RATE ANALYSIS OF CONCERETING

M-15 GRADE-PCC
SR.NO. ITEM
1 CEMENT 5.6
2 SAND 0.5
3 AGGREGATE(10MM) 0.5
4 AGGREGATE(20MM) 0.5
5 ADMIXTURE 0.5
6 WATER 160
7 Furry 1
8 SHUTTERING
9 CON. POURING

M-20 GRADE
SR.NO. ITEM
1 CEMENT 6.2
2 SAND 0.5
3 AGGREGATE(10MM) 0.5
4 AGGREGATE(20MM) 0.5
5 ADMIXTURE 0.5
6 WATER 160
7 BATCHING PLANT 1
8 SHUTTERING
9 CON. POURING

M-25 GRADE For Raft


SR.NO. ITEM
1 CEMENT 7
2 SAND 0.5
3 AGGREGATE(10MM) 0.5
4 AGGREGATE(20MM) 0.5
5 ADMIXTURE 0.5
6 WATER 160
7 BATCHING PLANT 1
8 SHUTTERING 0
9 CON. POURING

M-25 GRADE For Column And Beam


SR.NO. ITEM
1 CEMENT 8.3
2 SAND 0.5
3 AGGREGATE(10MM) 0.5
4 AGGREGATE(20MM) 0.5
5 ADMIXTURE 0.5
6 WATER 160
7 BATCHING PLANT 1
8 SHUTTERING 0
9 CON. POURING

1 CEMENT 485
2 SAND/Dust
3 AGGREGATE(10MM)
4 AGGREGATE(20MM)
5 ADMIXTURE
Actual Worst Rate Excluding
RATE Amt/Cum Cement
290 1624
993.82 497
618.37 309
728.80 364
75.00 38
1 160
150 150
0
450 450
3592 1968

Actual Worst
RATE Amt/Cum
290 1798
993.82 497
618.37 309
728.80 364
75.00 38
1 160
150 150
750 0
450 450
3766 1968

Actual Worst
RATE Amt/Cum
290 2030
993.82 497
618.37 309
728.80 364
75.00 38
1 160
150 150
750 0
250 250
3798 1768

RATE
290 2407
993.82 497
618.37 309
728.80 364
75.00 38
1 160
150 150
750 0
550 550
4475 2068

290 Bag
993.82 Cum
618.37 Cum
728.80 Cum
75.00 Lit