Target Activity
FY18 Analysis by Defect phenomenon
1) Leakage
2) Performance issue KCRC
Plant name: KI
a) Reusability
b) Assembly
Proses pengecheckan
After install bushing, didn’t lubang bushing sudah di
check the holes lakukan menggunakan flash
2 Caution b Quality No.2 00:05:52 concentricity. Potential the light dan hanya saja tidak Andri Agung OK OK 26 June 2023
lubrication hole was not terlampir dalam video sudah
center. tercantum di check sheet
Assembly.
Stand assembly di
Manpower hand position tambahkan special base
7 Caution b Safety No.5 00:08:36 when hitting tool was not sesuai dengan ketinggian. Andri Agung OK OK 26 June 2023
ergonomics Pemasangan menjadi lebih
ergonomi.
Dilakukan pengecheckan
Rotating torque was not rotating torque. Sesuai
11 Caution b Quality No.9 00:11:46 checked after main cap standart prosedure. Andri Agung OK OK 26 June 2023
tightening torque Tercantum di check sheet.
Check video
Protrusion liner
measurement only applied
on 1 point for every cylinder
Protusion linner di lakukan
liner. It's better to measure
14 Caution b Quality No.10 00:00:09 pengecheckan 4 posisi Andri Agung OK OK 26 June 2023
it in 4 position to ensure
check video
evenness of cylinder liner
surface to Cylinder block
surface.
Marking direction of
Verification marking sudah
mounting bolts of Oil Pump
dilakukan sebelum proses
19 Caution b Quality No.14 00:04:05 were not same and no Andri Agung OK OK 26 June 2023
tightening torque sesuai
verification marking after
dengan basic assembly