Presentation structure
• Financing
2
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Brief about the RRTS Corridor
3
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Genesis of Regional Rapid Transit System (RRTS)
Scheme evolved
Regional
Planning Functional Plan
MoU signed
through a decade
Commission of
Plan for
India (now NITI
on Transport for
NCR, 2032
b/w GOI, Uttar long multi-state
NCR-2021 Pradesh, Delhi,
recommended
Aayog) prepared by
Haryana and multi-stakeholder
constituted Task NCRPB,
RRTS
Force under recommended
Rajasthan for consultative
implementation
chairmanship of
Secretary,
8 RRTS
corridors (3 to be
of RRTS by process
NCRTC
MoUD for RRTS implemented
in Phase 1)
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
RRTS in NCR – enhancing Regional Mobility
Delhi
Delhi
Area covered by
RRTS in 1 hr
(r - 100 Km)
Delhi-Ghaziabad-Meerut Ghaziabad-Khurja
Delhi-Gurgaon-Rewari-Alwar Delhi-Bahadurgarh-Rohtak
Delhi-Sonipat-Panipat Ghaziabad-Hapur
Delhi-Faridabad-Ballabgarh-Palwal Delhi-Shahdra-Baraut
Legal Framework
▪ The Metro Railway
(Construction of Works) 2013 2016 2019
Act 1978
▪ The Metro Railways In 2013, Union Government of
In 2016, December 2016,
(Operation & Cabinet Appointments BOD of NCRTC India sanction
Maintenance) Act 2002 approved Committee of having representation the Delhi-
formation of Ghaziabad-
as amended through the Cabinet of four NCR states
NCRTC with the (ACC) appointed & GoI approved the Meerut RRTS
Metro Railway objective of project in
full time DPR of Delhi-
(Amendment) Act, 2009 implementation Managing Director Ghaziabad-Meerut March 2019;
and O&M of RRTS of NCRTC RRTS work started
▪ The Railways Act, 1989 projects in NCR in June 2019
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
RRTS – filling the gap of regional commute
National Railways Passenger Trains Metro Rail Transit Autos / Shared Autos
National Airlines Inter-state Buses Bus Rapid Transit E-Rickshaws
High Speed Rail RRTS (Semi-high City Buses Feeder Buses
Speed rail)
High Speed Rail & Semi-High Speed Rail are in nascent stages of implementation
Technological Operations
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
3 prioritized corridors in Phase I
Delhi – Delhi – *Delhi
Parameters
Meerut Panipat – SNB
Total Length (km) 82.15 103.02 107
Elevated (km) 69.79 91.54 70
Underground (km) 12.36 11.48 37
At-grade (km) - - -
Estimated travel time (min) 60 72 75
No. of total stations 24 17 16
~ 2 mn
~ 292 600
5 Depots daily
kms coaches
ridership
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Broad system parameters
Parameter RRTS
Design Speed 180 kmph intended to be upgraded to 220 kmph
Operating/Average Speed 160 kmph/ ~90-100 kmph
Frequency 5-10 min(RRTS)
Inter-Station Distance 5 – 10 km
Services on Network Inter-operable
Train Length 6/9 coach trains : infrastructure for 9 coach trains
Gauge Standard Gauge
• 3.2 meters wide cars
Rolling Stock • Transverse seating
• One business class coach in every train
Tunnels Twin tunnels of Dia 6.5 m
Signalling ETCS Level II with LTE communication backbone
PSD/PSG At all stations
Track Ballastless Track suitable for 180 kmph/220 kmph
1x25 KV AC
Traction
Rigid OCS in tunnels
Bearings Spherical or other suitable for the speed
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
RRTS projects are significantly different from Metro Rail
• RRTS is a high-speed Rail based Regional Transit System with a maximum design speed of
180 kmph and an average speed of 100 kmph. It is similar to Cercaneas of Spain, RER & Transilien
of France, Cross Rail of UK and MTR of Hong Kong
• Inter station distances: 5 – 10 Km
• It will be the FASTEST, the most COMFORTABLE and the SAFEST mode of travel in NCR
Max. Ops
Speed 160
Km/hr
Max. Ops
Speed 80
Km/hr
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Financing Plan (Delhi-Meerut Corridor)
13
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Framework for implementation of Delhi-Meerut RRTS Corridor
Govt. of India,
20.0%
GoUP &
GNCTD,
20.0%
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Loan Name: Delhi-Meerut Regional Rapid Transit System Project
(Project Number: 51073-003)
• Loan Amount: US$ 2,049 million
(ADB Financing: US$ 1,049 million; AIIB Joint Co-financing: US$ 500 million; NDB
financing: US$ 500 million)
• Implementing Agency: National Capital Region Transport Corporation (NCRTC)
• Loan Repayment Period: 17 years for principal repayment (Feb’ 2029 to Aug’ 2045)
• Construction Period: from 2019 to 2025
• Categories of Procurement: (Civil Works/ Supply of Equipment/ Consultancy Services)
• Nature of Procurement: ICB/NCB/QCBS as per procurement policies of ADB
• Geographical Location: (Delhi-Ghaziabad-Meerut)
• Future Procurement Opportunities: All the major packages have been awarded and are under execution.
However, last mile packages and other property development packages are in pipeline of Bidding.
• Project Director/Concerned Official’s Contact Details:
• Name & Designation: Mr. Anil Kumar Shrangarya, Director (Projects)
• Postal Address: GatiShakti Bhawan, INA, New Delhi-110023
• Phone Numbers: +91 011 24666700
• Email Id: anil.shrangarya@ncrtc.in
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Procurement: Delhi-Meerut RRTS Corridor
➢ Major Packages: Approximately 96% packages have been awarded and are
under execution. Balance Packages are to be invited.
➢ Minor Package: Several minor packages are under execution and further
Packages shall be invited as per requirement.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Various Non-Fare Box Revenue streams for Delhi-Meerut Corridor
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Delhi-Gurugram-Rewari-SNB
RRTS Corridor
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Delhi – SNB RRTS Corridor INA
Alignment details
Total Length (km) 107
Elevated (km) 70
In Delhi 0.22
In Haryana 68
In Rajasthan 2
Underground (km) 37
In Delhi 22
In Haryana 15
In Rajasthan 0.0
Estimated travel time ~ 75 min
No. of total stations 16
In Delhi (U/G: 3) 4
In Haryana (U/G: 2) 11
In Rajasthan 1
19
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Stations on Delhi-SNB Corridor
Interstation
Cumulative distance
S.No Station Name State distance (in
(in km)
km)
1 Sarai Kale Khan Station Delhi 0.48 0.00
2 INA Delhi 7.29 6.81
3 Munirka Station Delhi 5.07 11.88
4 Aerocity Station Delhi 5.38 17.26
5 Udyog Vihar Station Haryana 7.78 25.04
6 Sec 16 Station Haryana 4.83 29.87
7 Rajiv Chowk Station Haryana 3.49 33.36
8 Kherki Daula Station Haryana 6.28 39.64
9 Manesar Station Haryana 7.13 46.77
10 Panchgaon Station Haryana 6.77 53.54
11 Bilaspur Chowk Haryana 5.50 59.04
12 Dharuhera Station Haryana 11.66 70.70
13 MBIR Station Haryana 9.86 80.56
14 Rewari Station Haryana 3.51 84.07
15 Bawal Station Haryana 10.10 94.17
16 SNB Station Rajasthan 11.84 106.01
6 20
10 Elevated Station
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Underground Station
Status of Pre-enabling works
21
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Progress: Pre-construction activities
➢ CPM Field offices are functional at Gurugram and Delhi since May 2019 and Jan 2020 respectively
➢ Enabling works: In order to save time in project implementation once the Project is sanctioned by GOI,
enabling works are substantially completed with the support of Government of Haryana.
23
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Framework for implementation of DLI-SNB RRTS Corridor
Govt. of
DPR of Delhi-SNB RRTS Corridor is under active India,
consideration of Govt. of India for approval and GoH, 20.0%
sanction of the project is awaited GNCTD &
GoR, 20.0%
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Loan Name: Delhi-SNB Regional Rapid Transit System Investment
Project (Project Number: 56015-002)
• Loan Amount: US$ 2358 million
(ADB Financing: US$ 1382 million; World Bank Financing: US$ 457 million; JICA
financing: US$ 519 million)
• Implementing Agency: National Capital Region Transport Corporation (NCRTC)
• Loan Period: Proposal is under active review.
• Construction Period: likely construction period is about 6 years from the date of sanction of the project.
• Categories of Procurement: (Civil Works/ Supply of Equipment/ Consultancy Services)
• Nature of Procurement: Expected to be ICB/NCB/QCBS as per procurement policies of ADB
• Geographical Location: (Delhi-Gurugram-Rewari-SNB)
• Future Procurement Opportunities: Please refer next slides.
• Project Director/Concerned Official’s Contact Details:
• Name & Designation: Mr. Anil Kumar Shrangarya, Director (Projects)
• Postal Address: GatiShakti Bhawan, INA, New Delhi-110023
• Phone Numbers: +91 011 24666700
• Email Id: anil.shrangarya@ncrtc.in
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Expected future Procurement Opportunities
(Delhi-SNB Corridor)
26
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Expected Future Procurement Opportunities – Civil & Elect. Works
(DLI-SNB Corridor)
Likely Date for
SN Type of Work Location Scope of Work Invitation of Bid
(IFB)
All civil, PEB and E&M
1 Construction of Depot cum Workshop Dharuhera Q1/2024
work
Environment Control System (ECS), ECS, TVS & BMS for 37
2 Tunnel Ventilation System (TVS) and DLI-SNB km UG section and 6 Q2/2024
Building Management System (BMS) Nos. of UG stations
3 Escalators and Travelators DLI-SNB For 6 Nos. of UG and 9 Q3/2024
4 Elevators (Lifts) DLI-SNB Nos. of elevated stations Q3/2024
5 HH Rails & Fastening System DLI-SNB Entire 107 Route km Q3/2024
Kherki Daula Toll to Manesar Sector-1, Manesar Ravine Area 26.6 Route Km & 3
6 Construction of Elevated Viaduct Q1/2024
ramp to Bilaspur Chowk, Bilaspur Chowk to Dharuhera Nos. Elv. Stns.
35 Route km & 4
7 Construction of Elevated Viaduct Dharuhera to SNB Q3/2024
Nos. Elv. Stn.
Design and Construction of twin 13 Route km & 2 Nos.
8 Ramp at Millenium Park (including Ramp Structure) to Munirka Q2/2024
Tunnels UG Stn.
Design and Construction of twin Ex. Munirka to Ramp at IDPL Complex (including Ramp 9 Route km & 1 No. UG
9 Q1/2024
Tunnels Structure) Stn.
9.0 Route Km & 2
10 Construction of Elevated Viaduct IDPL Complex to Rajiv Chowk (Incl. Elevated ramp structure) Q2/2024
Nos. Elv. Stns.
Design and Construction of twin 15 Route km & 3 Nos.
11 Rajiv Chowk to Kherki Daula Toll and Manesar to Ravine Area Q2/2024
Tunnels UG Stn.
Other Packages As and when required
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Expected Future Procurement Opportunities – Other Infrastructural
Works (DLI-SNB Corridor)
Likely Date
for Invitation
SN Type of Work Location Scope of Work
of Bid
(IFB)
Signalling, Train Control Systems, Telecommunication system,
1 DLI-SNB Entire 107 Route km Q1/2025
Platform Screen Doors
2 Solar DLI-SNB RESCO Model Q1/2025
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Delhi-Sonipat-Panipat
RRTS Corridor
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Delhi – Panipat RRTS Corridor
Alignment details
30
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Stations on Delhi-Panipat Corridor
Geotechnical Investigation
Road Widening
Anand Vihar • Retail, Offices ~50,000 sqm of BUA above UG RRTS Station
➢ Structure shall be provided either by NCRTC and leased to private developers on long term lease for
furnishing, renting out ( revenue sharing) and operations or the land will be leased to developer and he
shall develop it and in lieu provide upfront premium plus annual lease to NCRTC as the case may be. In
both the cases Built-up area will be returned to NCRTC after the lease period.
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Masterplanning for PD – Ghaziabad RRTS Station
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Masterplanning for PD – Duhai Depot
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Proposals for PD – Anand Vihar
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Proposals for PD – Bhaisali
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Property Business / In-station commercial
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
Property Business / In-station commercial