Estimation Summary
Estimation Summary
Estimation Summary
No. of sheet piles Used No. of Gabions Used No. of Filter Cloth
389.61038961039 900
389.61038961039 900
114.805194805195 265.2
101.818181818182 235.2
67.5324675324675 156
67.5324675324675 156
31.1688311688312 72
8.96103896103896 20.7
54.9350649350649 126.9
UNITS
bags
cu.m
cu.m
pcs
pcs
pcs
CONCRETE PER 1 METER
QUANTITY UNITS
cement 5.04 bags
sand 0.28 cu.m
gravel 0.56 cu.m
Units For 7-16 mm dia main longitudinal bars For 11-12 mm dia main longitudinal bars
Sum
Tot river length in m
with revetment structures
956.34
overall weight
27745.173005 29132.431655
29134.35
LED COMPUTATION