Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
19 views

Notes Oracle Cloud

Setting up cloud infrastructure on Oracle Cloud typically involves planning, designing the network and compute resources, provisioning storage and databases, implementing security and identity management, monitoring the infrastructure, and automating processes. The overall timeline can range from several weeks to months depending on the size and complexity of the application and how much automation is used.

Uploaded by

Redmi
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

Notes Oracle Cloud

Setting up cloud infrastructure on Oracle Cloud typically involves planning, designing the network and compute resources, provisioning storage and databases, implementing security and identity management, monitoring the infrastructure, and automating processes. The overall timeline can range from several weeks to months depending on the size and complexity of the application and how much automation is used.

Uploaded by

Redmi
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Setting up cloud infrastructure on Oracle Cloud involves various components and considerations, such as

networking, compute resources, storage, security, and monitoring. While I can provide you with a high-
level estimation model, please note that the actual timeline and effort required for your specific
infrastructure setup may vary depending on factors such as the size and complexity of your application,
the number of environments, and the level of automation required.

Here's a general estimation model for setting up cloud infrastructure on Oracle Cloud:

1. Planning and Design (1-2 weeks):

- Understand your application requirements, including scalability, availability, and performance needs.

- Define the desired architecture and infrastructure components.

- Determine the Oracle Cloud services and resources required, such as Compute instances, Object
Storage, Virtual Cloud Networks (VCNs), load balancers, and databases.

2. Networking (1-2 days):

- Set up a Virtual Cloud Network (VCN) to provide isolation and control network traffic.

- Define subnets for different tiers or components of your application.

- Establish connectivity between VCNs or on-premises networks if needed.

- Configure network security lists and security rules to control inbound and outbound traffic.

- Set up internet gateways or virtual private gateways for connectivity.

3. Compute Resources (1-2 days):

- Determine the compute resources needed, such as Oracle Compute instances, Container Engine for
Kubernetes, or Functions.

- Select the appropriate instance types and configurations based on your application requirements.

- Provision Compute instances or deploy containers using Oracle Cloud Infrastructure Compute service,
Oracle Container Engine for Kubernetes (OKE), or Oracle Functions.

- Configure auto-scaling groups if your application requires dynamic resource allocation.

4. Storage and Databases (1-2 days):

- Choose the appropriate storage options based on your data requirements, such as Oracle Object
Storage, Block Volumes, or Autonomous Databases.
- Set up Object Storage containers or Block Volumes and configure access controls.

- Decide on the database solutions needed, such as Oracle Autonomous Database, Oracle Database on
Compute, or MySQL Database Service.

- Provision and configure databases, including backup and replication if required.

5. Security and Identity (1-2 days):

- Implement security measures like Oracle Identity and Access Management (IAM) for identity and
access management.

- Set up IAM users, groups, and policies to manage permissions for different users or groups.

- Enable Oracle Cloud Guard for threat detection and monitoring.

- Configure Oracle Key Management for securely storing and managing keys.

6. Monitoring and Logging (1-2 days):

- Enable monitoring and logging services like Oracle Cloud Infrastructure Monitoring and Logging.

- Set up alarms and notifications for monitoring resource health, performance, and availability.

- Configure Logging to collect and analyze logs from your resources.

7. Automation and Infrastructure as Code (IaC) (ongoing):

- Implement Infrastructure as Code using Oracle Resource Manager or Terraform.

- Automate the provisioning and configuration of resources using Oracle Cloud Infrastructure CLI or
SDKs.

- Leverage Oracle Cloud Infrastructure Service Catalog for centralized management and automation.

8. Testing and Deployment (1-2 days):

- Set up testing environments for integration, performance, and security testing.

- Define deployment pipelines using CI/CD tools like Oracle Developer Cloud Service or third-party
tools integrated with Oracle Cloud Infrastructure.

- Automate the deployment process for consistent and repeatable deployments.

9. Documentation and Knowledge Transfer (ongoing):


- Document the infrastructure setup, configurations, and dependencies.

- Provide necessary documentation and training to the operations team for ongoing management and
maintenance.

Remember, these estimations are rough guidelines, and the actual implementation time may vary based
on your project's specific requirements. It's

important to plan and design your infrastructure carefully and leverage automation and IaC to
streamline the provisioning and management processes.

You might also like