OPRNS SAUDI ARABIAN OIL COMPANY

WASIT GAS PROGRAM


PMT
CERT

TABLE OF CONTENTS
ZHK
ENG’G

RJV

1.0 GENERAL............................................................................................................... 4
1.1 Scope ...................................................................................................................... 4
1.2 Site and Ambient Conditions................................................................................... 5
1.3 Industry Codes and Standards................................................................................ 5
1.4 Related Drawings.................................................................................................... 5
DESCRIPTION

2.0 SYSTEM DESCRIPTION........................................................................................ 6


2.1 Operating Philosophy.............................................................................................. 6
2.2 System Architecture and Overview ......................................................................... 6
Issued for Bid

2.2.1 Base Station ............................................................................................................ 6


2.2.2 Switching and Control Node (SCN)......................................................................... 6
2.2.3 End Users and Talk-groups .................................................................................... 7

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
2.2.4 Dispatcher Consoles ............................................................................................... 7
10-00914/302-0001

3.0 FUNCTIONAL REQUIREMENTS........................................................................... 8


JO/EWO NO.

3.1 Coverage and Interference Analysis ....................................................................... 8


3.2 Transmitter Noise and Desensitization Analysis..................................................... 9
3.3 Traffic Analysis........................................................................................................ 9
3.4 Operating Frequencies and Bandwidth................................................................... 9
3.5 Telephone Interconnects......................................................................................... 9
DATE

05/27/10

3.6 Network Management System .............................................................................. 10


3.7 Base Station Specifications................................................................................... 10
REV
NO.

3.7.1 Transceivers.......................................................................................................... 10
0

DRAWN
3.7.2 Base Station Controller ......................................................................................... 11
DATE 3.7.3 RF Distribution System ......................................................................................... 12
CHECKED 3.8 Dispatcher Console............................................................................................... 15
BY
DATE
3.9 Logging Recorder.................................................................................................. 16
3.10 Radio Specifications.............................................................................................. 16
3.10.1 Fixed Desktop Radios ........................................................................................... 17
DISCIPLINE
ENGINEER 3.10.2 Vehicle-Mounted Mobile Radios ........................................................................... 18
DATE
3.10.3 Hand-held Radios ................................................................................................. 19
3.11 System Monitoring ................................................................................................ 20
PROJECT
ENGINEER
4.0 INSTALLATION .................................................................................................... 20
DATE
4.1 General.................................................................................................................. 20
4.2 Safety and Security Requirement ......................................................................... 22
CERTIFIED 4.3 Material Included................................................................................................... 22
DATE 4.4 Plant Tagging ........................................................................................................ 23
5.0 INSPECTION AND TESTING............................................................................... 23
CONSTRUCTION
AGENCY 5.1 General.................................................................................................................. 23
DATE 5.2 QA/QC Requirements ........................................................................................... 24
5.3 Commissioning...................................................................................................... 25
OPERATIONS
5.4 Factory Acceptance Testing (FAT) ....................................................................... 25
DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 2
0
UNTIL CERTIFIED of
AND DATED.
29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

5.5 Field Testing.......................................................................................................... 26


5.6 Site Acceptance Testing ....................................................................................... 26
CERT

ZHK

5.7 Hardware Component Testing .............................................................................. 27


5.8 Software Verification Testing ................................................................................ 27
ENG’G

RJV

5.9 Mechanical Completion Certificate (MCC) ............................................................ 28


5.10 Performance Acceptance Testing (PAT) .............................................................. 28
6.0 DOCUMENTATION .............................................................................................. 28
6.1 Drawings ............................................................................................................... 29
6.2 System Drawings .................................................................................................. 29
DESCRIPTION

6.3 Rack Face Elevation (RFE) Drawings................................................................... 29


6.4 As-Built Drawings.................................................................................................. 29
6.5 Installation Drawings ............................................................................................. 29
6.6 Manuals................................................................................................................. 29
Issued for Bid

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
10-00914/302-0001
JO/EWO NO.
DATE

05/27/10
REV
NO.

DRAWN

DATE

CHECKED

BY
DATE

DISCIPLINE
ENGINEER

DATE

PROJECT
ENGINEER

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 3
0
UNTIL CERTIFIED of
AND DATED.
29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

1.0 GENERAL
CERT

ZHK

1.1 Scope
ENG’G

RJV

This Functional Specification Document (FSD) describes the requirements


for the provision of the Mobile Radio System for the Wasit Gas Plant
(WGP), under the Wasit Gas Project (BI-10-00914) and NGL Fractionation
Facilities (BI-10-00302).
DESCRIPTION

The Permanent Communications ‘Contractor’ shall design, supply, install,


test, and commission the Mobile Radio System that is based on TErrestrial
Trunked RAdio (TETRA) technology. The major system components shall
Issued for Bid

consist of the following and not limited to the following:


‰ System Racks

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
‰ Base Station controller and transceivers
10-00914/302-0001
JO/EWO NO.

‰ RF distribution system (transmitter combiner, receiver multicoupler,


antenna panels, feeders and feeder line protection)
‰ 103 handheld radios: 61 for Operations, 20 for Fire, 20 for Security,
and 2 for Medical personnel
DATE

05/27/10

‰ 22 vehicle-mounted radios: 5 for Operations, 10 for Fire, 5 for Security,


and 2 for Medical personnel
REV
NO.

‰ 12 desktop radios: 6 for CCR consoles, 1 for DCC console, 1 for Fire
0

DRAWN
Station console, 1 for the Sulphur Loading Monitoring Building console,
DATE
1 for the Main Gatehouse, 1 for the Computer Gatehouse, and 1 for the
CHECKED
Sulphur Loading Area Gatehouse
BY
DATE
‰ 2 dispatcher console radios: 1 for the CCR, and 1 for the DCC
‰ 36 RF signal enhancers. Refer to Section 3.7.3.2 for a full list of
DISCIPLINE
ENGINEER buildings with signal enhancers
DATE
‰ Ethernet LAN switches and media converters, as required
PROJECT
ENGINEER System will allow for interconnection to Saudi Aramco VoIP, PABX, or
DATE
PSTN exchange.

CERTIFIED
The base station will be open, scalable, and modular to accommodate
additional capacity requirements.
DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 4
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

1.2 Site and Ambient Conditions


CERT

ZHK

The project specific ambient conditions shall be based climatic condition of


ENG’G

Khursaniyah as per SAES-A-112 Saudi Aramco metrological and seismic


RJV

data.

1.3 Industry Codes and Standards

The works should conform to the requirements of the latest issues and
DESCRIPTION

most recent revisions of the Saudi Aramco and International Standards


and Procedures listed below.
Issued for Bid

SAES-A-105 Noise Control


SAES-B-068 Electrical Area Classification
SAES-P-100 Basic Power System Design Criteria

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
SAES-P-103 UPS and DC System
SAES-P-104 Wiring Methods and Materials
10-00914/302-0001
JO/EWO NO.

SAES-P-111 Grounding
SAES-T-481 Powered in-plant Communications
SAES-T-492 VHF/UHF Land-Mobile and Fixed Radio
SAES-T-744 Installation of Communication Towers
SAES-T-795 Communications Facility Grounding System
DATE

05/27/10

SAEP-1634 Factory Acceptance Test


ANSI/NFPA-70 National Electrical Code
ETSI TETRA TErrestrial Trunked RAdio
REV
NO.

DRAWN ETSI 300392-2 Air Interface Standard


DATE EIA/TIA 222 Structural Standard for Antenna – Supporting
CHECKED Structures and Antennas
BY EIA/TIA 329-B Minimum Standards for Base Station Antennas
DATE
EIA/TIA 329-B-1 Minimum Standards for Vehicular Antennas
EIA/TIA 603 Land Mobile FM or PM Communications – Equipment
DISCIPLINE Measurement and Performance Standards
ENGINEER
ITU-T G Transmission Systems and Media, Digital Systems
DATE
and Networks
PROJECT
ENGINEER
1.4 Related Drawings
DATE

CERTIFIED
The following documents and drawings are referenced in this FSD and
form part of the specification.
DATE

CONSTRUCTION
AGENCY
Q76-T-PP-118327 Radio Tower Functional Specification
Q76-T-PP-118035 Mobile Radio System Block Diagram
DATE

OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 5
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

2.0 SYSTEM DESCRIPTION


CERT

ZHK

2.1 Operating Philosophy


ENG’G

RJV

Radio System is to provide flexible and effective two-way mobile voice


communications between operations and support personnel around the
project facilities.

Mobile radio system shall be based on TETRA technology. This


DESCRIPTION

technology offers efficient use of spectrum operating in the 410-430 MHz


range on 25 kHz bandwidth channels. Radios are to inter-operate between
the trunked mode (normal mode of operation) and conventional mode to
provide users flexibility in movement outside coverage area or in the event
Issued for Bid

the system is down.

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
End users shall have the ability to dial into the Saudi Aramco telephone
system as well as accessing the public telephone network to make phone
10-00914/302-0001
JO/EWO NO.

calls using their radios.

System shall be compatible and shall interface with the existing Saudi
Aramco TETRA infrastructure per BI-10-00112. It shall follow the standard
practices of similar facilities. The Base Station at Wasit shall be connected
DATE

05/27/10

to the Ras Tanura Switching and Control Node (SCN).

2.2 System Architecture and Overview


REV
NO.

DRAWN

DATE
2.2.1 Base Station
CHECKED
The base station shall be capable to provide radio users within and around
BY
DATE the project facilities with required access to the TETRA network in Eastern
Province.
DISCIPLINE
ENGINEER Contractor shall provide the Base Station equipment and racks including
DATE Controller, Transceivers, RF Distribution System, and Ethernet LAN Switch
PROJECT
at the Administration Building Main Telecommunications Equipment Room
ENGINEER (MTER). Base Station Controller shall be switch based and IP-capable for
DATE the interface with Ras Tanura SCN and dispatcher consoles.
CERTIFIED
2.2.2 Switching and Control Node (SCN)
DATE

CONSTRUCTION
SCN provides vital network functions including digital switching, resource
AGENCY management, trunking, speech item allocation, signaling services, data
DATE services, statistics, call control functions, and interface to other Base
OPERATIONS
Station SCNs, dispatcher consoles, Network Management System

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 6
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

terminals, external conventional channels, logging recorders, and the


telephone network.
CERT

ZHK

The Base Station under the Wasit Project shall be interfaced to the TETRA
ENG’G

RJV

network being deployed by BI-10-00112 via the TETRA SCN in Ras


Tanura. Communications between the Wasit Base Station and Ras Tanura
SCN shall utilize the Backbone Fiber Optic, IP-based Corporate WAN
between the two facilities. The Base Station shall connect to the SCN in a
protected loop.
DESCRIPTION

2.2.3 End Users and Talk-groups

The entire fleet shall be divided into different talk-groups. Users assigned a
Issued for Bid

hand-held, vehicle-mounted, or a fixed desktop radio will belong to a Talk-


group. Users can communicate to any user of any group or to entire

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
groups at a time. Users will access the system via RF communications
with the Base Station. Indoor users in all PIBs, Substations, and manned
10-00914/302-0001

buildings will have the TETRA coverage via RF signal enhancers installed
JO/EWO NO.

on top of the respective buildings.

Contractor shall submit the Wasit Talk-group Plan for reservation to BI-10-
00112 to reserve.
DATE

05/27/10

Contractor shall provide the hand-held, vehicle-mounted, and fixed radios


per 1.1.
REV
NO.

DRAWN
2.2.4 Dispatcher Consoles
DATE

CHECKED
Dispatchers have access to advanced features and functions of the
BY
DATE trunked radio system. Dispatchers can manage fleets and maintain the
system. Operators will be able to assign, change, or delete user or group
aliases over the air.
DISCIPLINE
ENGINEER

DATE Radio System Contractor shall provide and install two switch-based, IP
capable Dispatcher Consoles. One Console shall be installed in the
PROJECT
ENGINEER Central Control Room (CCR). The other Console shall be installed in the
DATE Disaster Control Center (DCC) of the Administration Building.
Communications between the CCR and DCC shall utilize the Outside Plant
CERTIFIED
Fiber Optic, IP-based network between the two facilities.
DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 7
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

3.0 FUNCTIONAL REQUIREMENTS


CERT

ZHK

3.1 Coverage and Interference Analysis


ENG’G

RJV

The contractor shall provide a detailed Radio Frequency (RF) coverage


study, frequency planning, interference analysis, and in-building and
outdoor coverage.
DESCRIPTION

Operational areas within and around the Wasit Gas Plant and key facilities
shall have radio coverage 95% of the time and 95% of locations. The
minimum received signal level required shall meet Mean Opinion Score
(MOS) of 3.5 as per Perceptual Evaluation of Speech Quality (PESQ)
Issued for Bid

measuring method specified by ITU-T standard P.862 within the plant


boundaries and surroundings areas.

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
Propagation analysis shall determine the required tower height, transmit
10-00914/302-0001

power, and RF distribution system parameters of the Base Station and


JO/EWO NO.

Radios. Contractor shall use the latest Mentum Planet software for the
propagation analysis. Contractor shall also supply the latest Mentum
Planet software, with a 30m digital terrain resolution (image, vector, clutter
files) for the kingdom wide area, to the Saudi Aramco Engineering
DATE

Department/WEG for study verification and recommendations. Preliminary


05/27/10

coverage analysis showed that a 30m tower is required to cover the Wasit
Gas Plant perimeter and surroundings. Contractor shall confirm this
REV
NO.

DRAWN
requirement during the detailed design phase of the project.
DATE

CHECKED
Contractor shall undertake co-channel, adjacent channel interference
BY
analysis. Contractor shall request from BI-10-00112 the coverage analysis
DATE and frequency plan of the Northern Area for the Contractor to consider in
the interference/coverage analysis.
DISCIPLINE
ENGINEER
As an option, Contractor may hire the same radio consultant used by BI-
DATE
10-00112 to conduct the coverage and interference analysis.
PROJECT
ENGINEER
A field analysis shall be conducted to verify the theoretical studies. At
DATE minimum, field analysis shall measure the Received Signal Strength
CERTIFIED
Indications (dBm) and the Voice Quality within the Wasit Gas Plant
Perimeter and the area up to the downstream pipeline to verify the tower
DATE
height requirements prior to system installation.
CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 8
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

3.2 Transmitter Noise and Desensitization Analysis


CERT

ZHK

Contractor shall perform Transmitter Noise and Receiver Desensitization


ENG’G

analysis to confirm that the antenna system provides sufficient isolation


RJV

and will not cause transmitter and receiver performance degradation. If


any problems do arise, they shall be analyzed and solutions be provided.

3.3 Traffic Analysis


DESCRIPTION

Contractor shall perform the required analysis to derive the user profile
such as call types, duration, and call rates to incorporate the effect of
additional users and traffic channels. The following shall be identified:
Issued for Bid

‰ The total traffic load the system can support with the available traffic
channels

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
‰ The maximum number of users that can be served given the available
10-00914/302-0001

traffic channels.
JO/EWO NO.

If the required Grade of Service (GoS) could not be achieved, Contractor


shall highlight findings and provide recommendations to Saudi Aramco.

3.4 Operating Frequencies and Bandwidth


DATE

05/27/10

System shall operate in the UHF band in the 410-430 MHz range with 25
kHz channel bandwidth subject to local government authority’s final
REV
NO.

approval.
0

DRAWN

DATE
Contractor shall submit the Wasit frequency plan and requirements to BI-
CHECKED
10-00112 based on the Coverage/Interference Analysis.
BY
DATE
3.5 Telephone Interconnects
DISCIPLINE
ENGINEER System shall include optional feature for radio users providing capability of
DATE dialing into the Saudi Aramco Telephone System and PSTN telephone
network to make phone calls. A radio user with the proper authorization
PROJECT
ENGINEER may call a Saudi Aramco Telephone system extension or PSTN number
DATE via the site telephone system by dialing pre-assigned access codes.
Radio users are capable of receiving calls from any Telephone system
CERTIFIED
extension or PSTN telephone. Radio shall be able to display incoming and
DATE out-going phone numbers.
CONSTRUCTION
AGENCY Telephone network interface at Ras Tanura SCN will be provided under
DATE BI-10-00112. Contractor shall determine the number of users with access
OPERATIONS
to the PSTN via the TETRA network and submit a plan.

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 9
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

3.6 Network Management System


CERT

ZHK

Network Management System will be provided by BI-10-00112. System


architecture shall allow for channel reuse. A network operator at Ras
ENG’G

RJV

Tanura SCN shall be able to perform on the Wasit TETRA network the
following functions:
‰ Define groups and sub groups
‰ Control how the network works
DESCRIPTION

‰ Diagnose network faults


‰ Collect traffic information
Issued for Bid

3.7 Base Station Specifications

Base Station shall be designed according to the TETRA Standards.

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
Signaling over the air shall be compliant with ETSI 300392-2. System shall
10-00914/302-0001

be based on the EADS TETRA system or equivalent.


JO/EWO NO.

The Base Station shall be installed inside the MTER. All equipment will be
housed inside standard 19”/23” rack mountable cabinets. All Base Station
modules shall be equipped with front panel LED displays indicating their
operating status.
DATE

05/27/10

Base Station shall operate in:


REV
NO.

DRAWN ‰ Normal Trunked Mode where it is controlled by and reports to Ras


DATE Tanura SCN
CHECKED ‰ Fallback Mode where the Ras Tanura SCN loses link to the other
BY
DATE
SCNs. Radios will still operate in the trunked mode but cannot
communicate with other individuals and Base Stations of the other
SCNs. Radios shall display the Fallback Mode status to their users
DISCIPLINE
ENGINEER whenever the Base Station is in this mode
DATE ‰ Local Mode where a transceiver operates separately from the normal
PROJECT
traffic for maintenance purposes
ENGINEER
The Base station consists of the following main components:
DATE

CERTIFIED 3.7.1 Transceivers


DATE
The Base Station will have three transceiver cards with a 6-receiver
CONSTRUCTION
AGENCY
diversity enabled per carrier. The receiver diversity shall use cross-
DATE
polarization and/or omni directional antenna configurations that provide the
best coverage reception for uplink and downlink radio communications.
OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 10
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

The transceiver shall have the following minimum features:


CERT

ZHK

‰ Frequency Range: 410-430 MHz


‰ Channel Spacing: 25 kHz
ENG’G

RJV

‰ Channel Bandwidth: 25 kHz


‰ Modulation: π/4 DQPSK
‰ Input Power: -48 VDC
‰ Transmit Power: Minimum of 25 W at antenna port
DESCRIPTION

‰ Duty Cycle: 100%


‰ Spurious Output: -60 dBC adjacent channel
Issued for Bid

-70 dBC second channel


‰ Receiver Static Sensitivity: -115 dBm (4% BER) or better

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
‰ Receiver Dynamic Sensitivity: -109 dBm (4% BER) or better
10-00914/302-0001
JO/EWO NO.

‰ Temperature Range Operation: -20°C to +55°C


‰ Storage: -30°C to +70°C
‰ Relative Humidity: 10% to 95% at 50°C, non-condensing
DATE

05/27/10

3.7.2 Base Station Controller

A switch based, IP capable Base Station Controller is the heart of the


REV
NO.

DRAWN TETRA system at the Wasit Gas Plant. It controls the local radio traffic as
DATE well as all in-bound/outbound communications to other Base Stations.
CHECKED

BY The controller shall have the following minimum features:


DATE
‰ High performance PC platform
DISCIPLINE ‰ Input Voltage: -48 VDC
ENGINEER

DATE ‰ Windows operating system


PROJECT ‰ Compact flash disk
ENGINEER

DATE
‰ Ethernet 10/100 Mbit Interfaces, RJ 45 Connectors

CERTIFIED
‰ Four E1 interfaces 75/120 ohm
DATE ‰ Operations and Maintenance interface via RS232 or TCP/IP
CONSTRUCTION ‰ Automatic switch over to a redundant Controller at failure
AGENCY

DATE
If during the time of construction, the SCN or the Controller is not yet IP
capable, the Contractor shall provide Ethernet to E1 converters to
OPERATIONS
interconnect the Wasit Gas Plant Base Station and Ras Tanura SCN.
DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 11
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

3.7.3 RF Distribution System


CERT

ZHK

System final configuration shall be determined during detailed design and


after the propagation study to determine the equipment needed for area
ENG’G

RJV

coverage with minimum output RF power possible.

System shall consist of the following components:

3.7.3.1 Antenna System


DESCRIPTION

The antenna system includes, but not limited to, the following components:
‰ Antennas
Issued for Bid

‰ Transmission coaxial cables


‰ Combiner/Multi-Coupler

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
10-00914/302-0001

The antenna system shall have the following minimum features:


JO/EWO NO.

‰ Frequency Range: 410-430 MHz


‰ Transmit Antenna: Omni directional
‰ Receive Antenna: 3 high gain X polarized directional
DATE

05/27/10

panel and/or omni directional antennas


configuration for best coverage
REV
NO.

‰ Gain: 8 dBd or as required


0

DRAWN

DATE
‰ Max Power Input: 300 Watts
CHECKED ‰ VSWR: Less than 1.5:1 @ 50 ohms
BY
DATE ‰ Minimum Stand-Off: ¼ Wavelength
‰ Lightning Protection: Direct ground protection to radio tower
DISCIPLINE
ENGINEER ‰ Connector Input: Type N-male connector on antenna
DATE base
PROJECT ‰ Polarization: Vertical
ENGINEER

DATE ‰ Rated Wind Velocity: 270 km/hr


CERTIFIED ‰ Environment: Suitable for high saline and dusty type
DATE ‰ Antenna Structure: EIA Standard RS-329
CONSTRUCTION
AGENCY
‰ Mounting Hardware: Clams and hardware to adapt to
specific radio tower/pole
DATE
‰ Transimission Lines Foam-dielectric, Coaxial
OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 12
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

Minimum 7/8” for < 100m length


CERT

ZHK

Minimum 1¼” for > 100 m length


Maximum loss of 1.76dB/100m at
ENG’G

RJV

400MHz

Maximum permissible twist and tilt angle for tower installed antennae will
be ± 0.5°. Ensure antennae mounting brackets comply with these
parameters.
DESCRIPTION

The combiner/multi-coupler shall have the following minimum features:


‰ Resonant-cavity, expandable, auto-tune
Issued for Bid

‰ Maximum Insertion Loss: 3.5 dB

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
‰ Receiver multi-coupler with pre-selector filter, expandable
‰ Adjacent channel separation: ≤ 180 kHz
10-00914/302-0001
JO/EWO NO.

3.7.3.2 RF Signal Enhancers


37 signal extenders shall be provided for all PIBs, Substations, and
manned buildings. System consists, but not limited to, the following
DATE

05/27/10

components:
‰ Indoor antennas, ceiling mounted, as required
REV
NO.

DRAWN
‰ Outdoor antennas mounted on a pole on top of the buildings
DATE

CHECKED
‰ Transmission coaxial cables (Refer to Sec. 3.6.5.1)
BY ‰ Signal enhancer
DATE

Signal enhancer shall have the following minimum features:


DISCIPLINE
ENGINEER
‰ Solid state
DATE ‰ Frequency: 410-430 MHz
PROJECT ‰ Frequency Stability: ±0.0002%
ENGINEER

DATE ‰ Input Power: -48 VDC


CERTIFIED ‰ Frequency Synthesized Transceivers
DATE ‰ Cabinet-mounted
CONSTRUCTION
AGENCY
‰ Continuous Duty Operation
DATE ‰ Temperature Range: Operation: -20°C to +55°C
OPERATIONS ‰ Storage: -30°C to +70°C

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 13
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

‰ Relative Humidity: 10% to 95% at 50°C, non-condensing


CERT

ZHK

Below is a list of buildings requiring signal enhancers:


ENG’G

RJV

Building
# Building #

Wasit In-Plant Facilities:


DESCRIPTION

1 Central Control Building (CCR) 555


2 Operat., Maint., Plann., & Eng.-1 370
3 Operat., Maint., Plann., & Eng.-2 371
Issued for Bid

4 Operat., Maint., Plann., & Eng.-3 373


5 Operat., Maint., Plann., & Eng.-4 369

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
6 Maintenance Service Building 1 470
7 Maintenance Service Building-2 469
10-00914/302-0001
JO/EWO NO.

8 Maintenance Service Building 3 473


9 Maintenance Service Building 4 471
10 Process Interface Building-Train 100 571
11 Process Interface Building-Train 200 572
12 Process Interface Building-Train 300 573
DATE

05/27/10

13 Process Interface Building-Train 400 574


14 Process Interface Building-Inlet & Outlet 550
REV
NO.

DRAWN 15 Process Interface Building-Power & Utilities 500


DATE 16 Process Interface Building-Cogen 510
CHECKED 17 Process Interface Building-SRU 1 & SRU 2 552
BY
DATE
18 Process Interface Building-SRU 3 & SRU 4 554
19 Process Interface Building-1Sulphur Handling 580
20 Process Interface Building - Inlet & Outlet - NGL 570
DISCIPLINE
ENGINEER 21 230kV Main Substation 200
DATE 22 Utilities Plant Substation 210
PROJECT 23 13.kV Distribution Substation-1 220
ENGINEER
24 Utilities Plant Substation 230
DATE
25 13.kV Distribution Substation-2 240
CERTIFIED 26 Sulfur Plant Substation 250
DATE 27 13.8/4.16/0.48kV Train-100 Substation 261
CONSTRUCTION
28 13.8/4.16/0.48kV Train-200 Substation 262
AGENCY
29 13.8/4.16/0.48kV Train-300 Substation 263
DATE
30 13.8/4.16/0.48kV Train-400 Substation 264
OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 14
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

Building
CERT

# Building #
ZHK
ENG’G

31 NGL Fractionation Substation 270


RJV

32 Operator/Supervisor Shelter-1 390


33 Operator/Supervisor Shelter-2 368
34 Operator/Supervisor Shelter-3 OSOS 3
35 Operator/Supervisor Shelter-4 OSOS 4
DESCRIPTION

36 Operator/Supervisor Shelter-5 333


Issued for Bid

3.8 Dispatcher Console

Two switch-based, IP capable Dispatch Consoles that are based on EADS

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
technology or equivalent shall be installed: one in the Control Room and
one in the Disaster Control Center. Dedicated dispatch personnel will be
10-00914/302-0001
JO/EWO NO.

assigned at both locations to monitor the system. A console shall consist


and not limited to the following components:
‰ Industrial standard multimedia PC platform
‰ Touch screen display
DATE

05/27/10

‰ Keyboard, Mouse
‰ Table Microphone
REV
NO.

DRAWN ‰ Table Push-to-talk switch


DATE
‰ Foot Push-to-talk switch
CHECKED

BY ‰ External Speaker
DATE
‰ Headset
DISCIPLINE ‰ Smart Card Reader Access
ENGINEER

DATE ‰ Select and Unselect Speakers


PROJECT ‰ Windows Operating System
ENGINEER

DATE
‰ Ethernet 10/100 Mbit Interface, RJ 45 Connector

CERTIFIED
‰ 4 USB 2.0 ports, 9 pin serial, parallel ports
DATE ‰ One Gigabyte RAM
CONSTRUCTION ‰ 250 Gigabyte Internal Hard Drive, 7200 RPM
AGENCY

DATE
‰ CD-RW/DVD Combo Drive
OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 15
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

Dispatcher Consoles shall have the following minimum functions:


CERT

ZHK

‰ Place and receive individual and group calls in voice and data
communication modes
ENG’G

RJV

‰ Create, modify, and delete radio subscribers and groups; modify their
call rights and attributes
‰ Create and modify network parameters
‰ Display activity log windows (on the monitor) for every call activity.
Display the corresponding talk-group, radio aliases, call type, and time
DESCRIPTION

of day
‰ Setup a minimum of 10 connections involving PSTN users in a non-
Issued for Bid

blocking configuration
‰ Call other Dispatcher Console operators

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
‰ Access conventional external networks
10-00914/302-0001

‰ Identify all emergency calls


JO/EWO NO.

‰ Track and identify status of all users whenever they log-onto the
system and display a time-stamp
Contractor shall provide the required Ethernet Switches or equivalent
hardware for Controller to Console fiber optic communications between the
DATE

05/27/10

MTER and CCR.


REV
NO.

3.9 Logging Recorder


0

DRAWN

DATE A digital logging recorder will be provided at Ras Tanura SCN by BI-10-
CHECKED 00112.
BY
DATE
Contractor shall upgrade the logging recorder and provide licenses as
required to accommodate the Wasit Gas Plant traffic requirements.
DISCIPLINE
ENGINEER

DATE
3.10 Radio Specifications

PROJECT All radios shall feature the following:


ENGINEER

DATE
‰ Conventional Operation
CERTIFIED ‰ Repeater Talk Around
DATE ‰ Operator Emergency/Alert
CONSTRUCTION
AGENCY
‰ Individual Call
DATE ‰ Group Call
OPERATIONS ‰ Call to public network and emergency

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 16
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

Radios shall be intrinsically safe, based on the EADS TETRA systems or


equivalent.
CERT

ZHK

3.10.1 Fixed Desktop Radios


ENG’G

RJV

8 fixed desktop radio workstations will be installed: 7 at the CCR Operator


Consoles, and 1 at the Fire Station.

The fixed desktop radios shall have the following minimum features:
DESCRIPTION

‰ Frequency Range 410-430 MHz in Trunked Mode


406-430 MHz in Conventional Mode
Programmable
Issued for Bid

‰ Channel Spacing 25 kHz

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
‰ Channel Bandwidth 25 kHz
‰ Frequency Stability ±0.0002%
10-00914/302-0001
JO/EWO NO.

‰ Modulation π/4 DQPSK


‰ Input Voltage/Frequency 110 – 220 VAC, 50-60 Hz
‰ Transmit Power Minimum of 10 W with adaptive power
control
DATE

05/27/10

‰ Receiver Static Sensitivity -112 dBm (4% BER) or better


REV

‰ Radio Mounting Table top installation


NO.

DRAWN

DATE
‰ Coax Cable, flexible, 12.5 mm (1/2”) low loss foam dielectric (50 ohm),
N-type connectors complete with hanging hardware
CHECKED

BY ‰ Channel Scan Capable


DATE
‰ Alphanumeric Display
DISCIPLINE ‰ DTMF Keypad (back-lit)
ENGINEER

DATE ‰ External Speaker 7 Watt


PROJECT ‰ Audio Distortion < 5%
ENGINEER

DATE
‰ Detachable Microphone with coil cord

CERTIFIED
‰ Tone Coded Squelch (Programmable)
DATE ‰ Temperature Range Operation -20°C to +55°C
CONSTRUCTION ‰ Storage -30°C to +70°C
AGENCY

DATE
‰ Relative Humidity 10% to 95% at 50°C, non-condensing
OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 17
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

3.10.2 Vehicle-Mounted Mobile Radios


CERT

ZHK

A total of 23 vehicle-mounted mobile radios shall be provided. The vehicle-


ENG’G

mounted mobile radios are multi-channel, compact in size, fully


RJV

synthesized, supplied with visual alphanumeric display and all required


mounting hardware for a complete installation with mobile vehicles. Radios
include all controls, accessories, inter-cabling, antenna, and radio
mounting adapter.
DESCRIPTION

The vehicle-mounted mobile radios shall have the following minimum


features:
‰ Frequency Range 410-430 MHz in Trunked Mode
Issued for Bid

‰ 406-430 MHz in Conventional Mode Programmable

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
‰ Channel Spacing 25 kHz
‰ Channel Bandwidth 25 kHz
10-00914/302-0001
JO/EWO NO.

‰ Frequency Stability ±0.0002%


‰ Modulation π/4 DQPSK
‰ Input Power 13.8 VDC ± 10% at 3 Amp
DATE

05/27/10

‰ Transmit Power Minimum of 10 W with adaptive power


control
REV
NO.

‰ Receiver Static Sensitivity -112 dBm (4% BER)


0

DRAWN

DATE
‰ Receiver Dynamic Sensitivity -103 dBm (4% BER)
CHECKED ‰ Radio Mounting Dash or Trunk Mounted
BY
DATE ‰ Antenna Vehicle Mounted for optimum radio
signal
DISCIPLINE
ENGINEER
‰ Antenna Gain 5 dBi minimum
DATE ‰ Coax Cable, 3 m long flexible, 12.5 mm (1/2”) low loss foam dielectric
PROJECT
(50 ohm), N-type connectors complete with hanging hardware
ENGINEER
‰ Channel Scan Capable
DATE
‰ Alphanumeric Display
CERTIFIED

DATE
‰ DTMF Keypad (back-lit)

CONSTRUCTION
‰ External Speaker 7 Watt
AGENCY
‰ Audio Distortion < 5%
DATE
‰ Detachable Noise Cancelling Microphone with coil cord, push-to-talk
OPERATIONS
button
DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 18
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

‰ Tone Coded Squelch (Programmable)


CERT

ZHK

‰ Temperature Range Operation: -20°C to +55°C


‰ Storage: -30°C to +70°C
ENG’G

RJV

‰ Relative Humidity 10% to 95% at 50°C, non-condensing


‰ Shock and Vibration EIA-603 or equivalent

3.10.3 Hand-held Radios


DESCRIPTION

A total of 61 hand-held mobile radios shall be provided. The portable hand-


held radios are fully synthesized, state-of-the art, rugged equipment.
Radios include visual channel displays on the front of the radio indicating
Issued for Bid

the current operating mode and an indication of low battery voltage. All
portable hand-helds are intrinsically safe radios and have heavy-duty

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
batteries.
10-00914/302-0001

The hand-held radios shall have the following minimum features:


JO/EWO NO.

‰ Frequency Range 410-430 MHz in Trunked Mode


406-430 MHz in Conventional Mode
Programmable
DATE

05/27/10

‰ Channel Spacing 25 kHz


‰ Channel Bandwidth 25 kHz
REV
NO.

DRAWN
‰ Frequency Stability ±0.0002%
DATE ‰ Modulation π/4 DQPSK
CHECKED
‰ Transmit Power Minimum of 0.6 Watt with adaptive
BY
DATE power control of 3 steps of 5dB
‰ Receiver Static Sensitivity -112 dBm (4% BER)
DISCIPLINE
ENGINEER ‰ Receiver Dynamic Sensitivity -103 dBm (4% BER)
DATE
‰ Antenna High Gain Helical Type
PROJECT
ENGINEER ‰ One Battery Spare per radio
DATE
‰ Battery Capacity ≥ 900mAh with 10/10/80 duty cycle for
CERTIFIED 8 hours of continual use
DATE ‰ Single rapid battery charger 110 – 220 VAC, 50-60 Hz with US type
CONSTRUCTION
plugs, 220 VAC European adapters in
AGENCY limited quantities
DATE
‰ Charging time < 2.5 hrs
OPERATIONS
‰ Channel Scan Capable
DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 19
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

‰ Alphanumeric Display
CERT

ZHK

‰ DTMF Keypad (back-lit)


‰ Audio Distortion <5%
ENG’G

RJV

‰ Detachable Microphone with coil cord


‰ Tone Coded Squelch (Programmable)
‰ Intrinsically Safe Conforms to:
NEC 505 Class I, Division I
DESCRIPTION

z Gas Groups C&D (Ethylene and Propane) and ATEX Class I,


Zone I
Issued for Bid

z Gas Groups IIb (Ethylene and Propane)


‰ Temperature Range Operation: -20°C to +55°C

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
‰ Storage: -30°C to +70°C
10-00914/302-0001

‰ Relative Humidity 10% to 95% at 50°C, non-condensing


JO/EWO NO.

‰ Shock and Vibration EIA-603 or equivalent


‰ Rain MIL-STD 810E, Method 506.3,
Procedure I and II or equivalent
DATE

‰ Salt Fog MIL-STD 810E, Method 509.3,


05/27/10

Procedure I, or IEC529 IP54


REV

‰ Sand and Dust MIL-STD 810E, Method 510.3,


NO.

DRAWN Procedure I
DATE
‰ Compact, rugged, and lightweight
CHECKED

BY ‰ Dimensions Nominal 165 x 62 x 48 mm with battery


DATE
or smaller

DISCIPLINE 3.11 System Monitoring


ENGINEER

DATE
Radio System is to provide a monitoring feature of all system equipment
PROJECT status.
ENGINEER

DATE
4.0 INSTALLATION
CERTIFIED

DATE
4.1 General

CONSTRUCTION
AGENCY
Contractor shall install all equipment required by this specification to
produce a fully functioning system ready for handover to Saudi Aramco.
DATE

OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 20
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

Fully trained personnel who are familiar with the systems, equipment and
installation techniques, shall carry out the installation.
CERT

ZHK

Installation work shall be performed in a workmanlike manner, using best


ENG’G

RJV

practice methodology and adhering to the requirements of Saudi Aramco


Standards.

Equipment, materials, devices and facilities shall meet the following


minimum requirements:
DESCRIPTION

‰ Manufactured by experienced manufacturers of the specific


components and facilities
‰ Design shall minimize the requirement for field repair or maintenance
Issued for Bid

‰ Modular design

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
‰ Internal or self-diagnostics for component failures
‰ Maintainable on a unit basis without affecting the ongoing operation of
10-00914/302-0001
JO/EWO NO.

the balance of other systems


‰ Modular components, test ports and cable terminations shall be
accessible
‰ Damage caused by the failure of one component shall be limited to the
DATE

05/27/10

component that has failed, without affecting the ongoing operation of


the overall system.
REV
NO.

Equipment, devices and enclosures in open accessible and process areas


0

DRAWN
shall be secured with tamper proof fasteners.
DATE

CHECKED
Contractor shall verify the mounting locations with Saudi Aramco prior to
BY
DATE installation. Contractor shall notify Saudi Aramco if a particular location is
not suitable for the application.
DISCIPLINE
ENGINEER Contractor shall label each wire and cable on each end indicating the wire
DATE designation that appears in the System Design Manual and/or wiring and
cabling schedule. The labeling shall be identical in nomenclature and all
PROJECT
ENGINEER labels shall be typed and covered with transparent heat-shrinkable tubing.
DATE
Contractor shall neatly arrange all cable on cable ladder rack, cable tray,
CERTIFIED
or supports and prevent twisting and unnecessary crossover of cables. All
DATE signal cables and wiring shall be secured with lace twine or, in isolated
CONSTRUCTION
cases, tie wraps.
AGENCY

DATE Where necessary, the installation shall include the integration of the
OPERATIONS
equipment being supplied into an existing system.

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 21
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

Electromagnetic shielding and filtering shall be installed on all coaxial


cables.
CERT

ZHK

Contractor shall provide concise installation records for maintenance and


ENG’G

RJV

future trouble shooting purposes.

4.2 Safety and Security Requirement

Saudi Aramco places a very high onus upon all of its employees and its
contractors and their staff to conduct their business with safety and
DESCRIPTION

security as paramount considerations.

Ensure safety rail for climbing and maintenance operations, complete with
Issued for Bid

climbing harness are included.

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
The equipment supplied shall operate without creating a hazard to the user
directly and/or other third parties.
10-00914/302-0001
JO/EWO NO.

Hazard warning labels shall be affixed to the equipment to advise of any


feature of the equipment that may cause potential injury to the user or
maintenance personnel.

Maintenance manuals and other documentation must highlight any


DATE

05/27/10

potential dangers that may be encountered during the servicing or repair of


the equipment.
REV
NO.

DRAWN

DATE
Contractor shall perform all activities in accordance with Saudi Aramco
safe working procedures.
CHECKED

BY
DATE Contractors shall fully comply with the statutory requirements of the Saudi
Arabian Government Supreme Commission for Industrial Security, Safety
DISCIPLINE
and Security Directives pertaining to communications sites.
ENGINEER

DATE Contractor staff shall obtain clearance to gain entry to all sites and carry
PROJECT
suitable identification at all times.
ENGINEER

DATE Many of the Saudi Aramco communications systems are regarded as


critical. Contractor shall take all precautions to avoid disruption to traffic.
CERTIFIED

DATE
4.3 Material Included
CONSTRUCTION
AGENCY Contractor shall provide all necessary equipment and installation materials
DATE necessary for a fully functioning system. This may include, but is not
OPERATIONS
limited to the following items:

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 22
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

‰ Equipment mounting racks, shelves, or brackets


CERT

ZHK

‰ Antennae with mounting brackets


‰ Rack wiring, inter-equipment wiring and inter-rack wiring
ENG’G

RJV

‰ Jack fields, panels and terminal blocks


‰ Building cabling, power supply cabling, signal cabling
‰ Patch cords and cable
‰ Cable trays, cable racks, and conduits
DESCRIPTION

‰ Signal and power receptacles/outlets


‰ Fixings and fasteners
Issued for Bid

‰ Equipment and cable identification labels


‰ An equipment safety and signal grounding system and the connection

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
of the equipment to it, or connection to an existing system
10-00914/302-0001
JO/EWO NO.

4.4 Plant Tagging

Contractor is responsible for labeling all cables with cable markers


provided by Saudi Aramco.
DATE

05/27/10

Cable markers will be assigned by Saudi Aramco and shall be affixed by


Contractor.
REV
NO.

DRAWN Verification of cable marking shall be carried out as part of the Mechanical
DATE Completion inspection.
CHECKED

BY
DATE
5.0 INSPECTION AND TESTING
5.1 General
DISCIPLINE
ENGINEER

DATE
Contractor shall develop a system test plan, test schedule, and test
procedures for each of the following test activities.
PROJECT
ENGINEER
Contractor shall be responsible for ensuring conformance to
DATE
specification(s) and standards. Completion of inspections shall not relieve
CERTIFIED Contractor of the ultimate responsibility for equipment conformance.
DATE Inspection and testing requirements shall be in accordance with all
relevant Saudi Aramco inspection requirements and the applicable
CONSTRUCTION
AGENCY specifications, to the relevant sections of this specification and the data
DATE
sheets.
OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 23
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

Contractor shall be responsible for coordinating the inspection and testing


of all supplied equipment. Contractor shall ensure that Saudi Aramco
CERT

ZHK

representatives are given the necessary access for inspection, and


adequate warning of inspection and witness tests.
ENG’G

RJV

The system test plans, schedules, and procedures shall be provided to


Saudi Aramco Industrial Security Operations for review and approval prior
to conducting the tests. The test plan/procedure shall be submitted to
Saudi Aramco no later than 16 weeks before the test date.
DESCRIPTION

Contractor shall inspect the equipment for compliance with:


‰ Approved for construction drawings, latest revision
Issued for Bid

‰ Requirements of the requisition and agreed correspondence thereafter


‰ Applicable standards, which shall also include the sub-referenced

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
standards herein and specifications
10-00914/302-0001

‰ Test and inspection plans produced by, and as part of, the Quality Plan
JO/EWO NO.

All measuring instruments required for shop testing shall be supported by


valid calibration certification.
DATE

05/27/10

All spare parts shall be subject to the same inspection standards and full
material certification as the main Radio system order.
REV
NO.

DRAWN Contractor shall give a minimum of 30 working days notice prior to carrying
DATE out any tests on the equipment covered by this specification.
CHECKED

BY Representatives of Saudi Aramco must witness all test activities.


DATE

5.2 QA/QC Requirements


DISCIPLINE
ENGINEER
Contractor shall operate a Quality System in accordance with Contract
DATE
Schedule ‘Q’.
PROJECT
ENGINEER
All equipment, the principal manufacturing steps, type of inspection/test,
DATE
the controlling procedure, and the acceptance standard shall be defined in
CERTIFIED an Inspection and Test Plan (ITP). The ITP shall include a space for
DATE
Contractor/Saudi Aramco to advise inspection, Hold/Witness points, and
whether the inspection shall be by Contractor, third party, or Saudi
CONSTRUCTION
AGENCY
Aramco.
DATE

OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 24
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

Contractor may use their standard format ITP, provided the content
includes (and references) the information and all requirements of the Saudi
CERT

ZHK

Aramco Form 175.


ENG’G

RJV

5.3 Commissioning

Contractor is ultimately responsible for delivering a fully functional system


that meets all the requirements of this specification and all applicable
standards. The commissioning process demonstrates this to Saudi
Aramco before handing over the system.
DESCRIPTION

The process of system commissioning shall consist of a number of


different activities, culminating in the acceptance of the operational system
Issued for Bid

by Saudi Aramco.

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
Any piece of equipment, device, or material shall be made available for
inspections or tests, as deemed necessary by Saudi Aramco. Use of the
10-00914/302-0001

equipment, devices or material shall not imply acceptance of the system or


JO/EWO NO.

acceptability of any component. Availability and demonstration of the


systems shall not be withheld, and the use of components shall not imply
the start of the Warranty Period.

Contractor shall make available all necessary testing equipment such as


DATE

05/27/10

calibrated instruments, platforms and ladders, as necessary to


satisfactorily demonstrate the acceptability of the components and
REV
NO.

systems. Instrumentation to be used for testing shall be calibrated or


0

DRAWN

DATE
supplied by an approved laboratory or manufacturer.
CHECKED
Contractor shall make available all necessary personnel required to carry
BY
DATE out the commissioning and acceptance testing.

DISCIPLINE
Installation, engineering, software and system personnel shall be available
ENGINEER on-site during any testing carried out under this section. Such personnel
DATE shall be familiar with the installation and function of the Radio TETRA
PROJECT
system, and shall undertake all tests as requested, in order to verify that
ENGINEER the Radio system components individually and as a whole, meet the
DATE specifications.
CERTIFIED
5.4 Factory Acceptance Testing (FAT)
DATE

CONSTRUCTION
Factory Acceptance Testing (FAT) shall demonstrate that the Radio
AGENCY system meets the functional and operational requirements established in
DATE this specification. FAT procedures shall be issued for Saudi Aramco
OPERATIONS
CE&TSD approval four (4) months prior to FAT.

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 25
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

System hardware and software components shall be tested in-factory prior


to shipment and shall be witnessed by Wireless Engineering Group
CERT

ZHK

representative of CE&TSD to ensure system compliance and performance


with Saudi Aramco and TETRA standards
ENG’G

RJV

Contractor shall provide documentation (test reports) and certification of


Factory Acceptance Testing. All test failures, discrepancies, and issues
resulting from FAT shall be resolved prior to shipment of the system.
FAT shall include and demonstrate the following:
DESCRIPTION

‰ Functionality of all radio devices


‰ Functionality of all system devices
Issued for Bid

‰ Operation of a radio under trunked mode and conventional mode

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
5.5 Field Testing
10-00914/302-0001
JO/EWO NO.

Field Functional Testing of system components shall be conducted during


the installation.

Test procedures shall contain as a minimum:


‰ Type of test (i.e. RF Transmit and Received Signal Strength
DATE

05/27/10

Indications, Frequency measurements, Interference Analysis, etc…)


‰ Name of systems’ equipment or system to be tested
REV
NO.

DRAWN
‰ System and equipment configuration
DATE

CHECKED
‰ Parameters to test (shall conform to applicable ITU-G
BY
recommendations
DATE
‰ Test conditions
DISCIPLINE ‰ List of required test equipment and materials
ENGINEER

DATE
‰ Explanation and diagrams of the test set-up

PROJECT
‰ Pass/fail criteria for each test
ENGINEER
‰ Test record forms for each test
DATE

CERTIFIED 5.6 Site Acceptance Testing


DATE
Site Acceptance Testing (SAT) shall be conducted on-site after Radio
CONSTRUCTION
AGENCY
system installation, operation and completion of three (3) month "burn-in”
period.
DATE

OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 26
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

A representative of Saudi Aramco shall witness Radio Site Acceptance


Testing.
CERT

ZHK

Radio system shall be considered completed only by means of the SAT


ENG’G

RJV

approval, signed-off by Saudi Aramco Representative.

Contractor shall provide to Saudi Aramco, a test plan describing the


acceptance test procedures.
Acceptance testing shall at minimum include and demonstrate the
DESCRIPTION

following:
‰ Voice and data communications between all radio devices and the
Wasit Gas Plant Base Station
Issued for Bid

‰ Communications between any radio that falls inside the WASIT Gas
Plant coverage area (determined by the theoretical/field analysis) and

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
any radio on the Saudi Aramco network including and not limited to the
Berri Gas Plant and Khursaniya Gas Plant
10-00914/302-0001
JO/EWO NO.

‰ Group Calling
‰ Emergency Calling
‰ Conventional Mode Calling
‰ Access to the Saudi Aramco PSTN by any radio user in the coverage
DATE

05/27/10

area
‰ System control, configuration, management, and monitoring by a
REV
NO.

DRAWN Dispatcher Console Operator


DATE
‰ System redundancy
CHECKED

BY
DATE
5.7 Hardware Component Testing

All Commercial-Of-The-Shelf (COTS) hardware components shall be


DISCIPLINE
ENGINEER tested in-plant for proper function prior to shipment.
DATE
Contractor shall provide documentation of hardware performance testing.
PROJECT
ENGINEER
5.8 Software Verification Testing
DATE

CERTIFIED All COTS software shall be verified in-plant for proper function prior to
DATE shipment.
CONSTRUCTION
AGENCY Contractor shall provide documentation of software verification testing.
DATE

OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 27
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

5.9 Mechanical Completion Certificate (MCC)


CERT

ZHK

Mechanical completion is the acceptance that the physical installation


ENG’G

conforms to Saudi Aramco standards, and that all required equipment has
RJV

been provided and is plant tagged.

Saudi Aramco inspection shall take place in the presence of Contractor.


The inspector shall prepare an exception list, detailing all violations of the
standards.
DESCRIPTION

Failure to identify any error or omission during inspections made in the


installation phase, shall not relieve the Contractor of any of the
Issued for Bid

specification requirements.

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
Once the “Yes” exception list is cleared, the Mechanical Completion
Certificate can be issued and the Commissioning can proceed to the Site
10-00914/302-0001

Acceptance Test.
JO/EWO NO.

The Radio system MCC shall be considered complete only when the SAT
approval has been signed-off by a Saudi Aramco representative.
DATE

5.10 Performance Acceptance Testing (PAT)


05/27/10

Performance Acceptance Tests, as specified in Saudi Aramco General


REV
NO.

Instruction 2.710, shall be passed prior to formal handover of the system.


0

DRAWN

DATE
Contractor obligations (Material and Non-material) shall be considered
CHECKED
fulfilled only by means of the Performance Acceptance Test (PAT)
BY
DATE approval, signed-off by Saudi Aramco.

Contractor shall carry out the PAT in the presence of Saudi Aramco
DISCIPLINE
ENGINEER personnel, who will certify the acceptance of the system on a test-by-test
DATE basis.
PROJECT
ENGINEER Contractor shall guarantee performance of the supplied equipment in
DATE accordance with the requirements of the Radio system and Tower FSD. If
the required performance is not achieved, Contractor shall implement all
CERTIFIED
required modifications at his expense.
DATE

CONSTRUCTION 6.0 DOCUMENTATION


AGENCY

DATE As a minimum, the following documents and drawings shall be provided for
OPERATIONS
SLI review:

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 28
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT

‰ Equipment lists indicating manufacturer, type, part numbers, tag


numbers
CERT

ZHK

‰ Data sheets for all system components


ENG’G

RJV

‰ Wiring and interconnection diagrams


‰ Instructions, configurations, and maintenance manuals
‰ Installation details
Contractor shall submit a complete set of manufacturer books, in electronic
DESCRIPTION

and hardcopy, in the quantities and formats specified in purchase order


document list.
Issued for Bid

As a minimum, the books shall include the final revision of the above listed
documents.

THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
6.1 Drawings
10-00914/302-0001
JO/EWO NO.

Complete drawing packages shall be provided. Information contained in


these drawings will be used to update purchaser's drawings.

6.2 System Drawings


DATE

System wiring schematic shall be provided showing all major components.


05/27/10

6.3 Rack Face Elevation (RFE) Drawings


REV
NO.

DRAWN
RFE drawings shall be provided for each bay. All major components shall
DATE
be shown including module and part numbers.
CHECKED

BY
DATE 6.4 As-Built Drawings

Red-lined drawings shall be provided during construction and as-built


DISCIPLINE
ENGINEER drawing shall be submitted prior to project completion.
DATE
6.5 Installation Drawings
PROJECT
ENGINEER
Installation drawings shall be provided for all equipment bays.
DATE

CERTIFIED 6.6 Manuals


DATE
The following shall be included in the System Design Manual: Instruction,
CONSTRUCTION
AGENCY
operation, and installation manuals shall be provided for all equipment.
DATE

OPERATIONS

DATE

WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED All Program
FOR
CONSTRUCTION Q76 T PP-118324 29
0
UNTIL CERTIFIED of
AND DATED. 29
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914/302-0001