BssTech

INSTALLATION REPORT OF REFERENCE


CELL

Doc. No.: B S I N - Q A Q C - C P J 1 9 2 3 5 - 0 0 3 F R
Contractor: BHARAT TANKS & VESSELS

Project: LPG MOUNDED STORAGE TANK FARM


(CAPACITY: 2X420 m°& 2 X840m) Page: 1 of 1

Reference Drawing: BSIN-DR-CPJ19235-001& BSIN-DR-CPJ19235-006

Reference cell:
Type of permanent

Serial Completion Status Remarks


Items to Check/ Inspection
#
Check the reference cell Calibration
1
certificate

Check the reference cell tag No.

Check the cable size and type of


3 insulations for reference electrode tail
cable.

Check the reference cell installation


4
depth& from the structure
distance
Check the reference cell cable routing
5 & terminations

Check the connection of the cables on


the structure and its terminations

Reference cell calibration at site and


7 value shall be noted.

Name: Sign: Date:


CP Contractor:
Sign: Date:
Main Contractor: Name:
Client/Consultant: Name: Sign: Date:
BssTech
INSTALLATION REPORT OF POLARIZATION CELL
Contractor: BHARAT TANKS & VESSELS Doc. No.: BSIN-QAQC-CPJ19235-011FR
Project: LPG MOUNDED STORAGE TANK FARM
(CAPACITY: 2X420 m' &2X840 m)
Page:1 of 1

Reference Drawing: BSIN-DR-CPJ19235-007

Date
SI.# Items to Check/ Inspection
Completion Remarks
Status

1. Check the type of Polarization Cell as per


specification.
2 Check the location of installation of Polarization
Cell.

3. Check all cables are free from damage and properly


tagged
4. Check proper size of cable & cable lug is used

5. Check all the cables are properly terminated as per


the installation drawing

CP Contractor: Name: Sign: Date


Main Contractor: Name: Sign: Date:

Client/Consultant: | Name: Sign: Date:


BsSTech
INSTALLATION REPORT OF CATHODE JUNCTION BOX

Contractor: BHARAT TANKS & VESSELS


Doc. No.: BSIN-QAQC-CPJ19235-004-2FR
Project: LPG MOUNDED STORAGE TANK FARM
(CAPACITY: 2X420 m' &2X840 m) Page: 1 of 1

Reference Drawing: BSIN-DR-CPJ19235-005

Sl Date:
T
No Items to Check/ Inspection Status Remarks
1 Junction Box Tag No.
Location of Junction Box.
3 Connection scheme.
Check the installation of Junction Box as per the
procedure and drawing.
5 Check the concrete foundation is as per the
drawing.
6 Check the cable entry is as per the specification
Checks the terminations inside the Junction Box
are performed perfectly.

8 Check the stress relief loop has been provided for


the cables.
Structure to Junction Box distance.

10 Incoming and Outgoing cable tag.

CP Contractor Name:
Sign Date:
Main Contractor: Name: Sign: Date:
Client/Consultant: Name: Sign: Date:
BssTech
INSTALLATION REPORT OF ANODE JUNCTION BOX

Contractor: BHARAT TANKS & VESSELS Doc. No.: BSIN-QAQC-CPJ19235-004-1FR


Project: LPG MOUNDED STORAGE TANK FARM
(CAPACITY: 2X420 m* & 2X840 m') Page: 1 of 1

Reference Drawing: BSIN-DR-CPJ19235-004

Date:
SI.
Items to Checkl Inspection Status Remarks
No
Junction Box Tag No.
Location of Junction Box.
2
3 Connection scheme.
4 Check the installation of Junction Box as per the
procedure and drawing.
--

5 Check the concrete foundation is as per the


drawing.
Check the cable entry is as per the specification

7 Checks the terminations inside the Junction Box


are performed perfectly.

8 Check the stress relief loop has been provided for


the cables.

9 Struclure to Junction Box distance.

10 Incoming and outgoing cable tag.

CP Contractor Name: Sign: Date:

Main Contractor: Name: Sign: Date:

Client/Consultant: Name: Sign Date:


BssTech
INSTALLATION REPORT OF THERMITE WELDING

Contractor: BHARAT TANKS & VESSELS Doc. No.: BSIN-QAQC-CPJ19235-006FR

Project: LPG MOUNDED STORAGE TANK FARM


(CAPACITY: 2X420 m' & 2X840 m) Page: 1 off 1

Reference Drawing: BSIN-DR-CPJ19235-009

Date:

SL# Items to Check/ Inspection Status Remarks

1 Location.

Check the size of Thermit Weld as per


2
size of Cable.

3 Check the surface preparation.

Check the cable is free of cuts and


4
damage.

5 Check Cable connection to structure

Check the epoxy hardner has been set


properly after thermite welding

CP Contractor Name: Sign: Date:

Sign: Date:
Main Contractor Name:
Client/Consultant: Name: Sign: Date:
BssTech
INSTALLATION REPORT OF SURGE DIVERTER

Contractor: BHARAT TANKS & VESSELS Doc. No.: BSIN-QAQC-CPJ19235-009FR


Project: LPG MOUNDED STORAGE TANK FARM
(CAPACITY: 2X420 m' &2X840 m) Page: 1 of1

Reference Drawing: BSIN-DR-CPJ19235-001-A, BSIN-DR-CPJ19235-001-B

Date:
SI.
Items to Checkl Inspection Status Remarks
No.
Check the type of surge diverter
as per specification.
2 Area/Location

3 Check the labels/tags of surge


diverter
Check the length and size of tail
cable
5 Confirm the number of cleats
across the flange
Ensured that electrical
discontinuity is maintained
7 Check the installation of Surge
diverter has been done properly.

CP Contractor: Name: Sign: Date


Main Contractor Name: Sign: Date:

Client/Consultant: Name: Sign: Date