Professional Documents
Culture Documents
Instructions
Instructions
SUN-5K-SG04LP3-EU
SUN-6K-SG04LP3-EU
SUN-8K-SG04LP3-EU
SUN-10K-SG04LP3-EU
SUN-12K-SG04LP3-EU
User Manual
Contents
1. Safety Introductions ………………………………………………… 01
2. Product instructions ………………………………………………… 02-04
2.1 Product Overview
2.2 Product Size
2.3 Product Features
2.4 Basic System Architecture
3. Installation …………………………………………………………… 05-24
3.1 Parts list
3.2 Mounting instructions
3.3 Battery connection
3.4 Grid connection and backup load connection
3.5 PV Connection
3.6 CT Connection
3.6.1 Meter Connection
3.7 Earth Connection(mandatory)
3.8 WIFI Connection
3.9 Wiring System for Inverter
3.10 Wiring diagram
3.11 Typical application diagram of diesel generator
3.12 phase parallel connection diagram
4. OPERATION …………………………………………………………… 25
4.1 Power ON/OFF
4.2 Operation and Display Panel
5. LCD Display Icons …………………………………………………… 26-38
5.1 Main Screen
5.2 Solar Power Curve
5.3 Curve Page-Solar & Load & Grid
5.4 System Setup Menu
5.5 Basic Setup Menu
5.6 Battery Setup Menu
5.7 System Work Mode Setup Menu
5.8 Grid Setup Menu
5.9 Generator Port Use Setup Menu
5.10 Advanced Function Setup Menu
5.11 Device Info Setup Menu
6. Mode …………………………………………………………………… 38-39
7. Limitation of Liability ……………………………………………… 39-43
8. Datasheet ……………………………………………………………… 44-45
9. Appendix I …………………………………………………………… 46-47
10. Appendix II …………………………………………………………… 48
About This Manual
The manual mainly describes the product informa�on, guidelines for installa�on, opera�on and
maintenance. The manual cannot include complete informa�on about the photovoltaic (PV)
system.
1. Safety Introduc�ons
Safety signs
The DC input terminals of the inverter must Surface high temperature, Please do not
not be grounded. touch the inverter case.
The AC and DC circuits must be Prohibit disassembling inverter case,
disconnected separately, and there exis�ng shock hazard, which may
the maintenance personnel cause serious injury or death, please ask
must wait for 5 minutes before they are completely qualified person to repair.
powered off before they can start working.
Please read the instruc�ons carefully Do Not put it in the waste bin! Recycle it
before use. by licensed professional!
· This chapter contains important safety and opera�ng instruc�ons. Read and keep this manual
for future reference.
· Before using the inverter, please read the instruc�ons and warning signs of the ba�ery and
corresponding sec�ons in the instruc�on manual.
· Do not disassemble the inverter. If you need maintenance or repair, take it to a professional
service center.
· Improper reassembly may result in electric shock or fire.
· To reduce risk of electric shock, disconnect all wires before a�emp�ng any maintenance or
cleaning. Turning off the unit will not reduce this risk.
· Cau�on: Only qualified personnel can install this device with ba�ery.
· Never charge a frozen ba�ery.
· For op�mum opera�on of this inverter, please follow required specifica�on to select appropriate
cable size. It is very important to correctly operate this inverter.
· Be very cau�ous when working with metal tools on or around ba�eries. Dropping a tool may
cause a spark or short circuit in ba�eries or other electrical parts, even cause an explosion.
· Please strictly follow installa�on procedure when you want to disconnect AC or DC terminals.
Please refer to "Installa�on" sec�on of this manual for the details.
· Grounding instruc�ons - this inverter should be connected to a permanent grounded wiring
system. Be sure to comply with local requirements and regula�on to install this inverter.
· Never cause AC output and DC input short circuited. Do not connect to the mains when DC
input short circuits.
- 01 -
2. Product Introduc�ons
This is a mul�func�onal inverter, combining func�ons of inverter, solar charger and ba�ery
charger to offer uninterrup�ble power support with portable size. Its comprehensive LCD display
offers user configurable and easy accessible bu�on opera�on such as ba�ery charging, AC/solar
charging, and acceptable input voltage based on different applica�ons.
1
2
3
4 6
5 7
10
11
8
9
15
13 16
14
12
422.0 mm
450.9 mm
658.0 mm
279.0 mm
782.5 mm
Inverter Size
279.0 mm
422.0 mm
254.0 mm
240.00 mm
363.00 mm
120.00 mm
- 03 -
2.3 Product Features
- 230V/400V Three phase Pure sine wave inverter.
- Self-consump�on and feed-in to the grid.
- Auto restart while AC is recovering.
- Programmable supply priority for ba�ery or grid.
- Programmable mul�ple opera�on modes: On grid, off grid and UPS.
- Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng.
- Configurable AC/Solar/Generator Charger priority by LCD se�ng.
- Compa�ble with mains voltage or generator power.
- Overload/over temperature/short circuit protec�on.
- Smart ba�ery charger design for op�mized ba�ery performance
- With limit func�on, prevent excess power overflow to the grid.
- Suppor�ng WIFI monitoring and build-in 2 strings for 1 MPP tracker, 1 string for 1 MPP tracker.
- Smart se�able three stages MPPT charging for op�mized ba�ery performance.
- Time of use func�on.
- Smart Load Func�on.
AC cable DC cable
WiFI
GPRS
CT
- 04 -
3. Installa�on
3.1 Parts List
Check the equipment before installa�on. Please make sure nothing is damaged in the package.
You should have received the items in the following package:
User
Three-Phase Smart Meter
- 05 -
3.2 Moun�ng instruc�ons
Installa�on Precau�on
This Hybrid inverter is designed for outdoor use(IP65), Please make sure the installa�on site
meets below condi�ons:
· Not in direct sunlight
· Not in areas where highly flammable materials are stored.
· Not in poten�al explosive areas.
· Not in the cool air directly.
· Not near the television Antenna or antenna cable.
· Not higher than al�tude of about 2000 meters above sea level.
· Not in environment of precipita�on or humidity(>95%)
Please AVOID direct sunlight, rain exposure, snow laying up during installa�on and
opera�on. Before connec�ng all wires, please take off the metal cover by removing
screws as shown below:
- 06 -
≥500mm
≥500mm
For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and
approx. 50cm above and below the unit. And 100cm to the front.
- 07 -
3.3 Ba�ery connec�on
For safe opera�on and compliance, a separate DC over-current protector or disconnect device is
required between the ba�ery and the inverter. In some applica�ons, switching devices may not
be required but over-current protectors are s�ll required. Refer to the typical amperage in the
table below for the required fuse or circuit breaker size.
- 08 -
All wiring must be performed by a professional person.
Connec�ng the ba�ery with a suitable cable is important for safe and efficient
opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for
recommended cables.
29.54mm
m
30m
30mm
For 5-12kW model, ba�ery connector screw size: M10
15.3/16mm
10.
5mm
- 09 -
3.3.2 Func�on port defini�on
Inverter
CN1: TEMP: 1,2 CN2: G_start: 1,2
CT_1: 3,4 G_valve: 3,4
CT_2: 5,6 Grid_Ry: 5,6
CT_3: 7,8 CN1 RSD: 7+, 8- CN2
Parallel_A Parallel_B Meter-485
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 Modbus BMS
- 10 -
3.3.3 Temperature sensor connec�on for lead-acid ba�ery
Inverter
12
Temp. CT
- 11 -
3.4 Grid connec�on and backup load connec�on
· Before connec�ng to the grid, a separate AC breaker must be installed between the inverter
and the grid, and also between the backup load and the inverter. This will ensure the inverter
can be securely disconnected during maintenance and fully protected from over current. The
recommended of AC breaker for the load port is 63A for 8kW, 63A for 10kw and 63A for 12kW.
The recommended of AC breaker for the grid port is 63A for 8kW, 63A for 10kw and 63A for 12kW.
· There are three terminal blocks with "Grid" "Load"and "GEN" markings. Please do not misconnect
input and output connectors.
All wiring must be performed by a qualified personnel.It is very important for
system safety and efficient opera�on to use appropriate cable for AC input
connec�on. To reduce risk of injury, please use the proper recommended cable
as below.
backup load connec�on
Model Wire Size Cable(mm 2 ) Torque value(max)
5/6/8/10/12kW 10AWG 6 1.2Nm
Grid connec�on
Model Wire Size Cable(mm 2 ) Torque value(max)
5/6/8/10/12kW 10AWG 6 1.2Nm
LOAD
PE
GEN PORT
PE
GRID T(L3)
S(L2)
R(L1)
N
- 12 -
Be sure that AC power source is disconnected before a�emp�ng to wire it to the
unit.
3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten
terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well.
4. Make sure the wires are securely connected.
5. Appliances such as air condi�oner are required at least 2-3 minutes to restart because it is
required to have enough �me to balance refrigerant gas inside of circuit. If a power shortage
occurs and recovers in short �me, it will cause damage to your connected appliances. To
prevent this kind of damage, please check manufacturer of air condi�oner if it is equipped with
�me-delay func�on before installa�on. Otherwise, this inverter will trigger overload fault and
cut off output to protect your appliance but some�mes it s�ll causes internal damage to the air
condi�oner
3.5 PV Connec�on
Before connec�ng to PV modules, please install a separately DC circuit breaker between
inverter and PV modules. It is very important for system safety and efficient opera�on to
use appropriate cable for PV module connec�on. To reduce risk of injury, please use the
proper recommended cable size as below.
5/6/8/10/12kW 12AWG 4
To avoid any malfunc�on, do not connect any PV modules with possible current
leakage to the inverter. For example, grounded PV modules will cause current
leakage to the inverter. When using PV modules, please ensure the PV+ & PV-
of solar panel is not connected to the system ground bar.
It is requested to use PV junc�on box with surge protec�on. Otherwise, it will
cause damage on inverter when lightning occurs on PV modules.
- 13 -
3.5.1 PV Module Selec�on:
When selec�ng proper PV modules, please be sure to consider below parameters:
1) Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of
inverter.
2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage.
3) The PV modules used to connected to this inverter shall be Class A ra�ng cer�fied according
to lEC 61730.
No. of Strings per MPP Tracker 1+1 1+1 1+1 2+1 2+1
Chart 3-5
3.5.2 PV Module Wire Connec�on:
1. Switch the Grid Supply Main Switch(AC)OFF.
2. Switch the DC lsolator OFF.
3. Assemble PV input connector to the inverter.
Safety Hint:
When using PV modules, please ensure the PV+ & PV- of solar panel is not
connected to the system ground bar.
Safety Hint:
Before connec�on, please make sure the polarity of the output voltage of PV
array matches the “DC+” and “DC-” symbols.
Safety Hint:
Before connec�ng inverter, please make sure the PV array open circuit voltage is
within the 800V of the inverter.
Pic 5.1 DC+ male connector Pic 5.2 DC- female connector
- 14 -
Safety Hint:
Please use approved DC cable for PV system.
Cross section(mm )
Cable type
Range Recommended value
Industry generic PV cable 4.0~6.0
4.0(12AWG)
(model: PV1-F) (12~10AWG)
Chart 3-6
7mm
7mm
Pic 3.3 Disassemble the connector cap nut
c) Insert the contact pin to the top part of the connector and screw up the cap nut to the top
part of the connector. (as shown in picture 5.5).
- 15 -
Pic 3.5 connector with cap nut screwed on
d) Finally insert the DC connector into the posi�ve and nega�ve input of the inverter, shown as
picture 5.6
Warning:
Sunlight shines on the panel will generate voltage, high voltage in series may
cause danger to life. Therefore, before connec�ng the DC input line, the solar
panel needs to be blocked by the opaque material and the DC switch should
be 'OFF', otherwise, the high voltage of the inverter may lead to life-
threatening condi�ons.
Warning:
Use the DC power connector of the accessories. Do not interconnect the
connectors of different manufacturers.
- 16 -
3.6 CT Connec�on
PE
N T
Inverter R S
GRID
CT
Arrow pointing
to inverter R
CT1
CT2
T
CT3
N
Grid
*Note:when the reading of the load power on the LCD is not correct, please
reverse the CT arrow.
- 17 -
3.6.1 Meter Connec�on
PE
N T
R S
GRID
Inverter
PE
N
Parallel_A Parallel_B Meter-485 port
3 6 9 10 R
Three-Phase Smart Meter
S
RS485A
3 6 9 10
SET ESC T Grid
RS485B
R 24 25
(1,4,7,10) T (3,6,9,10)
SET ESC
RS 485
24 25
1 4 7 10
PE
N T
R S
GRID
Inverter
N TSR
Parallel_A Parallel_B Meter-485 port 8 7 6 5
RS485B
RS485A
GND Eastron
PE
1 2 3 4 5 6 7 8 R
R
S
S T
Eastron
T S T
R
N
(1,2,3,4) (5,6,7,8) Grid
B A G
5 6 7 8
RS 485
RS 485 B RS 485 A GND
- 18 -
Note:
When the inverter is in the off-grid state, the N line needs to be connected to the
earth.
Note:
In final installa�on,breaker cer�fied according to IEC 60947-1 and IEC 60947-2
shall be installed with the equipment.
- 19 -
PV This diagram is an example for an applica�on that neutral connects with the
PE in a distribu�on box.
For countries such as Australia, New Zealand, South Africa, etc., please follow
DC Breaker local wiring regula�ons!
BMS
N N
R R
S RCD S
Load
T T
Battery AC Breaker
PE or PE
DC Breaker
3.9 Wiring System for Inverter
Load
Hybrid Inverter
CT
N N
N
R R
CT1
- 20 -
R S S Grid
GEN S CT2
T T T
CT3
PORT
PE AC Breaker AC Breaker
AC Breaker PE
Grid
PE
E-BAR E-BAR
N R S T PE
Home Loads
This diagram is an example for an applica�on in which neutral is separated from the PE in the distribu�on box.
For countries such as China, Germany,the Czech Republic, Italy, etc., please follow local wiring regua�ons!
Note:Backup func�on is op�onal in German market.please leave backup side empty if backup func�on is not
available in the inverter.
When the inverter is working in backup mode, neutral and PE on the backup side are connected via the internal
relay. Also,this internal relay will be open when the inverter is working in grid �ed mode.
N
3.10 Wiring diagram
PE
Distribution box
L1 L1
BMS
L2 L2
L3 RCD L3
Backup
N N
Battery Loads
PE or PE
Backup
Hybrid Inverter CT
- 21 -
L1 L1
CT1
L2 L2
CT2
L3 L3 Grid
Solar CT3
N N
Array
PE PE
On-Grid
L1 L2 L3 N PE
Home Loads
CAN L wire N wire PE wire
BMS
Ground
Inverter
①DC
Breaker
③AC Breaker
- 22 -
3.11 Typical applica�on diagram of diesel generator
CAN L wire N wire PE wire
coil
open
relay N
contact R
S
T
G S
②AC
PE Backup Load
GS (diesel generator startup signal) Breaker
BMS
GRID
L OA D
G EN
Ground
Inverter
①DC
Breaker
③AC Breaker
Battery pack
- 23 -
3.12 Three phase parallel connec�on diagram
Max. 10pcs parallel for on-grid and off-grid opera�on.
CAN L wire N wire PE wire
Inverter
No.3
Parallel_A Parallel_B Meter-485
(slave)
Ground
Inverter
① Inverter
④ ⑤
No.2
⑤⑦⑨ AC Breaker for backup load
SUN 10K-SG-EU: 63A AC breaker
SUN 12K-SG-EU: 63A AC breaker
(slave)
Ground
⑦
②
⑥
SUN 10K-SG-EU: 300A DC breaker
SUN 12K-SG-EU: 300A DC breaker
SUN 5K-SG-EU: 150A DC breaker
SUN 6K-SG-EU: 200A DC breaker
SUN 8K-SG-EU: 250A DC breaker
①②③ DC Breaker for battery
Inverter
No.1
(master)
Ground
③ ⑨
Battery pack ⑧
Arrow pointing
to inverter Home Load
Master inverter Slave Inverter Slave Inverter Backup Load
Advanced Function Advanced Function Advanced Function
Parallel Modbus SN Parallel Modbus SN Parallel Modbus SN
EX_Meter For CT Meter Select EX_Meter For CT Meter Select EX_Meter For CT Meter Select
No Meter 0/3 No Meter 0/3 No Meter 0/3
- 24 -
4. OPERATION
4.1 Power ON/OFF
Once the unit has been properly installed and the ba�eries are connected well, simply press
On/Off bu�on(located on the le� side of the case) to turn on the unit. When system without
ba�ery connected, but connect with either PV or grid, and ON/OFF bu�on is switched off, LCD
will s�ll light up(Display will show OFF), In this condi�on, when switch on ON/OFF bu�on and
select NO ba�ery,system can s�ll working.
Up To go to previous selec�on
- 25 -
5. LCD Display Icons
5.1 Main Screen
The LCD is touchscreen, below screen shows the overall informa�on of the inverter.
05/28/2019 15:34:40
0 8.30 12 0 -3.00 8
KW KW
ON
25%
0 -2.00
KW
8 0 3.00
KW
8
1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it
turns into "comm./F01~F64" , it means the inverter has communica�on errors or other errors,
the error message will display under this icon(F01-F64 errors, detail error info can be viewed in
the System Alarms menu).
3.System Setup Icon, Press this set bu�on,you can enter into the system setup screen which
including Basic Setup, Ba�ery Setup, Grid Setup, System Work Mode, Generator port use,
Advanced func�on and Li-Ba� info.
4.The main screen showing the info including Solar, Grid, Load and Ba�ery. Its also displaying the
energy flow direc�on by arrow. When the power is approximate to high level, the color on the
panels will changing from green to red so system info showing vividly on the main screen.
- 26-
5.1.1 LCD opera�on flow chart
Inverter Page
Main Screen
Battery Page BMS Page
Battery Setting
Grid Setting
System Setup
Gen Port Use
Basic Setting
Advanced Function
Device info
- 27 -
5.2 Solar Power Curve
Energy Press the “Energy “bu�on will enter into the power
curve page.
1166w
1244w
50Hz
-81w
50Hz
① This is Inverter detail page.
222v 0.8w 222v 0.1A ① Inverter Genera�on.
221v 0w 229v 5.0w 230v 0.1A
229v 1166w 229v 0.9w 223v 0.1A Voltage, Current, Power for each Phase.
225v 0w HM: LD: INV_P:
AC-T: mean Heat-sink temperature.
-10W 28W -30W
Load 5W 1192W -26W AC_T:
0W 24W -25W 38.8C
SOC:99%
-21w Grid Inverter
BAT_V:53.65V
DC_P1: 0W DC_P2: 0W
BAT_I: -0.41A DC_V1: 0V DC_V2: 0V
BAT_T: 27.0C DC_I1: 0.0A DC_I2: 0.0A
Battery PV1 PV2
Energy
L1: 0V L2: 0V L3: 0V Energy Press the “Energy “ bu�on will enter into the power
curve page.
- 28 -
Li-BMS
U:49.58V
I:2.04A
Li-BMS
Power: 101W Volt Curr Temp SOC Energy Charge Fault
Volt Curr
1 50.38V 19.70A 30.6C 52.0% 26.0Ah 0.0V 0.0A 0|0|0
Temp:25.0C
Energy 2
3
4
50.33V
50.30V
0.00V
19.10A
16.90A
0.00A
31.0C
30.2C
0.0C
51.0%
12.0%
0.0%
25.5Ah
6.0Ah
0.0Ah
53.2V
53.2V
0.0V
25.0A
25.0A
0.0A
0|0|0
0|0|0
0|0|0
Sum
Data
5 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
6 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
7 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
8 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
This is Ba�ery detail page. 9 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
10 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Details
11 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Data
if you use Lithium Ba�ery, you can enter BMS page. 12 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
13 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
14 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
15 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
CANCEL Day Month Year Total CANCEL Day Month Year Total
CANCEL Day Month Year Total CANCEL Day Month Year Total
Solar power curve for daily, monthly, yearly and total can be roughly checked on the LCD, for more
accuracy power genera�on, pls check on the monitoring system. Click the up and down arrow to
check power curve of different period.
- 29 -
5.4 System Setup Menu
System Setup
This is System Setup page.
Basic Advanced
Setting Function Device Info.
Basic Setting
Factory Reset: Reset all parameters of the inverter.
Time Syncs Beep Auto Dim Lock out all changes: Enable this menu for se�ng
Year Month Day Basic parameters that require locking and cannot be set up.
2019 03 17
Set Before performing a successful factory reset and locking
the systems, to keep all changes you need to type in a
Hour Minute password to enable the se�ng.
24-Hour 09 15 The password for factory se�ngs is 9999 and for lock
out is 7777.
Factory Reset Lock out all changes
PassWord
Factory Reset Password: 9999
X--X--X--X DEL Lock out all changes Password: 7777
1 2 3
4 5 6
7 8 9
CANCEL 0 OK
- 30 -
5.6 Ba�ery Setup Menu
Battery Setting Ba�ery capacity: it tells hybrid inverter to know
your ba�ery bank size.
Batt Mode
Lithium
Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V).
Batt Capacity 400Ah
Batt
Use Batt V Max A Charge 40A
Mode Use Ba� %: Use Ba�ery SOC for all the se�ngs (%).
Use Batt % Max A Discharge 40A Max. A charge/discharge: Max ba�ery charge/discharge
No Batt
current(0-120A for 5kW model, 0-150A for 6kW model,
Activate Battery 0-190A for 8kW model, 0-210A for 10kW model, 0-240A
for 12kW model).
For AGM and Flooded, we recommend Ah ba�ery
size x 20%= Charge/Discharge amps.
. For Lithium, we recommend Ah ba�ery size x 50% =
Charge/Discharge amps.
. For Gel, follow manufacturer' s instruc�ons.
No Ba�: �ck this item if no ba�ery is connected
to the system.
Ac�ve ba�ery: This feature will help recover a
ba�ery that is over discharged by slowly charging
from the solar array or grid.
This is Grid Charge, you need select. ② Gen Max Run Time: It indicates the longest �me
Generator can run in one day, when �me is up, the
Start =30%: No use,Just for customiza�on. Generator will be turned off. 24H means that it does
A = 40A: It indicates the Current that the not shut down all the �me.
Grid charges the Ba�ery.
Gen Down Time: It indicates the delay �me of the
Grid Charge: It indicates that the grid charges Generator to shut down a�er it has reached the running
the ba�ery. �me.
Grid Signal: Disable.
0 2.00 7 0 0.00 5
KW KW
ON
76% Signal
on
0 -1.39
KW
5 0 2.00
KW 5
- 31-
Generator
This page tells generator output voltage, frequency,
Power: 6000W Today=10 KWH power. And, how much energy is used from generator.
Total =10 KWH
Battery Setting
Lithium Mode: This is BMS protocol.Please reference
the document(Approved Ba�ery).
Lithium Mode 00
Shutdown 10%: It indicates the inverter will shutdown
Batt
Shutdown 10% Set3 if the SOC below this value.
Low Ba� 20%: It indicates the inverter will alarm if the
Low Batt 20%
SOC below this value.
Restart 40% Restart 40%: Ba�ery voltage at 40% AC output will
resume.
Equalization V 57.6V
Shutdown 20%: The inverter will shutdown if the SOC
TEMPCO(mV/C/Cell)
below this value.
Equalization Days 30 days
② -5
Low Ba� 35%: The inverter will alarm if the SOC
③
Batt Resistance below this value.
Equalization Hours 3.0 hours
25mOhms Restart 50%: Ba�ery SOC at 50% AC output will resume.
- 32 -
5.7 System Work Mode Setup Menu
System Work Mode Work Mode
Selling First: This Mode allows hybrid inverter to sell
Selling First 12000 Max Solar Power back any excess power produced by the solar panels to
Zero Export To Load Solar Sell
Work the grid. If �me of use is ac�ve, the ba�ery energy also
Mode1
can be sold into grid.
Zero Export To CT Solar Sell The PV energy will be used to power the load and charge
the ba�ery and then excess energy will flow to grid.
Max Sell Power 12000 Zero-export Power 20
Power source priority for the load is as follows:
Energy pattern BattFirst LoadFirst 1. Solar Panels.
Grid Peak Shaving 8000 Power 2. Grid.
3. Ba�eries (un�l programable % discharge is reached).
Zero Export To Load: Hybrid inverter will only provide power to the backup load connected. The hybrid
inverter will neither provide power to the home load nor sell power to grid. The built-in CT will detect
power flowing back to the grid and will reduce the power of the inverter only to supply the local load and
charge the ba�ery.
Battery
Zero Export To CT: Hybrid inverter will not only provide power to the backup load connected but also give
power to the home load connected. If PV power and ba�ery power is insufficient, it will take grid energy
as supplement. The hybrid inverter will not sell power to grid. In this mode, a CT is needed. The installa�on
method of the CT please refer to chapter 3.6 CT Connec�on. The external CT will detect power flowing back
to the grid and will reduce the power of the inverter only to supply the local load, charge ba�ery and home
load.
CT
Battery
Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus
energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load
consump�on and charge ba�ery and feed into grid.
Max. sell power: Allowed the maximum output power to flow to grid.
Zero-export Power: for zero-export mode, it tells the grid output power. Recommend to set it as 20-100W
to ensure the hybrid inverter won' t feed power to grid.
Energy Pa�ern: PV Power source priority.
Ba� First: PV power is firstly used to charge the ba�ery and then used to power the load. If PV power is
insufficient, grid will make supplement for ba�ery and load simultaneously.
Load First: PV power is firstly used to power the load and then used to charge the ba�ery. If PV power is
insufficient, Grid will provide power to load.
Max Solar Power: allowed the maximum DC input power.
Grid Peak-shaving: when it is ac�ve, grid output power will be limited within the set value. If the load
power exceeds the allowed value, it will take PV energy and ba�ery as supplement. If s�ll can’t meet the
load requirement, grid power will increase to meet the load needs.
- 33 -
System Work Mode Time of use: it is used to program when to use grid or
generator to charge the ba�ery, and when to discharge
Grid Time Of Use the ba�ery to power the load. Only �ck "Time Of Use"
Charge Gen Time Power Batt then the follow items (Grid, charge, �me, power etc.)
Work
01:00 5:00 12000 49.0V Mode2
will take effect.
Note: when in selling first mode and click �me of use,
05:00 9:00 12000 50.2V
the ba�ery power can be sold into grid.
09:00 13:00 12000 50.9V Grid charge: u�lize grid to charge the ba�ery in a �me
13:00 17:00 12000 51.4V
period.
Gen charge: u�lize diesel generator to charge the ba�ery
17:00 21:00 12000 47.1V in a �me period.
21:00 01:00 12000 49.0V Time: real �me, range of 01:00-24:00.
Note: when the grid is present, only the “�me of use”
is �cked, then the ba�ery will discharge. Otherwise,
the ba�ery won’t discharge even the ba�ery SOC is
Battery Setting full. But in the off-grid mode (when grid is not
available, inverter will work in the off-grid mode
Start 30% 30% automa�cally).
Power: Max. discharge power of ba�ery allowed.
Batt Ba�(V or SOC %): ba�ery SOC % or voltage at when the
A 40A 40A
Set2
ac�on is to happen.
Gen Charge Grid Charge
For example
During 01:00-05:00,
Gen Signal Grid Signal
if ba�ery SOC is lower than 80%, it will use grid to charge the
Gen Max Run Time 0.0 hours ba�ery un�l ba�ery SOC reaches 80%.
During 05:00-08:00,
Gen Down Time 0.5 hours if ba�ery SOC is higher than 40%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 40%. At the same �me,
if ba�ery SOC is lower than 40%, then grid will charge the
System Work Mode ba�ery SOC to 40%.
During 08:00-10:00,
② Grid Time Of Use if ba�ery SOC is higher than 40%, hybrid inverter will discharge
Charge Gen Time Power Batt
Work
the ba�ery un�l the SOC reaches 40%.
01:00 5:00 12000 80% Mode2 During 10:00-15:00,
when ba�ery SOC is higher than 80%, hybrid inverter will
05:00 8:00 12000 40%
discharge the ba�ery un�l the SOC reaches 80%.
08:00 10:00 12000 40% During 15:00-18:00,
10:00 15:00 12000 80% when ba�ery SOC is higher than 40%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 40%.
15:00 18:00 12000 40% During 18:00-01:00,
18:00 01:00 12000 35% when ba�ery SOC is higher than 35%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 35%.
System Work Mode It allows users to choose which day to execute the
se�ng of “Time of Use”.
Mon Tue Wed Thu Fri Sat Sun For example, the inverter will execute the �me of use
Work page on Mon/Tue/Wed/Thu/Fri/Sat only.
Mode4
- 34 -
5.8 Grid Setup Menu
Grid Setting/Grid code selection
Grid Mode:General Standard、UL1741 & IEEE1547、
Grid Mode General Standard CPUC RULE21、SRD-UL-1741、CEI 0-21、Australia A、
0/11
Rz
Grid Level LN:133VAC LL:230VAC
Rz: Large resistance ground resistor. Or the system IT system-neutral is not grounded
doesn’t have Neutral line
- 35 -
Grid Setting/F(W) FW: this series inverter is able to adjust inverter output
F(W) power according to grid frequency.
Over frequency Droop F 40%PE/Hz
Droop F: percentage of nominal power per Hz
Grid For example, “Start freq F>50.2Hz, Stop freq F<51.5,
Start freq F Stop freq F Set4
50.20Hz 51.5Hz
Droop F=40%PE/Hz” when the grid frequency reaches
Start delay F 0.00s Stop delay F 0.00s 50.2Hz, the inverter will decrease its ac�ve power at
Droop F of 40%. And then when grid system frequency
Under frequency Droop F 40%PE/Hz is less than 50.1Hz, the inverter will stop decreasing
Start freq F 49.80Hz Stop freq F 49.80Hz output power.
For the detailed setup values, please follow the local
Start delay F Stop delay F 0.00s
0.00s
grid code.
Grid Setting/V(W) V(Q) V(W): It is used to adjust the inverter ac�ve power
according to the set grid voltage.
V(W) V(Q)
V(Q): It is used to adjust the inverter reac�ve power
Lock-in/Pn Lock-out/Pn
Grid
according to the set grid voltage.
5% 20%
Set5 This func�on is used to adjust inverter output power
P1 Q1
(ac�ve power and reac�ve power) when grid voltage
V1 V1
108.0% 100% 94.0% 44%
changes.
V2 110.0% P2 80% V2 97.0% Q2 0%
Lock-in/Pn 5%: When the inverter ac�ve power is less
V3 112.0% P3 60% V3 105.0% Q3 0%
than 5% rated power, the VQ mode will not take effect.
Lock-out/Pn 20%: If the inverter ac�ve power is
V4 114.0% P4 40% V4 108.0% Q4 -44% increasing from 5% to 20% rated power, the VQ mode
will take effect again.
For example: V2=110%, P2=80%. When the grid voltage reaches the 110% �mes of rated grid voltage,
inverter output power will reduce its ac�ve output power to 80% rated power.
For example: V1=94%, Q1=44%. When the grid voltage reaches the 94% �mes of rated grid voltage,
inverter output power will output 44% reac�ve output power.
For the detailed setup values, please follow the local grid code.
Grid Setting/P(Q) P(F) P(Q): It is used to adjust the inverter reac�ve power
according to the set ac�ve power.
P(Q) P(PF) P(PF): It is used to adjust the inverter PF according
to the set ac�ve power.
Lock-in/Pn Lock-out/Pn
Grid For the detailed setup values, please follow the local
50% 50% Set6 grid code.
P1 0% Q1 2% P1 0% PF1 -0.000
Lock-in/Pn 50%: When the inverter output ac�ve power
is less then 50% rated power, it won't enter the P(PF)
P2 2% Q2 0% P2 0% PF2 -0.000 mode.
Lock-out/Pn 50%: When the inverter output ac�ve
P3 0% Q3 21% P3 0% PF3 0.000 power is higher then 50% rated power, it will enter the
P(PF) mode.
P4 22% Q4 25% P4 62% PF4 0.264 Note : only when the grid voltage is equal to or higher
than 1.05�mes of rated grid voltage, then the P(PF)
mode will take effect.
- 36 -
5.9 Generator Port Use Setup Menu
GEN PORT USE Generator input rated power: allowed Max. power from diesel
generator.
Mode GEN connect to grid input: connect the diesel generator to the
Generator Input GEN connect to Grid input
grid input port.
Rated Power PORT
Set1
Smart Load Output: This mode u�lizes the Gen input connec�on
8000W
as an output which only receives power when the ba�ery SOC
SmartLoad Output On Grid always on is above a user programmable threshold.
AC Couple Frz High e.g. ON: 100%, OFF=95%: When the ba�ery bank SOC reaches
55.00Hz 100%, Smart Load Port will switch on automa�cally and power
OFF(V) 51.0V
the load connected. When the ba�ery bank SOC < 95% , the
Micro Inv Input ON(V) 54.0V Smart Load Port will switch off automa�cally.
Ml export to Grid cutoff
Relay
Asymmetric phase feeding: If it was checked, the inverter will take power from the grid balance of on each
phase (L1/L2/L3) when needed.
- 37 -
Advanced Function This is for Wind Turbine
DC 1 for WindTurbine DC 2 for WindTurbine
I/A
Advanced Function
Ex_Meter For CT: when using zero-export to CT mode,
Parallel Modbus SN the hybrid inverter can select EX_Meter For CT func�on
Master 00 and use the different meters.e.g.CHNT and Eastron.
Paral.
Slave Set3
6. Mode
Mode I:Basic
AC cable DC cable COM cable
Solar
CT
Battery
Grid
- 38 -
Mode II: With Generator
AC cable DC cable
Grid
CT
Battery
Generator
Grid
CT
Battery
Smart Load
Grid
CT
Battery
On-Grid Inverter
The 1st priority power of the system is always the PV power, then 2nd and
3rd priority power will be the ba�ery bank or grid according to the se�ngs.
The last power backup will be the Generator if it is available.
7. Limita�on of Liability
In addi�on to the product warranty described above, the state and local laws and regula�ons
provide financial compensa�on for the product's power connec�on (including viola�on of implied
terms and warran�es). The company hereby declares that the terms and condi�ons of the
product and the policy cannot and can only legally exclude all liability within a limited scope.
- 39 -
Error code Description Solutions
1. When the grid type and frequency changed it will report F13;
2. When the battery mode was changed to “No battery”
mode,it will report F13;
3. For some old FW version, it will report F13 when the
system work mode changed;
F13 working mode change 4, Generally, it will disappear automatically when shows F13;
5. If still same, and turn off the DC switch and AC switch and
wait for one minute and then turn on the DC/AC switch;
6. Seek help from us, if can not go back to normal state.
- 40 -
Error code Description Solutions
BUS over current.
F21 Tz_HV_Overcurr_fault 1, Check the PV input current and battery current setting
2. Restart the system 2~3 times.
3. If the fault still exists, please contact us for help.
Remotely shutdown
F22 Tz_EmergStop_Fault 1, it tells the inverter is remotely controlled.
- 41 -
Error code Description Solutions
- 42-
Under the guidance of our company, customers return our products so that our company can
provide service of maintenance or replacement of products of the same value. Customers need to
pay the necessary freight and other related costs. Any replacement or repair of the product will
cover the remaining warranty period of the product. If any part of the product or product is
replaced by the company itself during the warranty period, all rights and interests of the
replacement product or component belong to the company.
Factory warranty does not include damage due to the following reasons:
· Damage during transporta�on of equipment;
· Damage caused by incorrect installa�on or commissioning;
· Damage caused by failure to comply with opera�on instruc�ons, installa�on instruc�ons or
maintenance instruc�ons;
· Damage caused by a�empts to modify, alter or repair products;
· Damage caused by incorrect use or opera�on;
· Damage caused by insufficient ven�la�on of equipment;
· Damage caused by failure to comply with applicable safety standards or regula�ons;
· Damage caused by natural disasters or force majeure (e.g. floods, lightning, overvoltage, storms,
fires, etc.)
In addi�on, normal wear or any other failure will not affect the basic opera�on of the product.
Any external scratches, stains or natural mechanical wear does not represent a defect in the
product.
- 43 -
8. Datasheet
Model SUN-5K- SUN-6K- SUN-8K- SUN-10K- SUN-12K-
SG04LP3-EU SG04LP3-EU SG04LP3-EU SG04LP3-EU SG04LP3-EU
Battery Input Date
Ba�ery Type Lead-acid or Li-lon
Ba�ery Voltage Range(V) 40-60V
Max. Charging Current(A) 120A 150A 190A 210A 240A
Max. Discharging Current(A) 120A 150A 190A 210A 240A
Charging Curve 3 Stages / Equaliza�on
External Temperature Sensor yes
Charging Strategy for Li-lon Ba�ery Self-adap�on to BMS
PV String Input Data
Max. DC Input Power(W) 6500W 7800W 10400W 13000W 15600W
PV Input Voltage(V) 550V (160V~800V)
MPPT Range(V) 200V-650V
Start-up Voltage(V) 160V
PV Input Current(A) 13A+13A 13A+13A 13A+13A 26A+13A 26A+13A
Max.PV Isc(A) 17A+17A 17A+17A 17A+17A 34A+17A 34A+17A
No. of MPPT Trackers 2
No. of Strings Per MPPT Tracker 1+1 1+1 1+1 2+1 2+1
AC Output Data
Rated AC Output and UPS Power(W) 5000 6000 8000 10000 12000
Max. AC Output Power(W) 5500 6600 8800 11000 13200
Peak Power(off grid) 2 �mes of rated power, 10 S
AC Output Rated Current(A) 7.6/7.2A 9.1/8.7A 12.1/11.6A 15.2/14.5A 18.2/17.4A
Max. AC Current(A) 8.4/8A 10/9.6A 13.4/12.8A 16.7/15.9A 20/19.1A
Max. Three-phase Unbalanced
Output Current(A) 11.4/10.9A 13.6/13A 18.2/17.4A 22.7/21.7A 27.3/26.1A
Max Output short circuit current(A) 75A
Max. Con�nuous AC Passthrough(A) 45A
Output Frequency and Voltage 50/60Hz; 3L/N/PE 220/380, 230/400Vac (Three phase)
Grid Type Three Phase
Total Harmonic Distor�on (THD) <3% (of nominal power)
DC current injec�on <0.5% ln
Efficiency
Max. Efficiency 97.60%
Euro Efficiency 97.00%
MPPT Efficiency >99%
Protection
PV Arc Fault Detec�on Integrated
PV Input Lightning Protec�on Integrated
An�-islanding Protec�on Integrated
PV String Input Reverse Polarity Protec�on Integrated
Insula�on Resistor Detec�on Integrated
Residual Current Monitoring Unit Integrated
Output Over Current Protec�on Integrated
Output Shorted Protec�on Integrated
Surge Protec�on DC Type III / AC Type III
Over Voltage Category DC Type II / AC Type III
- 44 -
Certifications and Standards
VDE4105,IEC61727/62116,VDE0126,AS4777.2,CEI 0 21,EN50549-1,
Grid Regula�on
G98,G99,C10-11,UNE217002,NBR16149/NBR16150
EMC/Safety Regula�on
IEC/EN 62109-1,IEC/EN 62109-2,IEC/EN 61000-6-1,
IEC/EN 61000-6-2,IEC/EN 61000-6-3,IEC/EN 61000-6-4
General Data
Opera�ng Temperature Rande(℃) -40~60℃, >45℃ Dera�ng
Cooling Smart cooling
Noise(dB) ≤45 dB(A)
Communica�on with BMS RS485; CAN
Weight(kg) 33.6
Cabinet size(mm) 422W×702H×281D (Excluding connectors and brackets)
Protec�on Degree IP65
Installa�on Style Wall-mounted
Warranty 5 years
- 45 -
9. Appendix I
21
87 65 43
Defini�on of RJ45 Port Pin for BMS 12345678
21
87 65 43
No. Meter-485 Pin
12345678
1 METER-485-B
Meter-485 Port
2 METER-485-A
3 COM-GND
4 METER-485-B
5 METER-485-A
6 COM-GND
7 METER-485-A
8 METER-485-B
- 46 -
RS232
No. WIFI/RS232
1
2 TX
3 RX
4
5 D-GND
6
7
8
9 12Vdc
5 4 3 2 1
9 8 7 6
WIFI/RS232
- 47 -
10. Appendix II
1. Split Core Current Transformer (CT) dimension: (mm)
2. Secondary output cable length is 4m.
Lead Outside
- 48 -