available preferably in any of the most usable
radial (in the west side).
w) Monitor Antenna plinth shall be, constructed in the direction away from the
approach road / main road direction, its template is normally supplied, if not supplied
then it shall not be very different from a single CP plinth.
P a g e 3 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
151
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
x) Monitor Plinth constructed shall support the supplied monitor antenna structure so
that monitor antenna is azimuthally 6 feet (2 meter) above CP level. However, this may
be subject to NOC accorded in consultation with CNS-In-Charge/RCDU. HDPE/Concrete
Hume pipe shall be, laid on either side of Monitor path/road with openings as suggested
above.
y) Generally, the size of the Monitor Antenna mast plinth height is about 30cm above CP
plinth level of DVOR and shall be, provided with bolts to fix the base plate for DVOR
monitor antenna mast using supplied items by OEM. The work of erection of Monitor
Mast shall be, carried out by RCDU installation team.
z) The location of the L1, L2, L3 (for Conventional Vertical Air terminal Lightening
Arrestors) shall be 120 degree apart evenly spread around the CP after minimum 3 feet
hard pavement area.
aa) The Vertical Air terminal lightening arrestors shall be made of 1 inch 90% or more pure
copper rod of 5 feet positioned above 30 feet 2 inch GI pipe.
bb) The LA concrete plinth of these arrestors shall be about 2ft x 2ft x 2.5ft (LBH) and can
be, constructed at the time of erection of DVOR CP.
cc) All the CP works shall be, carried out at site in consultation with CNS-In- Charge/RCDU
Recommendations.
3. Vertical section shall be, fixed to wall at 1000 mm center-to-center and intermediate at
400 mm c/c.
4. Fixing 10 mm thick EGSB grade Medium Density Fiber (M.D.F.) Board confirming to IS
P a g e 4 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
152
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
12406-1988 such as NUWUD or equivalent to be, fixed on top of above framing with
drywall screws 25 mm long at 300 mm c/c nominal.
6. Finally fixing on the vertical faces 1.5 mm thick laminate of approved make and shade
shall be, fixed using approved adhesive leaving 1.5 mm wide grooves as desired. (color
shall be RAL 9003 or as approved by CNS-In-Charge)
c) FALSE CEILING
1. 12.5 mm thick, Gyp-board false ceiling with seamless finish is to be, provided in
equipment room. (color shall be RAL 9003 or as approved by CNS-In-Charge)
d) TILE FLOORING
1. Tile flooring is to be, provided in the shelter.
2. Granite vitrified tile flooring of Light Gray (RAL 7004), smooth-antiskid finish, laid on
minimum 20 mm thick base of cement mortar of 1:4 (1 cement: 4 coarse sand), after
applying cement slurry to the back of the tiles and jointed with white cement mixed
with pigment to match the shade of tiles.
3. The color of the tiles shall be light gray (RAL7004 or as approved by CNS-In-Charge).
4. Wall paneling, false ceiling & Tile flooring works is to be carried out after making
provision for Construction of holding joints for Equipment racks, Provision of pipes
in the hole/Openings in the wall, other electrical and duct etc.. works shown in drawing
(2017/02).
e) The day & night marking on the shelter shall be, provided as per ICAO criteria. Provision for
other works as per the requirements projected by local CNS station in charge, in consultation
with RCDU and NOC accorded by CHQ.
g) WATER PROVISIONING: Site shelter & Toilet shall be, provisioned with regular potable
water supply using a 1000-Liter overhead water tank.
h) 1” water CPVC pipe with 09 taps opening over earth pits shall be, laid around hard standing.
i) DME Antenna shall be, installed over the CP and its location shall be, indicated to station
by RCDU.
P a g e 5 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
153
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
NOTE:
a. Foundation Bolts and foundation plates are, supplied along with the CP material.
b. Foundation bolts shall be embedded, within in the CP plinths casting during casting.
c. The height of bolt outside the finished top surface of CP plinth shall be 04 inches.
d. One plinth-pair foundations of P-1 & P-2 of CP Plinth shall be aligned to the North.
a) Provision of fixing of four 1.5 Ton Split type, single phase, air conditioners with
individual circuit breakers and voltage stabilizers as per drawing (2017/02)
Or
b) fixing of 01 no’s 1.5 ton split type 1 phase air-conditioner and 01 no’s Dual 3 phase 1.5
ton precision air-conditioner, configured in main stand/by mode to cool 03 no’s of
top/bottom/side fed 42U 19” racks of DVOR/DME equipment as per design and
location approved by CNS-In-charge/RCDU.
Note:
Single phase air conditioner type, shall not be connected in the phase
connected to single phase UPS/supplying power to the equipment.
The load on each source supply shall be, evenly distributed properly to avoid
phase imbalance & runaway.
e) The power at the location is to be laid, in underground Hume pipe and terminated in
the main switchboard in the electrical room.
f) The mains switch board to be provided in the electrical room shall have the
P a g e 6 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
154
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
following provisions:
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
155
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
j) UPS shall have provision of control mechanism with appropriate indications to control
UPS operation in I/O ON/OFF, O/P ON/OFF, Bypass ON/OFF modes, Emergency
shut down and normal shutdown from local and remote locations.
k) UPS shall preferably indicate i/p, o/p voltage, frequency, power factor, on load, on
battery, battery backup time left may also be available.
m) The UPS shall be, installed in the equipment shelter at a convenient place. UPS shall
be, fed through appropriate MCB/Isolators. The output of the UPS shall be connected
to the input of the type III or class C surge protected 16Amp MCBs having 5/15 Amp
industrial sockets (Qty.06) for feeding equipment’s (DVOR/DME) installed in the
equipment room.
n) The UPS battery shall be of Advanced Glass Mat Valve Regulated Sealed Lead Acid
Battery Construction (AGM or VRSLAB) in ABS Flame retardant (UL94V-O) grade (UL
2436) spill containment casing to meet UL 62368-1 / IEC 62133 or equivalent
standards type.
p) SIX (4+2) CFL/LED lights (100W candles-cent bulb light equivalent) preferably in
IP54/55 enclosures with 5/15 Amp individual switch-sockets fed via MCB shall be
installed within the equipment shelter.
P a g e 8 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
156
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
r) One portable hand held type EMERGENCY LIGHT (Rechargeable) shall be, provided.
t) DG sets shall be, installed at a separate location, in a low noise enclosure at any
suitable place around counterpoise in consultation with CNS-In-Charge/RCDU. DG
set shall not require separate DG room with the exhaust outlet. Exhaust outlet shall
be below the level of CP.
v) PROVISION OF EARTHING PIT: Provision for 11 no. earth pits digging (02 for DVOR
& HP-DME Equipments + 04 for CP + 03 for LA + 02 for field monitor & LA) shall be,
provisioned along with civil or electrical works.
z) IP BASED ADDRESSABLE FIRE SENSOR, smoke detection & alarm system shall be,
provisioned in DVOR/DME shelter with status indication at ATS Complex
Equipment/Nav-aid Room.
aa) IP BASED CCTV with 04 no’s day/night IP PTZ cameras with 30 days data storage
shall be, provisioned in DVOR/DME shelter with status indication at ATS Complex
Equipment/Nav-aid Room.
P a g e 9 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
157
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
CCD/CMOS sensor
ii. Number of Pixels 720 X 576
iii. Scanning System: PAL
iv. Resolution: 540 TV Lines or better Scalable resolution from CIF-4CIF
(PAL) in all FPS
v. F=3.4mm to 119mm(approx.)
vi. 35X optical zoom plus 12x digital zoom
vii. Wide dynamic range, Day/Night with Electronic Image Stabilization
viii. Illumination (For Outdoor camera)0.1 (Night) Lux (Color), 0.05 Lux (B/W) or
better
ix. Housing (Outdoor) IP 66
x. Pan Travel 360º Continuous
xi. Tilt Travel 0 - 90º
xii. Unicast /Multicast support,
xiii. Dual H.264 & MPEG/MJPEG video stream for independent viewing and
recording
xiv. Electronic Shutter: 1/2 to 1/30,000 sec
xv. Auto Focus, Auto Iris, BLC/white balance/electronic shutter: On/Off/Auto
xvi. Pan range 360° continuous, Tilt: -5° - +/- 90° (with auto-flip)
xvii. Manual Pan / Tilt speed 240°/sec, Preset Pan/Tilt speed 120°/sec
xviii. 64 Pre-sets per tour
xix. 2 alarm inputs, 2 relay outputs
xx. 32 Privacy masking zones
xxi. External Power supply, if required: As per OEM's design, however generally
AC 230 V @ 50Hz/12V or 24 V AC Rectifier and SMPS if DC supply
xxii. Frame Rate : 1-25FPS for PAL
xxiii. Resolution: Adjustable
xxiv. Bandwidth: 64Kbps to 6Mbps
xxv. Remote access for configuration, viewing and control via standard web
browser.
xxvi. Supported Protocols: As per system design for real time live monitoring and
recording using IPv4, HTTP, TCP, RTSP, RTP, ICMP, UDP, IGMP, RTCP, FTN,
DNS, DHCP, Bonjour, AR etc.
xxvii. Ethernet 10/100 Base-T Auto sensing, Half /Full Duplex (RJ45)
xxviii. Outdoor enclosure with IP66 rated, Vandal proof, Built in Heater and Blower
and shall be of same make as of camera.
xxix. Mount: pipe/corner/ parapet/ pendant with wall mount bracket and as
required
xxx. FCC, CE certified & UL listed for Safety
P a g e 10 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
158
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
The following, m aterials shall be, made available to RCDU at site by the Airport/ CNS In-charge.
P a g e 11 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
159
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
P a g e 12 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
160
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
ANNEXURE - I
Station is to provision mandatorily following for assistance of RCDU team and confirm its
availability along with site readiness.
Estimates for provisioning may be made in AA & ES or from station revenue expenditure.
P a g e 13 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
161
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
Annexure-II
P a g e 14 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
162
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
Room.
h. Minimum 08 port Modular Managed Switches Qty-02 no’s each with 04 SFP plus populated
ports shall be provisioned with Dual Power Supply & SFP plus port shall be utilized for
connecting various infrastructures at a shelter to equipment room. Latest Specifications of
available products in market may be enquired from vendors like CISCO/ JUNIPER/ ALLIED
TELESSIS/ BROCADE etc by station to meet the requirements detailed in this LOW.
P a g e 15 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
163
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
Annexure III
PRIMARY PROTECTION (CLASS B / Type 2): A SURGE PROTECTION DEVICE (SPD) having
100KA 10/350 micro seconds neutral to earth, 50 KA 10/350 micro sec line to neutral, with
limiting voltage less than 1.5 KV shall be provided on the mains power entry point at the incomers
before UPS & shall be of modular type.
1. The enclosure shall be of high quality workmanship and materials suitable for a wall
mounting installation and shall be IP – 42 or higher rated without fan cooling.
2. The offered, Three phase SPD/Single Phase system (as per site requirement) and shall have:
i. Lines protected Line-Neutral and Neutral to Earth + Line to Line + Line to Ground (4 modes).
ii. Nominal Operating Voltage: 220/240 V AC
iii. Input Power Frequency: 47-60 Hz
iv. Protection: Transverse and common mode.
v. Response Time:< 100 ns
vi. Surge rating:10/350 µs pulse response
vii. Voltage Protection Level:< 1.5 KV
viii. The SPDs may also have LED indication per phase, if feasible, to notify the working
status of the SPD.
ix. Approvals and Testing: Listed with UL-1449-3/IEC – 61643 - 62305.
x. Enclosure: IP 42 or higher
All accessories required for installing the Surge Protection System shall be, installed.
P a g e 16 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
164
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
P a g e 17 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
165
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
multiple Earth connections to site. The Earth Distribution Plate shall have at least 5 holes
with stainless steel nut and bolt of M8 size. The distribution shall be, mounted on insulator
with C Clamp.
c) The earth distribution plate shall be connected from earth pit by 90% pure Copper Strip of 25
mm wide x 3mm.
d) Connection to the Equipment/system shall be made using 99% pure PVC insulated copper
cable of 50mm square cross section or 99% pure Copper Strip of 25 mm wide x 3mm from
Earth Distribution Plate, as per siting requirements, with stainless steel nut and bolt of M8
size.
e) Earth pit shall be apart from building by about 10m and depending on site conditions.
f) All jointing shall be, brazed with copper.
g) All masonry work (concrete) shall be, made on earth pits protecting, easy identification,
maintenance etc.
h) An earth pit chamber made of lockable plastic material shall be used as inspection
chamber.
i) Earth system shall have minimum useful life of at least 06 years.
j) A detailed drawing for Copper Plate Earthing System is attached to this section.
P a g e 18 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
166
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
P a g e 19 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
167
712312/2021/O/o GM(RCDU&FIU)
RCDU/LOW-06/GEN/DVOR/2019/VER 4.3
Annexure IV
P a g e 20 | 20
Internal document of AAI, RCDU, New Delhi-03 for use by its officers
168
712
1 2 3 4 5 6 7 8 169
712
2100
A 550
A
2100
550
P1
F1
2100 2100
550 550
2100
2100
550
550
P1 P1
F1 F1
2800
B 1950
B
2200
600
P2
F2
2200 2200
3836
3836
550 550
26000
2100
2100
1950
1950
550
550
2800
2800
C F1
P1
P2 P2 F1
P1 C
2800
2100 1950
2800
1950
550
2200
600
P2
2100
550
2200
600
F2
D D
2100 2100
550 550
2100
2100
550
550
P1 P1
F1 F1
2100
550
2100
550
P1
F1
E E
F Model:
Drawn by
REF: P/N
Checked by Approved by - date File name
SERVICE
Date Scale
F
JITENDER VARUN DKU 13-06-2017 NTS
TITAL:
1 2 3 6 7 8
170
712
171
1 2 3 4 5 6 7 8 712
RevNo Revision note Date Signature Checked
Anchor Bolt Holes
P1
3000 4000 6000 6000 4000 3000
P7 P6 156
330 330 106
A T3 T2
A
M12x45
Hex Bolt A
2670
2670
3000
T5 T14
T1
T4 1044
0 0
P2 1044 50
25 56
330 330 50
T7 T7 206
6670
7000
7000
25
P2
T6
T6
60 330 60 DETAIL A
4000
105 15
M12x45
T1 Hex Bolt
6000 6000
T4
B P4
T10 P3
P4
330
50
25 60 3xM20
Hex Nut B
2xM20
125
Plain washer
T9 Ø150
T10
9670
9670
1044
0
450
450
300
330
1044
T8 Ø20
450
450
M20x450
0
T6 Anchor Bolt
3856
2176
T2
T12 T3 50 25 60
6000
6000
85
311
84
T8X PL-100x8x100
84
T9
85
311 21 T13 60 Ø22
T7
135
135 T7 Anchor Bolt
P4
P4 165 270 Qty:82+16 =98 Nos.
290 150
P5 P1 15
1689
T11
C P1
T5 P3 9659 2146
P3 567 T5 Ø22
C
DETAIL C
27
T6
25670
12000
11670
81
330 330 330
8
T6X
567 450
T10 T10
8
T10 150
81
393 60 330 60 M12x45
27
M16
P4
T10
C 193 150
33
567
25 400 25
567
Hex Bolt
50
150 193 Anchor Bolt Hole
33
60
P4 100 Ø150 25 100
T7 T7
84
85
T9
6000
6000
T8
85
260
330
195
195
195
195
60
60
6670 11670 6670
84
Ø22
330 330
T2
T3 Ø22 32 100 32
100 Ø22
60
T6
1044
0
343 507 400 507 343
1044
9670
9670
D D
0
T10
T8 2150
T9 330
P4
T10 P3
P4
DETAIL D
T4
D T1
BOQ Mark. No. Section Length Qty.
4000
T6 P1 PL-450 x 6 450 4
T7 Mark. No. Section Length Qty.
T7 P2 PL-450 x 6 450 4
T6 T1 ISA45X45X5 5086 4
P3 PL-450 x 6 450 4
7000
7000
6670
T2 ISA45X45X5 5086 4
P4 PL-260x6 393 8
330 330 T3 ISA45X45X5 5086 4
P5 PL-180x8 371 1
T4 ISA45X45X5 5086 4
P6 PL-40x6 156 12
0
1044
T5 ISA45X45X5 4050 4
P2 1044 P2 P7 PL-40x6 206 12
0
E T6 ISA45X45X5 4050 7
E
2670
2670
3000
T1 T4 T6X ISA45X45X5 4050 1
T5 T7 ISA45X45X5 6424 8
S. No. HARDWARE QTY
T8 ISA45X45X5 3453 3
T2 T3 1 M12x45 With 1nut, 1pw, 1sw 200
T8X ISA45X45X5 3453 1
M20x450 with 3nut, 2pw
T9 ISA45X45X5 2 (anchor bolt) 82
3453 4
330
P1 T10 ISA45X45X5 2150 8 M20x450 with 3nut, 2pw
2670 9670 9670 2670 3 (anchor bolt) for 4m & 6m 16
T11 ISA45X45X5 1461 1 Pole
330 330 330 330
T12 ISA45X45X5 1150 1
T13 ISA45X45X5 361 1
T14 ISA45X45X5 206 12
330
Model: TSPL-CP-12 P/N SERVICE
Drawn by Checked by Approved by - date File name Date Scale
F S.M.NAYEEM S.K. AMAN PANKAJ CHHATWAL CP-12_COL 19-05-2017 NTS F
TITAL:
TRIDENT STRUCTURES (P) LTD. GA DRAWING TEMPLATE CP-12N
E-105, SITE-B, SURAJPUR IND,AREA DRG. NO. Revision Sheet
GREATER NOIDA, G.B.NAGAR (U.P.) TSPL/15-16/CP/TEMP-001 01 1/25
1 2 3 6 7 8
172
4
712312/2021/O/o GM(RCDU&FIU)
Ø225x6Th
Cap Plate, 1Nos
Ø225x12Th
FLANG, 1Nos
SPECIFICATIONS:
1. HEIGHT OF POLE :6Mtr
2. WIND LOAD :120KMPH.
A
A
3. HEAD LOAD :20Kgs.
PIPE
Ø114.3mmX4.5W.T
B
B
Ø225x12Th
FLANG, 2Nos
GI Ø6mm ROPE
3 Nos, 120°
RIBS
4Nos
C
C
Ø6 THIMBLE
D
D
Ø12 D SHACKLE
PIPE
Ø114.3mmX4.5W.T
PL600X12, - 600 Lg
1Nos
Ø16X700
GUY ROPE ANCHOR ROD
RIB
100X100X6
E
Ø20X450
ANCHOR BOLT
PL100X100X6
SIDE ELEVATION
A A
B B
PIPE 101.6X5.6 OD
500 PIPE 89.0 OD
4xM12x150
141 40x5 162 Bolt with Nut & 2 PW
C C
Ø14
8 8
1220
SECTION C-C
3 500 PIPE 89.0 OD
D 8° 8° D
200
Ø130
A C B 25 150 25
12
Ø103 Ø14
50
200
100
E E
50
4Slot 12x30 121 40x6 142
712312/2021/O/o GM(RCDU&FIU)
136
Ø180
A C B
18 14 14 18
1220
PIPE 101.6X5.6 OD
SECTION B-B
SECTION A-A
Drawn by Checked by APPROVED BY File name Date Scale
F S.M NAYEEM MADAN LAL P.CHHATWAL 22-02-2019 NTS F
TITAL:
DRG. NO. Revision Sheet
**STAR MARK DIMS ARE CRITICAL** Machining Symbol (Before Hot Dip Galavanised) TSPL/18-19/CP/C23 03 1 of 5
1 2 3 Plot Date : 22-02-2019 6 7 8
174
1 2 3 4 5 6 7 8
712
BOQ-C24-25 ASSLY 25b
Mark. No. Section Length Qty. 16 ASSLY.
A C25a ISMC75X40 2804 1 16
25a A
C25b PL-139.5X4 838 6 96
C24c PL-45X6 75 4 64
788
5 2804 150
92 25c
14 2788 788
546
7.5° 24c
C C
251
790
710
838
710
7.5° 74
92
1276
1276
5 7.5°
2509
788
24
727
686
730
D 74
150 D
686
486
2493 150
686
31
74
684 149 673 145 649 68
116
2442
E E
41
116
75
2744
1 2 3 6 7 8
175
1 2 3 4 5 6 7 8 712
C34 C40
HARDWARE
Mark.
C35 ITEM Qty.
C38 No.
A B-1
A-1 B-1 A
A-1 A-1
A HEX BOLT M8x35 With 1Nut 1PW 48
A-1 B-1
B-2 B-1
C36 B-1 A-1 Sq. U BOLT 70X90 With 2Nut 2PW
A-1 C37 B 76
A-1 A-1
B-2 C J HOOK (125) With 1Nut 1PW 32
B-2 B-2 A-1
A-1 C39
B-1 B-1 D HEX BOLT M12X50 With 1Nut 1PW 12
B-2 B-2
A-1 A-1
C36
C37 A-1 B-2 B-2 A-1
B-1 B-1 B-2 B-1 B-1
C41
B B-1
B
B-2 B-2
A-1 A-1
A-1 B-1 A-1
B-1
C38 B-1 C35
B-1 B-2 B-2 B-2 B-2
B-1
B-1
A-1 A-1
A-1 A-1
C40 C31
C B-1
B-1
C
C-1
C-1
C-1
C-1
C-1
C-1
C-1
C-1
C-1
B-1 B-2 B-2 B-2 B-2 B-1 C34
C-1 C-1 B-1
D-1 D-1 C-1
C-1
D-1 D-1
C-1 C-1
A-1 D-1 D-1
A-1 C-1 C-1 A-1 A-1
C30 D-1 D-1
C-1 C-1
C34 D-1 D-1
C-1
D-1 D-1
C-1 C30a
C-1 C-1
B-1 B-2 B-2 C-1 B-2 B-2 B-1
C40
C-1
C-1
C-1
C-1
C-1
C-1
C-1
C-1
D A-1 A-1 A-1
A-1 D
C35
B-2 B-2 B-2 B-2 B-1
B-1 C38
A-1 A-1
A-1
A-1
B-2 B-2
B-2
E C36
B-1
A-1 B-1
B-2
A-1 B-1
C37 E
B-1
A-1 A-1
B-2 B-2
B-1 B-1
A-1 B-2 A-1
B-2
C37 B-2 B-2 C36
A-1 A-1 A-1
B-1 B-2 A-1
A-1 B-1
B-1
C35
C38 A-1 A-1
B-1 B-1
A-1 Drawn by Checked by APPROVED BY File name Date Scale
F C40
S.M NAYEEM S.K.AMAN . S.K AMAN TSPL- CP12 05/08/15 NTS F
C34 TITAL:
TRIDENT STRUCTURES (P) LTD.
DRG. NO. Revision Sheet
**STAR MARK DIMS ARE CRITICAL** TSPL/17-18/CP/C34-40 03 1 of
1 2 3 6 7 8
176
712
PL
TS
FL-40X4
ISA 65X65X6
25@300
ISA 65X65X6
A A
LA ASSLY.
INSULATOR
300 20 75
B B
22
14
200
200
200
LA MOUNTING BKT.
22
75
20 855 200 875
C Ø20
C
BASE SUPPORT
2500
ISMC75
D D
E Ø60.3x3.6 E
2000
712312/2021/O/o GM(RCDU&FIU)
6
75 75
2100 200
Drawn by Checked by APPROVED BY File name Date Scale
F S.M NAYEEM MADAN LAL P.CHHATWAL 22-02-2019 NTS F
TITAL:
DRG. NO. Revision Sheet
**STAR MARK DIMS ARE CRITICAL** TSPL/17-18/CP-1010/CW-01 02 01
1 2 3 Plot Date : 22.02.2019 6 7 8
1 2 3 4 5 6 7 8
179
A 820 A
C17
C17a
C17e
C17b
C17d
C17c
C17c
B C17d
B
C17b
820
C17e
C17a
C C
900
C17
C17
820
C17a
C17c
E E
C17d
C17b
712312/2021/O/o GM(RCDU&FIU)
C17e
C17a
C17
30500
PLAN PORPOSED RAIL FITMENT ASSLY
& WALK WAY
Drawn by Checked by APPROVED BY File name Date Scale
F S.M NAYEEM MADAN LAL 21-02-2019 NTS F
TITAL:
DRG. NO. Revision Sheet
TSPL/18-19/CP-1010/CW-01 03 01
1 2 3 Plot Date : 21.02.2019 6 7 8
180
712
181
712
182
712
FALSE CEILING
WATER
TANK
SUN SHADE
FLOOR LEVEL
EARTH PIT
MAINHOLE
5M
COL
EARTH PIT
MAINHOLE
5M
5M
EARTH PIT
MAINHOLE
5M
EF EF EF
D4
LEGENDS:-
D3
HARD STANDING
PREFERABLY CEMENT
LED LED 1. ROOF HEIGHT OF KITCHEN AND PANTRY
INTERLOCK BRICK
TOILET PANTRY
SHOULD BE LOWER AS SHOWN
2. EF 15" DIA. EXHAUST FAN
3. LED TUBE LIGHT
BATT. ROOM ELECTRICAL ROOM 4. WEATHER PROOF LIGHT
2.175M x 3M 2.675M x 3M
LED LED 6" HOLE FOR
5. D 1.5 M WIDE WOODEN DOOR
CABLE TRENCH
6. D1 1.5 M WIDE ALUMINUM DOOR WITH
W
D3
GLASS & BOARD
D3 D3
7. D2 0.9 M WIDE ALUMINUM DOOR WITH
5M
COL
UPS COMM DME
COL
RACK GLASS & BOARD
LED
8. D3 0.75 M WIDE WOODEN DOOR
OD UNIT
EARTH PIT MAINHOLE
A/C
LED
LED
11. A/C 1.5 TON AIRCONDITIONER
VOR
12. CEILING FAN
W
EQUIPMENT ROOM
5M x 4.1M
WORK AREA ROOM
3.5M x 4M
2 NOS. CABLEENTRY HOLES 1FT
SEPARATE AT 2.75 M HT.
13. 5 AMP. POWER PLUG
14. 15 AMP. POWER PLUG
LED LED
2" DIA HOLE FOR RC
CABLE
15. MON = MONITOR PLINTH UP TO 110M
D3 AND MAIN HOLE AT EVERY 30M.
A/C A/C A/C
D2
16. LA = LIGHTNING ARRESTOR PLINTH
D1
W W
OD UNIT OD UNIT OD UNIT
LA PLINTH
D 5M
2M EARTH PIT
MAINHOLE
SUN SHADE
LED LIGHT
COL
5M LA PLINTH
AIRPORTS AUTHORITY OF INDIA
2M
LA PLINTH
EARTH PIT
EARTH PIT
MAINHOLE RADIO CONS. AND DEV. UNIT
MAINHOLE
DATED
RCDU DRG NO. 2017/02 29-07-19
PREPARED BY : APPROVED BY :
CHECKED BY :
DETAIL OF DVOR BUILDING FOR TRIDENT STRUCTURES COUNTER POISE
RADIO CONS. & D. UNIT
NEW DELHI
183
712312/2021/O/o GM(RCDU&FIU)
184
712
1 2 3 4 5 6 7 8
185
712312/2021/O/o GM(RCDU&FIU) DVOR EARTHING BASIC LAYOUT DIAGRAM
A EA6
NORTH A
P5 REFERENCES
LEGEND DESCRIPTION
MH5 MON MONITOR PLINTH
LA3
P6
MH(1-20) MAN HOLE
MH12 LA EARTHPIT WITH
P12
MAN HOLE FOR
B MH4 MH6
LIGHTINING B
ARRESTOR
EA EARTH PIT WITH
MAN HOLE
120-150MM HDPE
P1
MH20 MH19 1 INCH CPVC
MH14 MH13 WATER PIPE
EA1
WATER TAP
MH15
C MON
WT WATER TANK C
EA2 110M EA5
MH16 MH11 DVOR Building
MH1 MH3
P11 P4 11mX8m P2
MH7
P7
EA3
WT
MH18
D MH17 D
P3
MH2
MH10
MH8
P8
P10 LA3
E LA1 MH9 E
P9
EA4
F
AIRPORTS AUTHORITY OF INDIA F
TOTAL NO OF MAN HOLE =24
WATER TAP SHOULD BE 2 FEET ABOVE EARHPIT RADIO CONS. AND DEV UNIT
CONNECTED TO 1" C PVC PIPE
RCDU DRG NO 2019\01 DATED 14/12/2019
1 2 3 6 7 8
186
712312/2021/O/o GM(RCDU&FIU)
4 3 3 4
4 3 3 4
4 3 3 4
3 4
4 3
3 4
4 3 2
3 4
4 3
3 4
4 3
3 4
4 3 5 6 7 8
3 4
4 3
3 4
4 3 1
3 4
13 12 11 10