T962472001P00 TELECOMMUNICATIONS-signed
T962472001P00 TELECOMMUNICATIONS-signed
T962472001P00 TELECOMMUNICATIONS-signed
OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG'G CERT
KHP
SAA
BILL OF MATERIAL
DESCRIPTION
BI-11-20034
TELECOMMUNICATIONS MTO
JO/EWO
DISCIPLINE
ENGINEER
25-Mar-21
DATE
PROJECT
ENGINEER
SAA
25-Mar-21
DATE
CERTIFIED
KHP
25-Mar-21
DATE
CONSTRUCTION
AGENCY
MMS
DATE 1-Apr-21
OPERATIONS UMM WU'AL WELLS MANIFOLDS AND PIPELINES
PLP TURAIF
8-Apr-21
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
BILL OF MATERIAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
TELECOMMUNICATIONS MTO DOC 1
N54 A TD-962472
UMM WU'AL WELLS MANIFOLDS AND PIPELINES OF 00
TURAIF SAUDI ARABIA JO / EWO: 11-20034-2002 7
Rev: S1 CLASS: 1 DSN: 1657
Saudi Aramco 6228-ENG (11/2010)
OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG'G CERT
KHP
TABLE OF CONTENTS
SAA
25-Mar-21
DATE
REV
NO.
00
DISCIPLINE
ENGINEER
25-Mar-21
DATE
PROJECT
ENGINEER
SAA
25-Mar-21
DATE
CERTIFIED
KHP
25-Mar-21
DATE
CONSTRUCTION
AGENCY
MMS
1-Apr-21
DATE
OPERATIONS
PLP
8-Apr-21
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
BILL OF MATERIAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
TELECOMMUNICATIONS MTO DOC 2
N54 A TD-962472
UMM WU'AL WELLS MANIFOLDS AND PIPELINES, UMWL-42 OF 00
TURAIF SAUDI ARABIA JO / EWO: 11-20034-2002 7
Rev: S1 CLASS: 1 DSN: 1657
MATERIAL TAKE-OFF
Saudi Aramco 6228-ENG (11/2010)
BACKFILLING
CONTRACTOR 262 CM
SUPPLY
NOTES : 1) CONSTRUCTION CONTRACTOR SHALL VERIFY ALL THE QUANTITIES AND DESCRIPTION OF ALL THE MATERIALS
REQUIRED TO COMPLETE THE WORK
AS PER THE CONSTRUCTION DRAWINGS, SCOPE OF WORK, APPLICABLE STANDARDS AND SPECIFICATIONS.
2) ABBREVIATIONS; M = METERS; EA= EACH; CM = CUBIC METERS; FT= FEET; CN= CAN; RO= ROLL; LB= POUNDS; PK= PACK; KT= KIT
APPROVAL
COMPILED BY REV. REFERENCE DRAWINGS
CHECKED DATE PROJECT ENGR DATE
00 XA-857158, XA-857159, XA-587199, XA-857179
XA-857190,
START-UP
B.I E.W.O PHASE ENG. ITEM AREA PRELIMINARY REVISION
DATE
11-20034-2002 COMMUNICATION
NORTH ARABIA FINAL X REVISION 00
Materials for COMMUNICATION SHEET 3 OF 7
INDEX T
UMM WU'AL WELLS MANIFOLDS & P/L, UMWL-42 TD-962472
UNCONVENTIONAL GAS PROJECT PROJECT
PLANT N54 NORTH ARABIA SAUDI
ARABIA
MATERIAL TAKE-OFF
Saudi Aramco 6228-ENG (11/2010)
CONTRACTOR
SUPPLY
NOTES : 1) CONSTRUCTION CONTRACTOR SHALL VERIFY ALL THE QUANTITIES AND DESCRIPTION OF ALL THE MATERIALS
REQUIRED TO COMPLETE THE WORK
AS PER THE CONSTRUCTION DRAWINGS, SCOPE OF WORK, APPLICABLE STANDARDS AND SPECIFICATIONS.
2) ABBREVIATIONS; M = METERS; EA= EACH; CM = CUBIC METERS; FT= FEET; CN= CAN; RO= ROLL; LB= POUNDS; PK= PACK; KT= KIT
APPROVAL
COMPILED BY REV. REFERENCE DRAWINGS
CHECKED DATE PROJECT ENGR DATE
00 XA-857158, XA-857159, XA-587199, XA-857179
XA-857190,
START-UP
B.I E.W.O PHASE ENG. ITEM AREA PRELIMINARY REVISION
DATE
11-20034-2002 COMMUNICATION
NORTH ARABIA FINAL X REVISION 00
Materials for COMMUNICATION SHEET 4 OF 7
INDEX T
UMM WU'AL WELLS MANIFOLDS & P/L, UMWL-42 TD-962472
UNCONVENTIONAL GAS PROJECT PROJECT
PLANT N54 NORTH ARABIA SAUDI
ARABIA
MATERIAL TAKE-OFF
Saudi Aramco 6228-ENG (11/2010)
NOTES : 1) CONSTRUCTION CONTRACTOR SHALL VERIFY ALL THE QUANTITIES AND DESCRIPTION OF ALL THE MATERIALS
REQUIRED TO COMPLETE THE WORK
AS PER THE CONSTRUCTION DRAWINGS, SCOPE OF WORK, APPLICABLE STANDARDS AND SPECIFICATIONS.
2) ABBREVIATIONS; M = METERS; EA= EACH; CM = CUBIC METERS; FT= FEET; CN= CAN; RO= ROLL; LB= POUNDS; PK= PACK; KT= KIT
APPROVAL
COMPILED BY REV. REFERENCE DRAWINGS
CHECKED DATE PROJECT ENGR DATE
VA-381717, VA-381718, VA-381752.002 VA-
00
381753.003 & 004
VA-381754.002, VA-381755.003 & 004
START-UP
B.I E.W.O PHASE ENG. ITEM AREA PRELIMINARY REVISION
DATE
11-20034-2002 COMMUNICATION
NORTH ARABIA FINAL X REVISION 00
Materials for COMMUNICATION SHEET 5 OF 7
INDEX T
UMM WU'AL WELLS MANIFOLDS & P/L, UMWL-42 TD-962472
UNCONVENTIONAL GAS PROJECT PROJECT
PLANT N54 NORTH ARABIA SAUDI
ARABIA
MATERIAL TAKE-OFF
Saudi Aramco 6228-ENG (11/2010)
BACKFILLING
CONTRACTOR 18 CM
SUPPLY
2) ABBREVIATIONS; M = METERS; EA= EACH; CM = CUBIC METERS; FT= FEET; CN= CAN; RO= ROLL; LB= POUNDS; PK= PACK; KT= KIT
APPROVAL
COMPILED BY REV. REFERENCE DRAWINGS
CHECKED DATE PROJECT ENGR DATE
00 XA-857190, XA-857218
START-UP
B.I E.W.O PHASE ENG. ITEM AREA PRELIMINARY REVISION
DATE
11-20034-2002 COMMUNICATION
NORTH ARABIA FINAL X REVISION 00
Materials for COMMUNICATION SHEET 6 OF 7
INDEX T
UMM WU'AL WELLS MANIFOLDS & P/L, UMWL-42 TD-962472
UNCONVENTIONAL GAS PROJECT PROJECT
PLANT N54 NORTH ARABIA SAUDI
ARABIA
MATERIAL TAKE-OFF
Saudi Aramco 6228-ENG (11/2010)
CONTRACTOR
SUPPLY
CONTRACTOR
SUPPLY
CONTRACTOR
SUPPLY
CONTRACTOR
SUPPLY
CONTRACTOR
SUPPLY
CONTRACTOR
SUPPLY
CONTRACTOR
SUPPLY
CONTRACTOR
SUPPLY
CONTRACTOR
SUPPLY
CONTRACTOR
SUPPLY
CONTRACTOR
SUPPLY
NOTES : 1) CONSTRUCTION CONTRACTOR SHALL VERIFY ALL THE QUANTITIES AND DESCRIPTION OF ALL THE MATERIALS
REQUIRED TO COMPLETE THE WORK
AS PER THE CONSTRUCTION DRAWINGS, SCOPE OF WORK, APPLICABLE STANDARDS AND SPECIFICATIONS.
2) ABBREVIATIONS; M = METERS; EA= EACH; CM = CUBIC METERS; FT= FEET; CN= CAN; RO= ROLL; LB= POUNDS; PK= PACK; KT= KIT
APPROVAL
COMPILED BY REV. REFERENCE DRAWINGS
CHECKED DATE PROJECT ENGR DATE
00 XA-857190, XA-857218
START-UP
B.I E.W.O PHASE ENG. ITEM AREA PRELIMINARY REVISION
DATE
11-20034-2002 COMMUNICATION
NORTH ARABIA FINAL X REVISION 00
Materials for COMMUNICATION SHEET 7 OF 7
INDEX T
UMM WU'AL WELLS MANIFOLDS & P/L, UMWL-42 TD-962472
UNCONVENTIONAL GAS PROJECT PROJECT
PLANT N54 NORTH ARABIA SAUDI
ARABIA