F-01 Tender Handover Agenda
F-01 Tender Handover Agenda
F-01 Tender Handover Agenda
LOCATION: DATE:
ATTENDEES: Role: Name: APOLOGIES: Position: Name:
1. General Manager;
2. Business Procurement Director –
Estimating Manager
3. Assigned Project Director;
4. Design Manager (where there is a
design requirement to be met);
5. Corporate Planning Manager –/
Planning Manager
6. Corporate Commercial Director /
Divisional Commercial Manager
7. Project Commercial Manager;
8. Business Systems Director;
9. Functional Managers (HR/QHSE
etc.); and
10. Others as deemed appropriate by
the GM
DISTRIBUTION: Attendees, Apologies, Managing Director, Corporate Commercial Director, Deputy Managing Director, Chief Operating Officer,
Project File (Total Copies = ).
Signature
Signature
Signature
Tender Submission Document C O
HSE Documentation C O
BOQ Priced C O
BOQ Un-Priced C O
Pricing Build Ups C O
Tender Program (s) C O
Planning Notes C O
Tender Correspondence C O
Post Tender Correspondence C O
Tender Documentation (Drawings, Specifications etc.) C O
Consultant Appointments O C
Completed Subcontract Report O C
Subcontract Enquiry & Response O C
Materials Enquiry & Response O C
Tender Summary File C C O
Signed Financial Statement: Agreed Contract Sum C C O
O = Original : C = Copy
4.0 MOBILISATION
4.1 Site establishment/layout plan drawn up?
4.2 Existing Services identified?
4.3 Temporary power / sewer / water arranged?
4.4 Fencing?
4.5 Sheds?
4.6 Survey / set out arrangements?
4.7 Status of permits- Town Planning /Development
Application?
- Demolition?
- Building?
- Licenses?
- Other?
4.8 Telephone / fax applications made?
4.9 Site security arrangements?
4.10 Existing conditions / dilapidations report status?
4.11 Adjacent owner/community issues?
4.12 Computer hardware / software / modem / network
requirements?
4.13 Progress photography intentions?
4.14 Extent / location of COMPANY signage?
4.15 Access established to – Project Costing System?
– Project Value System?
4.16 Postal address / PO Box set up?
4.17 Requirement for project bank account?
4.18 Major Plant requirements? - Contractor?
- External?
4.19 Other: …
11.0 DOCUMENTATION HANDOVER CHECKLIST Full copy of standard tender file to be handed
over/reviewed, including:
11.1 Tender Submission
a) Tender submission to client
b) Tender qualifications to client
c) Tender program/Org Chart
11.2 Tender Estimate
a) Tender summary
b) Indirect cost
c) Direct cost
d) Plant hire rates
e) Labor rates
f) Construction Work Method Studies
g) Quantity Take-offs
h) Site Investigation / Photos / Surveys / Geotechnical
Data
i) Complete set of drawings / specs
j) Tender Addenda
k) PC/Prov. Sums
11.3 Commercial
a) Contract Analysis of commercial conditions/Risk
analysis
b) Insurances
BY BY
TASK DETAILS STATUS
WHO WHEN
12.0 OTHER ISSUES
12.1 Date for Project Delivery Plan Meeting?
12.2 Date for conclusion of finalized budget?
12.3 Date for Risk Assessment Workshop?
12.4 Date for independent design review?
12.5