Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
3 views

DDATS

The document contains reports from a solver in Microsoft Excel that found an optimal solution to maximize total profit of $7400 with variable values of 40 for L911 and 90 for L923 while satisfying all constraints. Sensitivity analysis was also performed on the variable values and constraints. Limits on the variable values were also reported with the resulting objective values.

Uploaded by

Yo Tu
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

DDATS

The document contains reports from a solver in Microsoft Excel that found an optimal solution to maximize total profit of $7400 with variable values of 40 for L911 and 90 for L923 while satisfying all constraints. Sensitivity analysis was also performed on the variable values and constraints. Limits on the variable values were also reported with the resulting objective values.

Uploaded by

Yo Tu
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Microsoft Excel 16.

0 Answer Report
Worksheet: [Data Solver.xlsx]Sheet1
Report Created: 9/3/2023 1:15:40 PM
Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
Solver Engine
Engine: Simplex LP
Solution Time: 0.047 Seconds.
Iterations: 2 Subproblems: 0
Solver Options
Max Time Unlimited, Iterations Unlimited, Precision 0.000001, Use Automatic Scaling
Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNegative

Objective Cell (Max)


Cell Name Original Value Final Value
$H$4 Total Profit 7400.00 7400.00

Variable Cells
Cell Name Original Value Final Value Integer
$B$4 L911 40.0 40.0 Contin
$C$4 L923 90.0 90.0 Contin

Constraints
Cell Name Cell Value Formula Status Slack
$E$7 Assebly Time Used 760 $E$7<=$H$7 Not Binding 240
$E$8 Inspection Time Used 220 $E$8<=$H$8 Binding 0
$E$9 Storage Time Used 390 $E$9<=$H$9 Binding 0
Microsoft Excel 16.0 Sensitivity Report
Worksheet: [Data Solver.xlsx]Sheet1
Report Created: 9/3/2023 1:15:40 PM

Variable Cells
Final Reduced Objective Allowable Allowable
Cell Name Value Cost Coefficient Increase Decrease
$B$4 L911 40 0 50 10 20
$C$4 L923 90 0 60 40 10

Constraints
Final Shadow Constraint Allowable Allowable
Cell Name Value Price R.H. Side Increase Decrease
$E$7 Assebly Time Used 760 0 1000 1E+030 240
$E$8 Inspection Time Used 220 10 220 40 40
$E$9 Storage Time Used 390 13.333333333 390 45 60
Microsoft Excel 16.0 Limits Report
Worksheet: [Data Solver.xlsx]Sheet1
Report Created: 9/3/2023 1:15:40 PM

Objective
Cell Name Value
$H$4 Total Profit 7400.00

Variable Lower Objective Upper Objective


Cell Name Value Limit Result Limit Result
$B$4 L911 40.0 0.0 5400.0 40.0 7400.0
$C$4 L923 90.0 0.0 2000.0 90.0 7400.0
LED Lights
$ 50.00 $ 60.00
Output L911 L923 Used Total Profit
40.0 90.0 7400.00

Inputs RHS
Assebly Time 10.0 4.0 760 1000.0
Inspection Time 1.0 2.0 220 220.0
Storage Time 3.0 3.0 390 390.0

You might also like