Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Projekt

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

PROJECT

MURRAY GROVE LOCATIO


N

Hackney-
London,
UK
THE WORLD’S FIRST
NINE STOREY CLT BUILDING

MULTI-STOREY RESIDENTIAL
Constructed entirely in timber, Stadthaus Murray Grove CARBON CALCULATION
was the first nine storey cross-laminated timber Total stored/sequestered carbon in the KLH® – CLT for
residential development built in the world. Stadthaus Murray Grove is 222.2 tonnes

AWARDS
Designed by Waugh Thistleton Architects, the KLH cross-
2009 | Evening Standard Homes & Property Awards, Best
laminated solid timber panels formed a cellular structure
New Small Development; Short listed for RIBA London
of timber load-bearing walls, including all stairwells and
Region Award; Your New Homes, Best Eco Development;
lift cores, with timber floor slabs. Built in 35 days,
Shortlisted for British Construction Industry, Best
Stadthaus Murray Grove comprise of 29 private and
Practice Award; Shortlisted for British Construction
affordable housing.
Industry, Environmental Award; British Construction
PROJECT DETAILS Industry, Judges’ Special Award;
Project Dates: 2007 – 2009 2008 | Shortlisted in the Hackney Design Awards;
KLH UK Services: Supply and Erect Structural Wood Award and the Offsite Construction
Timber Volume: 926 m3 Wood Award
Build Period: Number 7 weeks 2007 | Hot Property Awards, Green Homes, Silver Winner
CONTRACTOR ARCHITECTURE TIMBER CONSTRUCTION

Telford Homes Waugh Thistleton Architects KLH UK Ltd.


www.telfordhomes.london/ www.waughthistleton.com www.klhuk.com

ENGINEER PHOTOGRAPHY

Techniker © WillPryce
https://techniker.co.uk/ © Sissy Slotover Smutny

For further information +43 (0) 3588 8835 or office@klh.at

You might also like