FSD - Antenna Tower
FSD - Antenna Tower
FSD - Antenna Tower
ZHK
TABLE OF CONTENTS
ENG’G
RJV
1.0 GENERAL............................................................................................................... 3
1.1 Scope ...................................................................................................................... 3
1.2 Site and Ambient Conditions................................................................................... 3
DESCRIPTION
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
3.3 Antennas and Mounting .......................................................................................... 6
3.4 Electrical System..................................................................................................... 6
10-00914-0001
JO/EWO NO.
05/27/10
BY
DATE
DISCIPLINE
ENGINEER
DATE
PROJECT
ENGINEER
DATE
CERTIFIED
DATE
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED SU&O
FOR
CONSTRUCTION Q75 T PP-418245 2
UNTIL CERTIFIED of 0
AND DATED.
9
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT
CERT
ZHK
1.0 GENERAL
ENG’G
1.1 Scope
RJV
00302).
Foundations
Structural
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
Mounting
10-00914-0001
JO/EWO NO.
Electrical System
Fence
05/27/10
DRAWN
data.
DATE
1.3 Industry Codes and Standards
CHECKED
BY
DATE The works should conform to the requirements of the latest issues and
most recent revisions of the Saudi Aramco and International Standards
DISCIPLINE
ENGINEER
and Procedures listed below.
DATE
PROJECT
SAES-A-112 Metrological and Seismic Design Data
ENGINEER SAES-B-068 Electrical Area Classification
DATE SAES-T-492 VHF/UHF Land-Mobile and Fixed Radio
SAES-T-744 Design Criteria / Installation of Communication
CERTIFIED
Towers
DATE SAES-T-795 Communications Facility Grounding System
CONSTRUCTION SAES-T-887 Telecommunications: Electrical Coordination -
AGENCY
Protection at Power Plants and Radio Stations
DATE SAES-P-111 Grounding
OPERATIONS
SAES-O-100 General Requirements Safety and Security
SAES-O-101 Standard Security Fence – Category 1
DATE
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED SU&O
FOR
CONSTRUCTION Q75 T PP-418245 3
UNTIL CERTIFIED of 0
AND DATED. 9
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT
ZHK
Fencing
SAES-H-100 Coating Materials & Application Requirements
for Industrial Facilities
Issued for Bid
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
ANSI/NFPA-70 National Electrical Code
ETSI TETRA TErrestrial Trunked RAdio
ETSI 300392-2 Air Interface Standard
10-00914-0001
JO/EWO NO.
05/27/10
Standards
0
DRAWN
ITU-T G Transmission Systems and Media, Digital
DATE
Systems and Networks
CHECKED
1.4 Related Drawings
BY
DATE
The following documents and drawings are referenced in this FSD and
DISCIPLINE
ENGINEER
form part of the specification.
DATE
Q76-T-PP-118324 Mobile Radio System Functional Specification
PROJECT
ENGINEER
Q76-T-PP-118035 Mobile Radio System Block Diagram
Q76-T-PP-118040 Communications Grounding Block Diagram
DATE
DATE
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED SU&O
FOR
CONSTRUCTION Q75 T PP-418245 4
UNTIL CERTIFIED of 0
AND DATED. 9
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT
ZHK
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
Maximum Horizontal Force
Maximum Upward Force (upward)
10-00914-0001
JO/EWO NO.
Dead Load, Live Load, and the Wind Load for above parameters.
Loading Capacity of the tower shall be calculated for the known loading to
be on the tower for its commissioning plus any additional loading expected
to occur within one year after commissioning as per SAES-A-112. Ice
DATE
05/27/10
CHECKED
The Antenna Antenna Tower structure is required to be self-supported and
BY
free-standing type. And the material shall be made of steel according to
DATE Saudi Aramco Standard (SAES-T-744).
DISCIPLINE
ENGINEER The Tower structure size, height and locations are selected to provide
DATE
adequate coverage of the site.
PROJECT
ENGINEER The basic wind speed for the location of the tower shall be determined and
DATE
considered from SAES-A-112 and according to EIA /TIA-222-G. 60 miles
per hour shall be the operational wind speed requirements for tower
CERTIFIED structures in Saudi Arabia.
DATE
OPERATIONS
DATE
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED SU&O
FOR
CONSTRUCTION Q75 T PP-418245 5
UNTIL CERTIFIED of 0
AND DATED. 9
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT
ZHK
The maximum permissible twist and tilt angle for tower installed antennas
ENG’G
Tower lighting including obstacle lights for aircraft safety to meet Saudi
Arabia Government regulations. Lighting of the tower shall comply with
SAES-B-063.
Issued for Bid
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
surges. The tower ground ring shall be bonded:
zTo the grounding plate twice (if one exists)
10-00914-0001
JO/EWO NO.
05/27/10
not less than 0.8 m (2.5 feet) below grade level and at least 0.6 m (2 feet)
0
DRAWN
outside foundation and tower footings
DATE Tower lighting protection rod of sufficient length to provide a 45
CHECKED degrees cone of protection to the lower structure including antennas.
BY Also, ensure antennas are insulated and isolated such that operating
DATE
personnel are protected from potential hazards.
DISCIPLINE
ENGINEER
Cable support system to support transmission lines.
DATE
3.5 Fence
PROJECT
ENGINEER
A perimeter fence (20m x 30m) for the tower shall be provided and shall
DATE
meet the requirement for Category I, Security Perimeter Fencing for Saudi
CERTIFIED Aramco's vital industrial facilities and Safety and Security Directive No. 1
DATE
(SSD/1) of the Saudi Arabian Government Supreme Commission for
Industrial Security.
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED SU&O
FOR
CONSTRUCTION Q75 T PP-418245 6
UNTIL CERTIFIED of 0
AND DATED. 9
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT
ZHK
3.6.1 Painting
ENG’G
RJV
The Antenna tower and antenna should have a minimum design life of
twenty (20) years. To eliminate corrosion, all anchor rods shall be fusion
bonded epoxy coated. The coating shall be 500 to 625 micrometers (20 to
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
25 mils) dry film thickness.
10-00914-0001
JO/EWO NO.
Saudi Aramco places a very high onus upon all of its employees and its
contractors and their staff to conduct their business with safety and
security as paramount considerations.
DATE
05/27/10
Ensure safety rail for climbing and maintenance operations, complete with
climbing harness are included.
REV
NO.
DRAWN The equipment supplied shall operate without creating a hazard to the user
DATE directly and/or other third parties.
CHECKED
BY Provide all necessary safety guards around all moving equipment parts to
DATE
protect operating personnel from injury.
DISCIPLINE
ENGINEER Hazard warning labels shall be affixed to the equipment to advise of any
DATE feature of the equipment that may cause potential injury to the user or
PROJECT
maintenance personnel.
ENGINEER
CONSTRUCTION Contractor shall perform all activities in accordance with Saudi Aramco
AGENCY
safe working procedures.
DATE
OPERATIONS
DATE
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED SU&O
FOR
CONSTRUCTION Q75 T PP-418245 7
UNTIL CERTIFIED of 0
AND DATED. 9
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT
Contractors shall fully comply with the statutory requirements of the Saudi
CERT
ZHK
RJV
Contractor staff shall obtain clearance to gain entry to all sites and carry
suitable identification at all times.
4.0 INSPECTION
Issued for Bid
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
conforms to Saudi Aramco standards, and that all required equipment has
been provided and is plant tagged.
10-00914-0001
JO/EWO NO.
05/27/10
DRAWN
Once the “Yes” exception list is cleared, the Mechanical Completion
DATE
Certificate can be issued and the Commissioning can proceed to the Site
CHECKED
Acceptance Test.
BY
DATE The Antenna system MCC shall be considered complete only when the
SAT approval has been signed-off by a Saudi Aramco representative.
DISCIPLINE
ENGINEER
DATE
5.0 DOCUMENTATION
PROJECT
ENGINEER
As a minimum, the following documents and drawings shall be provided for
DATE
SLI review:
CERTIFIED
Equipment lists indicating manufacturer, type, part numbers, tag
DATE
numbers
CONSTRUCTION
AGENCY Installation details
DATE Contractor shall submit a complete set of manufacturer books, in electronic
OPERATIONS and hardcopy, in the quantities and formats specified in purchase order
document list.
DATE
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED SU&O
FOR
CONSTRUCTION Q75 T PP-418245 8
UNTIL CERTIFIED of 0
AND DATED. 9
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914-0001
OPRNS SAUDI ARABIAN OIL COMPANY
WASIT GAS PROGRAM
PMT
5.1 Drawings
CERT
ZHK
THIS DRAWING AND THE INFORMATION HEREIN ARE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF THE OWNER
10-00914-0001
JO/EWO NO.
DATE
05/27/10
REV
NO.
DRAWN
DATE
CHECKED
BY
DATE
DISCIPLINE
ENGINEER
DATE
PROJECT
ENGINEER
DATE
CERTIFIED
DATE
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
WASIT GAS PROGRAM PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
THIS DOCUMENT IS
NOT TO BE USED SU&O
FOR
CONSTRUCTION Q75 T PP-418245 9
UNTIL CERTIFIED of 0
AND DATED. 9
Wasit Gas Program SAUDI ARAMCO JO/EWO NO. 10-00914-0001