Itp Piping
Itp Piping
Itp Piping
COMPLEX DEVELOPMENT
D R A
N
I 11-MA R - 2 013
0-6092 Bir Seba Field Development CA’s Doc. No. BRS1-SP-Q-BRS-2006
Contractor’s
Doc. No.
S-000-1540-0007
INSPECTION AND TEST PLAN
FOR PIPING WORK Issue Purpose For Construction
Rev. 2
CONTENTS
PAGE
1. GENERAL............................................................................................................................................3
2. DEFINITION ........................................................................................................................................3
5. INSPECTION REPORTS/RECORDS...................................................................................................4
D R A
N
I 11-MA R - 2 013
Page2of28
0-6092 Bir Seba Field Development CA’s Doc. No. BRS1-SP-Q-BRS-2006
Contractor’s
Doc. No.
S-000-1540-0007
INSPECTION AND TEST PLAN
FOR PIPING WORK Issue Purpose For Construction
Rev. 2
1. GENERAL
This specification covers the scope of field test and inspection for CA, CONTRACTOR and
Subcontractor at jobsite during construction stage of Bir Seba (BRS) Field Development Project
(Phase-I) of GBRS.
2. DEFINITION
3. REFERENCE DOCUMENTS
D R A
N
I 11-MA R - 2 013
Page3of28
0-6092 Bir Seba Field Development CA’s Doc. No. BRS1-SP-Q-BRS-2006
Contractor’s
Doc. No.
S-000-1540-0007
INSPECTION AND TEST PLAN
FOR PIPING WORK Issue Purpose For Construction
Rev. 2
5. INSPECTION REPORTS/RECORDS
Blank format of each inspection record/report are shown in the Attachment-2.
Subcontractor shall prepare all required inspection reports or records using the blank formats in
Attachment -2. If subcontractor would like to use his format instead of the format in Attachment -2,
CONTRACTOR’s approval on the format is required before use.
6. OTHER REQUIREMENTS
6.1 INSPECTION NOTIFICATION
Subcontractor shall submit the Application for Inspection for every required test and inspection items on
the scopes in the Attachment-1. The detail requirements for the Application are shown in the
S-000-1540-0001.
Subcontractor is not authorized to proceed to the subsequent works before completion of the
inspection of the work under proceeding.
The requirements of inspection do not supplant or negate the Sub-contractor’s responsibilities defined
in contract and governing statutory regulations or codes.
By obtaining prior approval by CA, CONTRACTOR may modify his inspection surveillance to be
followed by Subcontractors.
D R A
N
I 11-MA R - 2 013
Page4of28
0-6092 Bir Seba Field Development CA’s Doc. No. BRS1-SP-Q-BRS-2006
Contractor’s
Doc. No.
S-000-1540-0007
INSPECTION AND TEST PLAN
FOR PIPING WORK Issue Purpose For Construction
Rev. 2
ATTACHMENT –1
SCOPE OF FIELD TEST AND INSPECTION
ABREVIATIONS
I : Execution of Inspection
W : Witness of inspection or work
M Monitoring of works / QC activities
R Review of inspection report
F : Full, ex, “FW” means “Full Witness”, “FI” means “Full Inspection”
S : Spot, ex, “SW” means “Spot Witness”, “SI” means “Spot Inspection” (Note)
Note : When “SW” or “FW” is specified, the inspection request shall be submitted to CA/JGC and the
test/inspection will be performed under witness by CA and/or JGC.
When “SI” is specified, CA and/or JGC will inspect/check the items at any time during
fabrication or construction.
CA and/or JGC reserve the right to SW and M any activities of this ITP.
In case if CA’s “A” takes time for approval, Subcontractors can continue following works with
the condition of JGC’s “A” approval and confirmation with CA.
D R A
N
I 11-MA R - 2 013
Page5of28
0-6092 Bir Seba Field Development CA’s Doc. No. BRS1-SP-Q-BRS-2006
Contractor’s
S-000-1540-0007
Doc. No.
INSPECTION AND TEST PLAN
FOR PIPING WORK Issue Purpose For Construction
Rev. 2
CATEGORY : PIPING (1 OF 7)
NO. ITEM CODE REFERENCE FREQUENCY Subcon JGC CA DPEM / Format REMARKS
SPECIFICATION ARH Number
1. GENERAL
Before start
WELDING CONSUMABLE CONTROL, STORAGE S-000-3160-0001
1.4 welding and FI/P FW/A SW/A - -
AND TREATMENT Sec.6.1
periodical
Before start
INSPECTION AND CALIBRATION OF TOOLS AND BRS1-SP-0-BRS-0005 Calibration
1.5 work and FI/P FW/A SW/A - -
EQUIPMENTS Sec.8.1 Certificates
periodical
2. PRE-FABRICATION
Before start
2.1 CHECK REVISION OF ISO/SPOOL DRAWING FI/P FW/A SW/A - FM24
work
Before start
(3) WPS FI/P FW/A SW/A R FM24
welding works
D R A
N
I 11-MAR 13
- 2 0
Page6of28
0-6092 Bir Seba Field Development CA’s Doc. No. BRS1-SP-Q-BRS-2006
Contractor’s
S-000-1540-0007
Doc. No.
INSPECTION AND TEST PLAN
FOR PIPING WORK Issue Purpose For Construction
Rev. 2
NO. ITEM CODE REFERENCE FREQUENCY Subcon JGC CA DPEM / Format REMARKS
SPECIFICATION ARH Number
S-000-1540-2001 Before & during
(5) PRE-HEATING & INTERPASS TEMPERATURE ASME B31.3 FI/P FW/A SW/A R -
Sec.8 welding
BRS-SP-P-BRS-0004
(7) MATERIAL TRACEABILITY Before welding FI/P FW/A SW/A R FM24
Sec.7.3
S-000-1540-2001 FM24 /
2.6 VISUAL INSPECTION ASME B31.3 After welding FI/P FW/A SW/A R
Sec.9 FM35
S-000-1540-2005 FM30
2.7 RADIOGRAPHIC INSPECTION, PT OR MT & UT ASME B31.3 Sec.6 After welding FI/P FW/A FW/A R FM31 FM36
S-000-1360-0001 FM32
S-000-1540-2005
2.8 POSITIVE ALLOY MATERIAL IDENTIFICATION ASME B31.3 After welding FI/P FW/A FW/A R FM39
Sec.6
BRS1-SP-0-BRS-0005
2.9 REINFORCING PAD AIR LEAK TEST After welding FI/P FW/A SW/A - FM40
Sec.4.3
S-000-3160-0001 Smoothness of
2.10 ORIFICE FLANGE ASME B31.3 After RT FI/P FW/A SW/A - FM41
Sec.7.7 internal of root pass
After spool
2.11 COMPLETED SPOOL IDENTIFICATION FI/P FW/A SW/A - FM37
fabrication
D R A
N
I 11-MAR 13
- 2 0
Page7of28
0-6092 Bir Seba Field Development CA’s Doc. No. BRS1-SP-Q-BRS-2006
Contractor’s
S-000-1540-0007
Doc. No.
INSPECTION AND TEST PLAN
FOR PIPING WORK Issue Purpose For Construction
Rev. 2
NO. ITEM CODE REFERENCE FREQUENCY Subcon JGC CA DPEM / Format REMARKS
SPECIFICATION ARH Number
REFER TO S-000-1540-0004 FOR EARTH WORK, SUCH AS SAND BEDDING AND BACK FILLING.
REFER TO S-000-1540-0006 FOR CS, GRE AND PVC PIPING INSTALLATION AND WRAPPING.
Before start
4.1 CHECK REVISION OF ISO/SPOOL DRAWING FI/P FW/A SW/A - FM24
work
Scratch or damage
FLANGE FACE AND ALIGNMENT INSPECTION OF During piping on flange face
S-000-3160-0001
4.3 SPOOLS CONNECTING WITH EQUIPMENT connection to FI/P FW/A SW - Later
Sec.7.2 Stress free on
NOZZLES equip. nozzle
equipment nozzle
Before
(1) INSTALLATION MATERIAL FI/P FW/A SW - FM35
installation
Before start
(2) WELDER QUALIFICATION ASME IX S-000-1540-2003 FI/P FW/A SW/A R FM24 WPS/PQR
welding works
Before start
(3) WPS ASME IX S-000-1540-2001 FI/P FW/A SW/A R FM24
welding works
Including gap
S-000-1540-2005 Before start
(4) FIT-UP ASME B31.3 FI/P FW/A SW/A R FM24 inspection of socket
Sec.5 welding works
weld
D R A
N
I 11-MAR 13
- 2 0
Page8of28
0-6092 Bir Seba Field Development CA’s Doc. No. BRS1-SP-Q-BRS-2006
Contractor’s
S-000-1540-0007
Doc. No.
INSPECTION AND TEST PLAN
FOR PIPING WORK Issue Purpose For Construction
Rev. 2
NO. ITEM CODE REFERENCE FREQUENCY Subcon JGC CA DPEM / Format REMARKS
SPECIFICATION ARH Number
S-000-1540-2001 Before & during
(5) PRE-HEATING & INTERPASS TEMPERATURE ASME B31.3 FI/P FW/A SW/A R -
Sec.8 welding
BRS1-SP-P-BRS-0004
(7) MATERIAL TRACEABILITY Before welding FI/P FW/A SW/A R FM24
Sec.7.3
S-000-1540-2001
4.8 VISUAL INSPECTION ASME B31.3 After welding FI/P FW/A SW/A R FM24
Sec.9
S-000-1540-2005 FM30
4.9 RADIOGRAPHIC INSPECTION & PT OR MT ASME B31.3 Sec.6 After welding FI/P FW/A FW/A R FM31
S-000-1360-0001 FM32
S-000-1540-2005
4.10 POSITIVE ALLOY MATERIAL IDENTIFICATION ASME B31.3 After welding FI/P FW/A FW/A R FM39
Sec.6
Before and
(2) JOINT TRACEABILITY & INSPECTION FI/P FW/A SW/A R FM28
After Bonding
BRS1-SP-0-BRS-0005
4.12 REINFORCING PAD AIR LEAK TEST After welding FI/P FW/A FW/A - FM40
Sec.4.3
D R A
N
I 11-MAR 13
- 2 0
Page9of28
0-6092 Bir Seba Field Development CA’s Doc. No. BRS1-SP-Q-BRS-2006
Contractor’s
S-000-1540-0007
Doc. No.
INSPECTION AND TEST PLAN
FOR PIPING WORK Issue Purpose For Construction
Rev. 2
NO. ITEM CODE REFERENCE FREQUENCY Subcon JGC CA DPEM / Format REMARKS
SPECIFICATION ARH Number
S-000-3160-0001 Smoothness of root
4.13 ORIFICE FLANGE ASME B31.3 After RT FI/P FW/A SW/A - FM41
Sec.7.7 pass internal
5. PRESSURE TEST
Before
5.3 QC DOCUMENTS REVIEW FI/P FW/A FW/A - -
Pressure Test
S-000-1540-2006
Before
5.5 TEST EQUIPMENT CALIBRATION Sec. 3.3(9) FI/P FW/A SW/A - - Test certificates
Pressure Test
D R A
N
I 11-MAR 13
- 2 0
Page10of28
0-6092 Bir Seba Field Development CA’s Doc. No. BRS1-SP-Q-BRS-2006
Contractor’s
S-000-1540-0007
Doc. No.
INSPECTION AND TEST PLAN
FOR PIPING WORK Issue Purpose For Construction
Rev. 2
NO. ITEM CODE REFERENCE FREQUENCY Subcon JGC CA DPEM / Format REMARKS
SPECIFICATION ARH Number
FM26
During If Required ARH is
5.6 WITNESS OF PRESSURE TEST ASME B31.3 S-000-1540-2006 FI/P FW/A FW/A FW/A ARH
Pressure Test FW/A
Format
S-000-3160-0001 After
5.8 POST TEST LINE CHECK (REINSTATEMENT) FI/P FW/A SW/A - FM27
Sec.9.3 Reinstatement
All items
6.1 CHECK VALVE TECHNICAL DATA V-216G-0501-A-1002 FI/P FW/A SW/A - -
before test
All items
6.2 VISUAL INSPECTION OF VALVE FI/P FW/A FW/A - Later
before test
Prior to
S-000-3160-0001
6.5 PRESERVATION OF VALVE Installation and FI/P FW/A SW - -
Sec.7.7
periodical
D R A
N
I 11-MAR 13
- 2 0
Page11of28
0-6092 Bir Seba Field Development CA’s Doc. No. BRS1-SP-Q-BRS-2006
Contractor’s
Doc. No.
S-000-1540-0007
INSPECTION AND TEST PLAN
FOR PIPING WORK Issue Purpose For Construction
Rev. 2
ATTACHMENT – 2
INSPECTION REPORT/RECORD FORMAT
D R A
N
I 11-MA R - 2 013
Page12of28