Doc. No.: B S I N - Q A Q C - C P J 1 9 2 3 5 - 0 0 3 F R
Contractor: BHARAT TANKS & VESSELS
Reference cell:
Type of permanent
Date
SI.# Items to Check/ Inspection
Completion Remarks
Status
Sl Date:
T
No Items to Check/ Inspection Status Remarks
1 Junction Box Tag No.
Location of Junction Box.
3 Connection scheme.
Check the installation of Junction Box as per the
procedure and drawing.
5 Check the concrete foundation is as per the
drawing.
6 Check the cable entry is as per the specification
Checks the terminations inside the Junction Box
are performed perfectly.
CP Contractor Name:
Sign Date:
Main Contractor: Name: Sign: Date:
Client/Consultant: Name: Sign: Date:
BssTech
INSTALLATION REPORT OF ANODE JUNCTION BOX
Date:
SI.
Items to Checkl Inspection Status Remarks
No
Junction Box Tag No.
Location of Junction Box.
2
3 Connection scheme.
4 Check the installation of Junction Box as per the
procedure and drawing.
--
Date:
1 Location.
Sign: Date:
Main Contractor Name:
Client/Consultant: Name: Sign: Date:
BssTech
INSTALLATION REPORT OF SURGE DIVERTER
Date:
SI.
Items to Checkl Inspection Status Remarks
No.
Check the type of surge diverter
as per specification.
2 Area/Location