TECHNICAL QUERY

NATIONAL BASICS COMPANY LTD.


NBC-SA-TQ-0008-23
Date: 21-June-23

From: Ali Al Khasawneh, Contractor Representative To: Eyad A. Al-Marhoun, Company Representative
Company: NATIONAL BASICS COMPANY Company: SAUDI ARAMCO
Project Title: PREPARE DRILL SITES - QATIF Project BI: 10-13223

PART I. PROBLEM/REQUEST DESCRIPTION


Subject: Asphalt Road is blocking by HCIS fence at Site QG-8

CHANGE REQUEST: YES  NO Response Required By (Date): ASAP

Based on the scope of work the highlighted area Asphalt Road blocking by the new HCIS fence constructing by contractor.
Hence contractor seeking advice from Saudi Aramco for the further construction activities.

Mentioning below the proposal based on the discussion with Saudi Aramco PMT

1.) The fence boundary will be shifted based on the attached proposal 1 drawing. The Asphalt Road will be
remained.

2.) Or else will follow the scope as it is.

Note: Attached highlighted drawing for your reference.

COST IMPACT: YES NO 

REFERENCE DOCUMENT: CA-875438-001

       
     
Originator: _______________ Date: 21-June-23 Approved: _________________ Date: 21-June-23
Jesan Philip Ali Al Khasawneh,  
Construction Manager   Project Manager  
PART II. SAPMT RESPONSE

DESIGN IMPACT Remarks: ___________________


WAIVER REQUIRED  Waiver Requested No. ____________ Date: __________ ___________________________
CHANGES REQUIRED  DCN/FCN No. __________________ Date: __________ ___________________________
___________________________

Senior Project Engineer


Prepared By: _________________________ Date: __________

Superintendent _________________________ Date: __________ ______________________ Date ____________


PART III. CLOSE OUT / VERIFICATION
INCORPORATION OF CHANGE: Remarks: _______________________________________
Document: _____________ Rev: ________ Date: _________
CHANGE INCORPORATED?
Drawn By: _____________ Checked By: _________ Date: _________

CONTRACTOR ACTION VERIFIED? Verified By: _____________________________ Date: _________