Wind Loading (ASCE7)
Wind Loading (ASCE7)
WIND LOADING
In accordance with ASCE7-10
Using the directional design method
Tedds calculation version 2.1.10
22 ft
10.8 ft
34 ft 22 ft
Plan Elevation
Building data
Type of roof; Monoslope
Length of building; b = 34.00 ft
Width of building; d = 22.00 ft
Height to eaves; H = 9.00 ft
Pitch of roof; α0 = 4.8 deg
Mean height; h = 9.00 ft
General wind load requirements
Basic wind speed; V = 115.0 mph
Risk category; II
Velocity pressure exponent coef (Table 26.6-1); Kd = 0.85
Exposure category (cl 26.7.3); B
Enclosure classification (cl.26.10); Partially open buildings
Internal pressure coef +ve (Table 26.11-1); GCpi_p = 0.18
Internal pressure coef –ve (Table 26.11-1); GCpi_n = -0.18
Gust effect factor; Gf = 0.85
Minimum design wind loading (cl.27.4.7); pmin_r = 8 lb/ft2
Topography
Topography factor not significant; Kzt = 1.0
Velocity pressure equation; q = 0.00256 × Kz × Kzt × Kd × V2 × 1psf/mph2;
Overall loading
Projected vertical plan area of wall; Avert_w_0 = b × H = 306.00 ft2
Projected vertical area of roof; Avert_r_0 = b × d × tan(α0) = 62.15 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w × Avert_w_0 + pmin_r × Avert_r_0 = 5.39 kips
Leeward net force; Fl = Fw,wB = -3.7 kips
Windward net force; Fw = Fw,wA = 2.5 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 5.4 kips
Roof load case 2 - Wind 0, GCpi -0.18, -0cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A (+ve) 9.00 -0.18 16.40 0.44 153.53 0.07
B (+ve) 9.00 -0.18 16.40 0.44 153.53 0.07
C (+ve) 9.00 -0.18 16.40 0.44 307.05 0.14
D (+ve) 9.00 -0.18 16.40 0.44 136.47 0.06
Total vertical net force; Fw,v = 0.33 kips
Total horizontal net force; Fw,h = 0.03 kips
Walls load case 2 - Wind 0, GCpi -0.18, -0cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A
Project Job Ref.
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
9.00 0.80 16.40 14.11 306.00 4.32
B 9.00 -0.50 16.40 -4.02 368.15 -1.48
C 9.00 -0.70 16.40 -6.81 218.11 -1.48
D 9.00 -0.70 16.40 -6.81 218.11 -1.48
Overall loading
Projected vertical plan area of wall; Avert_w_0 = b × H = 306.00 ft2
Projected vertical area of roof; Avert_r_0 = b × d × tan(α0) = 62.15 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w × Avert_w_0 + pmin_r × Avert_r_0 = 5.39 kips
Leeward net force; Fl = Fw,wB = -1.5 kips
Windward net force; Fw = Fw,wA = 4.3 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 5.8 kips
Roof load case 3 - Wind 90, GCpi 0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A (-ve) 9.00 -0.90 16.40 -15.50 99.34 -1.54
B (-ve) 9.00 -0.90 16.40 -15.50 99.34 -1.54
C (-ve) 9.00 -0.50 16.40 -9.92 198.68 -1.97
D (-ve) 9.00 -0.30 16.40 -7.14 353.21 -2.52
Total vertical net force; Fw,v = -7.55 kips
Total horizontal net force; Fw,h = 0.00 kips
Walls load case 3 - Wind 90, GCpi 0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A 10.83 0.80 16.40 8.20 218.13 1.79
B 9.00 -0.39 16.40 -8.40 218.11 -1.83
C 9.00 -0.70 16.40 -12.71 306.00 -3.89
D 9.00 -0.70 16.40 -12.71 368.15 -4.68
Overall loading
Projected vertical plan area of wall; Avert_w_90 = d × (H + d × tan(α0) / 2) = 218.11 ft2
Projected vertical area of roof; Avert_r_90 = 0.00 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w × Avert_w_90 + pmin_r × Avert_r_90 = 3.49 kips
Leeward net force; Fl = Fw,wB = -1.8 kips
Windward net force; Fw = Fw,wA = 1.8 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 3.6 kips
Project Job Ref.
Overall loading
Projected vertical plan area of wall; Avert_w_90 = d × (H + d × tan(α0) / 2) = 218.11 ft2
Projected vertical area of roof; Avert_r_90 = 0.00 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w × Avert_w_90 + pmin_r × Avert_r_90 = 3.49 kips
Leeward net force; Fl = Fw,wB = -0.5 kips
Windward net force; Fw = Fw,wA = 3.1 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 3.6 kips
Roof load case 5 - Wind 180, GCpi 0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A (-ve) 9.00 -0.90 16.40 -15.50 153.53 -2.38
B (-ve) 9.00 -0.90 16.40 -15.50 153.53 -2.38
C (-ve) 9.00 -0.50 16.40 -9.92 307.05 -3.05
D (-ve) 9.00 -0.30 16.40 -7.14 136.47 -0.97
Total vertical net force; Fw,v = -8.75 kips
Total horizontal net force; Fw,h = -0.73 kips
Walls load case 5 - Wind 180, GCpi 0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A 10.83 0.80 16.40 8.20 368.19 3.02
B 9.00 -0.50 16.40 -9.92 306.00 -3.04
Project Job Ref.
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
C 9.00 -0.70 16.40 -12.71 218.11 -2.77
D 9.00 -0.70 16.40 -12.71 218.11 -2.77
Overall loading
Projected vertical plan area of wall; Avert_w_180 = b × (H + d × tan(α0)) = 368.15 ft2
Projected vertical area of roof; Avert_r_180 = b × d × tan(α0) = 62.15 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w × Avert_w_180 + pmin_r × Avert_r_180 = 6.39 kips
Leeward net force; Fl = Fw,wB = -3.0 kips
Windward net force; Fw = Fw,wA = 3.0 kips
Overall horizontal loading; Fw,total = max(Fw - Fl - Fw,h, Fw,total_min) = 6.8 kips
Roof load case 6 - Wind 180, GCpi -0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A (+ve) 9.00 -0.18 16.40 0.44 153.53 0.07
B (+ve) 9.00 -0.18 16.40 0.44 153.53 0.07
C (+ve) 9.00 -0.18 16.40 0.44 307.05 0.14
D (+ve) 9.00 -0.18 16.40 0.44 136.47 0.06
Total vertical net force; Fw,v = 0.33 kips
Total horizontal net force; Fw,h = 0.03 kips
Walls load case 6 - Wind 180, GCpi -0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(ft) (psf) (psf) (ft2) (kips)
A 10.83 0.80 16.40 14.11 368.19 5.19
B 9.00 -0.50 16.40 -4.02 306.00 -1.23
C 9.00 -0.70 16.40 -6.81 218.11 -1.48
D 9.00 -0.70 16.40 -6.81 218.11 -1.48
Overall loading
Projected vertical plan area of wall; Avert_w_180 = b × (H + d × tan(α0)) = 368.15 ft2
Projected vertical area of roof; Avert_r_180 = b × d × tan(α0) = 62.15 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w × Avert_w_180 + pmin_r × Avert_r_180 = 6.39 kips
Leeward net force; Fl = Fw,wB = -1.2 kips
Windward net force; Fw = Fw,wA = 5.2 kips
Overall horizontal loading; Fw,total = max(Fw - Fl - Fw,h, Fw,total_min) = 6.4 kips
Project Job Ref.
34 ft
4 ft
D
9 ft
C
22 ft
4.5 ft
B
4.5 ft
Wind - 0o
9 ft
A1
34 ft
Windward face
10.8 ft
10.8 ft
D B
22 ft 34 ft
Side face Leeward face
Project Job Ref.
34 ft
Wind - 90o
22 ft
A B C D
4.5 ft 4.5 ft 9 ft 16 ft
10.8 ft
A1
22 ft
Windward face
10.8 ft
10.8 ft
D B
34 ft 22 ft
Side face Leeward face
Project Job Ref.
Wind - 180o
4.5 ft
A
4.5 ft
B
22 ft
9 ft
C
4 ft
34 ft
10.8 ft
A1
34 ft
Windward face
9 ft
9 ft
D B
22 ft 34 ft
Side face Leeward face