Distribution Board Schedule
Distribution Board Schedule
Distribution Board Schedule
CONNECTED
CIRCUIT WIRE SIZE NO- OF CIRCUIT BREAKER LOAD PER PHASE (KWA)
DESCRIPTION POWER
NO- (mm²) POLES
RATING(A) TYPE KWA R S T
1 SDB-LIBRARY AC/G 5X10.00 1 3X50 C 35 • • •
2 SDB-LIBRARY AC/1F 5X10.00 1 3X63 C 40 • • •
3 SDB-GF L 5X6.00 1 3X50 C 17.8 • • •
4 SDB-GF S 5X6.00 1 3X50 C 10.8 • • •
5 SDB -FF 5X6.00 1 3X50 C 22 • • •
6 RESERVE
7 RESERVE
8 RESERVE
SUB TOTAL 125.6 • • •
MAIN SWITCH 250Amp, 3phase, MBC KWA CONNECTED 125.600
LOCATION TOP/BOTTOM KW CONNECTED 100.48
FEEDER 3*(4X25)mm² DIVERSITY 1
POWER SOURCE MDB-Hall KW DEMAND 100.48
LINE AMPERE 250
DISTRIBUTION BOARD SCHEDULE
PANEL NO. MDB OF 3BLKS BUS TYPE : TPN+PE MOUNTING : Surface
SERVICE VOLTAGE : 220/380/VOLT BUS BAR RATING : 1250A,85KA IP RATING : 67
3 Phase, 4 wire + E 50HZ
-
2. DISTRIBUTION BOARD (For -
Multipurpose Hall)
Supply, install & connec Surface mounted standard Main
distribution board (MDB HALL) IP67 made of approved quality
2.1 -
standard steel with locable door & separate earthing, Neutral &
phase bus bars of 1000A and consisting of :-
1pcs of MCB 600A/3ph
1pcs of
MCB 32A/3ph
N0- 1 692,874.00 692,874.00
3pcs of MCB
25A/3ph
25% reserve -
Supply, install & connect Surface mounted standard Sub
distribution board (SDB-Kitchen GF) IP67 made of approved quality
2.1 -
standard steel with locable door & separate earthing, Neutral &
phase bus bars of 800A and consisting of :-
2pcs
of MCB 80A/3ph
8pcs
N0- 1 30,524.00 30,524.00
of MCB 25A/3ph
-
4 LIGHT FITTING AND LAMPS -
Highbay Light fitting for Multipurpose Hall to use on high roof -
ceiling part of the hall ceiling (Specified or Equivalent)
4.1 Ledvance LDPFM HB PRO 200W/6500K,Product N0- 38 24382.8 926,546.40
Number( 4058075261983), 200w, Lm( 27,000), K- 6,500, Ra >80
Subtotal 3,416,540.40
VAT(%) 512,481.06
Total 3,929,021.46
PSCO 2nd Phase
-
2. DISTRIBUTION BOARD (For -
Multipurpose Hall)
Supply, install & connec Surface mounted standard Main
2.1 distribution board (MDB HALL) IP67 made of approved quality -
standard steel with locable door & separate earthing, Neutral &
phase bus bars of 1000A and consisting of :-
1pcs of MCB 600A/3ph
1pcs of
MCB 32A/3ph
N0- 1
3pcs of MCB
25A/3ph
25% reserve
7
PSCO 2nd Phase
8pcs N0- 1
of MCB 25A/3ph
8
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) MAIN DISTRIBUTION BOARD(MDB OF 3BLKS)
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 855,374.00 Birr/No.
** Indexed
Type of Material Unit Qty * Rate Cost per Unit Labour by Grade No. UF Hourly Cost Hourly Cost Type of Equipment No. Hourly Rental
Supply, install & connect Surface
mounted standard Compound Main
distribution board (MDB OF 3BLKS)
IP67 made of approved quality standard
steel with locable door & separate
earthing, Neutral & phase bus bars of
1250A and consisting of :-
3 pcs Ammeter
(0-400)A
3 pc current transformer
1000/5A
1 pc volt meter (0-500 V) with 7 step
selector switch 3 pcs fuse
protection for the voltmeters of 8-10A
3 pcs pilot lamps. No. 1 650,000.00 650000 EL 1 1 60.00 60.00
1Pc of Ass./EL 1 1 40.00 40
D/L 1 1 25 25
A= Materials Unit Cost 650000 Birr/No. B= Manpower Unit Cost 1180.00 Birr/Pcs C=Equipment Unit Cost 6800
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 657,980.00 Birr/No.
Over head cost : 10% 65,798.00 "
Profit Cost: 20% 131,596.00 "
Total Unit Cost : 855,374.00 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) MAIN DISTRIBUTION BOARD(MDB HALL)
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 692,874.00 Birr/No.
** Indexed
Type of Material Unit Qty * Rate Cost per Unit Labour by Grade No. UF Hourly Cost Hourly Cost Type of Equipment No. Hourly Rental
Supply, install & connec Surface
mounted standard Main distribution
board (MDB HALL) IP67 made of
approved quality standard steel with
locable door & separate earthing,
Neutral & phase bus bars of 1000A and
consisting of :-
Foreman 1 0.45 50.00 22.50 tools 1 850
1pcs of MCB 800A/3ph
1pcs of MCB 600A/3ph
1pcs of
MCB 32A/3ph
3pcs of MCB 25A/3ph
25% No. 1 525,000.00 525000 EL 1 1 60.00 60.00
Ass./EL 1 1 40.00 40
D/L 1 1 25 25
A= Materials Unit Cost 525000 Birr/No. B= Manpower Unit Cost 1180.00 Birr/Pcs C=Equipment Unit Cost 6800
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 532,980.00 Birr/No.
Over head cost : 10% 53,298.00 "
Profit Cost: 20% 106,596.00 "
Total Unit Cost : 692,874.00 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) MAIN DISTRIBUTION BOARD(SDB-Kitchen GF)
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 634,374.00 Birr/No.
** Indexed
Type of Material Unit Qty * Rate Cost per Unit Labour by Grade No. UF Hourly Cost Hourly Cost Type of Equipment No. Hourly Rental
Supply, install & connect Surface
mounted standard Sub distribution
board (SDB-Kitchen GF) IP67 made of
approved quality standard steel with
locable door & separate earthing,
Neutral & phase bus bars of 800A and
consisting of :-
Foreman 1 0.45 50.00 22.50 tools 1 850
1pcs of MCB 600A/3ph
1pcs of MCB
125A/3ph
2pcs of MCB 80A/3ph
2pcs of MCB
63A/3ph
2pcs of MCB 32A/3ph
8pcs of MCB
25A/3ph No. 1 480,000.00 480000 EL 1 1 60.00 60.00
5pcs of MCB 20A/3ph
Ass./EL 1 1 40.00 40
D/L 1 1 25 25
A= Materials Unit Cost 480000 Birr/No. B= Manpower Unit Cost 1180.00 Birr/Pcs C=Equipment Unit Cost 6800
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 487,980.00 Birr/No.
Over head cost : 10% 48,798.00 "
Profit Cost: 20% 97,596.00 "
Total Unit Cost : 634,374.00 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) MAIN DISTRIBUTION BOARD( MDB LIBRARY)
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 246,974.00 Birr/No.
** Indexed
Type of Material Unit Qty * Rate Cost per Unit Labour by Grade No. UF Hourly Cost Hourly Cost Type of Equipment No. Hourly Rental
Supply, install & connect Surface
mounted standard Main distribution
board ( MDB LIBRARY) IP67 made of
approved quality standard steel with
locable door & separate earthing,
Neutral & phase bus bars of 320A and
consisting of :-
Foreman 1 0.45 50.00 22.50 tools 1 850
1pcs of MCB 250A/3ph
1pcs of MCB
63A/3ph
4pcs of MCB 50A/3ph
25% reserve pitch. No. 1 182,000.00 182000 EL 1 1 60.00 60.00
Ass./EL 1 1 40.00 40
D/L 1 1 25 25
A= Materials Unit Cost 182000 Birr/No. B= Manpower Unit Cost 1180.00 Birr/Pcs C=Equipment Unit Cost 6800
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 189,980.00 Birr/No.
Over head cost : 10% 18,998.00 "
Profit Cost: 20% 37,996.00 "
Total Unit Cost : 246,974.00 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) MAIN DISTRIBUTION BOARD (SDB-LIBRARY AC/G)
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 29,874.00 Birr/No.
** Indexed
Type of Material Unit Qty * Rate Cost per Unit Labour by Grade No. UF Hourly Cost Hourly Cost Type of Equipment No. Hourly Rental
Supply, install & connect Flush
mounted standard Sub distribution
board (SDB-LIBRARY AC/G) IP67
made of approved quality standard steel
with locable door & separate earthing,
Neutral & phase bus bars of 63A and
consisting of :-
Foreman 1 0.45 50.00 22.50 tools 1 850
1pcs of MCB 63A/3ph
7pcs of MCB
25A/3ph No. 1 15,000.00 15000 EL 1 1 60.00 60.00
25% reserve pitch.
Ass./EL 1 1 40.00 40
D/L 1 1 25 25
A= Materials Unit Cost 15000 Birr/No. B= Manpower Unit Cost 1180.00 Birr/Pcs C=Equipment Unit Cost 6800
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 22,980.00 Birr/No.
Over head cost : 10% 2,298.00 "
Profit Cost: 20% 4,596.00 "
Total Unit Cost : 29,874.00 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) MAIN DISTRIBUTION BOARD(SDB-LIBRARY AC/1F)
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 30,524.00 Birr/No.
** Indexed
Type of Material Unit Qty * Rate Cost per Unit Labour by Grade No. UF Hourly Cost Hourly Cost Type of Equipment No. Hourly Rental
Supply, install & connect Flush
mounted standard Sub distribution
board (SDB-LIBRARY AC/1F) IP67
made of approved quality standard steel
with locable door & separate earthing,
Neutral & phase bus bars of 63A and
consisting of :-
Foreman 1 0.45 50.00 22.50 tools 1 850
1pcs of MCB 63A/3ph
8pcs of MCB
25A/3ph No. 1 15,500.00 15500 EL 1 1 60.00 60.00
25% reserve pitch.
Ass./EL 1 1 40.00 40
D/L 1 1 25 25
A= Materials Unit Cost 15500 Birr/No. B= Manpower Unit Cost 1180.00 Birr/Pcs C=Equipment Unit Cost 6800
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 23,480.00 Birr/No.
Over head cost : 10% 2,348.00 "
Profit Cost: 20% 4,696.00 "
Total Unit Cost : 30,524.00 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) Highbay Light fitting
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 24,382.80 Birr/No.
** Indexed
Type of Material Unit Qty * Rate Cost per Unit Labour by Grade No. UF Hourly Cost Hourly Cost Type of Equipment No. Hourly Rental
Highbay Light fitting for Multipurpose
Hall to use on high roof ceiling part of
the hall ceiling (Specified or
Equivalent)
Foreman 1 0.45 30.00 13.50 tools 1 1
Ledvance LDPFM HB PRO
200W/6500K,Product
Number( 4058075261983), 200w,
Lm( 27,000), K- 6,500, Ra >80
No. 1 18,000.00 18000 EL 1 1 35.00 35.00
Ass./EL 1 1 25.00 25
D/L 1 1 20 20
A= Materials Unit Cost 18000 Birr/No. B= Manpower Unit Cost 748.00 Birr/Pcs C=Equipment Unit Cost 8
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 18,756.00 Birr/No.
Over head cost : 10% 1,875.60 "
Profit Cost: 20% 3,751.20 "
Total Unit Cost : 24,382.80 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-
Hourly Cost
850
0
0
0
0
0
0
850.00
Birr/No.
Hourly Cost
850
0
0
0
0
0
0
850.00
Birr/No.
-
Hourly Cost
850
0
0
0
0
0
0
850.00
Birr/No.
Hourly Cost
850
0
0
0
0
0
0
850.00
Birr/No.
-
Hourly Cost
850
0
0
0
0
0
0
850.00
Birr/No.
Hourly Cost
850
0
0
0
0
0
0
850.00
Birr/No.
-
Hourly Cost
0
0
0
0
0
0
1.00
Birr/No.
DISTRIBUTION BOARD SCHEDULE
PANEL NO. SDB-Kitchen BUS TYPE : TPN+PE
SERVICE VOLTAGE : 220/380/VOLT BUS BAR RATING : 250A,40KA
3 Phase, 4 wire + E 50HZ
CONNECTED
POWER LOAD PER PHASE (KWA)
KWA R S T 13.125
13.125 • • •
1.25 •
1.25
1.5 • 1.5
1.375 • 1.375
1.25 •
0.75 • 0.75
0.9375 • 0.9375
27.5 • • • 27.5
10 • • • 10
18.75 • • • 18.75
13.125 • • • 13.125
22.5 • • • 22.5
40 • • • 40
0.375 • 0.375
9.125 • • • 9.125
161.5625 • • •
KWA CONNECTED 161.563
KW CONNECTED 129.25
DIVERSITY 1
KW DEMAND 129.25 245.4760240671
LINE AMPERE 250 306.8450300839
ULE
MOUNTING : Surface
IP RATING : 67
CONNECTED
POWER LOAD PER PHASE (KWA)
KWA R S T
129.25 • • •
9.34 • • •
17.385 • • •
8.19 • • •
6.255 • • •
170.42 • • •
KWA CONNECTED 170.420
KW CONNECTED 136.336
DIVERSITY 1
KW DEMAND 136.336 258.9339978121
LINE AMPERE 320 323.6674972651
ULE
MOUNTING : Flush
IP RATING : 67
CONNECTED
LOAD PER PHASE (KWA)
POWER
KWA R S T
5 •
5 •
5 •
5 •
5 •
5 •
5 •
35 • • •
KWA CONNECTED 35.000
KW CONNECTED 28
DIVERSITY 1
KW DEMAND 28
LINE AMPERE 50
ULE
MOUNTING : Flush
IP RATING : 67
KWA R S T
5 •
5 •
5 •
5 •
5 •
5 •
5 •
5 •
40 • • •
KWA CONNECTED 40.000
KW CONNECTED 32
DIVERSITY 1
KW DEMAND 32
LINE AMPERE 63
ULE
MOUNTING : Surface
IP RATING : 67
CONNECTED
POWER LOAD PER PHASE (KWA)
KWA R S T
35 • • •
40 • • •
17.8 • • •
10.8 • • •
22 • • •
125.6 • • •
KWA CONNECTED 125.600
KW CONNECTED 100.48
DIVERSITY 1
KW DEMAND 100.48
LINE AMPERE 200
ULE
MOUNTING : Surface
IP RATING : 65
CONNECTED LOAD PER PHASE (KWA)
POWER
KWA R S T
136.336 • • •
23.76 • • •
125.6 • • •
285.696 • • •
KWA CONNECTED 285.696
KW CONNECTED 228.5568
DIVERSITY 1
KW DEMAND 228.5568
LINE AMPERE 600
Item Description unit Qty Rate
8 highbay light
9 spot light
10 cable
4*4sqmm for sdb's
4*6 sqmm for sdb's
3* 150/70+1X70 sqmm for GF machine SDB's
3(3*150/70+1X70) sqmm for FF M achine SDB's
4(3*150/70+1X70 sqmm for hall MDB's
1. Disturbution Boards(Library)
4.10 PHILIPS TMS 012/118 IMKwith 1xTLD 18W approved equivalent PCs 2.0
4 pc ACB of 16A/1P
NO 1.0
1 pc ACB
5.00 Lighting Fixtures -
5.10 Disano 1202 polar MBF 125 (422135-00) No 20.0
5.20 SPP 202 SON--T 100W 220V BG ALU No 20.0
5.30 Tumbler Switch of 16A, 1ph No 20.0
12.00 Power Cables(XLPE 0.6/1KV or approved equ.)
12.01 3x6mm2 to each socket group junction boxes ML 600.0
12.02 3x4mm2 to each water heater ML 500.0
KITCHEN BLOCKS Final Fix
7 Flush Mounted Socket Outlet
1 32A/3P socket outlet for Range Stove No 3.0
RJ 45 twin outlets type LEGRAND 2(74213) category 6 with 8
2 contacts complete with clip on support frame. No 1.0
Switches
3 Duoble(774005+774042) No 4.0
Lihgting Fixture
4 PHILIPS TCW 079/136+1 x'TL'D36W No 1.0
5 PHILIPS TMS022 2 x'TL'D36WC No 2.0
6 PHILIPS TMS022 1 x'TL'D36W No 6.0
7 PHILIPS TMS022 1 x'TL'D18W No 4.0
8 PHILIPS TCW 079/118+1 x'TL'D18W No 1.0
9 PHILIPS TCW 079/118+1 x'TL'D18W No 1.0
it must be transported
From Ambo Hospital To
Shashamanne
4 pc
ACB of 40A/3P
NO 1.0
4 pc ACB of 16A/1P
1 pc ACB of 10A/1P
Subtotal
VAT(%)
Total
Unit Price Total
Amount
Subtotal
VAT(%)
Total
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) MAIN DISTRIBUTION BOARD(MDB OF 3BLKS)
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 855,374.00 Birr/No.
3 pcs Ammeter
(0-400)A
3 pc current transformer
1000/5A
1 pc volt meter (0-500 V) with 7 step
selector switch 3 pcs fuse
protection for the voltmeters of 8-10A
3 pcs pilot lamps. No. 1 650,000.00 650000 EL 1 1 60.00 60.00
1Pc of Ass./EL 1 1 40.00 40
D/L 1 1 25 25
A= Materials Unit Cost 650000 Birr/No. B= Manpower Unit Cost 1180.00 Birr/Pcs C=Equipment Unit Cost 6800
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 657,980.00 Birr/No.
Over head cost : 10% 65,798.00 "
Profit Cost: 20% 131,596.00 "
Total Unit Cost : 855,374.00 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) BELL PUSH BUTTON
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 669.24 Birr/No.
A= Materials Unit Cost 250 Birr/No. B= Manpower Unit Cost 260.80 Birr/Pcs C=Equipment Unit Cost 4
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 514.80 Birr/No.
Over head cost : 10% 51.48 "
Profit Cost: 20% 102.96 "
Total Unit Cost : 669.24 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) Power Distribution for socket Group Junction
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 3,497.00 Birr/No.
A= Materials Unit Cost 2000 Birr/No. B= Manpower Unit Cost 674.00 Birr/Pcs C=Equipment Unit Cost 16
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 2,690.00 Birr/No.
Over head cost : 10% 269.00 "
Profit Cost: 20% 538.00 "
Total Unit Cost : 3,497.00 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) Isolato
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 13,624.00 Birr/No.
A= Materials Unit Cost 2500 Birr/No. B= Manpower Unit Cost 1180.00 Birr/Pcs C=Equipment Unit Cost 6800
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 10,480.00 Birr/No.
Over head cost : 10% 1,048.00 "
Profit Cost: 20% 2,096.00 "
Total Unit Cost : 13,624.00 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) floor mounted main distribution board (CMDB)
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 855,374.00 Birr/No.
A= Materials Unit Cost 650000 Birr/No. B= Manpower Unit Cost 1180.00 Birr/Pcs C=Equipment Unit Cost 6800
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 657,980.00 Birr/No.
Over head cost : 10% 65,798.00 "
Profit Cost: 20% 131,596.00 "
Total Unit Cost : 855,374.00 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DISTRIBUTION BOARD
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
1.01 ELECTRICAL INSTALLATION Super Structure
PROJECT: PSCO 2nd Phase LABOUR HOURLY OUTPUT in No. 0.125
PROJECT: EQUIPEMENT HOURLY OUTPUT in No. 0.125
WORK ITEM: (14.1 ) Sub distribution board SDB-WARD FOR LAUNDARY
TOTAL QANTITY OF WORK ITEM: 1 No. RESULT: 66,365.00 Birr/No.
1 pc ACB of
125A/3P
A= Materials Unit Cost 50000 Birr/No. B= Manpower Unit Cost 650.00 Birr/Pcs C=Equipment Unit Cost 400
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 51,050.00 Birr/No.
Over head cost : 10% 5,105.00 "
Profit Cost: 20% 10,210.00 "
Total Unit Cost : 66,365.00 Birr/No.
Remark :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-
Hourly Cost
850
0
0
0
0
0
0
850.00
Birr/No.
Hourly Cost
0.5
0
0
0
0
0
0
0.50
Birr/No.
-
Hourly Cost
0
0
0
0
0
0
2.00
Birr/No.
Hourly Cost
850
0
0
0
0
0
0
850.00
Birr/No.
-
Hourly Cost
850
0
0
0
0
0
0
850.00
Birr/No.
-
Hourly Cost
50
0
0
0
0
0
0
50.00
Birr/No.
DUE TO ADDITION of INDUSTRIAL TUMBLE DRYER and INDUSTRIAL
Washer Extractor On LAUNDARY BLOCKS
INDUSTRIAL TUMBLE DRYER
Power supply 61kw CB
125A/3ph Cable
4X35mm²
INDUSTRIAL Washer Extractor
Power supply 40kw CB
100A/3ph Cable
5X25mm²